This is a Questions and Answers document for Request for Information (RFI)/Sources Sought HE1254-27-RE-OKINAWAVEHICLES issued by DoWEA (Department of War Equipping Agency) regarding Okinawa Vehicle Lease and On-Board Video Surveillance System (OBVSS) capabilities, with responses current as of 17 November 2026.

The requirement encompasses vehicle leasing and maintenance services with integrated OBVSS, telematics, and fleet management systems for passenger transportation in Okinawa. The solicitation includes two 7-passenger vans, standard buses, and tour buses with minimum passenger capacity requirements specified in the Performance Work Statement. OBVSS recording must capture all footage continuously from engine start to shutdown with one-year retention requirements. All contractor-provided solutions must comply with Federal Acquisition Regulation (FAR), Defense Federal Acquisition Regulation Supplement (DFARS), National Defense Authorization Act (NDAA), Trade Agreements Act, cybersecurity, and supply-chain security requirements. Cloud-hosted services and data storage must reside in U.S. government-approved locations within the United States or other approved countries, with contractors required to identify hosting locations upon Government request. The pricing currency strategy is Yen, though other currencies may be considered based on vendor feedback. The extension option (FAR 52.217-8 OPTION TOTAL) is priced for six months despite 12-month quantities displayed. The original response deadline of 11 November 2026 was extended to 18 November 2026 to allow vendors additional time for pricing confirmation and submission of complete materials including capability statements, ROM (Rough Order of Magnitude), and SAM registration information. Responses to the RFI do not obligate vendors or affect eligibility for subsequent formal solicitation. Questions regarding minimum aisle width for Japanese-manufactured vehicles and OBVSS requirements for 7-passenger vans remain unanswered in this document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI /Sources Sought: HE1254-27-RE-OKINAWAVEHICLES | DoWEA Okinawa Vehicle Lease and OBVSS, Questions and Answers as of 17 November 2026

The following questions are from vendors who have expressed interest in this requirement.

Since the RFI is currently posted on SAM.gov until 11 Nov 2026, there will likely be more questions. We would like to try to update the current posting with answers to better engage with interested parties during this phase.

Questions and Answers

1. Would the Government welcome a technology-focused capability statement and separately identified technology ROM from a vendor that would require a local vehicle leasing and maintenance partner?

Answer: Yes, the Government would welcome any capability statements and ROMs that help to meet the requirement.

2. Should the one-year OBVSS retention requirement cover all recorded footage continuously, or designated incident footage with a shorter rolling retention period for routine recordings?

Answer: Yes. Recording should begin when the bus is started and end when it is parked and turned off. All footage in between should be retained for one year.

3. Are there prescribed hosting locations, cloud authorizations, equipment restrictions, or cybersecurity requirements beyond those stated in the draft PWS?

Answer: The Contractor shall comply with all applicable FAR, DFARS, NDAA, Trade Agreements Act (TAA), cybersecurity, supply-chain security, and Government data protection requirements incorporated into the solicitation and resulting contract.

Contractor-provided OBVSS, telematics, fleet management, connectivity, cloud-hosted, and data storage solutions shall not utilize prohibited telecommunications or video surveillance equipment and must support Government access to required data throughout the period of performance.

Contractor-hosted services and associated management portals shall be maintained in approved cloud environments located within the United States or other countries approved by the U.S. Government for the storage, processing, transmission, and backup of

Government-related data. The Contractor shall identify hosting locations and data residency arrangements upon Government request.

4. Please confirm the intended pricing currency and repair allowance in Attachment 2, which displays yen-denominated line items and dollar-denominated totals.

Answer: The current strategy is Yen, but other currencies may be considered based on vendor feedback.

5. Should the extension section be priced for six months, notwithstanding the 12-month quantities displayed in that section?

Answer: Yes, the extension section (FAR 52.217-8 OPTION TOTAL) is to be priced for six months.

6. Please confirm the controlling passenger capacities where the PWS minimums differ from the ranges in Attachment 2 (PWS vs. ROM).

Answer: Minimums in the PWS are correct. Attachment has been updated accordingly.

7. Submission Requirements - Is Attachment 2 – CLIN/SLIN ROM required to be submitted together with all other requested information by November 11?

Would it be acceptable to first submit the materials currently available, such as our Statement of Interest, Capability Statement, and SAM registration information, and provide the ROM separately at a later date?

Answer: With this amendment, the response date has been extended to 18 November 2026. All materials are requested by the revised suspense date.

8. Submission Deadline - We are currently confirming pricing based on the vehicle specifications and service requirements outlined in the Draft PWS, and this process requires some additional time.

Would it be possible to discuss an extension of the November 11 submission deadline?

Answer: The response date has been extended to 18 November 2026.

9. Participation in the Future Solicitation - If a company is unable to respond to this RFI by the deadline, would this affect its eligibility to participate in the formal solicitation when it is issued?

We are very interested in this opportunity and would like to provide as much detailed information as possible regarding our services and capabilities.

Answer: The Request for Information is for market research purposes and does not obligate a vendor. Responses to the RFI do not impact a vendor’s ability to respond to a future solicitation.

10. Minimum Aisle Width (Draft PWS 2.1.6.4)

The draft PWS requires a minimum aisle width of 21 inches (533 mm) for standard and tour buses (rear rows may reduce to approximately 19 inches).

Japanese domestic full-size coaches commonly have aisle widths of approximately 465 mm (18.3 inches).

Would the Government accept vehicles with Japanese domestic standard aisle widths, so that new Japanese-manufactured vehicles can be offered?

Answer:

11. OBVSS for Passenger Vans (Draft PWS 2.1.5 and 2.1.6)

Draft PWS 2.1.6 states that all vehicles shall be configured with OBVSS, telematics and fleet management system capabilities.

Please confirm whether the two (2) 7-passenger vans also require OBVSS. If so, please advise the required number of cameras for each van.