This Request for Proposal solicits scientific, operations, and administrative resources to assist the National Institutes of Health in meeting its operational objectives. Services required include research support, project management, administrative assistance, and information technology services. Multiple awards are anticipated to be made as indefinite delivery/indefinite quantity contracts with a five year ordering period and primarily fixed price task orders. The anticipated minimum value for the base period is included in Sample Task Order 1. Proposals are due by April 14, 2021, with awards anticipated to be made on that date. Pricing must be submitted in accordance with instructions and rate limitations apply to direct salary costs.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP Number : HHS-NIH-NIDA-SOL-2021-001

- 3 -

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

1. GENERAL INFORMATION

a. INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION [FAR Provision 52.215-1 (January 2017)]

a. Definitions. As used in this provision--

"Discussions" are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer's discretion, result in the offeror being allowed to revise its proposal.

"In writing", "writing", or "written" means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

"Proposal modification" is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

"Proposal revision" is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.

"Time," if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.

b. Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).

c. Submission, modification, revision, and withdrawal of proposals.

1. Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror. Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.

2. The first page of the proposal must show--

i. The solicitation number;

ii. The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

iii. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

iv. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and

v. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.

3. Submission, modification, revision, and withdrawal of proposals.

- 4 -

(i)Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.

(ii) (A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--

(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m.

one working day prior to the date specified for receipt of proposals; or

(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or

(3) It is the only proposal received.

(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.

(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.

(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.

(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.

(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.

(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.

- 5 -

(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).

(e) Restriction on disclosure and use of data.

(1) The proposal submitted in response to this request may contain data (trade secrets; business data (e.g., commercial information, financial information, cost and pricing data); and technical data) which the offeror, including its prospective subcontractor(s), does not want used or disclosed for any purpose other than for evaluation of the proposal. The use and disclosure of any data may be so restricted; provided, that the Government determines that the data is not required to be disclosed under the Freedom of Information Act, 5 U.S.C. 552, as amended, and the offeror marks the cover sheet of the proposal with the following statements, specifying the particular portions of the proposal which are to be restricted:

"Unless disclosure is required by the Freedom of Information Act, 5 U.S.C. 552, as amended, (the Act) as determined by Freedom of Information (FOI) officials of the Department of Health and Human Services (HHS), data contained in the portions of this proposal which the offeror has specifically identified by page number, paragraph, etc. as containing restricted information shall not be used or disclosed except for evaluation purposes.

The offeror acknowledges that HHS may not be able to withhold a record (e.g. data, document, etc.)

nor deny access to a record requested pursuant to the Act and that the HHS's FOI officials must make that determination. The offeror hereby agrees that the Government is not liable for disclosure if HHS has determined that disclosure is required by the Act.

If a contract is awarded to the offeror as a result of, or in connection with, the submission of this proposal, the Government shall have right to use or disclose the data to the extent provided in the contract. Proposals not resulting in a contract remain subject to the Act.

The offeror also agrees that the Government is not liable for disclosure or use of unmarked data and may use or disclose the data for any purpose, including the release of the information pursuant to requests under the Act. The data subject to this restriction are contained in pages ( insert page numbers, paragraph designations, etc. or other identification)."

(2) In addition, the offeror must mark each page of data it wishes to restrict with the following statement:

"Use or disclosure of data contained on this page is subject to the restriction on the cover sheet of this proposal or quotation."

(3) Offerors are cautioned that proposals submitted with restrictive statements or statements differing in substance from those cited above may not be considered for award. The Government reserves the right to reject any proposal submitted with a nonconforming statement(s).

(f) Contract award.

(1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.

(2) The Government may reject any or all proposals if such action is in the Government's interest.

(3) The Government may waive informalities and minor irregularities in proposals received.

(4) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may

- 6 -limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.

(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government's best interest to do so.

(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government.

(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.

(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.

(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:

(i) The agency's evaluation of the significant weak or deficient factors in the debriefed offeror's offer.

(ii) The overall evaluated cost or price and technical rating of the successful and debriefed offeror and past performance information on the debriefed offeror.

(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection;

(iv) A summary of the rationale for award.

(v) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.

(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.

(End of Provision)

b. NAICS CODE AND SIZE STANDARD

Note: The following information is to be used by the offeror in preparing its Representations and Certifications (See Section K of this RFP), specifically in completing the provision entitled, SMALL BUSINESS PROGRAM REPRESENTATION, FAR Clause 52.219-1.

1. The North American Industry Classification System (NAICS) code for this acquisition is 541690.

2. The small business size standard is $16.5 Million.

THIS REQUIREMENT IS NOT SET-ASIDE FOR SMALL BUSINESS. However, the Federal Acquisition Regulation (FAR) requires in every solicitation, (except for foreign acquisitions) the inclusion of the North

- 7 -

American Industry Classification System (NAICS) Code and corresponding size standard which best describes the nature of the requirement in the solicitation.

c. TYPE OF CONTRACT AND NUMBER OF AWARDS

1. It is anticipated that multiple awards will be made from this solicitation and that the award(s) will be made on/about April 14, 2021.

2. It is anticipated that the award(s) from this solicitation will be a multiple-year IDIQ contract with an anticipated five (5) year ordering period, and that primarily fixed price task orders with reimbursable travel costs will be used. In accordance with FAR Part 16, task orders issued against these contracts can be Fixed Price, Cost-Reimbursement and/or Time and Materials/Labor Hour type contracts.

3. FAR 16.301-3 limits use of any contract type, other than firm-fixed price, to a contractor whose accounting system is adequate for determining costs applicable to the contract. To be considered for an award under this solicitation, the Offeror is required to certify, in its Business Proposal, the adequacy of its accounting system. See the paragraph entitled, Adequate Accounting System in Section L.2. Business Proposal Instructions in this solicitation for additional information about this certification.

d. TASK ORDERS UNDER MULTIPLE AWARD INDEFINITE DELIVERY CONTRACTS

a. General

The Contractor will be required provide services under the resultant contract only in performance of task orders and modifications to task orders signed by the Contracting Officer. Costs not attributed to the performance of a specific task order shall not be allowed without the prior written consent of the Contracting Officer. The Contractor will commence performance upon the receipt of a Task Order signed by the Contracting Officer. Costs for the preparation of Task Order proposals shall not be reimbursed as a direct cost under the resultant contract.

One or more task orders may be issued during the performance period of the resultant contract. If a contractor responds to a Task Order Request for Proposal (TORFP) and is the successful offeror, that Contractor will be required to accept and perform the task order issued by the Contracting Officer within the scope of the resultant contract. The government has no obligation to issue any task orders, beyond the minimum identified in SECTION B of the contract. In the event of any inconsistency between any task order and the contract, the contract shall control.

In accordance with the Federal Acquisition Streamlining Act, the Contracting Officer will provide each Contractor a "Fair Opportunity" to be considered for each Task Order awarded in excess of $3,500, unless one of the conditions in FAR 16.505(b)(2) applies.

The competition requirements in FAR Part 6, and the policies in FAR Subpart 15.3, DO NOT APPLY to the task ordering process. For each requirement under the resultant contract, the government intends to provide each Contractor a fair opportunity for consideration of a task order. The Contracting Officer shall:

1. Issue a notice of intent to award a task order for services to all resultant Contractors within a technical area covered by the task order requirement. To satisfy this requirement, the Contracting Officer will provide an e-mail notifying all qualified Contractors of the requirement. The e-mail will identify how the details concerning the requirement, including a description of the work and selection criteria, will be provided, i.e. attached to the e-mail, posted on a website. Contractors will be asked to submit a response to the notice of intent, advising the government of their intent to submit a proposal or quote;

2. Afford all Contractors, within the technical area covered by the task order requirement, who are responding to the notice, a fair opportunity to submit an offer and have that offer fairly considered;

3. Consider price and cost under each order as one of the factors in the selection decision;

- 8 -

4. Keep submission requirements to a minimum;

5. Consider past performance on earlier task orders under this contract to the maximum extent possible.

Past performance considerations shall include, but not be limited to, the Contractor's performance regarding completeness, accuracy, clarity, timeliness and cost control. If a Contractor has no past performance on any earlier task order, past performance will be considered through other sources, such as the Contractor's original proposal.

In addition to the above, for all orders exceeding $6 million, the Contracting Officer will consider all requirements set forth in FAR 16.505(b)(1)(iv).

a. Exceptions to Fair Opportunity

Contractors may not be given an opportunity to be considered for requirements in excess of $3,500 if one of the following conditions applies:

1. The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays.

2. Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized.

3. The order must be issued on a sole-source basis in the interest of economy and efficiency because it is a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order.

4. It is necessary to place an order to satisfy a minimum guarantee.

b. Requesting Task Order Proposals

The Contracting Officer or a designated individual may solicit responses to requirements from Contractors within a technical area covered by a task order requirement in writing.

A Task Order Request for Proposals (TORFP) will be prepared and issued for each task order requirement.

All contract clauses contained the resultant contract shall be incorporated in the TORFP and the resultant task order. If conflicts exist between the contract clauses and the information outlined in the task order, the resultant contract language takes precedence over the information in the task order.

c. Competitive Ordering Process

1. All Contractors within a technical area will receive e-mail notification advising of the availability of each proposed task order requirement. All proposed task orders will incorporate all terms of the resultant contract unless otherwise specified in the proposed task order.

2. Contractors will be provided an adequate time to prepare and submit responses based on the Contracting Officer's consideration of the estimated dollar value and complexity of proposed task order. Responses will not be considered a proposal as defined in FAR Part 15. However, the Contractor shall provide information sufficient for consideration in accordance with FAR Part 16. Each TORFP will indicate the criteria for the evaluation of proposals. The responses shall demonstrate capability for each criterion to be evaluated. The Contractors maybe asked to demonstrate the following as appropriate:

● Understanding of the requirements;

● Experience and capability on similar tasks;

- 9 -

● Methods and procedures for satisfying the requirements with a discussion of potential problems to be encountered and proposed solutions and/or risk mitigation strategies.

● Procedures for assuring quality of work, products, and deliverables;

● Plan for managing the task order, including meeting requirements and schedules, and performance measures (if applicable);

● Staffing plan with skill levels and level of effort for each individual proposed. Generally, resumes will be required for proposed personnel (if not previously submitted);

● Letters of commitment;

● References to evaluate past performance; and

● Cost/Price to perform the task order.

d. Evaluation and Award of Task Order Proposals

The Government will evaluate the Task Order proposals against the requirements of the TORFP.

Specifically, the technical evaluation factors, cost/price, past performance and any other factor specifically identified in the TORFP will be used for evaluation of each proposal. In addition, the TORFP will identify the basis for selecting a contractor for award. Generally, technical factors will be significantly more important than price and other factors. However, each TORFP will specify how the award decision will be made.

Upon completion of evaluations, the Contracting Officer will issue a task order to the Contractor whose proposal is most advantageous to the government.

The Contracting Officer will notify the IDIQ Contractors of the selection decision.

e. COMMITMENT OF PUBLIC FUNDS

The Contracting Officer is the only individual who can legally commit the Government to the expenditure of public funds in connection with the proposed procurement. Any other commitment, either explicit or implied, is invalid.

f. PROMOTING EFFICIENT SPENDING

On September 21, 2011, the Office of Management and Budget issued Memorandum M-11-35, entitled, "Eliminating Conference Spending and Promoting Efficiency in Government," emphasizing the President's priority to ensure that the Government operates with the utmost efficiency and eliminates unnecessary or wasteful spending. This was followed by the Executive Order on Delivering an Efficient, Effective, and Accountable Government ( EO 13576) and the Executive Order on Promoting Efficient Spending ( EO 13589).

On January 3, 2012, the Department of Health and Human Services (DHHS) issued the memorandum "HHS Policy on Promoting Efficient Spending: Use of Appropriated Funds for Conferences and Meetings, Food, Promotional Items, and Printing, and Publications" (See http://www.hhs.gov/asfr/ogapa/acquisition/ effspendpol_memo.html).

In support of these directives, the NIH issued a January 30, 2012, Memorandum, entitled, "NIH Guidance Related to the HHS Policies on Promoting Efficient Spending: Use of Appropriated Funds for Conferences, Conference Grants and Meetings, Food, Promotional Items, and Printing and Publications." (See http:// oamp.od.nih.gov/)

Any contract awarded as a result of this solicitation will:

● Specifically prohibit the use of contract funds for the provision of food for meals, light refreshments and beverages for any NIH funded meeting or conference; and

- 10 -

● Limit the procurement of meeting space, promotional items, printing and publications.

g. COMMUNICATIONS PRIOR TO CONTRACT AWARD

Offerors shall direct all communications to the attention of the Contract Specialist or Contracting Officer cited on the face page of this SOLICITATIONS. Communications with other officials may compromise the competitiveness of this acquisition and result in cancellation of the requirement.

h. RELEASE OF INFORMATION

Contract selection and award information will be disclosed to offerors in accordance with regulations applicable to negotiated acquisition. Prompt written notice will be given to unsuccessful offerors as they are eliminated from the competition, and to all offerors following award.

i. REFERENCE MATERIALS

The Government issued RFI’s as it developed its automation system to provide the specifications and set expectations with industry to support NIH’s commitment to fair competition, in accordance with FAR 5.401. The SOAR requirement includes a digital process automation component and necessitate that Vendors can successfully integrate with the NIH-developed web services. The web services will govern the lifecycle of requests against the SOAR contract, from the NIH requesting New Task Orders (TOs) through TO closure. In addition, travel requests, requests to address Contractor concerns, request to revise TOs, requests to exercise pre-negotiated options, and invoicing will be included in the planned integrations between NIH and future SOAR Vendors. The link to the RFI information:

https://beta.sam.gov/opp/6c5ab5cb5b3742c68c9dbeeedb05005a/view

Failure of offerors to examine the reference materials prior to proposal preparation and submission will be at the offeror's risk.

j. PREPARATION COSTS

This RFP does not commit the Government to pay for the preparation and submission of a proposal.

k. SERVICE OF PROTEST (SEPTEMBER 2006) - FAR 52.233-2

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Brian O'Laughlin, Contracting Officer Office of Acquisitions National Institute on Drug Abuse 301 North Stonestreet Ave Room 03D08 Bethesda, MD 20852 MSC 6012

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of Provision)

2. INSTRUCTIONS TO OFFERORS

- 11 -

a. GENERAL INSTRUCTIONS

INTRODUCTION

The following instructions will establish the acceptable minimum requirements for the format and contents of proposals. Special attention is directed to the requirements for technical and business proposals to be submitted in accordance with these instructions.

1. Contract Type and General Clauses

It is contemplated that an Indefinite Delivery/Indefinite Quantity (IDIQ) type contract will be awarded (see General Information). Any resultant contract shall include the clauses applicable to the selected offeror's organization and type of contract awarded as required by Public Law, Executive Order, or acquisition regulations in effect at the time of execution of the proposed contract.

2. Authorized Official and Submission of Proposal

The proposal must be signed by an official authorized to bind your organization and must stipulate that it is predicated upon all the terms and conditions of this RFP. Your proposal shall be submitted in the number of copies, to the addressees, and marked as indicated in the Attachment entitled, PACKAGING AND DELIVERY OF PROPOSAL, Part III, Section J hereof. Proposals will be typewritten, paginated, reproduced on letter size paper, printed/copied double-sided, on at least 30 percent post consumer fiber paper, as required by FAR 4.302(b), and will be legible in all required copies. To expedite the proposal evaluation, all documents required for responding to the SOLICITATION should be placed in the following order:

I. COVER PAGE

Include RFP title, number, name of organization, DUNS No., identification of the proposal part, and indicate whether the proposal is an original or a copy.

II. TECHNICAL PROPOSAL

It is recommended that the technical proposal consist of a cover page, a table of contents, and the information requested in the Technical Proposal Instructions and as specified in SECTION J, List of Attachments.

III. BUSINESS PROPOSAL

It is recommended that the business proposal consist of a cover page, a table of contents, and the information requested in the Business Proposal Instructions and as specified in SECTION J, List of Attachments.

3. Proposal Summary and Data Record (NIH-2043)

The Offeror must complete the Form NIH-2043, attached, with particular attention to the length of time the proposal is firm and the designation of those personnel authorized to conduct negotiations. (See SECTION J, Attachment entitled, PROPOSAL SUMMARY AND DATA RECORD).

4. Separation of Technical and Business Proposals

The proposal must be prepared in two parts: a "Technical Proposal" and a "Business Proposal." Each of the parts shall be separate and complete in itself so that evaluation of one may be accomplished independently of, and concurrently with, evaluation of the other.

5. Alternate Proposals

- 12 -

You may, at your discretion, submit alternate proposals, or proposals which deviate from the requirements; provided, that you also submit a proposal for performance of the work as specified in the statement of work. Such proposals may be considered if overall performance would be improved or not compromised and if they are in the best interests of the Government. Alternative proposals, or deviations from any requirements of this RFP, shall be clearly identified.

6. Evaluation of Proposals

The Government will evaluate proposals in accordance with the factors set forth in PART IV, SECTION M of this RFP.

7. Potential Award Without Discussions

The Government reserves the right to award a contract without discussions if the Contracting Officer determines that the initial prices are fair and reasonable and that discussions are not necessary.

8. Use of the Metric System of Measurement

It is the policy of the Department of Health and Human Services to support the Federal transition to the metric system and to use the metric system of measurement in all procurements, grants, and other business related activities unless such use is impracticable or is likely to cause significant inefficiencies.

The offeror is encouraged to prepare their proposal using either "Hard Metric," "Soft Metric," or "Dual Systems" of measurement. The following definitions are provided for your information:

Hard Metric - - The replacement of a standard inch-pound size with an accepted metric size for a particular purpose. An example of size substitution might be: selling or packaging liquids by the liter instead of by the pint or quart (as for soft drinks), or instead of by the gallon (as for gasoline).

Soft Metric - The result of a mathematical conversion of inch-pound measurements to metric equivalents for a particular purpose. The physical characteristics are not changed.

Dual Systems - The use of both inch-pound and metric systems. For example, an item is designed, produced, and described in inch-pound values with soft metric values also shown for information or comparison purposes.

9. Privacy Act - Treatment of Proposal Information

The Privacy Act of 1974 (P.L. 93-579) requires that a Federal agency advise each individual whom it asks to supply information, the authority which authorizes the solicitation, whether disclosure is voluntary or mandatory, the principal purpose or purposes for which the information is intended to be used, the uses outside the agency which may be made of the information, and the effects on the individual, if any, of not providing all or any part of the requested information.

The NIH is requesting the information called for in this SOLICITATION pursuant to the authority provided by Sec. 301(a)(7) of the Public Health Service Act, as amended, and P.L. 92-218, as amended.

Providing the information requested is entirely voluntary. The collection of this information is for the purpose of conducting an accurate, fair, and adequate review prior to a discussion as to whether to award a contract.

Failure to provide any or all of the requested information may result in a less than adequate review.

In addition, the Privacy Act of 1974 (P.L. 93-579, Section 7) requires that the following information be provided when individuals are requested to disclose their social security number.

- 13 -

Provision of the social security number is voluntary. Social security numbers are requested for the purpose of accurate and efficient identification, referral, review and management of NIH contracting programs. Authority for requesting this information is provided by Section 301 and Title IV of the PHS Act, as amended.

The information provided by you may be routinely disclosed for the following purposes:

● to the cognizant audit agency and the Government Accountability Office for auditing.

● to the Department of Justice as required for litigation.

● to respond to congressional inquiries.

● to qualified experts, not within the definition of Department employees, for opinions as a part of the review process.

10. Privacy Act - System of Records Notice (SORN)

a. It has been determined that this contract is subject to the Privacy Act of 1974, because this contract provides for the design, development, or operation of a system of records on individuals.

The following System of Records Notices (SORN) are applicable to this contract:

i. 09-25-0200, Clinical, Basic and Population-based Research Studies of the National Institutes of Health (NIH), HHS/NIH/OD.

ii. 09-25-2015, Administration: Health Records of Employees, Visiting Scientists and Others Who Receive Medical Care through Employees Health Unit, HHS/NIH/ORS

The design, development, or operation work the Contractor is to perform is Operation of a system of records. The Contractor and any Subcontractor must follow disposition to be made of the Privacy Act records upon completion of contract performance shall be in accordance with Section C of the contract, and by direction of the Contracting Officer/Contracting Officer's Representative.

b. For information regarding the Countermeasures Injury Compensation Program under the Health Resources and Services Administration, please call 1–855– 266–2427 or visit http://www.hrsa.gov/cicp/.

11. Selection of Offerors

a. The acceptability of the technical portion of each contract proposal will be evaluated by a technical review committee. The committee will evaluate each proposal in strict conformity with the evaluation factors of the RFP, utilizing ratings and written critiques. The committee may suggest that the Contracting Officer request clarifying information from an offeror.

b. The business portion of each contract proposal found to be technical acceptable will be subjected to a cost and price analysis, management analysis, etc.

c. If award will be made without conducting discussions, offerors may be given the opportunity to clarify certain aspects of their proposal (e.g., the relevance of an offeror's past performance

- 14 -information and adverse past performance information to which the offeror has not previously had an opportunity to respond) or to resolve minor or clerical errors.

d. If the Government intends to conduct discussions prior to awarding a contract -

1. Communications will be held with offerors whose past performance information is the determining factor preventing them from being placed within the competitive range. Such communications shall address adverse past performance information to which an offeror has not had a prior opportunity to respond. Also, communications may be held with any other offerors whose exclusion from, or inclusion in, the competitive range is uncertain.

Such communications shall not be used to cure proposal deficiencies or omissions that alter the technical or cost elements of the proposal, and/or otherwise revise the proposal, but may be considered in rating proposals for the purpose of establishing the competitive range.

2. The Contracting Officer will, in concert with program staff, decide which proposals are in the competitive range. The competitive range will be comprised of all of the most highly rated proposals. Oral or written discussions will be conducted with all offerors in the competitive range.

While it is NIDA's policy to conduct discussions with all offerors in the competitive range, NIDA reserves the right, in special circumstances, to limit the number of proposals included in the competitive range to the greatest number that will permit an efficient competition. All aspects of the proposals are subject to discussions, including cost, technical approach, past performance, and contractual terms and conditions. At the conclusion of discussions, each offeror still in the competitive range shall be given an opportunity to submit a written Final Proposal Revision (FPR) with the reservation of the right to conduct finalization of details with the selected source in accordance with HHSAR Part 315.

e. The process described in FAR 15.101-1 will be employed, which permits the Government to make tradeoffs among cost or price and non-cost factors and to consider award to other than the lowest price offeror or other than the highest technically rated offeror.

f. The NIDA reserves the right to make a single award, multiple awards, or no award at all to the SOLICITATION. In addition, the SOLICITATION may be amended or canceled as necessary to meet NIDA requirements. Synopses of awards exceeding $25,000 will be published in www.beta.sam.gov.

12. Institutional Responsibility Regarding Investigator Conflicts of Interest

45 CFR Part 94 promotes objectivity in research by establishing standards to ensure there is no reasonable expectation that the design, conduct, or reporting of research to be performed under NIH contracts will be biased by any Investigator financial conflicts of interest. The Institution shall comply with all requirements of 45 CFR Part 94 at: http://www.ecfr.gov/cgi-bin/text-idx?

c=ecfr&SID=0af84ca649a74846f102aaf664da1623&rgn=div5&view=text&node=45:1.0.1.1.51&idno=45.

13. Certification of Filing and Payment of Taxes

None of the funds appropriated or otherwise made available by the Consolidated Appropriations Act, may be used to enter into a contract in an amount greater than $5,000,000 unless the prospective contractor certifies in writing to the agency awarding the contract that, to the best of its knowledge and belief, the contractor has filed all Federal tax returns required during the three (3) years preceding the certification, has not been convicted of a criminal offense under the Internal Revenue Code of 1986, and has not, more than ninety (90) days prior to certification, been notified of any unpaid Federal tax assessment for which the liability remains unsatisfied, unless the assessment is the subject of an installment agreement or offer in compromise that has been approved by the

- 15 -

Internal Revenue Service and is not in default, or the assessment is the subject of a non-frivolous administrative or judicial proceeding.

Note: The aforementioned certification must be included in the Offeror’s business proposal.

14. 52.203-98 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements--Representation (DEVIATION)

a. In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Resolution Appropriations Act, 2015 (Pub. L. 113-235), Government agencies are not permitted to use funds appropriated (or otherwise made available) under that or any other Act for contracts with an entity that requires employees or subcontractors of such entity seeking to report fraud, waste, or abuse to sign internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting such waste, fraud, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.

b. The prohibition in paragraph (a) of this provision does not contravene requirements applicable to Standard Form 312, Form 4414, or any other form issued by a Federal department or agency governing the nondisclosure of classified information.

c. Representation. By submission of its offer, the Offeror represents that it does not require employees or subcontractors of such entity seeking to report fraud, waste or abuse to sign internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting such waste, fraud, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information. (End of provision)

15. Past Performance Information

1. Offerors shall submit the following information as part of their Business proposal.

A list of up to the last five (5) contracts completed during the past three (3) years, which includes contracts awarded currently being performed that are similar in nature to the solicitation workscope. Contracts listed may include those entered into by the Federal Government, agencies of state and local governments and commercial concerns. Offerors may also submit past performance information regarding predecessor companies, key personnel who have relevant experience or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to the instant acquisition. For the purposes of this solicitation, a "major subcontract" is defined as any subcontract exceeding $700,000 in total cost.

Include the following information for each contract or subcontract listed:

1. Name of Contracting Organization

2. Contract Number (for subcontracts, provide the prime contract number and the subcontract number)

3. Contract Type

4. Total Contract Value

5. Description of Requirement

6. Contracting Officer's Name and Telephone Number

- 16 -

7. Program Manager's Name and Telephone Number

8. North American Industry Classification System (NAICS) Code

The offeror may provide information on problems encountered on the identified contracts and the offeror's corrective actions.

2. The Government is not required to contact all references provided by the offeror. Also, references other than those identified by the offeror may be contacted by the Government to obtain additional information that will be used in the evaluation of the offeror's past performance.

14. HHS SECURITY AND PRIVACY LANGUGAGE FOR INFORMATION AND IT

PROCUREMENTS

16. HHS Security and Privacy Language for Information and Information Technology Procurements is applicable to this solicitation and the following information is provided to assist in proposal preparation.

IMPORTANT NOTE TO OFFERORS: The following information shall be addressed in a separate section of the Business Proposal entitled "Information Security."

The Homeland Security Presidential Directive (HSPD)-12 and the Federal Information Security Management Act of 2002 (P.L. 107-347) (FISMA) requires each agency to develop, document, and implement an agency-wide information security program to safeguard information and information systems that support the operations and assets of the agency, including those provided or managed by another agency, contractor (including subcontractor), or other source.

INFORMATION SECURITY AND/OR PHYSICAL ACCESS SECURITY

A. POSITION SENSITIVITY DESIGNATIONS

All Contractor (and/or any subcontractor) employees must obtain a background investigation commensurate with their position sensitivity designation that complies with Parts 1400 and 731 of Title 5, Code of Federal Regulations (CFR).

The following position sensitivity designation levels apply to this solicitation/contract:

[ ] Level 6: Public Trust - High Risk. Contractor/subcontractor employees assigned to Level 6 positions shall undergo a Suitability Determination and Background Investigation (MBI).

[X] Level 5: Public Trust - Moderate Risk. Contractor/subcontractor employees assigned to Level 5 positions with no previous investigation and approval shall undergo a Suitability Determination and a Minimum Background Investigation (MBI), or a Limited Background Investigation (LBI).

[ ] Level 1: Non-Sensitive. Contractor/subcontractor employees assigned to Level 1 positions shall undergo a Suitability Determination and National Check and Inquiry Investigation (NACI).

1. HOMELAND SECURITY PRESIDENTIAL DIRECTIVE (HSPD)-12

The Contractor (and/or any subcontractor) and its employees shall comply with Homeland Security Presidential Directive (HSPD)-12, Policy for a Common Identification Standard for Federal Employees and Contractors; OMB M-05-24; FIPS 201, Personal Identity Verification (PIV) of Federal Employees and Contractors; HHS HSPD-12 policy;

and Executive Order 13467, Part 1 §1.2.

For additional information, see HSPD-12 policy at: https://www.dhs.gov/homeland-security-presidential-directive-12)

- 17 -

Roster-

a. The Contractor (and/or any subcontractor) shall submit a roster by name, position, e-mail address, phone number and responsibility, of all staff working under this acquisition where the Contractor will develop, have the ability to access, or host and/or maintain a government information system(s). The roster shall be submitted to the COR and/or CO within fourteen (14) calendar days after the effective date of this contract. Any revisions to the roster as a result of staffing changes shall be submitted within seven (7) calendar days of the change.

The COR will notify the Contractor of the appropriate level of investigation required for each staff member. An electronic template, "Roster of Employees Requiring Suitability Investigations," is available for contractor use at:

https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/SuitabilityRoster_10-15-12.xlsx .

b. If the Contractor is filling a new position, the Contractor shall provide a position description and the Government will determine the appropriate suitability level. Upon receipt of the Government's notification of applicable Suitability Investigations required, the Contractor shall complete and submit the required forms within 30 days of the notification.

c. Upon receipt of the Government's notification of applicable Suitability Investigations required, the Contractor shall complete and submit the required forms within 30 days of the notification.

d. The Contractor shall notify the Contracting Officer in advance when any new personnel, who are subject to a background check/investigation, will work under the contract and if they have previously been the subject of national agency checks or background investigations.

e. All contractor and subcontractor employees shall comply with the conditions established for their designated position sensitivity level prior to performing any work under this contract. Contractors may begin work after the fingerprint check has been completed.

f. Investigations are expensive and may delay performance, regardless of the outcome of the investigation. Delays associated with rejections and consequent re-investigations may not be excusable in accordance with the FAR clause, Excusable Delays - see FAR 52.249-14. Accordingly, the Contractor shall ensure that any additional employees whose names it submits for work under this contract have a reasonable chance for approval.

g. Typically, the Government investigates personnel at no cost to the Contractor. However, multiple investigations for the same position may, at the Contracting Officer's discretion, justify reduction(s) in the contract price of no more that the cost of the additional investigation(s).

h. The Contractor shall include language similar to this "HHS Controlled Facilities and Information Systems Security" language in all subcontracts that require subcontractor personnel to have the same frequency and duration of (1) physical access to an HHS-controlled facility; (2) logical access to an HHS-controlled information system; (3) access to sensitive HHS data/information, whether in an HHS-controlled information system or in hard copy; or (4) any combination of circumstances (1) through (3).

i. The Contractor shall direct inquiries, including requests for forms and assistance, to the Contracting Officer or designee.

j. Within seven (7) calendar days after the Government's final acceptance of the work under this contract, or upon termination of the contract, the Contractor’s employee shall coordinate with the parent Contractor to return all identification badges to the Contracting Officer or designee.

B. Security Assessment and Authorization (SA&A)- A valid authority to operate (ATO) certifies that the Contractor's information system meets the contract's requirements to protect the agency data. If the system under this contract does not have a valid ATO, the Contractor (and/or any subcontractor) shall work with the agency and supply the deliverables required to complete the ATO within the specified timeline(s) within three

(3) months after contract award. The Contractor shall conduct the SA&A requirements in accordance with HHS IS2P, NIST SP 800-37, Guide for Applying the Risk Management Framework to Federal Information Systems: A Security Life Cycle Approach (latest revision).

For an existing ATO, Contracting Officer Representative must make a determination if the existing ATO provides appropriate safeguards or if an additional ATO is required for the performance of the contract and state as such.

- 18 -

NIH acceptance of the ATO does not alleviate the Contractor's responsibility to ensure the system security and privacy controls are implemented and operating effectively.

C. SA&A…

This is the start of the file's text. The full file is on GovTribe.