This is a presolicitation synopsis for a multiple-award indefinite-delivery indefinite-quantity contract to provide design-build or design-bid-build construction services for stormwater management facilities, fuel line installation, paving, and related work on the Pentagon Reservation. The contract aims to help the Pentagon comply with Chesapeake Bay pollution limits and municipal stormwater permits. A 100% set-aside is planned for woman-owned small businesses under NAICS 237310. The solicitation is expected to release on or about May 30, 2022, with contract award by August 31, 2022. The contract ceiling is approximately $135 million shared among awardees, with a minimum $10,000 guarantee per awardee. Fair opportunity task orders from $500,000 to $15 million are anticipated over the 10-year ordering period. Example projects listed involve bio-retention facilities, parking lot work, fencing, and fuel line replacement at various Pentagon locations. Pricing will be firm-fixed-price at the task order level. The synopsis provides background on regulatory drivers but no other substantive information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A03 HQ003422R0098 Draft IDIQ Statement of Work_Presolicitation Notice.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MULTIPLE AWARD TOTAL MAXIMUM DAILY LOAD AND PAVING CONTRACT (TMDL-P)
STATEMENT OF WORK
May 27, 2022
TABLE OF CONTENTS
1. GENERAL
2. ADMINISTRATION
2.1. Project Kick-off Meeting
2.2. Coordination with Building Entities
2.3. Weekly Progress Meetings
2.4. Requests for Information (RFI)
3. KEY PERSONNEL
3.1. Separate and Distinct Individuals Generally Required
3.2. Dual Roles Require Advance Government Approval
3.3. Post-Award Key Personnel Changes
3.4. Key Personnel Employment Expectations
3.5. Documentation of Key Personnel Qualifications and Experience
3.6. Project Manager (PM)
3.7. Designer of Record (DOR)
3.8. Qualified Fire Protection Engineer (QFPE)
3.9. Site Safety Health Officer (SSHO)
3.10. Contractor Quality Control Manager (CQCM)
3.11. Site Superintendent
3.12. Scheduler
3.13. Registered Communications Distribution Designer (RCDD)
3.14. LEED Professional
4. SITE
4.1. Project Coordination Plan (PCP)
4.2. Existing Conditions Report
4.3. Construction Air Quality Management Plan
4.4. Storm Water Management
4.5. Debris Removal / Waste Management Plan / Waste Recycling Reports
4.6. Pre-Construction Submittal Register
4.7. Site Access and Maintenance
4.8. Delivery Screening of Equipment, Materials, Tools, and Supplies
4.9. Construction Signage
4.10. Outage Requests
4.11. Access Request Form
4.12. Fire Protection
4.13. Landscape Excavation / Damage Repair Requirements
5. COST – SCHEDULE – INVOICE
5.1. Schedule of Values (SOV) / Cost Loaded Initial Planned Schedule (IPS) / Cost Loaded Baseline Schedule
(CLBS)
5.2. Revised Schedule of Values / Cost Loaded Baseline Schedule
5.3. Progress Schedule
5.4. Coordination with Other Government Contractor (OGC) Schedules
6. QUALITY CONTROL & SAFETY
6.1. Design Quality Control Plan (DQC)
6.2. Construction Quality Control (CQC)
6.3. Testing and Acceptance:
6.4. Accident Prevention Plan (APP) and Activity Hazard Analysis (AHA)
6.5. Construction Daily Reports
7. DESIGN & CONSTRUCTION
7.1. Basis of Design (BOD)
7.2. Historic Approval Documents
7.3. Design Intent Documents (DIDs)
7.4. Design Document Submittals
7.5. Construction Submittals Register / Material Samples / Cut Sheets / Shop Drawings and Status Reports on
Materials Orders / Fire Alarm Shop Drawings
7.6. Transfer & Acceptance of Military Real Property (DD Form 1354)
7.7. Sustainability Design Requirements
7.8. Electrical
7.9. Fire Protection
7.10. Structural
7.11. Material Compatibility
7.12. Energy and Water Efficiency in Equipment, Appliances and Products
7.13. Information Technology (IT) & Network Integration (NI)
7.14. Codes
7.15. Unified Facilities Criteria (UFC) Requirements / Pentagon Facility Guide Specifications (PFGS)
7.16. Health and Safety Standards
7.17. Building Monitoring Systems
7.18. General Inspection Procedures
7.19. Construction Daily Reports
7.20. Design Support During Construction
7.21. On-Site Drawings and Permits
7.22. Sign Displacement
7.23. Demolition Requirements
7.24. Outages – Temporary Structures, Systems, and Components
7.25. Soil Removal or Procurement
8. COMMISSIONING
8.1. Resources
8.2. Pre-Construction Commissioning Coordination
8.3. Construction Commissioning Coordination
8.4. Third Party Cx Punch List
8.5. Building Systems Turnover and Operation
8.6. Government Acceptance will occur when:
9. CLOSEOUT
9.1. Closeout Kick-Off Meeting
9.2. Punch Lists
9.3. Training
9.4. Systems Operations and Maintenance Manuals (SOMMs)
9.5. Operation & Maintenance Manuals (O&Ms)
9.6. NFPA 72 Form-Record of Completion
9.7. NFPA 13 Contractor’s Material and Test Certificate for Aboveground Piping
9.8. Design Master Equipment List (DMEL)
9.9. As-Built Documents:
9.10. Issue for Record As-Built Documents
9.11. Warranty Binder
9.12. Waivers
9.13. Elevator and Escalator Certificates of Operation
9.14. Attic Stock Delivered Inventory
9.15. Certificate of Occupancy
9.16. Guiding Principles Checklist
9.17. Substantial Completion
9.18. Final/Construction Completion
9.19. Contract Completion
9.20. Utility Room List
9.21. Joint Use Rooms List
9.22. Cost to Complete
9.23. Final Submittal Register
ACRONYMS AND ABBREVIATIONS
Table 1. Acronyms and Abbreviations
ACRONYM DESCRIPTION
A/V Audio-Visual ABA Architectural Barriers Act ACM Asbestos Contaminated Materials ACRN Accounting Classification Reference Number AD Acquisition Directorate ADC After Date of Contract A-E Architect-Engineer AHA Activity Hazard Analysis AHJ Authority Having Jurisdiction AIA American Institute of Architects ANP After Notice to Proceed APP Accident Prevention Plan ASBCA Armed Services Board of Contract Appeals
ASHRAE
American Society of Heating, Refrigerating and Air-Conditioning Engineers
AWG Alterations Working Group BA Bachelor of Arts BAA Buy American Act, as amended BAS Building Automation System BC Branch Chief BOCC Building (or Base) Operations Control Center BOD Basis of Design BS Bachelor of Science BTEX Benzene, Toluene, Ethylbenzene and Xylene C&D Construction and Demolition CAC Common Access Card CAD Computer Aided Design CADD Computerized Aided Design and Drafting CAGE DLA Commercial and Government Entity Identifier CCM Certified Construction Manager CER Communication Equipment Room CFR Code of Federal Regulations CFA Commission on Fine Arts CLBS Cost Loaded Baseline Schedule CLIN Contract Line Item CM Configuration Management CM Construction Management CMD Construction Management Division CMMS Computerized Maintenance CO Contracting Officer, see also KO COFC Court of Federal Claims COR Contracting Officer’s Representative COTS Commercial Off-The-Shelf COVID-19 Disease caused by the SARS-Cov-2 Virus
CPARS Contractor Performance Assessment Reporting System CPM Critical Path Method CPRG Contract Pricing Reference Guide CQC Construction Quality Control CQCM Contractor Quality Control Manager CR Change Request CS Contract Specialist CSI Construction Specification Institute CSP Certified Safety Professional CTR Combined Telecommunications Room CTR Government Support Contractor or Government Contractor CUI Controlled Unclassified Information Cx Commissioning CxA Commissioning Agent CxS Commissioning Specialist CxT Commissioning Team D-B Design-Build D-B-B Design-Bid-Build D&B Dun & Bradstreet DAI Defense Agencies Initiative Db Decibels dba Doing Business As DBP Design-Build Professional DC District of Columbia DCAA Defense Contract Audit Agency DCMA Defense Contract Management Agency DCx Decommissioning DD1155 Order for Supplies or Services DD Department of Defense (When used as a prefix before a form number) DD Division Director DFARS Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2) DID Design Intent Document DLA Defense Logistics Agency DMEL Detailed Master Equipment List DoD Department of Defense DoDACC Department of Defense Activity Address Code DOL U.S. Department of Labor DOR Designer of Record DQC Design Quality Control DUNS Data Universal Numbering System (Dun & Bradstreet Proprietary) Dy Day, Calendar day unless specified otherwise E.O. Executive Order EAD Engineering and Architectural Division ECA Energy Compliance Analysis ECM Engineering and Construction Management EDS Electronic Data Standard eFIC Enterprise Facility Information Center
EISA Energy Independence and Security Act EITSD Enterprise Information Services Technology Services Directorate EN Evaluation Notice EM Engineering Manual EMCS Energy Monitoring Control System EO Equal Opportunity EP Engineering Pamphlet EPA Environmental Protection Agency ESEB Environmental, Sustainability, and Energy Branch FAPIIS Federal Awardee Performance and Integrity Information System FAR Federal Acquisition Regulation (48 CFR Chapter 1) FCL Facility Clearance FEMP Federal Energy Management Program FFP Firm-Fixed-Price FHA Federal Highway Administration FMD Financial Management Directorate FOB Free On Board FON Fair Opportunity Notice FOUO For Official Use Only – Obsolete marking - See CUI FPT Functional Performance Test FR Federal Register FRCS Facilities-Related Control System FSD Facility Services Division FTA Free Trade Agreement FY Fiscal Year G702 AIA Application and Certification for Payment G703 AIA Continuation Sheet (Schedule of Values) GAO U.S. Government Accountability Office GPA Government Purchase Agreement GPM Government Program Manager GSA U.S. Government Services Administration HEPA High-Efficiency Particulate Air HRP Heating and Refrigeration Plant HUBZone Historically Underutilized Business Zones HVAC Heating, Ventilation, and Air Conditioning IAQ Indoor Air Quality IBC International Building Code IDIQ Indefinite-Delivery, Indefinite-Quantity IFC Issue for Construction IPS Cost Loaded Initial Planned Schedule IT Information Technology IT/AV Information Technology/Audio Visual JSP Joint Service Provider KO Contracting Officer KTR Contractor LCPM Life Cycle Project Manager LEED Leadership in Energy and Environmental Design
LFD Leased Facilities Division LID Low Impact Development LOD Limit of Disturbance LOTO Lock out/Tag out LPTA Lowest Price Technically Acceptable M&V Measurement and Verification MACC Multiple Award Construction Contract, see also MAIDIQ MAIDIQ Multiple Award Indefinite-Delivery, Indefinite-Quantity MAXIMO IBM Maximo® Application Suite MC Mark Center MD Maryland MEF Metro Entrance Facility MERV Minimum Efficiency Reporting Ratio MILCON Military Construction MOC Modular Office Complex MOP Method of Procedure NADCA National Air Duct Cleaners Association NAICS North American Industry Classification System NCCS National Contract Classification System NCPC National Capital Planning Commission NCR National Capital Region NEPA National Environmental Policy Act NETA National Electrical Testing Association NFPA National Fire Protection Association NIPRnet Non-Classified Internet Protocol Router Network NISP National Industrial Security Program NTP Notice to Proceed OBR On-Board Review OF Optional Form OGC Other Government Contractor OPFM Office of the Pentagon Fire Marshall OSBP Office of Small Business Programs OSD Office of the Secretary of Defense OSHA Occupational Safety & Health Administration OSHB Occupational Safety and Health Branch P.E. Professional Engineer P/F Pass/Fail PA Pennsylvania PAC Pentagon Athletic Center PAK Post-Award Kickoff PBMO Pentagon Building Management Office PCP Project Coordination Plan PD2 Procurement Desktop Defense PDF Portable Document Format PDS Protective Distribution System PFAC Pentagon Facility Access Card PFC Pre-Functional Checklist
PFGS Pentagon Facilities Guide Specifications PFPA Pentagon Force Protection Agency PIEE Procurement Integrated Enterprise Environment PLC2 Pentagon Library and Conference Center PMP Project Management Professional POND Period of Non-Disruption POP Period of Performance PPTO Performance-Price Tradeoff PR Purchase Request or Funding Document PRMRF Pentagon Reservation Maintenance Revolving Fund PSC Product Service Code PTO Proposed Task Order Pub. L. Public Law PUE Power Usage Effectiveness PWS Performance Work Statement QA Quality Assurance QC Quality Control QCM See CQCM QPFE Qualified Fire Protection Engineer QTO Qualified Testing Organization RDF Remote Delivery Facility RCDD Registered Communications Distribution Designer RFI Request for Information RFP Request for Proposal RFQ Request for Quotation ROICC Resident/Regional Officer in Charge of Construction SAM System for Award Management SBA Small Business Administration SCD Standards and Compliance Division SCIF Sensitive Compartmentalized Information Facility SES Senior Executive Service SF24 Bid Bond SF25 Performance Bond SF25A Payment Bond SF1413 Statement and Acknowledgment SF1442 Construction Solicitation, Offer, and Award SF Standard Form SHPO State Historic Preservation Office SIPRnet Secret Internet Protocol Router Network SKM SKM Systems Analysis, Inc.
SLIN Sub-Line Item SMACNA Sheet Metal and Air Conditioning Contractor's National Association SMOC Secure Modular Office Complex SNAP Significant New Policy Alternative SOMM System Operations and Maintenance Manual SOO Statement of Objectives SOV Schedule of Values
SOW Statement of Work SPMD Space Portfolio Management Division SSHO Site Safety Health Officer TAA Trade Agreements Act, as amended TAB Testing, Adjusting, and Balancing TC Telecommunication Closet TMDL Total Maximum Daily Load TO Task Order TORFP Task Order Request for Proposal TPH Total Petroleum Hydrocarbons U.S.C. United States Code UCF Uniform Contract Format UEI Unique Entity Identifier UFC Unified Facilities Criteria UFGS Unified Facilities Guide Specifications UMR Unified Facilities Criteria Unified Master Reference List USACE United States Army Corps of Engineers USGBC U.S. Green Building Council VA Virginia VAR Visitor Access Request VDOT Virginia Department of Transportation VOC Volatile Organic Hydrocarbons WAWF Wide Area Workflow WHD U.S. Wage and Hour Division WHS Washington Headquarters Services WHSBC Washington Headquarters Services Building Code WHSFC Washington Headquarters Services Fire Code WMP Waste Management Plan WTO World Trade Organization
MULTIPLE AWARD TOTAL MAXIMUM DAILY LOAD AND PAVING CONTRACT (TMDL-P)
1. GENERAL
The Chesapeake Bay Total Maximum Daily Load (TMDL) was established in 2019 by the United States Environmental Protection Agency (EPA) to set a limit on the amount of pollutants that can enter the Bay. The Commonwealth of Virginia and the other states within the Chesapeake Bay watershed have specific load reductions that they must meet as part of this “pollution diet” for the Bay. Municipal Separate Storm Sewer System (MS4) Permittees in Virginia, including the Pentagon, are required to comply with the state-mandated pollutant load reductions as outlined in their Virginia Pollutant Discharge Elimination System (VPDES) MS4 permits issued by the Virginia Department of Environmental Quality (VADEQ). Washington Headquarters Services (WHS) is the operator of the Pentagon’s MS4 and is responsible for compliance with the Virginia MS4 permit. The MS4 permit requires permittees to comply with the Chesapeake Bay TMDL by reducing pollutant loads for sediment (total suspended solids, or TSS), total nitrogen (TN), and total phosphorus (TP) in storm water discharges.
The work acquired under this contract is for design-build or design-bid-build construction of government facilities at various locations within Washington Headquarters Services’ (WHS) area of responsibility on the Pentagon Reservation including, but not limited to, the District of Columbia, Maryland, and Virginia. Work includes various Storm water management facilities and attendant infrastructures. Projects may include, but are not limited to, new work, reconstruction, rehabilitation, sustainment, restoration, and modernization of storm water facilities as well as fuel line and associated infrastructure (i.e. a fillstand and containment area) installation, concrete paving, asphalt paving, curb, gutter, underground utility, security, and any other work related to compliance with The Chesapeake Bay Act, WHS TMDL program, or work included in NAICS 237 Heavy and Civil Engineering Construction. Significant off-hours work is anticipated.
For projects that use the design-build delivery method, the Contractor must provide well qualified, capable in house architect and engineering services or obtain services of an architect-engineering (A-E) design firm or firms experienced in the design, development, and coordination of projects with experience as noted within the specific Task Orders issued under this contract. For bid-build projects, the Contractor is responsible for delegated design work as indicated in individual task orders, Issue for Construction (IFC) documents, or as necessary to execute the Government’s design.
The following sections outline typical requirements applicable to most task orders. Some task orders may have different or additional requirements. Any deviations are noted in the statements of work or statement of objectives for each unique project.
2. ADMINISTRATION
2.1. Project Kick-off Meeting
After contract award, the Contractor must meet with the Government and/or designated technical personnel at a mutually agreeable time to discuss and develop mutual understandings concerning schedule and administering work. All Contractors’ key personnel must attend this meeting.
2.2. Coordination with Building Entities
The Contractor must coordinate all work with the following Pentagon organizations, and other entities and organizations as necessary, through the COR as appropriate, for design and construction.
2.3. Weekly Progress Meetings
The Contractor must meet weekly with the Government to jointly review actual progress on the project.
Ongoing or upcoming impacts to critical path activities should be discussed. The meeting must also address the status of Safety, RFI’s, RFP’s, Quality Control, and Submittals. The Contractor is responsible for separate written notification to the KO for any matter that affects cost, schedule, safety, quality, or any contractual matter. Required attendees are determined on a task-order specific basis. Meetings may be in-person or by electronic means; however, the Government reserves the right to require in-person attendance at no change to price as necessary to accomplish task order goals and objectives.
B. The Contractor must submit the following to the Government 24 hours in advance of each progress meeting:
1. The agenda, with notes from the previous week’s meeting minutes.
2. A 2-week look ahead schedule, a 1-week look back schedule, and the critical path in PDF format.
3. The Contractor must provide a schedule narrative explaining any activity variances from the accepted baseline schedule and corrective actions that have been introduced.
4. Any supplemental schedules covering work in progress or scheduled to begin within the next 30 days.
5. The up-to-date Pre-Construction or Construction Submittal Register.
6. An RFI Log showing a record of all RFIs, both open and closed.
7. Status Report on all Long Lead (over 30 calendar days from order to delivery) Material Orders.
C. Weekly Progress Meeting Minutes
The Contractor is responsible for maintaining minutes for progress meetings. The minutes must include all pertinent information reviewed, as well as responsible parties and resolution dates on all open items. The minutes must be sent to the COR/GPM for review within two business days of the meeting. The COR/GPM will provide feedback to the Contractor within three calendar days. The Contractor must incorporate comments and transmit these minutes for recording purposes.
D. Notices to the Contracting Officer
The Contractor is responsible for separate written notification to the KO for any matter that affects cost, schedule, safety, quality, or any contractual matter. Discussion of any topic in Weekly Progress Meetings or Minutes, RFIs, or any other type of exchange with parties other than the KO does not constitute notice to the KO.
2.4. Requests for Information (RFI)
The Contractor must use the Government provided RFI template as specified for each task order. The Contractor must fill in all requested information and sign the form before submission. See SOW Attachment F: Document Control, “RFI Template”.
An RFI is not a substitute for a notice to the KO. An RFI answer does not change the contract.
3. KEY PERSONNEL
The most common Key Personnel roles and qualifications are described in this section. Key Personnel, their qualifications, and security clearance requirements are specified on a task-order specific basis. Task orders may refer to these descriptions or provide similar tailored descriptions that meet individual project needs. Task orders may require some or all of the Key Personnel listed in this section. Some task orders may establish additional roles not listed in this section as Key Personnel. The Contractor must provide Key Personnel that meet the minimum qualifications and experience and hold any security clearance necessary as required by each task order.
3.1. Separate and Distinct Individuals Generally Required
The Contractor must provide separate and distinct individuals to fulfill the Key Personnel roles unless an individual project SOW states otherwise. Deviations from SOW requirements must be approved by the Government. Post-award deviations that allow dual hatting require an offer of fair and reasonable consideration in the form of a price decrease with the deviation request.
3.2. Dual Roles Require Advance Government Approval
Dual roles are only allowable with advance Government approval. With advance Government approval, the Contractor may utilize the Contractor Quality Control Manager (CQCM) as a dual role position for the Site Safety and Health Officer (SSHO) contingent upon submission of justification and demonstrating compliance with the minimum qualification requirements listed under the SSHO description. There is no guarantee the Government will authorize dual roles.
3.3. Post-Award Key Personnel Changes
Prior to making Key Personnel changes, the Contractor must notify the Government in writing 30 calendar days prior to the proposed change for Government review and acceptance. Any replacements must possess equivalent or better qualifications. The contractor is responsible for any delay or impacts from late notification or submission of a candidate that does not meet or exceed our stated requirements.
3.4. Key Personnel Employment Expectations
All Contractor key personnel, with the exception of the Designer of Record (DOR), Scheduler, Qualified Fire Protection Engineer (QFPE), Registered Communications Distribution Designer (RCDD), and LEED Professional must be direct employees of the prime Contractor. If the DOR and/or Scheduler are sub-contractors, they must be directly contracted to the prime Contractor. The QFPE, RCDD and/or LEED Professional must be directly employed by or contracted by either the prime Contractor or a first-tier subcontractor architecture or engineering firm.
3.5. Documentation of Key Personnel Qualifications and Experience
The Contracting Officer specifies how to document Key Personnel qualifications and experience at the task order level. Individual task orders may include some, all, or different Key Personnel than shown in this section. The Contractor must follow documentation submission instructions and provide the specified form, resumes, and substantiation such as certificates, licenses, and similar consistent with task order request for proposal instructions. The following table and descriptions provide minimum requirements applicable unless an individual task order specifies otherwise:
Table 2. Key Personnel Qualifications and Experience
Position Minimum Qualification Requirements Project Manager (PM) 10 years design-build construction management experience
AND
BA/BS degree (or higher) in construction management or engineering related field
AND
At least one of the following certifications or registrations OR an additional 10 years of construction management experience:
Active Certified Construction Manager (CCM) certified by the Construction Manager Certification Institute
OR
Active Project Management Professional (PMP) certification issued by the Project Management Institute
OR
Active Certified Professional Constructor (CPC) certified by the American Institute of Constructors & Constructor Certification Commission
OR
Active Designated Design-Build Professional certification administered by the DBIA
OR
Active Licensed Professional Registration in Virginia, Maryland, District of Columbia, or Pennsylvania
OR
If no Certification or License, then the Project Manager must have an additional 10 years of construction management experience for a total of 20 years of Construction Management experience, including at least 10 years of design-build construction management experience.
Designer of Record (DOR) BA/BS degree in an engineering or architectural discipline
AND
10 years of design experience
AND
Active Licensed Professional Registration in Virginia, Maryland, District of Columbia, or Pennsylvania.
This key person role is sometimes referred to as Lead DOR or DOR Project Manager.
Qualified Fire Protection Engineer (QFPE)
Registered professional engineer (P.E.)
AND
Has passed the fire protection engineering examination administered by NCEES
AND
Has 5 years of fire protection engineering experience.
Position Minimum Qualification Requirements Site Safety and Health Officer
(SSHO)
5 years of continuous construction industry safety experience in supervising/managing general construction
OR
3 years experience if a Certified Safety Professional (CSP) or Safety and Health degree is held
AND
Must have completed the 30-hour OSHA Construction Safety Class, OR
As an equivalent, 30 hours of formal construction safety and health training covering the subjects of the OSHA 30-hour course (see EM385-1-1, Appendix A, paragraph 3.d.3) applicable to the work to be performed and given by qualified instructors.
Contractor Quality Control Manager (CQCM)
5 years of experience as a construction Contractor Quality Control Manager / Contractor Quality Control System Manager / Quality Control Manager
AND
Completed USACE/NAVFAC Construction Quality Management for Contractors (CQM-C) Training with the past 5 years.
Site Superintendent 10 years of experience as Construction Site Superintendent
AND
Completion of OSHA training
Contractor’s Scheduler 5 years of experience scheduling construction projects similar in size and nature to the project
AND
Comprehensive knowledge of the Critical Path Method (CPM)
AND
Experienced in using Microsoft Project and Oracle Primavera P6 software.
LEED Professional (Required for projects that are pursuing LEED certification)
Active LEED AP Certification
AND
Experience certifying at least 3 LEED projects.
Registered Communications Distribution Designer (RCDD)
5 years of experience in design, integration, and implementation of data communications technology systems
AND
Active Certified RCDD®.
3.6. Project Manager (PM)
A. The Contractor must designate a PM with overall responsibility for the contract. The PM is responsible for the execution and coordination of all administration, design (if applicable), quality control, safety, and construction of the contract.
B. The PM must ensure that the controls and procedures in place are followed, conflicts, errors and omissions are eliminated, that all technical requirements are met and standards are adhered to.
C. The PM must serve as the single Point of Contact (POC) and liaison between the Government and the
Contractor.
D. The PM has the duty to promptly inquire with the KO for any contractual matter, scope determinations, contract interpretation and related contractual matters. The PM must promptly provide all required notices to the KO.
E. The PM must have proven experience in the management of design/build construction contracts.
F. All Submittals under Section 3.0 Site, 4.0 Cost-Schedule-Invoice, and 5.0 Quality Control and Safety requires the PM’s signature before submission to the Government.
3.7. Designer of Record (DOR)
A. The DOR is the Professional Engineer or Registered Architect member of the design-build team, as defined in the UFC, that leads the design team, ensures design submittals comply with contract requirements, and appropriate design team members check, approve, sign, date, certify, and stamp design-build submittals as required. The DOR is a single individual. The DOR is sometimes referred to as the Design Project Manager. As necessary, the Contractor must assemble and manage a full service team of licensed professionals, as required, to carry out all applicable disciplines and phases of the project. The DOR and design team members may be Prime Contractor employees or employees of a first-tier subcontractor to the Prime Contractor.
B. The DOR must have an active license in the State or District in which the work is being performed.
C. The DOR must have proven experience in design, installation, and commissioning, if applicable, in similar projects and is the design certifying authority throughout the project. The DOR must ensure that staff designers possess the required expertise in AutoCAD 2013 (.dwg) or later version for the production of the Construction Documents for this Contract.
D. The DOR must be involved in every step of the project and is responsible for the execution and coordination of all architecture-engineering elements, applicable disciplines, phases, and compliance with Electronic Data Standards.
E. The DOR must review and sign a statement certifying compliance with contract requirements on each design submission PRIOR to submitting it to the Government, or the Government will not review the submission.
F. The DOR must attend project site visits to review quality of workmanship, verify design compliance and submit to the Government a monthly report, with photos indicating such compliance.
G. The DOR is responsible for the Design Quality Control Plan.
H. All Submittals under Section 3.0: Site, Section 6.0: Design & Construction, and Section 8.0:
Closeout, requires the DOR’s stamp/signature of approval upon submission to the Government.
3.8. Qualified Fire Protection Engineer (QFPE)
A. The Contractor must designate a QFPE that has overall responsibility for every aspect of fire protection and life safety design, construction, and testing/commissioning, throughout all phases of Major Projects as defined by UFC 3-600-01.
B. The QFPE must be either the DOR or a first-tier sub-contractor to the DOR, and must meet the qualifications listed above.
C. The QFPE is responsible, at a minimum, for providing all Fire Protection Engineering Services identified in UFC 3-600-01, Section 1-7.
3.9. Site Safety Health Officer (SSHO)
A. The Contractor must designate an SSHO that has overall responsibility for safety. An alternate SSHO must be named to perform these duties in the primary SSHO’s absence. The SSHO and SSHO alternate credentials must meet or exceed the requirements listed in EM-385-1-1.
B. The Accident Prevention Plan (APP) must identify the accepted SSHO and any alternates.
C. The SSHO is responsible for managing, implementing and enforcing the Contractor’s Safety and
Health Program in accordance with the accepted APP.
D. The SSHO must be on site and routinely monitoring performance whenever work is performed. The SSHO role is a full-time responsibility at all times work is conducted on-site.
E. The Site Superintendent or the PM may not be the SSHO.
F. The Contracting Officer may request removal and replacement of the SSHO for less than satisfactory performance.
3.10. Contractor Quality Control Manager (CQCM)
A. The Contractor must designate a CQCM. The CQCM is responsible for ensuring the project is constructed in accordance with all established standards, code, protocols, and contract requirements.
The CQCM must provide evidence of completion of the USACE/NAVFAC Construction Quality Management for Contractors (CQM-C) Training within the past 5 years unless a task order states otherwise. An alternate CQCM must be named to perform these duties in the primary CQCM’s absence. The CQCM must have at least five (5) years of experience as a CQCM, or the years of experience specified by an individual project. The CQCM is sometimes referred to as the Contractor Quality Control System Manager (CQC System Manager) in some specification versions. The titles are equivalent, and both encompass the same duties for the onsite work organization.
B. The Contractor Quality Control Plan must document the accepted CQCM and all alternates.
C. The CQCM role includes direct oversight and review of the entire documentation and physical inspection phase of the construction process, as well as working with other key personnel (e.g.: PMs, Superintendents, etc.) to produce and document a product that meets all quality and contract requirements. The CQCM may not dual-hat or perform additional project management/contract administration roles unless an individual task order states otherwise.
D. The CQCM must report to an officer or an owner of the firm Prime Contractor and must not be subordinate to the Project Superintendent or the PM. The Contractor must delegate sufficient authorities to adequately perform the functions of CQCM, including, but not limited to, authority to stop work which is not in compliance with the contract.
E. The designated CQCM must be present on the site at all times active on-site work is conducted, and oversee all construction or demolition activities. Refer to SOW Attachment G: Quality Control, “UFGS 01 45 00.00 10”. All Submittals under Sections 6.0: Design and Construction and 8.0:
F. Closeout requires the CQCM’s signature of approval and stamped upon submission to the
Government.
3.11. Site Superintendent
A. The Contractor must designate a Site Superintendent that has overall responsibility for the day to day construction functions required for this contract. The Site Superintendent must have proven experience in the management/coordination of construction projects of similar nature and character.
An alternate Site Superintendent may be named to perform these duties in the primary Site Superintendent’s absence.
B. The accepted Site Superintendent and all alternates must be documented in all relevant plan submittals.
C. The Site Superintendent must be on site and actively engaged in monitoring the work at any time work is underway.
3.12. Scheduler
The Contractor must designate a Scheduler with a minimum of three (3) years of experience scheduling projects similar in size and nature to the project supported or have the number of years of experience specified on a task-order specific basis. The Scheduler must be experienced in using the scheduling software specified by individual task orders, typically Microsoft Project or Oracle Primavera P6. The Scheduler must have a comprehensive knowledge of the Critical Path Method (CPM). The Scheduler must attend initial schedule development meetings and progress meetings, or attend meetings as required on a task-order specific basis
3.13. Registered Communications Distribution Designer (RCDD)
A. The Contractor must designate an RCDD when an individual project requires the role for Key
Personnel. The RCDD must have at least five (5) years of experience in design, integration, and implementation of data communications technology systems and related infrastructures of similar size and complexity to the individual project, or as specified by individual task orders.
B. Active Certified RCDD®.
3.14. LEED Professional
A. For projects that are pursuing LEED certification, the Contractor must designate a LEED
Professional. This individual must be an active LEED Accredited Professional (AP), with certification from the U.S. Green Building Council (USGBC) and experience in certifying at least three LEED projects.
B. The LEED Professional is responsible for leading and coordinating the certification process. The
LEED Professional must submit the proposed LEED scorecard to the Government, with all design submissions, beginning with the Basis of Design (BOD).
C. Once the complete design is approved by the Government (acceptance of IFC documents), this individual must submit the design credits to the Government for review and approval, prior to submitting them to USGBC for design review. This will ensure the project is on track to meet LEED certification, prior to the final LEED submission, which also must be reviewed and approved by the Government, before submission to USGBC.
D. The LEED Professional must periodically report to the Government on the status of the construction credits.
E. The LEED Professional must meet regularly with the Government to provide updates on the status of
LEED documentation collection, and must provide updated LEED scorecards prior to each meeting.
4. SITE
4.1. Project Coordination Plan (PCP)
The PCP is the Contractor’s detailed plan to accomplish the project. The PCP includes all project phases, anticipated permits, staging, outages, work stoppages (due to weather and/or special events), risks associated with work stoppages, and facility/reservation areas the Contractor requires access to in order to execute the project.
The Contractor must provide a PCP for review and acceptance by the Government. The PCP must include the following sections:
A. Phasing Plan: The Contractor must present a written planned approach to complete the project and communicate phasing objectives that are planned for project execution. Phasing should be determined by clearly defined design factors, building restrictions (i.e. permit restrictions, required outages, building closures, etc.), and/or other logistical considerations. All determinants for phasing must be delineated and their impact and timeline identified. Each phase requires an overall summary, explanation, and justification for all work encompassed in a phase (diagrams and charts are acceptable as submissions). Typical phasing plans require (but are not limited to) the following elements:
1. Include diagram/graphic limits of work, dimensions of space, proposed laydown area, dumpster location, requested permit dates, and materials/equipment to be stored within the area (see Section 3.1.4).
2. Address any anticipated modifications or closures of existing egress routes or public spaces/corridors.
3. Address any anticipated impact to tenants, e.g.: noise, public space modifications/closures, no parking areas, etc.
4. Confined Space Permit: For any work that requires an individual to enter a confined space, supervise an entry, or approve an entry. (Submit Daily)
5. Hot Work Permit: Any operation involving open flames or producing heat and/or sparks, hot slag, or dross. Hot work includes, but is not limited to, brazing, cutting, grinding, soldering, arc welding, work on a pipe that would conduct heat through a wall or in contact with a wall, or torch-applied roofing. (Submit Daily)
6. Use of Space on the Reservation Permit (to include land): Whenever events, installations, projects, etc. require use of PBMO controlled or public spaces on WHS property. Use of equipment such as barbeque grills and open flames must be included in the Space Use Permit.
Excavation requires an excavation permit. (May require 30 calendar days or more for approval)
B. Environmental Requirements, to include Federal, State, or Local Permits, may be required for contract-related activities that have a potential environmental impact. Include the following permits and state which permits are not required in the PCP. Regulations that govern activities of concern, and may have permitting requirements, include, but are not limited to:
1. Clean Water Act (applies to activities such as storm water and other discharges, pollution control, erosion and sediment control, and wetlands protection).
2. Clean Air Act (applies to activities such as asbestos removal, natural gas/diesel fuel fired equipment installation/operation, incineration, and other air emissions).
3. Solid Waste Disposal Act (applies to activities such as construction debris and hazardous waste disposal).
C. Staging: The Contractor must identify and address:
1. Laydown Areas: Work must include the use of just-in-time delivery construction practices to the fullest extent. When long lead items must be ordered with contingency time, the Contractor must provide storage facilities off-site until the item is required. Staging and storage areas for this contract may be limited to the workspace and designated staging and laydown areas. These areas must be approved by the Government prior to demolition/construction start via the Use of Space Permit.
2. Construction Egress Plan: The Contractor must provide a detailed plan for safe egress routes during construction by submitting a Construction Egress Plan for Government review and acceptance prior to mobilization. Egress routes in the plan must comply with NFPA 101, Life Safety Code and Occupational Safety and Health Administration (OSHA).
D. System Outage Schedule: The Contractor must provide an initial schedule of anticipated major utility outages and tie-ins for the project, and must accompany the Government to outage coordination meetings. The Contractor must not impede, hinder, disrupt, or cause a discontinuation in any manner or period to the utilities, infrastructure, or facilities functions that may impact the occupancy, access, security, life safety, mission, or activities of the Pentagon or other DoD facilities in performance of work under this contract.
E. Anticipated Areas for Access Request (core key/swipe): The Contractor must list the room numbers that they will need access to for the purpose of surveying, construction, commissioning, etc.
Contractor must specify whether the access requested will be needed for the duration of the project or just pre/post construction. Contractor must refer to Section 3.12 for more information on Access Requests.
F. Traffic Control Plan: The Contractor must provide the complete details of the proposed traffic control plan for the maintenance of traffic and access through the contract work area with the PCP. Contractor must refer to SOW Attachment J, Safety Requirements “EM-385: Safety and Health Requirements” for Traffic Control requirements.
4.2. Existing Conditions Report
All record documents provided to the Contractor are for the Contractor’s reference only. The Government makes no guarantee of accuracy or completeness of record documents. The Contractor must provide to the Government an Existing Conditions Report based on existing conditions surveys and tests. The Contractor must identify all system and aesthetic deficiencies to notify the Government of the defects/flaws and the potential impact to the project and the end user. Failure to identify deficiencies indicates the Contractor’s concurrence that such systems and the work site are in good working condition.
A. Existing Conditions Survey: The Contractor must conduct a detailed and comprehensive existing site survey to understand, confirm, and document the existing conditions of the project site described in this statement of work and in any Government provided existing condition documents. The Contractor must notify the Government immediately of any potential hazardous conditions.
B. Existing Conditions Tests: The Contractor is responsible for performing any tests necessary to confirm that existing conditions are adequate for the full execution of all planned work (e.g. soil characteristics, moisture content of floors, floor level to receive finishes). If the Contractor proceeds with the work before testing and confirmation have been completed, any rework due to issues with unsuitable existing conditions must be at the cost of the Contractor. This includes implementation of manufacturer’s recommendations, recommended tests, and validation of product’s installation requirements. If testing electrical or mechanical systems, the Contractor may need to submit an outage request per Section 3.11.
4.3. Construction Air Quality Management Plan
A. The Contractor must develop and implement a construction Indoor Air Quality (IAQ) management plan that complies with the following:
ASHRAE Standard 189.1 Section 10.3.1.5 (Moisture Control) ASHRAE Standard 189.1 Section 10.3.1.4 (IAQ Construction Management) for new construction and renovation of unoccupied existing buildings SMACNA IAQ Guidelines for Occupied Buildings under Construction Second Edition 2007 or the most recent version for renovation of occupied existing buildings
B. Planning and Design
1. Occupied Areas: The Contractor must submit a plan to isolate work areas from occupied areas.
Where demolition or construction work will occur adjacent to occupied space, the Contractor must erect appropriate barriers (e.g., noise, dust, and odor) and take necessary steps to minimize interference with the occupants. This includes maintaining acceptable temperature, humidity, and ventilation in the occupied areas.
2. The Contractor must establish dedicated pathways (i.e., hallways, stairs, and elevators) for worker and material movement, if feasible.
C. During Construction
1. Heating, Venting, and Air Conditioning (HVAC) Protection: The Contractor must protect all HVAC equipment, including HVAC returns, from dust and other contaminants of concern that can settle in the system and be released back into the air.
2. The Contractor must deliver and store all HVAC materials properly (e.g., keep ends of stored duct work sealed in 6-mil plastic sheeting to prevent contamination and store in clean protected areas shielded from rain and other sources of moisture).
3. If possible, the Contractor must avoid using permanent HVAC equipment serving construction areas, de-energize the supply/return fans, and seal the return/supply grills.
4. In new construction and unoccupied existing buildings, permanent HVAC systems must not be used during construction, except for system startup, testing, balancing, and commissioning. The Contractor must provide temporary exhaust during construction operations.
5. Construction and demolition waste materials must not be stored in mechanical rooms with return-side equipment.
6. Ventilation: During construction in occupied buildings, the Contractor must maintain a negative pressure relative to adjacent spaces to prevent contaminants from entering occupied spaces.
7. Where HVAC equipment must be relocated within the renovated space, the Contractor must ensure that the equipment in the renovated space is placed to maintain and optimize IEQ and meet associated requirements, including ASHRAE Standard 55-2017 and ASHRAE Standard 62.1-2016, or latest versions.
8. For renovations in occupied existing buildings, the permanent HVAC system may be used during construction only if all of the following conditions are met:
a. A complete air filtration system with minimum efficiency reporting value (MERV) 8 filters at each return air grill, installed and properly maintained (The filter MERV rating must be determined by ASHRAE Standard 52.2-2017).
b. Filter media is inspected on a weekly basis and replaced if excessive loading or filter damage is noted.
c. No permanent diffusers are used.
d. No plenum type return air system is employed.
e. The HVAC duct system is adequately sealed to prevent the spread of airborne particulate and other contaminants.
9. Emissions and Moisture: The Contractor must perform regular visual inspections of materials before and immediately after installation for signs of moisture or mold growth. All materials with signs of mold growth must be discarded by the Contractor. The Contractor must discard furniture, carpet, or similar porous materials with persistent, musty odors or that have been wet for more than 24 hours. Contractor must verify that vapor barriers, without punctures and/or damage, are installed and sealed completely.
10. The Contractor must establish a schedule for interior finishes and install porous and absorptive materials (e.g., carpet, wood, furniture) after activities such as drywall and painting (sources of contaminants) are complete.
11. Carpet: The Contractor must sequence the installation of carpet so that materials that are high emitters of volatile organic compounds (VOCs) are installed and allowed to cure before installing finish carpet materials.
12. Storage: The Contractor must protect all carpet, tile, wall material, doors, furniture, and other materials stored and installed onsite from dust, dirt, and moisture damage by storing the materials off the floor on pallets or via other methods in the original packaging, covered, or sealed.
13. Housekeeping: The Contractor must institute cleaning procedures to regularly control dust, debris, and contaminants in building spaces during construction and prior to occupancy, including, but not limited to, the following:
a. Maintain clean and orderly worksites by using materials and methods that reduce or control dust and debris, such as vacuum assisted drywall sanding equipment and sticky walk-off mats.
b. Avoid dry sweeping; if necessary, use a dust suppressant.
c. Consider using wet methods (e.g., damp rags, wet mops, and wet scrubbers) and vacuums with high-efficiency particulate air (HEPA) filters to improve dust collection efficiency.
d. Remove spills or excess applications of solvent-containing products as soon as possible.
e. Increase cleaning frequency in adjacent occupied areas based on visible inspections.
f. Maintain clean surfaces, including on top of ledges, behind furniture and inside mechanical equipment.
D. After Construction
1. IAQ Testing or Flush-out: After construction ends, the building has been completely cleaned, all interior finishes and movable furnishings have been installed, and major VOC punch list items have been completed, the Contractor must conduct IAQ testing or a flush-out in accordance with ASHRAE Standard 189.1 Section 10.3.1.4 (IAQ Construction Management).
2. HVAC Cleaning and Testing: Contractor must clean all ductwork used to move supply or return air during construction with HEPA vacuums. Air in the ductwork must be tested to demonstrate cleanliness, in accordance with the National Air Duct Cleaners Association (NADCA) specifications. Cleaning, testing, and demonstration must be completed after the building flush-out/testing period and immediately prior to occupancy to avoid contamination from construction dust and other airborne particulates.
E. Air Quality: The Contractor must not use materials containing VOCs when available. Where not available, the Contractor must use low-VOC materials that meet ASHRAE Standard 189.1 Section
8.4.2 (Materials). If any sealant and adhesive products are used, they must not contain formaldehyde or heavy metals (heavy metals are any of several hazardous metallic elements with high atomic weights, including mercury, chromium, cadmium, arsenic, and lead).
F. Dust Mitigation Plan: Prior to any demolition/construction work, the Contractor must provide a dust analysis and dust mitigation plan for review and acceptance by the Government. Dust must not cause any adverse effects to building occupants. This plan must identify work activities that have the potential to produce dust levels greater than 15mg/m3 limits during normal working hours.