HORSLEY Awning SOW_Final.docx
DOCX document 31 KB Posted
- Attached to
- USCGC Horsley Awnings
- Solicitation number
- 2125405Y6174K96002
About this file
This is a Statement of Work (SOW) and associated solicitation for the replacement of canvas awnings on the USCGC DONALD HORSLEY, issued by the US Coast Guard Surface Forces Logistics Center. The requirement includes providing and installing two new canvas awnings - an Aft 01 Deck Sunshade (476 sq ft) and an Aft Main Deck Sunshade (750 sq ft) - both made with Royal Blue Top Gun Fabric and Gore Tex thread. The awnings must match existing construction, design, and material standards and include a minimum one-year warranty against manufacturing and installation defects.
The work is to be performed at the cutter's homeport in Galveston, TX during May 5-16, 2025, with specific dates to be determined after award. Working hours are Monday-Friday 0730-1600. The procurement will be awarded as a Firm Fixed Price Purchase Order using Best Value evaluation criteria based on complete requirements, meeting the required timeframe, and price. Contractors must have active SAM.gov registration and comply with base access/security requirements, including JCP certification for access to unclassified technical data. Site visits are encouraged for contractors to assess conditions and measurements, coordinated through EMC Grant Heeschen.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Smart Matrix Acquisition.GOV.pdf | ||
| Wage Rates.pdf | ||
| Solicitation -Supplies.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
PR 2125405Y6174K96002: CGC DONALD HORSLEY AWNING REPLACEMENT
1. SCOPE
1.1 The Contractor shall provide and install new canvas awnings on 01 and Main Deck Levels.
2. REFERENCES
154-WPC_613_201_1_-E, 154 FRC Rigging and Covers
3. REQUIREMENTS
3.1 Contractor shall provide Aft 01 Deck and Aft Main Deck Awning Canvas for the USCGC DONALD HORSLEY. For additional measurements and requirements, please coordinate site visit with Cutter Point of Contact, EMC Grant Heeschen (grant.m.heeschen@uscg.mil or 571-610-3220)
3.2 Awning shall match existing construction, design, and material standards.
3.3 Contractor shall install both awnings at the cutter’s homeport.
3000 Fort Point Rd Galveston, TX 77550
3.4 Period of Performance for installation is May 5-16, 2025 (actual dates will be determined after award). Working hours are Mon-Fri 0730-1600.
3.5 Installed awning shall be warrantied against manufacturing and installation defects for a minimum of one year.
3.6 Contractor shall comply with all required base access / security requirements, and applicable local, state, and federal safety and environmental regulations.
4. ADDITIONAL INFORMATION:
FAR 52.237-1 Site Visit: Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Controlled Unclassified Information: JCP certification is required for United States (U.S.) or Canadian contractors who wish to obtain access to unclassified technical data disclosing militarily critical technology with military or space application that is under the control of, or in the possession of the U.S. Department of Defense (DOD) or the Canadian Department of National Defense (DND).
ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify, or otherwise affect the terms of this contract.
ACCEPTANCE CRITERIA: Criteria evaluated for payment approval. The government will review work in its entirety prior to issuing invoice approval.
GOVERNMENT FURNISHED ITEMS AND SERVICES:
Utilities: The Government will provide water, and electricity for the Contractor as defined herein. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating in such a manner that precludes the waste of utilities, for example turning off the water faucets or valves after using the required amount to accomplish assigned work.
Electricity: The Government shall provide up to 20 amps and up to 120 volts of electrical services.
CONTRACTOR FURNISHED ITEMS, SERVICES AND RESPONSIBILITIES:
General: The Contractor shall furnish all equipment and services required to perform work under this SOW, other than those explicitly addressed in government furnished services.
The Contractor shall report to the designated work site on the date specified on the written notification by the Contracting Officer in the form of a signed order. No other individual has the authority to direct the Contractor to begin work, other than a warranted Contracting Officer.
Contractor Equipment: vehicles and tanks which holds or can hold hazardous materials that is left on Base Galveston premises must have the Contractor’s contact information placed in the driver’s side window indicating the Emergency Contact Number (answered 24/7/365) for the owner/operator of the vehicle. If a tank is left on the premises, the Emergency Contact Number (answered 24/7/365) for the owner/operator of the tank must be painted on the tank in a prominent location. The government will not assume liability for any vehicles/tanks left on Base Galveston property. The POC will coordinate approved storage locations.
General: The Contractor will be required to follow 29 CFR 1915 (OSHA Shipyard Industry Standard), 16 CFR1303, 29 CFR 1910, 29 CFR 1915.1025, 29 CFR 1926.62, 15 U.S.C. 2601, while performing this work at the U.S. Coast Guard Base Galveston.
Safety Equipment: The area where this work taking place requires hard hats, safety harnesses and safety glasses at all times. The Contractor will provide all required personnel safety equipment for their employees, including, but not limited to, safety helmet and safety glasses with side shields. All safety equipment shall meet OSHA standards. The Contractor shall follow all applicable OSHA guidelines and regulations.
EMERGENCY SERVICES: Base Galveston has 24-hour first aid and spill response. If necessary, the Contractor may call the Base Officer of the Day at 409-682-0142 for emergency situations. Injuries shall be reported immediately and followed up with a written report to the COR.
ENVIRONMENTAL PROTECTION REQUIREMENTS: Contractor shall abide by all federal, state, and local environmental regulations as published by the Environmental Protection Agency, 40 CFR (series) and any applicable Base Galveston plans/policies:
Transport and Disposal: The Contractor must properly remove and dispose of all materials in compliance with applicable Federal, state, and local environmental laws and regulations. Contractor assumes all responsibility and liability for the transport and proper disposal of materials and in particular the following requirements:
1. If a spill occurs, the Contractor shall notify the Cutter’s Officer of the Day immediately.
1. The Contractor MUST follow Base Galveston Response Plan, when operating on its property.
1. Written notification must be provided to the Base Environmental Specialist, Nick Duin (Nicholas.M.Duin@uscg.mil), of any activity that could potentially cause an environmental violation. Some examples of these activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.
1. The Contractor will be solely responsible for the transportation and proper disposal of waste material. Contractor must submit disposal sites to Base Galveston Environmental Department for site approvals and copies of Bill Of Lading or waste manifests. If Contractor elects to use dumpsters for holding or transportation of waste, dumpsters must be covered to prevent waste from becoming airborne.
1. Only the Base Galveston Environmental Dept is authorized to sign hazardous waste manifest.
File details come from the government source that posted it. Updated .