Conformed_Solicitation.doc
DOC document 747 KB Posted
- Attached to
- GlobalNET Platform Support Services
- Solicitation number
- HQ001314R0009
- Issued by
-
Defense Security Cooperation Agency
About this file
The attached conformed solicitation incorporates Amendment 0001 changes into the original solicitation document. Questions and Answers are included in this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GlobalNET_PWS_Amendment_0003.doc | DOC document | |
| Amendment_0003_SF30_Summary_of_Changes.doc | DOC document | |
| Amendment_0003_Conformed_1449.docx | DOCX document | |
| Amendment__0002_Conformed_Solicitation.doc | DOC document | |
| GlobalNET_PWS_Amendment_0002.doc | DOC document | |
| Amendment_0002_SF30_Summary_of_Changes.doc | DOC document | |
| Amendment_0001_Summary_of_Changes.doc | DOC document | |
| GlobalNET_PWS_Q A_Amendment_0001.doc | DOC document | |
| PAST_PERFORMANCE_QUESTIONNAIRE.doc | DOC document | |
| Contract_Line_Items_CLINS.doc | DOC document | |
| GlobalNET_v1_3.pdf | ||
| PAST_PERFORMANCE_QUESTIONNAIRE.doc | DOC document | |
| GlobalNET_PWS_Final_28_Apr.docx | DOCX document | |
| CLAUSES.doc | DOC document | |
| DSCA_-_Currently_Used_DSCA_Function_Point_Counting_Practice_Resolutions_....pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section SF 30 - BLOCK 14 CONTINUATION PAGE
REVISED PPQ
PAST PERFORMANCE QUESTIONNAIRE
HQ0013-14-R-0009
GlobalNET
DUE: 11 AM ON 12 June 2014
(Note: Complete questionnaire and email to Janet D’Angelo at janet.dangelo@dsca.mil)
I. Evaluation of Offeror:
Company/Division Providing Services:
Address:
Description of Project:
Contract Number:
Dollar Value (Annual):
Performance Period:
Performance Location:
Type of Contract:
Check One:
FORMCHECKBOX
Fixed Price FORMCHECKBOX Cost Reimbursement
FORMCHECKBOX
Time & Material
FORMCHECKBOX
Other (Please Specify):
Type & Extent of Subcontracting:
II. Evaluated by:
Company/Organization/Address:
Name & Title:
Signature:
Date:
Telephone:
FAX:
III. EVALUATION Criteria:
Please answer questions 1 through 13 using the following criteria. Circle only one response per question.
| Rating |
| Definition |
| Note |
Exceptional (4)
| Performance met contractual requirements and exceeded many to the government’s benefit. The contractual performance of the element or sub element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective. |
| To justify an “exceptional” rating, identify multiple significant events and state how they were of benefit to the government. A singular benefit, however, could be of such magnitude that it alone merits an “exceptional” rating. Also, there should have been no significant weaknesses identified. |
Very Good (3)
| Performance met contractual requirements and exceeded some to the government’s benefit. The contractual performance of the element or sub element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective. |
| To justify a “very good” rating, identify a significant event and state how it was a benefit to the government. There should have been no significant weaknesses identified. |
Satisfactory (2)
| Performance met contractual requirements. The contractual performance of the element or sub element contained some minor problems for which corrective actions taken by the contractor appeared to be or were satisfactory. |
| To justify a “satisfactory” rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract/order. There should have been no significant weaknesses identified. A fundamental principle of assigning ratings is that contractors will not be evaluated with a rating lower than “satisfactory” solely for not performing beyond the requirements of the contract/order. |
Marginal (1)
| Performance did not meet some contractual requirements. The contractual performance of the element or sub element being evaluated reflected a serious problem for which the contractor did not identify corrective actions. The contractor’s proposed actions were only marginally effective or were not fully implemented. |
| To justify a “marginal” performance rating, identify a significant event in each category that the contractor had trouble overcoming and state how it affected the government. A “marginal” rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., management, quality, safety, or environmental deficiency report or letter). |
| Unsatisfactory (0) |
| Performance did not meet most contractual requirements and recovery was not accomplished in a timely manner. The contractual performance of the element or sub element contained a serious problem(s) for which the contractor’s corrective actions were ineffective. |
| To justify an “unsatisfactory” rating, identify multiple significant events in each category that the contractor had trouble overcoming and state how it affected the government. A singular problem, however, could be of such serious magnitude that it alone merits an “unsatisfactory” rating. An “unsatisfactory” rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency report or letter. |
IV. Questions:
| Question |
| Response |
1. Evaluate the contractor's overall commitment to quality performance and customer satisfaction.
Comment:
FORMCHECKBOX
4 – Exceptional
FORMCHECKBOX
3 – Very Good
FORMCHECKBOX
2 – Satisfactory
FORMCHECKBOX
1 – Marginal
FORMCHECKBOX
0 – Unsatisfactory
FORMCHECKBOX
N/A
2. Evaluate the contractor's overall technical competence.
FORMCHECKBOX
FORMCHECKBOX
3 – Very Good
FORMCHECKBOX
2 – Satisfactory
FORMCHECKBOX
1 – Marginal
FORMCHECKBOX
0 – Unsatisfactory
FORMCHECKBOX
N/A
3. Evaluate the contractor's cooperation and willingness to work as a team (with your personnel, other contractors, etc.).
FORMCHECKBOX
FORMCHECKBOX
3 – Very Good
FORMCHECKBOX
2 – Satisfactory
FORMCHECKBOX
1 – Marginal
FORMCHECKBOX
0 – Unsatisfactory
FORMCHECKBOX
N/A
4. Evaluate the contractor's compliance with contractual requirements.
FORMCHECKBOX
FORMCHECKBOX
3 – Very Good
FORMCHECKBOX
2 – Satisfactory
FORMCHECKBOX
1 – Marginal
FORMCHECKBOX
0 – Unsatisfactory
FORMCHECKBOX
N/A
5. Evaluate the contractor's responsiveness to contract, program and/or schedule changes.
FORMCHECKBOX
FORMCHECKBOX
3 – Very Good
FORMCHECKBOX
2 – Satisfactory
FORMCHECKBOX
1 – Marginal
FORMCHECKBOX
0 – Unsatisfactory
FORMCHECKBOX
N/A
6. Evaluate the effectiveness of the contractor's overall quality control procedures.
FORMCHECKBOX
FORMCHECKBOX
3 – Very Good
FORMCHECKBOX
2 – Satisfactory
FORMCHECKBOX
1 – Marginal
FORMCHECKBOX
0 – Unsatisfactory
FORMCHECKBOX
N/A
7. Evaluate the effectiveness of the contractor's safety program or efforts.
FORMCHECKBOX
FORMCHECKBOX
3 – Very Good
FORMCHECKBOX
2 – Satisfactory
FORMCHECKBOX
1 – Marginal
FORMCHECKBOX
0 – Unsatisfactory
FORMCHECKBOX
N/A
8. Evaluate the effectiveness of the contractor's management and supervision.
FORMCHECKBOX
FORMCHECKBOX
3 – Very Good
FORMCHECKBOX
2 – Satisfactory
FORMCHECKBOX
1 – Marginal
FORMCHECKBOX
0 – Unsatisfactory
FORMCHECKBOX
N/A
9. Evaluate the contractor's ability to overcome technical problems, labor issues, and/or other performance difficulties.
FORMCHECKBOX
FORMCHECKBOX
3 – Very Good
FORMCHECKBOX
2 – Satisfactory
FORMCHECKBOX
1 – Marginal
FORMCHECKBOX
0 – Unsatisfactory
FORMCHECKBOX
N/A
10. Evaluate the contractor's ability to plan and conduct operations in the most effective manner.
FORMCHECKBOX
FORMCHECKBOX
3 – Very Good
FORMCHECKBOX
2 – Satisfactory
FORMCHECKBOX
1 – Marginal
FORMCHECKBOX
0 – Unsatisfactory
FORMCHECKBOX
N/A
11. Evaluate the contractor's ability to adhere to schedules and complete work on time.
FORMCHECKBOX
FORMCHECKBOX
3 – Very Good
FORMCHECKBOX
2 – Satisfactory
FORMCHECKBOX
1 – Marginal
FORMCHECKBOX
0 – Unsatisfactory
FORMCHECKBOX
N/A
12. Evaluate the quality and stability of the contractor's workforce and continuity of services.
FORMCHECKBOX
FORMCHECKBOX
3 – Very Good
FORMCHECKBOX
2 – Satisfactory
FORMCHECKBOX
1 – Marginal
FORMCHECKBOX
0 – Unsatisfactory
FORMCHECKBOX
N/A
13. Evaluate the availability, adequacy, and suitability of the contractor's staffing for the work required.
FORMCHECKBOX
FORMCHECKBOX
3 – Very Good
FORMCHECKBOX
2 – Satisfactory
FORMCHECKBOX
1 – Marginal
FORMCHECKBOX
0 – Unsatisfactory
FORMCHECKBOX
N/A
CLAUSES INCORPORATED BY FULL TEXT
52.224-1 PRIVACY ACT NOTIFICATION (APR 1984)
The Contractor will be required to design, develop, or operate a system of records on individuals, to accomplish an agency function subject to the Privacy Act of 1974, Public Law 93-579, December 31, 1974 (5 U.S.C. 552a) and applicable agency regulations. Violation of the Act may involve the imposition of criminal penalties.
(End of clause)
CLAUSES INCORPORATED BY FULL TEXT
52.224-2 PRIVACY ACT (APR 1984)
(a) The Contractor agrees to--
(1) Comply with the Privacy Act of 1974 (the Act) and the agency rules and regulations issued under the Act in the design, development, or operation of any system of records on individuals to accomplish an agency function when the contract specifically identifies--
(i) The systems of records; and
(ii) The design, development, or operation work that the contractor is to perform;
(2) Include the Privacy Act notification contained in this contract in every solicitation and resulting subcontract and in every subcontract awarded without a solicitation, when the work statement in the proposed subcontract requires the redesign, development, or operation of a system of records on individuals that is subject to the Act; and
(3) Include this clause, including this subparagraph (3), in all subcontracts awarded under this contract which requires the design, development, or operation of such a system of records.
(b) In the event of violations of the Act, a civil action may be brought against the agency involved when the violation concerns the design, development, or operation of a system of records on individuals to accomplish an agency function, and criminal penalties may be imposed upon the officers or employees of the agency when the violation concerns the operation of a system of records on individuals to accomplish an agency function. For purposes of the Act, when the contract is for the operation of a system of records on individuals to accomplish an agency function, the Contractor is considered to be an employee of the agency.
(c)(1) "Operation of a system of records," as used in this clause, means performance of any of the activities associated with maintaining the system of records, including the collection, use, and dissemination of records.
(2) "Record," as used in this clause, means any item, collection, or grouping of information about an individual that is maintained by an agency, including, but not limited to, education, financial transactions, medical history, and criminal or employment history and that contains the person's name, or the identifying number, symbol, or other identifying particular assigned to the individual, such as a fingerprint or voiceprint or a photograph.
(3) "System of records on individuals," as used in this clause, means a group of any records under the control of any agency from which information is retrieved by the name of the individual or by some identifying number, symbol, or other identifying particular assigned to the individual.
(End of clause)
QUESTIONS AND ANSWERS
HQ0013-14-R-0009
QUESTIONS AND ANSWERS
1. Please confirm that the only items required for Volume III - Contracting/Price Volume are the completed SF1449 (if one is provided), Section B and Section K
Volume III submissions shall contain the completed and signed SF1449 and amendments, Section B “Supplies or Services & Prices or Costs”, and Section K “Representations, Certifications, & Other Statements”.
2. Is there an ODC CLIN offerors should propose against? If so, can the Government provide some historical data on quantities and items previously required?
Answer: No, this solicitation does not include an ODC CLIN.
3. Section 5.2 of the PWS states that the “Contractor shall use all reasonable commercial efforts to ensure that all services are available 99.9% of the time in any calendar month, which translates to a maximum of 45 minutes of unavailability per calendar month.” Does this figure of 45 minutes refer to unscheduled downtime or the sum of both scheduled and unscheduled downtime?
Answer:
The “maximum of 45 minutes of unavailability per calendar month” refers to unscheduled downtime.
4. Has the Government developed Function/Snap Point counts for any of the planned enhancements listed in Section 5.3.2 of the PWS? If so, can these point counts be provided?
Answer:
The applicable Function/Snap Point counts for enhancements will be provided with the issuance of the task order for the enhancement.
5. Will the contractor be responsible for paying hosting and/or managed services fees associated with GlobalNET’s internet-hosted environments (i.e., Acquia Cloud, potentially Vazata Nova)? If so, in what line item should this be priced?
Answer:
Hosting and/or managed service fees shall be included in CLIN 0002 “Operations for GlobalNET”.
6. In section 5.3 of the PWS, do the levels associated with Function/Snap Point ranges correspond to sprint size ranges? For example, does a Level 6 set of requirements with 126-150 Function/Snap Points correspond to 6 planned sprints?
Answer:
No, a level 6 is one sprint estimated between 126 and 150 Function/Snap Points.
7. For Development Level pricing (e.g., item no. 1003 to 1011 in the base year), is it the Government’s intention to have a “menu” of fixed prices for development at different ranges of Function Points? For example, does “Item No 6 – Development Level 4” correspond to a price charged should the Government request systems enhancements estimated at 76-100 Function Points? Or are the Development Levels 1-9 meant to represent sequential completion of planned enhancements valued at a total of 250 Function Points?
Answer:
Yes, it is the Government’s intention to have a “menu” of fixed prices for development at different ranges of Function Points.” Should the Government request systems enhancements estimated at 76-100 Function Points, CLIN 0006 – Development Level 4 will apply.
8. Can the Contractor assume that not all Development Level Line Items will be exercised in a given year? That is, are we simply providing a list of prices for different-sized “chunks” of development that the Government may or may not request?
Answer:
Yes, the CLINs will provide pricing applicable for different-sized “chunks” of development that the Government may or may not request.
9. Can the Government provide any estimate of what levels of Development Services will be requested in the base and option years?
Answer:
The Government estimates approximately 615 function points per contract year.
10. The past performance deadline for the above solicitation is due on prior to the submission of questions. Is this correct? We believe that the answers to some of our questions may change which past performance we'd like to submit.
Past Performance Questionnaires shall be submitted by the closing date and time for the solicitation.
11. Can you advise on whether Cloud Services are a component of this Procurement?
Answer:
DSCA will consider proposals utilizing Cloud services which are FEDRAMP compliant, and managed IAW DoD standards.
12. What are the Security Requirements for the application hosting platform?
Answer:
With the exception of passwords as documented in the System Specification.
the DoD security standards are contained in the DoD Information Assurance Certification and Accreditation Process (DIACAP) and upcoming risk management framework (RMF).
13. Are DoD Cloud Service Requirements for Impact Levels being used to determine services to be utilized?
Answer:
No.
14. Will the Government provide the SF1449 referenced in Section 52.212-1 of the Clauses document?
The SF1449 is included in this amendment.
15. The Instructions for Volume II-Past Performance Information state: “The offeror shall provide a minimum of three (3) references relevant to its past performance and its major subcontractor’s past performance in providing similar services under existing or prior contracts for the last 5 years.” The instructions also state: “The offeror shall provide a list of no more than three (3) contracts completed within the past three years, which clearly demonstrates the offeror’s performance relevant to the requirements and all contracts and subcontracts currently in process.” Can the Government clarify how many past performances the offeror should provide and the range of years they must have been completed in?
Answer:
The Offeror shall provide three (3) references for contracts supported during the past three years demonstrating relevant experience.
16. Are security clearances required for personnel?
Answer:
No, security clearances are not required.
17. Can the Government clarify what is meant by the requirement that the contractor “shall address contributions to the Drupal project?”
Answer:
Offerors shall describe any contributions made to the open source DRUPAL project generally located at http://www.drupal.org.
18. For the travel CLIN (0014), is there a specific amount to be proposed, or will the Government provide a list of trips?
A list of trips is not currently available. The Government estimate for Travel is $10,000.00 per contract year. However, if additional travel requirements arise and funding is available, DSCA will modify the contract to include the additional travel requirements.
19. The solicitation indicates that G&A is not to be applied to the travel CLIN (0014). Is this during the proposal phase or during execution?
G&A shall not to be applied during either phase.
20. Does the Government require pricing back-up to be submitted along with the Schedule B?
The Government does not require back-up. However, if the offeror chooses to include pricing back up, it shall be submitted along with Schedule B.
21. Please let us know the exact Place of Performance for this opportunity. Its CONUS or OCONUS?
Your answer will help us to decide that we are applicable for this or not because we can provide the Support Services across the nation only.
Answer:
With the exception of the GTS personnel which are located at the OCONUS locations listed in Section 1.6.6.2 of the PWS, performance shall be at the contractor’s facility. Occasional Travel to OCONUS stakeholder locations may be required.
22. The solicitation said nothing that I found about security clearance requirements. But NGA is an agency that often requires them. Is a clearance required, and if so, what level?
Answer:
No, security clearances are not required.
23. Can you tell me who the incumbent is on the GlobalNet contract and what is the LOE (FTE/funding) for their contract?
The incumbent is Merlin International, Inc. The scope of work has changed significantly from the current contract; therefore, funding and the LOE could not be used for proposal analysis baselines.
24. I would like to know the exact place of performance for this effort. It’s CONUS or OCONUS?
Answer:
With the exception of the GTS personnel which are located at the OCONUS locations listed in Section 1.6.6.2 of the PWS, performance shall be at the contractor’s facility. Occasional travel to OCONUS stakeholder locations may be required.
25. In Section 5.3.2.1, it states “DSCA desires to move from that environment to a Federal Risk Authorization Management Program (FEDRAMP) compliant facility. DSCA would prefer the VAZATA Nova data center for reasons of consolidation and information exchange with the regional center person activity management system (RCPAMS) but other FEDRAMP compliant facilities may be appropriate.” Can VAZATA perform as the hosting provider even though they are still waiting for final FEDRAMP approval? If not, can DSCA provide an alternative preference for a FEDRAMP approved hosting provider?
Answer:
Yes, VAZATA can perform as the hosting provider even though they are pending final FEDRAMP approval
26. Section 5.3 – “All requirements should be detailed in terms of operational requirements and the corresponding function points and/or SNAP point sizes.”
Please define each of the Levels/Snap Points (1-9).
What is the assumed duration of the sprints?
Answer:
This amendment established a CLIN for SNAP points. Sprint durations will be negotiated at the Task Order level and dependent on FP level and/or SNAP size.
27. Is the intention that DSCA will solicit the development of the ‘Upgrade Plan’ as a task order on this IDIQ, after award, since this allows the awarded contractor more time to better understand the “as is” and “to be” goals and requirements for DSCA?
Answer:
Yes, the “Upgrade Plan” will be supported by a post-award task order.
28. The price proposal requests that respondents provide a NET AMT price for the various development levels and function ranges in fixed price CLINs 0003 through 0011. Since the ‘Upgrade Plan’ (referenced in section 5.3.2.1.3) requires interaction with DSCA to develop and approve the upgrade plan, will DSCA consider creating a Cost Plus Fixed Fee (CPFF) CLIN for the plan development and execution?
Answer:
No. The Upgrade Plan development and execution will be supported by FFP task order(s).
29. Section 5.3.1 “Configuration Management” –
a. Does DSCA have an approved configuration management plan or shall the contractor use its own change management plan?
b. What is the current LOE DSCA is receiving today for each of the labor categories referenced in the RFP?
c. Will DSCA consider another contract type such as FFP LOE or CPFF since the scope of the work is not clearly defined with regards to function points?
Answer:
a. Yes, DSCA has a configuration management plan.
b. The previous contract type was labor hour and did not utilize the International Function Point Users Group (IFPUG) 4.3 methodology to include the General System Characteristics, and the IFPUG Software Non-functional Assessment Practices (SNAP) Manual 2.1 or higher methodology to support development and enhancement requirements; therefore, the LOE for the previous contract will not provide an accurate baseline for the solicitation.
c. Applicable Function Points/ SNAPs will be identified and negotiated at the task order level.
30. In the Clauses document (Sub-factor A), “The contractor shall address contributions to the Drupal project”. “The offeror's response should demonstrate a strong understanding of the following factors, expertise, certifications or membership: Member of the Drupal Association”
Can DSCA quantify what minimum contributions are considered to be acceptable for evaluating a company's experience to fulfill the requirements in the PWS? For example, number of distributions maintained (e.g., a minimum of 3); number of members on the Drupal Association board (e.g., a minimum of 1); number of years as a Drupal Association member (e.g., a minimum of 1 year).
Answer:
The minimum number of Drupal contributions maintained is one.
The minimum number of members on the Drupal Association Board is one.
The minimum number of years as a Drupal Association membership is one.
31. Section 1.6.11 – “The contractor shall notify the COR 15 days prior to replacing key personnel and provide the resumes of proposed key personnel replacements with an equal or better-qualified person for review and approval by DSCA”
Are resumes required for each labor category or only for proposed key or Lead individuals?
In the Clauses document (Sub-factor B - Personnel and Project Team), is the contractor only required to submit resumes of proposed key personnel and technical leads?
Answer:
Resumes shall be provided for key personnel/technical leads.
32. Section 5.2.1 - Help Desk. Approximately how many Tier 1 Help Desk tickets help does DSCA anticipate to receive per year/month?
Answer:
Each GlobalNET community provides tier 1 support, separate from this solicitation.
The Contractor shall be responsible for Tier 2 and Tier 3 Help Desk requirements.
The estimated number of Tier 2 and Tier 3 tickets are noted in Section 5.2.1 of the PWS.
33. What are the network bandwidth requirements for the system?
There are currently approximately 50,000 provisioned GlobalNET accounts of which 25,000 are classified as active. Table 1 below lists the actual platform usage for the year. The platform currently is provisioned for 3TB storage and uses approximately
1.5 TB.The required backup solution maintains all transactions. The following table provides actual traffic for the date ranges shown.
| Month |
| Total requests |
| Uncached requests |
| Drupal requests |
| Bytes sent |
| 2013-06 |
| 108,470 |
| 1,276,670 |
| 3,901,045 |
| 37,478,863 |
| 2013-07 |
| 471,014 |
| 3,285,792 |
| 6,771,348 |
| 147,207,640 |
| 2013-08 |
| 252,238 |
| 3,774,864 |
| 10,435,524 |
| 164,653,899 |
| 2013-09 |
| 224,202 |
| 3,884,953 |
| 9,459,068 |
| 129,329,009 |
| 2013-10 |
| 201,081 |
| 2,995,230 |
| 9,272,563 |
| 117,858,708 |
| 2013-11 |
| 1,968,495 |
| 1,830,921 |
| 8,982,030 |
| 67,206,950,574 |
| 2013-12 |
| 3,141,549 |
| 2,177,759 |
| 7,052,437 |
| 112,380,264,653 |
| 2014-01 |
| 4,287,501 |
| 3,641,917 |
| 14,677,614 |
| 124,178,360,595 |
34. What is the MAC level of the system? What is the RPO/RTO?
The system level is MAC III.
Recovery Time Objective (RTO) = 1 Day
Recovery Point Objective (RPO) = 1 Day
35. Section 5.1.6 - Certification and Accreditation Support. “GlobalNET has an authority to operate (ATO). With the new hosting environment and software, the ATO will have to be revalidated using the DoD Information Assurance Certification and Accreditation Process (DIACAP)”.
Question: Will the contractor be required to submit a new DIACAP package for GlobalNET accreditation and ATO for the new hosting environment?
Answer:
Yes, the contractor will be required to submit a new DIACAP package for GlobalNET accreditation and ATO for the new hosting environment inheriting the FEDRAMP controls from the hosting facility.
36. Does DSCA intend to have CLIN 13 (Transition services) in Option Year 1 & 2? If so, what is the level of effort in the option years?
Answer:
There is no transition requirement in Option Year 1. CLIN 1013 has been changed to “RESERVED”. The transition services in Option Year 2 will support the transition from this contract to the follow-on contract.
37. Section 3.1 Equipment and Information: When authorized by the COR to perform on-site at Government facilities, adequate workspace, including desks, computer workstation setup, telephone, and other necessary equipment or supplies will be provided by DSCA. DSCA will provide the contractor access to regulations, directives, or other policy documents required to complete this task.
Question: Does DSCA require the contractor to use their own equipment (such as laptops) for development efforts or will government provide IA secured GFE with CAC access in support of managing, maintaining and developing applications?
Answer:
With the exception of the GTS locations identified in Section 1.6.6.2 and as indicated in Section 1.6.6, work will be performed at the contractor’s facility using the Contractor’s own equipment. The Government will provide alternate tokens for testing and CAC enablement for development efforts. The Government will provide equipment in support of the GTS.
38. What is the scope of the Zimbra project? Is the contractor expected to migrate and manage existing accounts? How many accounts in total will be managed? Are there PII concerns that need to be addressed?
In terms of operational continuity, the contractor has 30 days to migrate from Acquia’s cloud to a new hosting environment. Depending on the hardware required to provision the new hosting environment (private cloud infrastructure or dedicated physical configuration), will DSCA provide more time to transition and test to minimize risks to GlobalNet operations?
Answer:
Please refer to Section 5.2.4 Maintain Zimbra Email Servers.
Yes, the contractor is expected to migrate and manage existing accounts.
As indicated in Section 5.1.1, “there are approximately 100 email accounts that are anticipated to remain constant with some limited additions and subtractions as needed”.
PII requirements are limited to encrypted in motion.
No, transition time is limited to 30 days for migration and testing.
39. Section 5.2.1 - The contractor shall provide 24x7 on-call Help Desk support. Each community will assign a GlobalNET lead to respond to Tier 1 issues identified by users.
Issues that cannot be resolved by the Tier 1 support team will be escalated to the Help Desk.
Does DSCA require the contractor to provide a toll free number or online chat capabilities to field help desk questions?
Answer: No. Section 5.2.1 of the PWS is revised to read “The contractor shall ensure 24X7 systems operations. Each community will assign a GlobalNET lead to respond to Tier 1 issues identified by users. Issues that cannot be resolved by the Tier 1 support team will be escalated to systems operations support. Systems operations support will respond to the GlobalNET lead within 30 minutes of receiving the issue and assign a ticket number for resolution, in accordance with the hours of operations defined in Section 1.6.5. The team will provide updates to the responsible GlobalNET leads every 24 hours for Tier 2 items and every 3 days for Tier 3 items. The Government anticipates 125 Tier 2 support tickets and 50 Tier 3 support tickets per year.”
40. Reference CLIN 2014, this travel CLIN is in support of CLINs 0001-0013 and travel costs will be reimbursed in accordance with Per Diem Rates in effect at the time of travel as set forth in the Federal Travel Regulations (FTR) and/or Joint Travel Regulations (JTR) as applicable as referenced in the Federal Acquisition Regulation (FAR) Part 31.205-46.
Should this travel CLIN support CLINs 2001-2013?
This amendment corrects the description of CLIN 2014 to read “CLINs 2001-2013” vice “CLINs 0001-0013”
41. Reference PWS Section 5.3.2.1 “Build New Hosting Environment and Migrate Software/Content”, GlobalNET has three internet-hosted environments: development, test, and production all currently located in the Acquia Hosting Cloud serviced by the Amazon Elastic Cloud Compute (EC2). DSCA desires to move from that environment to a Federal Risk Authorization Management Program (FEDRAMP) compliant facility.
DSCA would prefer the Vazata Nova data center for reasons of consolidation and information exchange with the regional center person activity management system (RCPAMS) but other FEDRAMP compliant facilities may be appropriate.
As of 5/12/2014, Vazata is still in the process of obtaining a Joint Authorization Board (JAB) FedRAMP Authority to Operate (ATO) for Infrastructure as a Service (Moderate). Will the Government accept solutions that include moving GlobalNET to a data center that is already FISMA Moderate compliant and awaiting its FedRAMP
ATO?
Answer: Yes, the Government will consider solutions that include moving GlobalNET to a data center that is already FISMA Moderate compliant and awaiting its FedRAMP ATO.
42. Reference PWS sections 5.3.2.1, 5.3.2.1.1, 5.3.2.1.2, 5.3.2.1.3 “Build New Hosting Environment and Migrate Software/Content”, and CLINs 0003-0011, 1003-1011, 2003- 2011; Planning and building the new hosting environments and planning the migration of software and content are activities typically not quantified in the same manner as software development is measured. To which CLINs would this work be allocated?
Answer: “Build New Hosting Environment and Migrate Software/Content” is a Transition Activity; therefore, the work should be allocated under CLIN 0013. Please see revised PWS Sections 5.3 and 5.4 and CLIN revisions.
Section SF 1449 - CONTINUATION SHEET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
Program Management
FFP
The contractor shall provide Program Management Services in accordance with the requirements of Paragraph 5.1 of the Performance Work Statement.
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
Operations for GlobalNET
The contractor shall provide Turnkey Operation Support for GlobalNET in accordance with the requirements of Paragraph 5.2 of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
Development Level 1
Function Points 1-25. Price applies to all development requirements between 1 and 25 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
Development Level 2
Function Points 26-50. Price applies to all development requirements between 26 and 50 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
Development Level 3
Function Points 51-75. Price applies to all development requirements between 51 and 75 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
Development Level 4
Function Points 76-100. Price applies to all development requirements between 76 and 100 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
Development Level 5
Function Points 101-125. Price applies to all development requirements between 101 and 125 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
Development Level 6
Function Points 126-150. Price applies to all development requirements between 126 and 150 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
Development Level 7
Function Points 150-175. Price applies to all development requirements between 150 and 175 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
Development Level 8
Function Points 176-200. Price applies to all development requirements between 176 and 200 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
Development Level 9
Function Points 200-250. Price applies to all development requirements between 200 and 250 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
GlobalNET Technical Support Services
The contractor shall provide GlobalNET Technical Support Services in accordance with the requirements of Paragraph 5.4.3 of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
GlobalNet Transition Activities
The contractor shall provide GlobalNET Transition Activities in accordance with the requirements of Paragraph 5.3 of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
Travel
COST
This travel CLIN is in support of CLINs 0001-0013 and travel costs will be reimbursed in accordance with Per Diem Rates in effect at the time of travel as set forth in the Federal Travel Regulations (FTR) and/or Joint Travel Regulations (JTR) as applicable as referenced in the Federal Acquisition Regulation (FAR) Part 31.205-46.
No G&As costs shall be applied to travel.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
Manpower Reporting
The Contractor shall follow contractor manpower reporting instructions in accordance with guidelines in the PWS.
NOT SEPARATELY PRICED
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
SNAP Point
SNAP Point
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Program Management |
FFP
The contractor shall provide Program Management Services in accordance with the requirements of Paragraph 5.1 of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Operations for GlobalNET |
FFP
The contractor shall provide Turnkey Operation Support for GlobalNET in accordance with the requirements of Paragraph 5.2 of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Development Level 1 |
FFP
Function Points 1-25. Price applies to all development requirements between 1 and 25 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Development Level 2 |
FFP
Function Points 26-50. Price applies to all development requirements between 26 and 50 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Development Level 3 |
FFP
Function Points 51-75. Price applies to all development requirements between 51 and 75 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Development Level 4 |
FFP
Function Points 76-100. Price applies to all development requirements between 76 and 100 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Development Level 5 |
FFP
Function Points 101-125. Price applies to all development requirements between 101 and 125 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Development Level 6 |
FFP
Function Points 126-150. Price applies to all development requirements between 126 and 150 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Development Level 7 |
FFP
Function Points 150-175. Price applies to all development requirements between 150 and 175 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Development Level 8 |
FFP
Function Points 176-200. Price applies to all development requirements between 176 and 200 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Development Level 9 |
FFP
Function Points 200-250. Price applies to all development requirements between 200 and 250 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| GlobalNET Technical Support Services |
FFP
The contractor shall provide GlobalNET Technical Support Services in accordance with the requirements of Paragraph 5.4.3 of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Reserved |
FFP
The contractor shall provide GlobalNET Transition Activities in accordance with the requirements of Paragraph 5.3 of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Travel |
COST
This travel CLIN is in support of CLINs 1001-1013 and travel costs will be reimbursed in accordance with Per Diem Rates in effect at the time of travel as set forth in the Federal Travel Regulations (FTR) and/or Joint Travel Regulations (JTR) as applicable as referenced in the Federal Acquisition Regulation (FAR) Part 31.205-46.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Manpower Reporting |
FFP
The Contractor shall follow contractor manpower reporting instructions in accordance with guidelines in the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| SNAP Point |
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Program Management |
FFP
The contractor shall provide Program Management Services in accordance with the requirements of Paragraph 5.1 of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Operations for GlobalNET |
FFP
The contractor shall provide Turnkey Operation Support for GlobalNET in accordance with the requirements of Paragraph 5.2 of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Development Level 1 |
FFP
Function Points 1-25. Price applies to all development requirements between 1 and 25 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Development Level 2 |
FFP
Function Points 26-50. Price applies to all development requirements between 26 and 50 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Development Level 3 |
FFP
Function Points 51-75. Price applies to all development requirements between 51 and 75 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Development Level 5 |
FFP
Function Points 101-125. Price applies to all development requirements between 101 and 125 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Development Level 4 |
FFP
Function Points 76-100. Price applies to all development requirements between 76 and 100 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Development Level 6 |
FFP
Function Points 126-150. Price applies to all development requirements between 126 and 150 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Development Level 7 |
FFP
Function Points 150-175. Price applies to all development requirements between 150 and 175 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Development Level 8 |
FFP
Function Points 176-200. Price applies to all development requirements between 176 and 200 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Development Level 9 |
FFP
Function Points 200-250. Price applies to all development requirements between 200 and 250 Function Points.
The contractor shall provide GlobalNET development services in accordance with the requirements of Paragraph 5.4 GlobalNET Development of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| GlobalNET Technical Support Services |
FFP
The contractor shall provide GlobalNET Technical Support Services in accordance with the requirements of Paragraph 5.4.3 of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| GlobalNet Transition Activities |
FFP
The contractor shall provide GlobalNET Transition Activities in accordance with the requirements of Paragraph 5.3 of the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Travel |
COST
This travel CLIN is in support of CLINs 2001-2013 and travel costs will be reimbursed in accordance with Per Diem Rates in effect at the time of travel as set forth in the Federal Travel Regulations (FTR) and/or Joint Travel Regulations (JTR) as applicable as referenced in the Federal Acquisition Regulation (FAR) Part 31.205-46.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Manpower Reporting |
FFP
The Contractor shall follow contractor manpower reporting instructions in accordance with guidelines in the PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| SNAP Point |
FFP
SNAP Point
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
| 0004 |
| Destination |
| Government |
| Destination |
| Government |
| 0005 |
| Destination |
| Government |
| Destination |
| Government |
| 0006 |
| Destination |
| Government |
| Destination |
| Government |
| 0007 |
| Destination |
| Government |
| Destination |
| Government |
| 0008 |
| Destination |
| Government |
| Destination |
| Government |
| 0009 |
| Destination |
| Government |
| Destination |
| Government |
| 0010 |
| Destination |
| Government |
| Destination |
| Government |
| 0011 |
| Destination |
| Government |
| Destination |
| Government |
| 0012 |
| Destination |
| Government |
| Destination |
| Government |
| 0013 |
| Destination |
| Government |
| Destination |
| Government |
| 0014 |
| Destination |
| Government |
| Destination |
| Government |
| 0015 |
| Destination |
| Government |
| Destination |
| Government |
| 0016 |
| Destination |
| Government |
| Destination |
| Government |
| 1001 |
| Destination |
| Government |
| Destination |
| Government |
| 1002 |
| Destination |
| Government |
| Destination |
| Government |
| 1003 |
| Destination |
| Government |
| Destination |
| Government |
| 1004 |
| Destination |
| Government |
| Destination |
| Government |
| 1005 |
| Destination |
| Government |
| Destination |
| Government |
| 1006 |
| Destination |
| Government |
| Destination |
| Government |
| 1007 |
| Destination |
| Government |
| Destination |
| Government |
| 1008 |
| Destination |
| Government |
| Destination |
| Government |
| 1009 |
| Destination |
| Government |
| Destination |
| Government |
| 1010 |
| Destination |
| Government |
| Destination |
| Government |
| 1011 |
| Destination |
| Government |
| Destination |
| Government |
| 1012 |
| Destination |
| Government |
| Destination |
| Government |
| 1013 |
| Destination |
| Government |
| Destination |
| Government |
| 1014 |
| Destination |
| Government |
| Destination |
| Government |
| 1015 |
| Destination |
| Government |
| Destination |
| Government |
| 1016 |
| Destination |
| Government |
| Destination |
| Government |
| 2001 |
| Destination |
| Government |
| Destination |
| Government |
| 2002 |
| Destination |
| Government |
| Destination |
| Government |
| 2003 |
| Destination |
| Government |
| Destination |
| Government |
| 2004 |
| Destination |
| Government |
| Destination |
| Government |
| 2005 |
| Destination |
| Government |
| Destination |
| Government |
| 2006 |
| Destination |
| Government |
| Destination |
| Government |
| 2007 |
| Destination |
| Government |
| Destination |
| Government |
| 2008 |
| Destination |
| Government |
| Destination |
| Government |
| 2009 |
| Destination |
| Government |
| Destination |
| Government |
| 2010 |
| Destination |
| Government |
| Destination |
| Government |
| 2011 |
| Destination |
| Government |
| Destination |
| Government |
| 2012 |
| Destination |
| Government |
| Destination |
| Government |
| 2013 |
| Destination |
| Government |
| Destination |
| Government |
| 2014 |
| Destination |
| Government |
| Destination |
| Government |
| 2015 |
| Destination |
| Government |
| Destination |
| Government |
| 2016 |
| Destination |
| Government |
| Destination |
| Government |
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
| 0001 |
| POP 25-JUN-2014 TO |
24-JUN-2015
| N/A |
| DEFENSE SECURITY COOPERATION AGENCY-PGM |
PAUL WILL
MANAGEMENT DIVISION (MGT)
201 12TH STREET SOUTH
SUITE 203
ARLINGTON VA 22201-5403
(703) 601-3864
HQ0013
| 0002 |
| POP 25-JUN-2014 TO |
24-JUN-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 0003 |
| POP 25-JUN-2014 TO |
24-JUN-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 0004 |
| POP 25-JUN-2014 TO |
24-JUN-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 0005 |
| POP 25-JUN-2014 TO |
24-JUN-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 0006 |
| POP 25-JUN-2014 TO |
24-JUN-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 0007 |
| POP 25-JUN-2014 TO |
24-JUN-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 0008 |
| POP 25-JUN-2014 TO |
24-JUN-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 0009 |
| POP 25-JUN-2014 TO |
24-JUN-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 0010 |
| POP 25-JUN-2014 TO |
24-JUN-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 0011 |
| POP 25-JUN-2014 TO |
24-JUN-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 0012 |
| POP 25-JUN-2014 TO |
24-JUN-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 0013 |
| POP 25-JUN-2014 TO |
24-JUN-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 0014 |
| POP 26-JUN-2014 TO |
25-JUN-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 0015 |
| POP 25-JUN-2014 TO |
24-JUN-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 0016 |
| POP 25-JUN-2014 TO |
24-JUN-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 1001 |
| POP 25-JUN-2015 TO |
24-JUN-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 1002 |
| POP 25-JUN-2015 TO |
24-JUN-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 1003 |
| POP 25-JUN-2015 TO |
24-JUN-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 1004 |
| POP 25-JUN-2015 TO |
24-JUN-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 1005 |
| POP 25-JUN-2015 TO |
24-JUN-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 1006 |
| POP 25-JUN-2015 TO |
24-JUN-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 1007 |
| POP 25-JUN-2015 TO |
24-JUN-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 1008 |
| POP 25-JUN-2015 TO |
24-JUN-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 1009 |
| POP 25-JUN-2015 TO |
24-JUN-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 1010 |
| POP 25-JUN-2015 TO |
24-JUN-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 1011 |
| POP 25-JUN-2015 TO |
24-JUN-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 1012 |
| POP 25-JUN-2015 TO |
24-JUN-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 1013 |
| POP 25-JUN-2015 TO |
24-JUN-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 1014 |
| POP 26-JUN-2015 TO |
25-JUN-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 1015 |
| POP 25-JUN-2015 TO |
24-JUN-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 1016 |
| POP 25-JUN-2015 TO |
24-JUN-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 2001 |
| POP 25-JUN-2016 TO |
24-JUN-2017
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 2002 |
| POP 25-JUN-2016 TO |
24-JUN-2017
| N/A |
| (SAME AS PREVIOUS LOCATION) |
HQ0013
| 2003 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .