Holloman BEAR Pad Equipment Rental SOW_Updated (002).pdf
PDF 216 KB Posted
- Attached to
- Heavy Equipment Rental Federal contract opportunity
- Solicitation number
- FA480121Q0007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q and A for Heavy Equipment Rental.docx | DOCX document | |
| Q and A for Heavy Equipment Rental.docx | DOCX document | |
| Holloman BEAR Pad Equipment Renta SOW Updated (003).pdf | ||
| Solicitation - FA480121Q0007.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
Holloman AFB, HEAVY EQUIPMENT RENTAL
03 Dec 2020
Part I – General Contract Requirements
1. General Requirements.
1.1. The work to be accomplished shall include; delivery, limited field service (Reference section 3 of SOW), and pick-up of heavy equipment. Operators are not included.
1.2. Area for delivery shall be Holloman Air Force Base, New Mexico 88330 in a staging area within the 635 MMS Compound, to be further designated by Point of Contact
(POC) at the time of delivery.
1.3.
1.4. Delivery and Pick Up of heavy equipment shall be coordinated with the Contractor and the POC two (2) business days in advance between the hours of 7:00 am and 7:00 pm
Monday-Sunday. Meeting time between POC and the Contractor for delivery and pickup shall be agreed to seven (7) days in advance to minimize inconvenience to both parties. Equipment shall be delivered through the Commercial gate to be scanned.
1.5. Contractor shall deliver all equipment with a full tank of fuel and it will be returned by the Government with a full tank of fuel.
1.6. Initial delivery and a pick-up inspection shall be conducted at the delivery site and will include pictures and an inspection log detailing existing discrepancies as agreed upon by both parties. Acceptance for the delivery shall be made after proper documentation (i.e.
pictures, list of damages, and other paperwork required to clearly document the equipment’s general condition) is received by the POC.
1.7. All deliveries under this agreement shall be accompanied by an original delivery ticket or rental slip with the number of hours on the piece of equipment listed. All equipment replacements and changes throughout the life of the contact will be updated and annotated on new delivery tickets. Contractor shall provide a copy of said ticket or rental slip to the POC on site at the time of delivery. It shall contain the following:
Name of Supplier and POC
Contract Number
Date of Order
Date of Delivery
Detailed description of equipment (year, make, model)
Serial number or VIN of equipment
2. Equipment Requirements.
QTY EQUIPMENT TYPE DESCRIPTION Estimated
DURATION
(mo)
Estimated
PROJECTED
USAGE/VEHICLE (hrs)
2 Dump Truck, 20T Freightliner 10 or 13 speed or equal
2 320
(160 hrs per unit per month)
1 Grader CAT 120 or equal w/12 ft blade width
2 320
(160 hrs per unit per month)
1 Front End Loader, 4
CY
CAT 950M or equal 2 320
(160 hrs per unit per month)
1 Water Truck, 4,000
Gal
Freightliner w/PTO drive or equal
2 320
(160 hrs per unit per month)
1 Excavator CAT 320 or equal 1 160
(160 hrs per unit per month)
1 Compact Track Loader CAT 279D3 or equal 2 320
(160 hrs per unit per month)
5 Generator Trailer
(Light Cart)
6kW Generator, 4,200W, Diesel
2 160
(80 hrs per unit per month)
1 Sheep’s Foot Roller Cat Model 815 or equivalent
1 80
(80 hrs per unit per month)
1 Smooth Drum
Vibratory Roller
Cat Model CB7 or equivalent
2 160
(80 hrs per unit per month)
2.1. On/ About Timeline of use is as follows: Late February - April: All equipment shall be in place 15 March 2021, picked up 28 April 2021.
2.2. All equipment shall operate off of DSS (construction grade) Diesel fuel.
2.3. The projected usage included above are estimates per individual piece of heavy equipment.
2.4. At the time of delivery, all equipment shall be in good, working order in accordance with all applicable manufacturers’, OSHA, and DOT requirements.
3. Field Service (Repair & Preventative Maintenance).
3.1. Contractor shall schedule the delivery and all maintenance of heavy equipment between the hours of 7:00 A.M. – 7:00 P.M. Monday-Saturday, excluding federal holidays and
Sundays. In the event a repair is required, the contractor shall repair within 48 hours from the time the repair call is placed. Contractor shall provide a letter containing a point of contact’s name and phone number for a maintenance contact.
3.2. Contractor shall provide the name of a qualified mechanic, licensed by the State of New
Mexico to complete field service repairs, as required, in accordance with the timelines specified above.
3.3. If field service is determined by the POC and the Contractor to be impractical, or the rented equipment remains inoperable, Contractor shall provide a suitable substitute, acceptable to the POC, within 24 hours.
3.4. All repairs due to normal wear-and-tear in operation of heavy equipment will be the responsibility of the Contractor. Normal wear and tear is defined as tire tread wear, body panels coming loose, rock chips, leaks and other issues occurring during operation of the vehicle in accordance with the manufacturer’s published operation’s manual. If it is deemed that damage is caused by negligence or operator error, the Contractor shall provide a minimum of three (3) repair quotes to the contracting officer for reimbursement.
3.5. Contractor is responsible for all routine preventative maintenance associated with the equipment rentals and shall provide a detailed maintenance schedule for each individual piece of equipment at the time of delivery. If the preventative maintenance requires a piece of equipment to be down for more than eight (8) hours the Contractor shall provide a suitable substitute, acceptable to the contracting officer’s designated representative during the maintenance period.
3.6. Contractor shall remove all product waste associated with the field services provided.
3.7. Contractor shall provide a daily inspection checklist for each piece of equipment.
3.8. Contractor shall provide all items for operator maintenance (i.e. grease, grease guns, etc.) and be responsible for disposal of these items.
File details come from the government source that posted it. Updated .