This file is a Question and Answers document addressing clarifications on a Hand Held Terminals and SOTI Software Request for Information (RFI) issued by the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground. The RFI concerns the management and support of approximately 2,709 existing handheld terminal endpoints deployed across DeCA's worldwide enterprise, including 235 commissaries in 45 states, 13 countries, and two U.S. territories.

The Q&A responses clarify that several detailed requirements will be deferred to final solicitation documents, including exact model versions and geographic distribution of existing endpoints, specific license entitlements and current support contract details, quantitative service level agreements for depot and advance exchange support, spare-pool sizing and ownership assumptions, and specific OCONUS shipping and customs constraints. Regarding cybersecurity and compliance, the RFI establishes only high-level parameters, with Risk Management Framework (RMF) and Authority to Operate (ATO) status, eMASS management, STIG compliance, and workforce certifications to be fully defined later. The RFI indicates the Government's baseline requirement centers on an annual subscription licensing model for SOTI MobiControl software, though vendors are encouraged to demonstrate flexibility in supporting both perpetual and annual subscription options to enable dynamic seat scaling and prevent double-charging during hardware refreshes. Refresh quantities presented in the RFI are illustrative planning figures rather than guaranteed purchase orders, and vendors may submit multiple responses with separate Rough Order of Magnitude estimates for alternative architectural or licensing solutions.

View the file

Other files

File Type Posted
RFI.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Hand Held Terminals / SOTI Software RFI

- Included from previous Question and Answer.

- New question and answer addition.

Comment / QuestionTechnical Answer/Remarks
1For the approximately 2,709 existing endpoints, can the Government provide a model/version and geographic distribution, current support and SOTI license/entitlement inventory, and existing contract expiration dates sufficient to scope a renewal and worldwide service?Exact model & version, specific distribution and allocation, the specific existing license entitlements and support contract detail will be addressed in the final requirements documents
2For depot and advance exchange, what are the required geographic coverage, response and replacement times, shipping responsibility, spare-pool assumptions and any restrictions on OCONUS movement?The RFI defines the high-level operational model for hardware depot support and advance exchange across DeCA’s worldwide enterprise (235 commissaries in 45 states, 13 countries, and 2 U.S. territories) and establishes contractor responsibility for two-way shipping and centralized spare-pool management. However, specific performance metrics including quantitative replacement timelines (SLAs), spare-pool sizing/ownership, and specific OCONUS shipping/customs constraints are not defined in the RFI and will be addressed in the final requirements documents.
3What hosting boundary and current authorization status apply to the SOTI production/test environment? Which RMF/ATO, eMASS, STIG and workforce certification tasks remain the contractor's responsibility, and will Government-furnished information or access be available?The technical questions concerning hosting boundaries, Risk Management Framework (RMF) / Authority to Operate (ATO) status, eMASS management, Security Technical Implementation Guide (STIG) compliance, and cyber workforce certifications are highly detailed implementation requirements. The current RFI provides only high-level parameters for system hosting and administration, meaning these granular security, compliance, and access responsibilities are not defined at this stage. This level of detail will be fully addressed in the final requirements documents.
4Please confirm whether refresh quantities are illustrative optional scenarios rather than guaranteed orders, and whether the Government wants separate ROM assumptions for each scenario and for existing endpoints.The refresh quantities discussed in the RFI are illustrative planning figures rather than guaranteed purchase orders. While Section 4.3.4 outlines straightforward unit- and component-level cost benchmarks rather than mandatory multi-scenario models, the RFI explicitly allows vendors to submit multiple responses or quotes for alternative solutions. Vendors are therefore permitted to provide separate Rough Order of Magnitude (ROM) estimates if they propose distinct architectural, licensing, or hardware deployment alternatives.
5License Requirement: Is DeCA looking to renew its existing SOTI MobiControl licenses, purchase new licenses, or both?While the baseline requirement is structured around an annual subscription model (as noted in Section 3.1), Section 4.2.1 of the RFI explicitly requests that vendors demonstrate flexibility by describing their ability to support, manage, and transition between both perpetual and annual subscription licensing models. This ensures DeCA can scale seats dynamically and prevent double-charging during hardware refreshes.