Highway Sweeping WLS D-5 2021.pdf
PDF 172 KB Posted
- Solicitation number
- RFB 605 2100000699 1
- Issued by
- Kentucky
About this file
This is a Highway Sweeping Work Location Sheet for District 5 prepared by the Kentucky Department of Transportation. The document outlines sweeping services required across multiple interstate and state routes in Bullitt, Shelby, and Jefferson counties. The project encompasses 230.913 total sweeping miles distributed across three cycling categories: 3-cycle routes (1.42 miles), 6-cycle routes (12.655 miles), 12-cycle routes (158.608 miles), and 18-cycle routes (58.23 miles). Services include sweeping all pavement areas, curblines, bridges, barrier walls, overhead bridges, tunnels, and ramps at specified locations. The maximum time permitted to complete a full sweeping cycle is 21 calendar days, while designated partial sweeping cycles must be completed within 5 calendar days. Routes include I-65, I-64, I-71, I-264, I-265, and KY 841, with detailed milepost references and specific descriptions of work required at each location.
The document provides no information regarding pricing terms, set-asides, incumbent contractors, funding sources, or contract award details. This work location sheet serves as a technical specification document outlining the scope and geographic distribution of sweeping services required, with the number of cycles indicating the frequency of service delivery throughout the contract period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Annual_Affidavit_Rev__August_2020.pdf | ||
| Vendor Bid Sheet.xls | XLS spreadsheet | |
| District Map.pdf | ||
| Final_RFB_605_2100000699_1_SO_FORM.PDF | ||
| How to Respond to Online Bid through Kentucky Vendor Self....pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Highway Sweeping Work Location Sheet District 5
Route County Project Number From To Sweeping Miles # of Cycles Description
I-65 Bullitt FE01 015-0065 Rest Area Exit Ramp Rest Area Entrance Ramp 0.7 3 Sweep all pavement areas at the Rest Area
112-114 (MP 113.650) (MP 112.952)
I-64 Shelby FE01 106-0064 Rest Area Exit Ramp Rest Area Entrance Ramp 0.72 3 Sweep all pavement areas at the Rest Area
028-029 (MP28.250) MP28.970
Subtotal 3 Cycles Route(s) 1.42
KY 841 Jefferson FE01 056-0841 US 31W I-65 000-010 (MP 0.000) (MP 10.000) 2.45 6 Sweep curblines, bridges & barrier walls
I-265 Jefferson FE01 056-0265 I-65 I-71 7.105 6 Sweep curblines, bridges & barrier walls
010-035 (MP 10.000) (MP 35.000)
KY 841 Jefferson FJ11 056-0841 I-71 Barrier Wall Cross Over 3.1 6 Sweep curblines, bridges & barrier walls 035-038 (MP 35.000) (MP 38.100) Including Tunnels and ramps
Subtotal 6 Cycles Routes 12.655
I-264 Jefferson FE01 056-0264 I-64 I-71 80.36 12 Sweep curblines , Bridges, barrier walls and 000-024 (MP 0.000) (MP 23.055) overhead bridges at KY 864, KY 1703, KY 1932
I-64 , US 60 and US 42
I-64 Jefferson FE01 056-0064 Story Avenue Bridge 0.047 mile West of Browns Lane 3.525 12 Sweep all bridges and tunnels
006-012 (MP 6.303) (MP 11.875)
I-64 Jefferson FE01 056-0064 0.700 mile East of I-264 1.0 miles West of I-265 17.222 12 Sweep curblines , Bridges, barrier walls and 012-018 (MP 12.943) (MP 17.916) overhead bridges at Blankenbaker Parkway
(KY 913)
I-64 Jefferson FE01 056-0064 English Station Rd Bridge Shelby Co Line 9.178 12 Sweep curblines, bridges & barrier walls
019-024 (MP 19.573) (MP 23.974)
I-65 Bullitt FE01 015-0065 Hardin Co Line 0.700 mile North of Hardin Co Line 1.597 12 Sweep curblines, bridges & barrier walls
103-104 (MP 103.308) (MP 103.980)
I-65 Bullitt FE01 015-0065 Beginning of the Roadway
Bridge End of the Railroad Bridge 0.288 12 Sweep curbline of the railroad bridge and the roadway bridge
112-113 (MP 112.517) (MP 112.654)
I-65 Bullitt FE01 015-0065 0.2 Mile South o KY 480 0.2 Mile North of KY 44 3.588 12 Sweep curblines, bridges, barrier walls and
115-117 (MP 115.321) (MP 116.865) the overhead bridges at KY 44, KY 245 and KY1526
I-65 Bullitt FE01 015-0065 Beg. Of Barrier Wall End of Barrier Wall 0.138 12 Sweep the barrier wall ( Northbound)
118-119 (MP 118.180) (MP 118.042)
I-65 Jefferson FE01 056-0065 0.8 Mile North of the 0.245 Mile South of the 28.098 12 Sweep curblines, bridges, barrier walls and 123-132 Bullitt County Line Phillips Lane Bridge overhead bridges at I-265, KY 1065, KY 1631
(MP 123.900) (MP 131.289) and all ramp bridges at I-265
I-71 Jefferson FE01 056-0071 I-64 I-264 4.763 12 Sweep bridges and curblines
000-005 (MP 0.000) (MP 4.966)
I-64 Shelby FE01 106-0064 Beg. Of Barrier Wall End of Barrier Wall 9.851 12 Sweep curblines, bridges barrier walls and 023-033 (MP 23.974) (MP 32.875) overhead bridges at KY 1848 and KY 55
Subtotal 12-Cycle Routes 158.608
I-65 Jefferson FE01 056-0065 0.254 Mile South of the Kennedy Bridge 26.21 18 Sweep all paved areas outside of roadway 131-138 Phillips Lane Bridge (MP 137.300)
(MP 131.289)
I-64 Jefferson FE01 056-0064 Sherman Minton Bridge Melwood Avenue 32.02 18 Sweep all paved area outside of roadway
000-007 (MP 0.000) (MP 6.450)
Subtotal 18- Cycles Routes 58.23
Total Sweeping Miles 230.913
Maximum time to complete a Full Sweeping Cycles : 21 Calendar Days Maximum time to complete a Designated Partial Sweeping Cycle: 5 Calendar Days