HQC00524Q0009 0001.pdf

PDF 200 KB Posted

Attached to
Linen/Mat Rental & Cleaning Services at the Ft Wainwright and Ft Greely Commissaries
Solicitation number
HQC005-24-Q-0009
Issued by

About this file

This amendment modifies a solicitation for linen and mat rental cleaning services at two commissaries in Alaska. The Defense Commissary Agency seeks to award a firm-fixed price contract for a one-year base period and four one-year options to provide linen services at Fort Wainwright and Fort Greely commissaries. The period of performance is June 1, 2024 through May 31, 2029. Quotes are due by January 15, 2024. The amendment extends the response deadline by five days and adds an evaluation plan. Quotes will be evaluated for technical capability, past performance, and price. Award will be made to the lowest priced technically acceptable offer with acceptable past performance and fair and reasonable pricing that is determined responsible.

View the file

Other files

File Type Posted
Amendment 0002.pdf PDF
Full Amendment 0002.pdf PDF
Conformed Solicitation.pdf PDF
HQC00524Q0009.pdf PDF
Attachment 1 - Quote Sheets and Linen Listing - Alaska Stores.xls XLS spreadsheet
Attachment 2- Past Performance Survey.rtf RTF text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

POC: Heather Skalet, Contract Specialist (804)734-8000 ext 48727, Heather.Skalet@deca.mil ; Christina Ellison, Contracting Officer (804) 734-8000 x 86249, Christina.Ellison@deca.mil

The purpose for this amendment is to add the evaluation plan w hich w ill be utilized w hen proposals are review ed. Solicitation w ill be extended for an extra five (5) days.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Jan-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HQC00524Q0009

X 9B. DATED (SEE ITEM 11)

04-Dec-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Jan-2024

CODE

DEFENSE COMMISSARY AGENCY

ENTERPRISE ACQUISITION DIVISION

1300 EISENHOWER AVENUE

FORT GREGG-ADAMS VA 23801-1800

HQC005 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

HQC00524Q0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 08-Jan-2024 03:00 PM to 15-Jan-2024 03:00 PM.

The following have been modified:

LIST OF ATTACHMENTS

The following attachments included with this solicitation:

ATTACHMENT 1: Location Addresses and POCs (included in solicitation document) ATTACHMENT 2: Quote Sheets and Linen Listing (Excel Attachment) dtd 11.20.23 ATTACHMENT 4: Past Performance Survey (PDF Attachment)

52.212-2 EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

EVALUATION CRITERIA

Quotes will be evaluated independently, using the following factors on an acceptable or unacceptable basis:

1. Technical Capability

2. Past Performance

3. Price

EVALUATION MINIMUM REQUIREMENTS

1. Technical Capability: A quote will be evaluated as technically acceptable if it satisfies the Government’s minimum requirements described in the Statement of Work (SOW) and elsewhere in this solicitation, and based on evidence in the quote of the quoter’s technical approach, personnel/staffing, facilities, equipment, and understanding of the requirements.

2. Past Performance: Quoters will be rated on timeliness, quality of work, and business relations on a past performance survey with six questions. Based on the quoter’s performance record, the Government has a reasonable expectation that the quoter will successfully perform the required effort, or the quoter’s performance record is unknown. In evaluating past performance, the Government will use various sources of information, including, but not limited to federal, state and local government agencies, Better Business Bureaus, published media, electronic databases (CPARS/PPIRS), and/or the offeror’s performance on DeCA contracts. The evaluation of past performance will consider relevant facts and circumstances. The Government will evaluate past performance as an indicator of future performance. Past performance will be evaluated as either “Acceptable” or “Unacceptable.” If the business does not have a record of relevant past performance, the Government will rate past performance neither favorably nor unfavorably. A neutral rating will be considered as “Acceptable.”

3. Price: Price will be evaluated by adding the base and all option years to determine the Total Evaluated Price (TEP) for the location. The total evaluated price must be determined fair and reasonable in order to be determined

HQC00524Q0009

acceptable for award. The contract specialist will evaluate all quotes. Quotes will not be discussed or released to anyone not directly involved in the source selection for this acquisition.

EVALUATION METHODOLOGY

Specifically, the evaluation process shall proceed as follows: First, the quotes will be ranked in price order from lowest to highest based on the Total Evaluated Price (TEP). The lowest ranked TEP quoter will then be technically evaluated and given a rating of acceptable or unacceptable. If acceptable, the quoter’s past performance will then be evaluated and given a rating of acceptable or unacceptable. A quoter with no past performance will be rated as neutral-acceptable.

If the lowest ranked quoter’s past performance is rated as acceptable or neutral-acceptable, the Government will then evaluate pricing to determine fair and reasonableness using one or more of the techniques contained in FAR sub-part 13.106-3. If the lowest ranked TEP quote is judged to have acceptable technical capability, past performance and fair and reasonable pricing, the Government will complete a responsibility determination in accordance with the criteria specified in FAR 9.104-1. If found responsible, the evaluation process stops at this point as that offer is the lowest priced, technically acceptable (LPTA) quote that represents the best value to the Government. Award shall be made to that quoter without further consideration of any other quotes.

If the lowest rated quoter’s technical capability or past performance is assigned an unacceptable rating, or if the price is determined not fair and reasonable, or if the quoter is found to be non-responsible, the next lowest ranked TEP quote will be evaluated. This process will continue (in order of ascending (TEP) until a quoter is judged to have an acceptable technical capability rating, acceptable past performance, fair and reasonable pricing, and is deemed responsible.

The evaluation of past performance will be an assessment based on a consideration of all relevant facts and circumstances. The Government is seeking to determine whether the offeror has consistently demonstrated a genuine concern by performing quality services on time, with concern for the customer's satisfaction. The evaluator will use the business references provided by the quoter, and any other information available, such as the Government-wide Contract Performance Assessment Reporting System (CPARS) at www.cpars.gov . If adverse information is obtained, that was not previously communicated; the quoter will be provided an opportunity to respond.

The alternate proposal must be submitted as a totally separate document from the primary proposal. The alternate proposal must satisfy all of the submission requirements of the primary proposal and be clearly marked as an alternate proposal. Pricing for the alternate proposal will be evaluated in the same manner as the primary proposal.

If an offeror proposes a different pickup frequency in their alternate proposal, the government will evaluate price based on the number of pickups proposed per week and multiplying that number by 52 weeks.

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of provision)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .