PS_for_3D_Printer_Final_(1_Apr_15).pdf
PDF 151 KB Posted
- Solicitation number
- HILL-AFB-3D-PRINTER-ULTRASONIC-WASHER
About this file
Purchase Specifications for 3D Printer 4 Option Years of Extended Warranty Maintenance
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Purchase_Spec_for_Ultrasonic_Wash_Tank.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchase Description and
Specifications for
Fused Deposition Modeling
3D Production System
309 MXSG
March 26, 2015
1. DESCRIPTION OF REQUIREMENTS:
3D printer similar to Stratasys Fortus 900mc, for the 309th Maintenance Support Group, that meets the required specifications listed in paragraph two.
2. ACCESSORIES AND SPECIFICATIONS:
The 3D printer must meet the following specifications and processes:
2.1. Fused Deposition Modeling (FDM).
2.2. Dual material canister bays and auto changeover.
2.3. Operating system software and install disks for stand-alone operations.
2.4. Build Envelope 36 x 24 x 36 inch.
2.5. Achievable Accuracy +/- .0035 inch or +/- .0015 in/in whichever is greater.
2.6. Full set up and capability to operate the following materials.
2.6.1 ABS-M30 material.
2.6.2. Polycarbonate (PC) model material.
2.6.3. Nylon model material.
2.6.4. ULTEM 9085 or equivalent material option with Purge Ledge.
ABS-ESD7 material.
2.6.4.1. In accordance with Military Specification 1501, AMS 2460, Douglas Process Specification 9.71
2.6.4.1.1. Able to withstand hydrofluoric acid at 10% at 70 degrees Fahrenheit
2.6.4.1.2. Able to withstand chromic acid at 30-40% at 140 degrees Fahrenheit
2.6.4.1.3. Able to withstand sulfuric acid at 10-30% at 140 degrees Fahrenheit
2.6.4.1.4. Able to withstand sodium hydroxide at 40% at 140 degrees Fahrenheit
2.6.4.1.5. Withstand continuous and cyclic use.
2.7. User manuals.
2.8. Startup Kit (tools used for operation, materials, tip change, and basic maintenance)
2.8.1. Metal tip-wipe brush
2.8.2. Large platform cleaning brush
2.8.3. Head fixture tool
2.8.4. Material Clippers
2.8.5. Calibration tools
2.8.6. Needle-nose pliers
2.8.7. Long-handled paint chisel scraper
2.8.8. Philips screwdriver
2.8.9. Allen head screwdriver
2.8.10. General purpose tweezers
2.8.11. Exacto knife
2.8.12. Magnetic handle pick set
2.8.13. Allen wrench
2.8.14. Gloves
2.8.15. Sleeve guards
3. GENERAL REQUIREMENTS:
General requirements delivered by supplier shall include:
3.1. On-site installation and system set-up
3.2. Delivery, set up, initial calibration and functional testing
3.3. Maintenance, calibration, and repair support for requests with repair start-up within three business days
3.4. Initial start-up System and/or Software provided on disk.
3.5. Technical support for requests with response time within 48 hours
3.6. Updates to system and/or software provided on disk, for stand-alone operations, as commercial upgrades occur.
3.7. 12-Month parts and labor warranty
4. PRODUCT SPECIFICATIONS:
BASE SYSTEM
CONFIGURATION
Build Envelope (XYZ)
36 X 24 X 36 inches Platen supports two build zones for either a small or large build sheet
Full set up and capability to operate listed materials
ABS-M30 Material ABS-ESD7 Material Polycarbonate Material Nylon Material ULTEM 9085 Material or equivalent
Achievable Accuracy
Parts produced within an accuracy of +/- .0035 inch or +/- .0015 inch per inch whichever is greater
5. CONTRACTUAL REQUIREMENTS:
5.1. Delivery
The contractor shall deliver, without charge, the equipment to the following address located at Hill Air Force Base no sooner than August 24, 2015 and no later than September 14, 2015:
OO-ALC/MXSG
5909 Southgate Dr.
Bldg. 214 Hill AFB, Utah 84056 ATTN: Taylor Gittins or Gregory Wescott
5.1.1. On-site installation, system set-up and calibration shall be provided, without charge.
5.1.2. Technical Data
5.1.2.1. User Manual
6. WARRANTY:
The contractor shall provide, without charge, 12 months parts, labor, and calibration warranty. The contractor shall also provide program updates, on disk for stand-alone, for this equipment.
Also requesting the option to purchase up to four years of extended parts and labor warranty and maintenance and repair.
7. SECURITY REQUIREMENTS
The contractors coming onsite once or twice within the year will only require a one day visitor pass or weekly pass. The contractor shall contact GR two days ahead of time letting him/her know the day of the visit. The sponsor is authorized to arrange visit authorization through Pass and Identification (ID) office. Pass and ID office is located near Southgate Entrance, Phone: 801-777-8631 Office Hours:
0700-1630. The contractor shall be a U.S. Citizen. Proof of ID required: Driver’s license. If driving on base, the contractor shall supply Gate Security with proof of drivers’ insurance and registration. The sponsor shall be responsible to escort the contractor while on base.
| Purchase Description |
| and |
| 309 MXSG |
| March 26, 2015 |
| 2. ACCESSORIES AND SPECIFICATIONS: |
| 3. GENERAL REQUIREMENTS: |
| General requirements delivered by supplier shall include: |
| 4. PRODUCT SPECIFICATIONS: |
| 5.1. Delivery |
| 7. USECURITY REQUIREMENTS |
| The contractors coming onsite once or twice within the year will only require a one day visitor pass or weekly pass. The contractor shall contact GR two days ahead of time letting him/her know the day of the visit. The sponsor is authorized to arran... |
File details come from the government source that posted it. Updated .