This is a Statement of Work for troubleshooting and repair of a SIEMENS fire alarm system aboard the USCGC Healy, a U.S. Coast Guard vessel.
The contractor must perform comprehensive inspection and repair of the existing fire alarm control panel and detectors onboard CGC HEALY at USCG Base Seattle, 1519 Alaskan Way S, Seattle, WA 98123, with point of contact LT Stephen Bruno. The period of performance is 14 calendar days from contract award for 3 working days of on-site service. The contractor must be a Siemens technical representative capable of programming detector heads into the system. The scope of work (CLIN 0001) requires the contractor to provide all labor, materials, tools, and equipment to: (1) clear alarms and troubleshoot constant "Input source malfunction," "Not Responding," and "Communication Error" alarms on the FireFinder XLS Fire Alarm Control Panel, and reset all active alarms to return the system to normal operating state; (2) restore full capability to all fire alarm units except those in Generator Room 2 (1-80-2-E), program unidentified detector heads including recently installed HFP-11 smoke detectors in the Magazine Compartment (1-9-2-M), and conduct functional tests to verify proper activation and communication with the control panel; and (3) inspect the Master Fire Alarm Control Panel in the Engineering Control Center and annunciators in Damage Control Central and the Port and Starboard Quarterdecks to ensure full button functionality. The contractor must deliver a detailed inspection report documenting findings, repairs conducted, units requiring further work, and the final result of system grooming, including documentation of full restoration or a list of specific repairs necessary to restore full functionality with parts and labor hour estimates. CLIN 002 provides for potential repairs based on Condition Found Reports (CFR) not to exceed $2,500; any additional work beyond the base scope must be documented in a CFR and authorized only through written contract modification by the Contracting Officer. The deliverables must also include a detector list table with detector name, network address, loop, and compartment location for all detectors, referencing the ALARMCO, INC Operation and Maintenance Manual.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work SIEMENS Fire Alarm System
Troubleshooting USCGC Healy
1. GENERAL
1.1 Background
The objective of this project is to perform a comprehensive inspection and repair of the existing fire alarm control panel and detectors onboard CGC HEALY. The contractor must perform a groom of the system to resolve insistent trouble alarms. The contractor must be a Siemens technical representative with ability to program newly installed detector heads into system.
1.2 Period of Performance
The period of performance is fourteen (14) calendar days from date of contract award for three (3) working days. All work to be done onboard CGC HEALY at USCG Base Seattle Terminal 46.
1.3 Delivery Location
Services to be performed at:
USCG Base Seattle 1519 Alaskan Way S Seattle, WA 98123
POC: LT Stephen Bruno
1.4 References
• Coast Guard Drawing 420-WAGB-801-001, Rev K, Booklet of General Drawings
• ALARMCO, INC Operation and Maintenance Manual
2. SCOPE OF WORK CLIN 0001:
The contractor must provide all labor, materials, tools, and equipment necessary to complete the following tasks:
2.1 Clearing Alarms and Troubleshooting
• Review and document the panel's event log to identify the source of all current and historical faults, troubles, and alarm signals.
• Troubleshoot constant “Input source malfunction”, “Not Responding”, and “Communication Error” alarms that populate on FireFinder XLS Fire Alarm Control Panel.
• Clear and reset all active alarms and trouble codes on the panel to return the system to a "Normal" operating state.
2.2 Program Detectors
• Restore full capability to all fire alarm units onboard with the exception of those housed in Generator Room 2 (1-80-2-E).
• Program unidentified detector heads into the system including those recently installed HFP-11 smoke detectors in the Magazine Compartment (1-9-2-M).
• Conduct functional tests on the restored detectors to verify proper activation and comunication with the Fire Alarm Control Panel.
2.3 Fire Alarm Panel Inspection
• Ensure Master Fire Alarm Control Panel in the Engineering Control Center and annunciators in Damage Control Central, and the Port and Starboard Quarterdecks are working with full button functionality. See Coast Guard Drawing 420-WAGB-801-001 for guidance about the location of the spaces listed above.
3. DELIVERABLES
3.1 Inspection Report
A detailed inspection report to the US Coast Guard outlining findings of inspection, what repairs were conducted, which units need further work and the final result of system groom. Shall include documentation stating that the fire alarm panel and associated detectors have been restored to full functionality, or if full functionality has not been restored, include a list of specific repairs necessary to restore full functionality, including parts and necessary labor hours.
4. CLIN 002: Potential Repairs based on CFR not to exceed ($2,500 dollars)
4.1 Pricing for any additional travel costs, material, or field service days will be requested and handled by the KO under the terms of the contract. Any repairs beyond the base scope identified because of the troubleshooting shall be documented in a Condition Found Report (CFR) with a technical description of the recommended repairs. The CFR shall be provided to the Technical POCs and the Contracting Officer.
4.2 Any additional work will be authorized only by the KO through a written contract modification. The contractor shall not perform any repairs beyond the base scope until specifically authorized in writing by the KO. If the Government elects to proceed with additional repairs, the KO will issue a written contract modification that identifies the authorized additional work and associated firm fixed price. The contractor shall base any proposal for additional repairs on the findings in the CFR.
5. Detector List Provide a table of all detectors, including at a minimum:
• Detector Name
• Network Address
• Loop
• Compartment location of
An example table format is provided below. Reference current ALARMCO, INC Operation and Maintenance Manual created during the previous Fire & Smoke Detection Replacement Project under Contract No. HSCG40-12-S-30014.
Detector Name Network Address Loop Compartment
Gen Rm 1 FWD 002:115 2 1-80-1-E