Attachment_2_Work_Breakdown_Structure_WBS_28Jan2016.pdf

PDF 731 KB Posted

Attached to
Science & Technical Engagement Partnership Program (STEP)
Solicitation number
HDTRA1-16-R-0001
Issued by

About this file

Attachment 2 WBS

View the file

Other files

File Type Posted
Amendment_3.pdf PDF
Amendment_2.pdf PDF
Attachment_4_Sample_Technical_Directives_01_April_2016_A02.doc DOC document
Attachment_L1_Past_Performance_Information_Form.doc DOC document
Exhibit_A_STEP_CDRLs_DD14231_11MARCH2016_0001.pdf PDF
Attachment_3_Cost_Summary_Template_11_March_2016_0001.xls XLS spreadsheet
Attachment_L2_Past_Performance_Questionnaire.rtf RTF text file
Attachment_5_S-1_SocioEconomic_Commitment_11_March_2016_0001.xls XLS spreadsheet
Attachment_2_WBS_11_Mar_16_0001.pdf PDF
HDTRA1-16-R-0001-0001_STEP_RFP_Amendment_1.pdf PDF
Attachment_4_Sample_Technical_Directives_11_Mar_16_0001.doc DOC document
HDTRA1-16-R-0001_STEP_Pre-Solicitation_Conference_Final_Attendees.pdf PDF
Attachment_L2_-_Past_Performance_Worksheet_L2_28Jan2016.doc DOC document
Exhibit_A_STEP_CDRLs_DD14231_28Jan2016.pdf PDF
STEP_Pre-solicitation_QAs_05Feb2016_PAO_GC_revised030316.pdf PDF
STEP_RFP_030216.pdf PDF
Attachment_4_Sample_Technical_Directives_15Jan2016.doc DOC document
Attachment_3_Cost_Summary_Template_27Jan2016.xls XLS spreadsheet
Attachment_5_S-1_Socio-Economic_Commitment_-_Management_Template_28Jan2016.xls XLS spreadsheet
Attachment_L1_-_Past_Performance_Information_Form_L1_28Jan2016.doc DOC document
Attachment_1_STEP_SOW_14Jan2016.pdf PDF
HDTRA1-16-R-0001_Schedule_Announcement_10Feb2016.pdf PDF
HDTRA1-16-R-0001_STEP_Schedule_Announcement_for_RFP.pdf PDF
STEP_Pre-Solicitation_Conference_17-18Nov2015_PPT_FBO.pptx PPTX presentation
Exhibit_A_CDRLs_DRAFT.pdf PDF
Attachment_4_Sample_Technical_Directives_DRAFT.pdf PDF
HDTRA1-16-R-0001_STEP_DRAFT_RFP_FINAL_Signed.pdf PDF
Attachment_1_Statement_of_Work_DRAFT.pdf PDF
Attachment_3_Cost_Summary_Template_DRAFT.pdf PDF
Attachment_2_Work_Breakdown_Structure_WBS_DRAFT.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work Breakdown Structure

CLIN

SOW Task

Areas Labor Category Description Minimum Qualifications

0001, 1001, 2001, 3001 2 Project Manager

Responsible for the coordination and completion of projects. Supports execution of a variety of projects and assists in the preparation of project plans, acquisition program baselines, acquisition strategies, implementation plans, and funding plans for all assigned projects within multiple geographic areas. Sets deadlines, assigns responsibilities, and monitors and summarizes progress of a project. Must have experience with all project management functions, to include preparing project plans, acquisition program baselines, acquisition strategies, implementation plans, and funding plans. Must have ability to direct and coordinate multiple activities of large groups of diverse technical experts.

Master's Degree or equivalent and at least 7 years of work experience OR Bachelor's Degree or equivalent and at least 10 years of relevant work experience.

0001, 1001, 2001, 3001 3-6 Scientist I

Subject matter expert recognized as a critical resource, having established a reputation for technical excellence to the external community, or possess unique credentials in an esoteric field that are not readily accessible either nationally or worldwide. Must be capable of working in a consultating role, live and work in partner countries for up to 12 months per year, with periodic short visits to collaborating institutions. Possess unique credentials that provides expert advisor/contributions in complex and critical efforts. Must be skilled in providing unique, subject matter expertise in specific functional, technical, professional or policy areas. Responsibilities include: conducting sophisticated assessments of complex problems in areas of expertise; designing approaches to problems, analyzes and evaluating the work of others, and applying broad understanding of the state of the practice. Broadly recognized as authoritative, trusted sources of expertise within their community of practice.

Terminal degree (e.g., MD/DO, DVM, PhD, Doctorate) with at least 1 year of relevant professional experience; or Master’s degree with

3-7 years of relevant professional experience; or a

Bachelor’s degree and a minimum of 8 years of relevant professional experience as defined by full-time paid work in a relevant technical field such as (but not limited to) veterinary medicine;

human medicine; epidemiology; public health;

microbiology; molecular biology; laboratory biological safety and security.

0001, 1001, 2001, 3001 3-6

Scientist I - Uplift AFRICOM

Cost of living allowances to reimburse for excess costs incurred, exclusive of quarter costs, as a result of employments as a contracator while living in partner countries within the AFRICOM region (for up to 12 months per year)- entitled to Post

Allowance (e.g., COLA) based on U.S. DoD Regulations (Department of State Standardized Regulations Section 220); in addition to being a subject matter expert recognized as a critical resource, having established a reputation for technical excellence to the external community, or possess unique credentials in an esoteric field that are not readily accessible either nationally or worldwide. Must be capable of working in a consultating role, live and work in partner countries for up to 12 months per year, with periodic short visits to collaborating institutions. Possess unique credentials that provides expert advisor/contributions in complex and critical efforts. Must be skilled in providing unique, subject matter expertise in specific functional, technical, professional or policy areas. Responsibilities include: conducting sophisticated assessments of complex problems in areas of expertise; designing approaches to problems, analyzes and evaluating the work of others, and applying broad understanding of the state of the practice. Broadly recognized as authoritative, trusted sources of expertise within their community of practice.

Employment while living in partner countries within the AFRICOM region for up to 12 months in addition to minimum qualifications for Scientist I:

Terminal degree (e.g., MD/DO, DVM, PhD, Doctorate) with at least 1 year of relevant professional experience; or Master’s degree with

3-7 years of relevant professional experience; or a

Bachelor’s degree and a minimum of 8 years of relevant professional experience as defined by full-time paid work in a relevant technical field such as (but not limited to) veterinary medicine;

human medicine; epidemiology; public health;

microbiology; molecular biology; laboratory biological safety and security.

0001, 1001, 2001, 3001 3-6

Scientist I - Uplift CENTCOM

Cost of living allowances to reimburse for excess costs incurred, exclusive of quarter costs, as a result of employments as a contractor while living in partner countries within the CENTCOM region (for up to 12 months per year)- entitled to Post

Allowance (e.g., COLA) based on U.S. DoD Regulations (Department of State Standardized Regulations Section 220); in addition to being a subject matter expert recognized as a critical resource, having established a reputation for technical excellence to the external community, or possess unique credentials in an esoteric field that are not readily accessible either nationally or worldwide. Must be capable of working in a consultating role, live and work in partner countries for up to 12 months per year, with periodic short visits to collaborating institutions. Possess unique credentials that provides expert advisor/contributions in complex and critical efforts. Must be skilled in providing unique, subject matter expertise in specific functional, technical, professional or policy areas. Responsibilities include: conducting sophisticated assessments of complex problems in areas of expertise; designing approaches to problems, analyzes and evaluating the work of others, and applying broad understanding of the state of the practice. Broadly recognized as authoritative, trusted sources of expertise within their community of practice.

Employment while living in partner countries within the CENTCOM region for up to 12 months in addition to minimum qualifications for Scientist

I: Terminal degree (e.g., MD/DO, DVM, PhD, Doctorate) with at least 1 year of relevant professional experience; or Master’s degree with

3-7 years of relevant professional experience; or a

Bachelor’s degree and a minimum of 8 years of relevant professional experience as defined by full-time paid work in a relevant technical field such as (but not limited to) veterinary medicine;

human medicine; epidemiology; public health;

microbiology; molecular biology; laboratory biological safety and security.

0001, 1001, 2001, 3001 3-6

Scientist I - Uplift EUCOM

Cost of living allowances to reimburse for excess costs incurred, exclusive of quarter costs, as a result of employments as a contractor while living in partner countries within the EUCOM region (for up to 12 months per year)- entitled to Post

Allowance (e.g., COLA) based on U.s. DoD Regulations (Department of State Standardized Regulations Section 220); in addition to being a subject matter expert recognized as a critical resource, having established a reputation for technical excellence to the external community, or possess unique credentials in an esoteric field that are not readily accessible either nationally or worldwide. Must be capable of working in a consultating role, live and work in partner countries for up to 12 months per year, with periodic short visits to collaborating institutions. Possess unique credentials that provides expert advisor/contributions in complex and critical efforts. Must be skilled in providing unique, subject matter expertise in specific functional, technical, professional or policy areas. Responsibilities include: conducting sophisticated assessments of complex problems in areas of expertise; designing approaches to problems, analyzes and evaluating the work of others, and applying broad understanding of the state of the practice. Broadly recognized as authoritative, trusted sources of expertise within their community of practice.

Employment while living in partner countries within the EUCOM region for up to 12 months in addition to minimum qualifications for Scientist I:

Terminal degree (e.g., MD/DO, DVM, PhD, Doctorate) with at least 1 year of relevant professional experience; or Master’s degree with

3-7 years of relevant professional experience; or a

Bachelor’s degree and a minimum of 8 years of relevant professional experience as defined by full-time paid work in a relevant technical field such as (but not limited to) veterinary medicine;

human medicine; epidemiology; public health;

microbiology; molecular biology; laboratory biological safety and security.

Attachment 2 - HDTRA1-16-R-0001 - 28 Jan 2016

SOW Task

Areas Labor Category Description Minimum Qualifications

0001, 1001, 2001, 3001 3-6

Scientist I - Uplift PACOM

Cost of living allowances to reimburse for excess costs incurred, exclusive of quarter costs, as a result of employments as a contractor while living in partner countries within the PACOM region (for up to 12 months per year)- entitled to Post

Allowance (e.g., COLA) based on U.S. DoD Regulations (Department of State Standardized Regulations Section 220); in addition to being a subject matter expert recognized as a critical resource, having established a reputation for technical excellence to the external community, or possess unique credentials in an esoteric field that are not readily accessible either nationally or worldwide. Must be capable of working in a consultating role, live and work in partner countries for up to 12 months per year, with periodic short visits to collaborating institutions. Possess unique credentials that provides expert advisor/contributions in complex and critical efforts. Must be skilled in providing unique, subject matter expertise in specific functional, technical, professional or policy areas. Responsibilities include: conducting sophisticated assessments of complex problems in areas of expertise; designing approaches to problems, analyzes and evaluating the work of others, and applying broad understanding of the state of the practice. Broadly recognized as authoritative, trusted sources of expertise within their community of practice.

Employment while living in partner countries within the PACOM region for up to 12 months in addition to minimum qualifications for Scientist I:

Terminal degree (e.g., MD/DO, DVM, PhD, Doctorate) with at least 1 year of relevant professional experience; or Master’s degree with

3-7 years of relevant professional experience; or a

Bachelor’s degree and a minimum of 8 years of relevant professional experience as defined by full-time paid work in a relevant technical field such as (but not limited to) veterinary medicine;

human medicine; epidemiology; public health;

microbiology; molecular biology; laboratory biological safety and security.

0001, 1001, 2001, 3001 3-6 Scientist II

Subject matter expert recognized as a critical resource, having established a reputation for technical excellence to the external community, or possess unique credentials in an esoteric field that are not readily accessible either nationally or worldwide. Must be capable of working in a consultating role, live and work in partner countries for up to 12 months per year, with periodic short visits to collaborating institutions. Expected to act as an advisor providng support to complex and critical efforts that require scarce and highly specific investigative or leadership capability; work independently with little or no supervision to support the development and implementation of partner country research programs focusing on increased knowledge related to pathogens of security concern and/or the implementation of stakeholder agendas, and responsible for identifying additional engagement opportunities. The individual maintains currency in emerging technologies, research trends, and leading edge technology uses and modifications. Requires the ability to understand underlying business, management, scientific, technical, programmatic, operationational, and policy issues, and to provide expert analysis, assessment, and recommended courses of action for major programs/projects. Develop novel, multi-disciplinary approaches to complex and difficult problems and may analyze and evaluate the work of others, applying broad understanding of the state of the practice.

Terminal degree (e.g., MD/DO, DVM, PhD, Doctorate) with at least 3 years of work experience; or a Masters with 8-14 years of work experience; or a Bachelor’s degree with 15 years or more in a relevant professional experience as defined by full-time paid work in a technical field such as (but not limited to) veterinary medicine;

human medicine; epidemiology; public health;

microbiology; molecular biology; laboratory biological safety and security.

0001, 1001, 2001, 3001 3-6

Scientist II - Uplift AFRICOM

Cost of living allowances to reimburse for excess costs incurred, exclusive of quarter costs, as a result of employments as a contractor while living in partner countries within the AFRICOM region (for up to 12 months per year)- entitled to Post

Allowance (e.g., COLA) based on U.S. DoD Regulations (Department of State Standardized Regulations Section 220); in addition to being a subject matter expert recognized as a critical resource, having established a reputation for technical excellence to the external community, or possess unique credentials in an esoteric field that are not readily accessible either nationally or worldwide. Must be capable of working in a consultating role, live and work in partner countries for up to 12 months per year, with periodic short visits to collaborating institutions. Expected to act as an advisor providng support to complex and critical efforts that require scarce and highly specific investigative or leadership capability; work independently with little or no supervision to support the development and implementation of partner country research programs focusing on increased knowledge related to pathogens of security concern and/or the implementation of stakeholder agendas, and responsible for identifying additional engagement opportunities. The individual maintains currency in emerging technologies, research trends, and leading edge technology uses and modifications. Requires the ability to understand underlying business, management, scientific, technical, programmatic, operationational, and policy issues, and to provide expert analysis, assessment, and recommended courses of action for major programs/projects.

Develop novel, multi-disciplinary approaches to complex and difficult problems and may analyze and evaluate the work of others, applying broad understanding of the state of the practice.

Employment while living in partner countries within the AFRICOM region for up to 12 months in addition to minimum qualifications for Scientist II:

Terminal degree (e.g., MD/DO, DVM, PhD, Doctorate) with at least 1 year of relevant professional experience; or Master’s degree with

3-7 years of relevant professional experience; or a

Bachelor’s degree and a minimum of 8 years of relevant professional experience as defined by full-time paid work in a relevant technical field such as (but not limited to) veterinary medicine;

human medicine; epidemiology; public health;

microbiology; molecular biology; laboratory biological safety and security.

0001, 1001, 2001, 3001 3-6

Scientist II - Uplift CENTCOM

Cost of living allowances to reimburse for excess costs incurred, exclusive of quarter costs, as a result of employments as a contractor while living in partner countries within the CENTCOM region (for up to 12 months per year)- entitled to Post

Allowance (e.g., COLA) based on U.S. DoD Regulations (Department of State Standardized Regulations Section 220); in addition to being a subject matter expert recognized as a critical resource, having established a reputation for technical excellence to the external community, or possess unique credentials in an esoteric field that are not readily accessible either nationally or worldwide. Must be capable of working in a consultating role, live and work in partner countries for up to 12 months per year, with periodic short visits to collaborating institutions. Expected to act as an advisor providng support to complex and critical efforts that require scarce and highly specific investigative or leadership capability; work independently with little or no supervision to support the development and implementation of partner country research programs focusing on increased knowledge related to pathogens of security concern and/or the implementation of stakeholder agendas, and responsible for identifying additional engagement opportunities. The individual maintains currency in emerging technologies, research trends, and leading edge technology uses and modifications. Requires the ability to understand underlying business, management, scientific, technical, programmatic, operationational, and policy issues, and to provide expert analysis, assessment, and recommended courses of action for major programs/projects.

Develop novel, multi-disciplinary approaches to complex and difficult problems and may analyze and evaluate the work of others, applying broad understanding of the state of the practice.

Employment while living in partner countries within the CENTCOM region for up to 12 months in addition to minimum qualifications for Scientist

II: Terminal degree (e.g., MD/DO, DVM, PhD, Doctorate) with at least 1 year of relevant professional experience; or Master’s degree with

3-7 years of relevant professional experience; or a

Bachelor’s degree and a minimum of 8 years of relevant professional experience as defined by full-time paid work in a relevant technical field such as (but not limited to) veterinary medicine;

human medicine; epidemiology; public health;

microbiology; molecular biology; laboratory biological safety and security.

SOW Task

Areas Labor Category Description Minimum Qualifications

0001, 1001, 2001, 3001 3-6

Scientist II - Uplift EUCOM

Cost of living allowances to reimburse for excess costs incurred, exclusive of quarter costs, as a result of employments as a contractor while living in partner countries within the EUCOM region (for up to 12 months per year)- entitled to Post

Allowance (e.g., COLA) based on U.S. DoD Regulations (Department of State Standardized Regulations Section 220); in addition to being a subject matter expert recognized as a critical resource, having established a reputation for technical excellence to the external community, or possess unique credentials in an esoteric field that are not readily accessible either nationally or worldwide. Must be capable of working in a consultating role, live and work in partner countries for up to 12 months per year, with periodic short visits to collaborating institutions. Expected to act as an advisor providng support to complex and critical efforts that require scarce and highly specific investigative or leadership capability; work independently with little or no supervision to support the development and implementation of partner country research programs focusing on increased knowledge related to pathogens of security concern and/or the implementation of stakeholder agendas, and responsible for identifying additional engagement opportunities. The individual maintains currency in emerging technologies, research trends, and leading edge technology uses and modifications. Requires the ability to understand underlying business, management, scientific, technical, programmatic, operationational, and policy issues, and to provide expert analysis, assessment, and recommended courses of action for major programs/projects.

Develop novel, multi-disciplinary approaches to complex and difficult problems and may analyze and evaluate the work of others, applying broad understanding of the state of the practice.

Employment while living in partner countries within the EUCOM region for up to 12 months in addition to minimum qualifications for Scientist II:

Terminal degree (e.g., MD/DO, DVM, PhD, Doctorate) with at least 1 year of relevant professional experience; or Master’s degree with

3-7 years of relevant professional experience; or a

Bachelor’s degree and a minimum of 8 years of relevant professional experience as defined by full-time paid work in a relevant technical field such as (but not limited to) veterinary medicine;

human medicine; epidemiology; public health;

microbiology; molecular biology; laboratory biological safety and security.

0001, 1001, 2001, 3001 3-6

Scientist II - Uplift PACOM

Cost of living allowances to reimburse for excess costs incurred, exclusive of quarter costs, as a result of employments as a contractor while living in partner countries within the PACOM region (for up to 12 months per year)- entitled to Post

Allowance (e.g., COLA) based on U.S. DoD Regulations (Department of State Standardized Regulations Section 220); in addition to being a subject matter expert recognized as a critical resource, having established a reputation for technical excellence to the external community, or possess unique credentials in an esoteric field that are not readily accessible either nationally or worldwide. Must be capable of working in a consultating role, live and work in partner countries for up to 12 months per year, with periodic short visits to collaborating institutions. Expected to act as an advisor providng support to complex and critical efforts that require scarce and highly specific investigative or leadership capability; work independently with little or no supervision to support the development and implementation of partner country research programs focusing on increased knowledge related to pathogens of security concern and/or the implementation of stakeholder agendas, and responsible for identifying additional engagement opportunities. The individual maintains currency in emerging technologies, research trends, and leading edge technology uses and modifications. Requires the ability to understand underlying business, management, scientific, technical, programmatic, operationational, and policy issues, and to provide expert analysis, assessment, and recommended courses of action for major programs/projects.

Develop novel, multi-disciplinary approaches to complex and difficult problems and may analyze and evaluate the work of others, applying broad understanding of the state of the practice.

Employment while living in partner countries within the PACOM region for up to 12 months in addition to minimum qualifications for Scientist II:

Terminal degree (e.g., MD/DO, DVM, PhD, Doctorate) with at least 1 year of relevant professional experience; or Master’s degree with

3-7 years of relevant professional experience; or a

Bachelor’s degree and a minimum of 8 years of relevant professional experience as defined by full-time paid work in a relevant technical field such as (but not limited to) veterinary medicine;

human medicine; epidemiology; public health;

microbiology; molecular biology; laboratory biological safety and security.

0001, 1001, 2001, 3001 3-6 Scientist III

Subject matter expert recognized as a critical resource, having established a reputation for technical excellence to the external community, or possess unique credentials in an esoteric field that are not readily accessible either nationally or worldwide. Must be capable of working in a consultating role, live and work in partner countries for up to 12 months per year, with periodic short visits to collaborating institutions. Expected to act as an advisor providng support to complex and critical efforts that require scarce and highly specific investigative or leadership capability; work independently with little or no supervision to support the development and implementation of partner country research programs focusing on increased knowledge related to pathogens of security concern and/or the implementation of stakeholder agendas, and responsible for identifying additional engagement opportunities. The individual maintains currency in emerging technologies, research trends, and leading edge technology uses and modifications. Requires the ability to understand underlying business, management, scientific, technical, programmatic, operationational, and policy issues, and to provide expert analysis, assessment, and recommended courses of action for major programs/projects. Develop novel, multi-disciplinary approaches to complex and difficult problems and may analyze and evaluate the work of others, applying broad understanding of the state of the practice.

Terminal degree (e.g. MD/DO, DVM, PhD, Doctorate) with at least 10 years of work experience; or a Master’s degree and 15 years or more relevant professional work experience as defined by full-time paid work in a technical field such as (but not limited to) veterinary medicine;

human medicine; epidemiology; public health;

microbiology; molecular biology; laboratory biological safety and security.

0001, 1001, 2001, 3001 3-6

Scientist III - Uplift AFRICOM

Cost of living allowances to reimburse for excess costs incurred, exclusive of quarter costs, as a result of employments as a contractor while living in partner countries within the AFRICOM region (for up to 12 months per year)- entitled to Post

Allowance (e.g., COLA) based on U.S. DoD Regulations (Department of State Standardized Regulations Section 220); in addition to being a subject matter expert recognized as a critical resource, having established a reputation for technical excellence to the external community, or possess unique credentials in an esoteric field that are not readily accessible either nationally or worldwide. Must be capable of working in a consultating role, live and work in partner countries for up to 12 months per year, with periodic short visits to collaborating institutions. Expected to act as an advisor providng support to complex and critical efforts that require scarce and highly specific investigative or leadership capability; work independently with little or no supervision to support the development and implementation of partner country research programs focusing on increased knowledge related to pathogens of security concern and/or the implementation of stakeholder agendas, and responsible for identifying additional engagement opportunities. The individual maintains currency in emerging technologies, research trends, and leading edge technology uses and modifications. Requires the ability to understand underlying business, management, scientific, technical, programmatic, operationational, and policy issues, and to provide expert analysis, assessment, and recommended courses of action for major programs/projects.

Develop novel, multi-disciplinary approaches to complex and difficult problems and may analyze and evaluate the work of

Employment while living in partner countries within the AFRICOM region for up to 12 months in addition to minimum qualifications for Scientist

III: Terminal degree (e.g., MD/DO, DVM, PhD, Doctorate) with at least 1 year of relevant professional experience; or Master’s degree with

3-7 years of relevant professional experience; or a

Bachelor’s degree and a minimum of 8 years of relevant professional experience as defined by full-time paid work in a relevant technical field such as (but not limited to) veterinary medicine;

human medicine; epidemiology; public health;

microbiology; molecular biology; laboratory biological safety and security.

SOW Task

Areas Labor Category Description Minimum Qualifications

0001, 1001, 2001, 3001 3-6

Scientist III - Uplift CENTCOM

Cost of living allowances to reimburse for excess costs incurred, exclusive of quarter costs, as a result of employments as a contractor while living in partner countries within the CENTCOM region (for up to 12 months per year)- entitled to Post

Allowance (e.g., COLA) based on U.S. DoD Regulations (Department of State Standardized Regulations Section 220); in addition to being a subject matter expert recognized as a critical resource, having established a reputation for technical excellence to the external community, or possess unique credentials in an esoteric field that are not readily accessible either nationally or worldwide. Must be capable of working in a consultating role, live and work in partner countries for up to 12 months per year, with periodic short visits to collaborating institutions. Expected to act as an advisor providng support to complex and critical efforts that require scarce and highly specific investigative or leadership capability; work independently with little or no supervision to support the development and implementation of partner country research programs focusing on increased knowledge related to pathogens of security concern and/or the implementation of stakeholder agendas, and responsible for identifying additional engagement opportunities. The individual maintains currency in emerging technologies, research trends, and leading edge technology uses and modifications. Requires the ability to understand underlying business, management, scientific, technical, programmatic, operationational, and policy issues, and to provide expert analysis, assessment, and recommended courses of action for major programs/projects.

Develop novel, multi-disciplinary approaches to complex and difficult problems and may analyze and evaluate the work of others, applying broad understanding of the state of the practice.

Employment while living in partner countries within the CENTCOM region for up to 12 months in addition to minimum qualifications for Scientist

III: Terminal degree (e.g., MD/DO, DVM, PhD, Doctorate) with at least 1 year of relevant professional experience; or Master’s degree with

3-7 years of relevant professional experience; or a

Bachelor’s degree and a minimum of 8 years of relevant professional experience as defined by full-time paid work in a relevant technical field such as (but not limited to) veterinary medicine;

human medicine; epidemiology; public health;

microbiology; molecular biology; laboratory biological safety and security.

0001, 1001, 2001, 3001 3-6

Scientist III - Uplift EUCOM

Cost of living allowances to reimburse for excess costs incurred, exclusive of quarter costs, as a result of employments as a contractor while living in partner countries within the EUCOM region (for up to 12 months per year)- entitled to Post

Allowance (e.g., COLA) based on U.S. DoD Regulations (Department of State Standardized Regulations Section 220); in addition to being a subject matter expert recognized as a critical resource, having established a reputation for technical excellence to the external community, or possess unique credentials in an esoteric field that are not readily accessible either nationally or worldwide. Must be capable of working in a consultating role, live and work in partner countries for up to 12 months per year, with periodic short visits to collaborating institutions. Expected to act as an advisor providng support to complex and critical efforts that require scarce and highly specific investigative or leadership capability; work independently with little or no supervision to support the development and implementation of partner country research programs focusing on increased knowledge related to pathogens of security concern and/or the implementation of stakeholder agendas, and responsible for identifying additional engagement opportunities. The individual maintains currency in emerging technologies, research trends, and leading edge technology uses and modifications. Requires the ability to understand underlying business, management, scientific, technical, programmatic, operationational, and policy issues, and to provide expert analysis, assessment, and recommended courses of action for major programs/projects.

Develop novel, multi-disciplinary approaches to complex and difficult problems and may analyze and evaluate the work of others, applying broad understanding of the state of the practice.

Employment while living in partner countries within the EUCOM region for up to 12 months in addition to minimum qualifications for Scientist

III: Terminal degree (e.g., MD/DO, DVM, PhD, Doctorate) with at least 1 year of relevant professional experience; or Master’s degree with

3-7 years of relevant professional experience; or a

Bachelor’s degree and a minimum of 8 years of relevant professional experience as defined by full-time paid work in a relevant technical field such as (but not limited to) veterinary medicine;

human medicine; epidemiology; public health;

microbiology; molecular biology; laboratory biological safety and security.

0001, 1001, 2001, 3001 3-6

Scientist III - Uplift PACOM

Cost of living allowances to reimburse for excess costs incurred, exclusive of quarter costs, as a result of employments as a contractor while living in partner countries within the PACOM region (for up to 12 months per year)- entitled to Post

Allowance (e.g., COLA) based on U.S. DoD Regulations (Department of State Standardized Regulations Section 220); in addition to being a subject matter expert recognized as a critical resource, having established a reputation for technical excellence to the external community, or possess unique credentials in an esoteric field that are not readily accessible either nationally or worldwide. Must be capable of working in a consultating role, live and work in partner countries for up to 12 months per year, with periodic short visits to collaborating institutions. Expected to act as an advisor providng support to complex and critical efforts that require scarce and highly specific investigative or leadership capability; work independently with little or no supervision to support the development and implementation of partner country research programs focusing on increased knowledge related to pathogens of security concern and/or the implementation of stakeholder agendas, and responsible for identifying additional engagement opportunities. The individual maintains currency in emerging technologies, research trends, and leading edge technology uses and modifications. Requires the ability to understand underlying business, management, scientific, technical, programmatic, operationational, and policy issues, and to provide expert analysis, assessment, and recommended courses of action for major programs/projects.

Develop novel, multi-disciplinary approaches to complex and difficult problems and may analyze and evaluate the work of others, applying broad understanding of the state of the practice.

Employment while living in partner countries within the PACOM region for up to 12 months in addition to minimum qualifications for Scientist

III: Terminal degree (e.g., MD/DO, DVM, PhD, Doctorate) with at least 1 year of relevant professional experience; or Master’s degree with

3-7 years of relevant professional experience; or a

Bachelor’s degree and a minimum of 8 years of relevant professional experience as defined by full-time paid work in a relevant technical field such as (but not limited to) veterinary medicine;

human medicine; epidemiology; public health;

microbiology; molecular biology; laboratory biological safety and security.

0001, 1001, 2001, 3001 4 Trainer I

Develops and revises training courses and prepares appropriate new training materials, as required. Conducts trainings in multiple formats, including (but not limited to) classroom and field environments, workshops and seminars. Peforms duties with regular supervision.

Baccalaureate degree with 8 years or more work experience; or a Master’s degree and 3-7 years of relevant professional experience as defined by full time paid work in a relevant field, and experience performing relevant training development or instruction.

0001, 1001, 2001, 3001 4 Trainer II

Develops and revises training courses and prepares appropriate new training materials, as required. Conducts trainings in multiple formats, including (but not limited to) classroom and field environments, workshops and seminars. Peforms duties with limited supervision.

Baccalaureate degree with 15 years or more work experience; or Master’s degree with 8-14 years of relevant professional experience as defined by full time paid work in a relevant field, and experience performing relevant training development or instruction.

SOW Task

Areas Labor Category Description Minimum Qualifications

0001, 1001, 2001, 3001 4 Trainer III

Develops and revises training courses and prepares appropriate new training materials, as required. Conducts trainings in multiple formats, including (but not limited to) classroom and field environments, workshops and seminars. Performs duties without supervision.

Terminal degree (e.g., MD/DO, DVM, PhD, Doctorate) with 10 years or more work experience; or Masters with 15 years or more relevant professional experience as defined by full time paid work in a relevant technical field such as (but not limited to) veterinary medicine;

human medicine; epidemiology; public health;

microbiology; molecular biology; laboratory biological safety and security.

0001, 1001, 2001, 3001 2 Technical Analyst I

Conducts quantiative and qualitative analysis, demonstrates content knowledge and expertise in specific fields; supervises and manages project activities, prepares written reports, work in collaboration with program team members in developing and writing research proposals. Provides research support on all tasks. Provide meeting support. Maintain documentation of all research activities. Conduct secondary research and document findings. Attend and document collaborative meetings.

Bachelor's Degree or equivalent; 0-3 years relevant experience

0001, 1001, 2001, 3001 2 Technical Analyst II

Conducts quantiative and qualitative analysis, demonstrates content knowledge and expertise in specific fields; supervises and manages project activities, prepares written reports, work in collaboration with program team members in developing and writing research proposals. Provides research support on all tasks. Provide meeting support. Maintain documentation of all research activities. Conduct secondary research and document findings. Attend and document collaborative meetings.

Masters Degree; 3-5 years relevant experience

0001, 1001, 2001, 3001 3-6 Foreign Local National: AFRICOM

Permanent resident to the local AFRICOM region, recognized as a resource in a relevant scientific discipline, having established a reputation for technical excellence to the local community. Acts as an advisor and provides technical expertise and support to complex and critical efforts that require scarce and highly specific investigative or leadership capability. Has the ability to act as a technical resource for collaboration of client-sponsored research activities in-country, and facilitation of development of research projects and training courses, to include the development of work plans, research project materials, and training curriculum/course material.

Terminal degree (e.g., MD/DO, DVM, PhD, Doctorate, Master's) or 3-5 years experience in a relevant technical field such as (but not limited

to) veterinary medicine; human medicine;

epidemiology; public health; microbiology;

molecular biology; laboratory biological safety and security.

0001, 1001, 2001, 3001 3-6 Foreign Local National: CENTCOM

Permanent resident to the local CENTCOM region, recognized as a resource in a relevant scientific discipline, having established a reputation for technical excellence to the local community. Acts as an advisor and provides technical expertise and support to complex and critical efforts that require scarce and highly specific investigative or leadership capability. Has the ability to act as a technical resource for collaboration of client-sponsored research activities in-country, and facilitation of development of research projects and training courses, to include the development of work plans, research project materials, and training curriculum/course material.

Terminal degree (e.g., MD/DO, DVM, PhD, Doctorate, Master's) or 3-5 years experience in a relevant technical field such as (but not limited

to) veterinary medicine; human medicine;

epidemiology; public health; microbiology;

molecular biology; laboratory biological safety and security.

0001, 1001, 2001, 3001 3-6 Foreign Local National: EUCOM

Permanent resident to the local EUCOM region, recognized as a resource in a relevant scientific discipline, having established a reputation for technical excellence to the local community. Acts as an advisor and provides technical expertise and support to complex and critical efforts that require scarce and highly specific investigative or leadership capability. Has the ability to act as a technical resource for collaboration of client-sponsored research activities in-country, and facilitation of development of research projects and training courses, to include the development of work plans, research project materials, and training curriculum/course material.

Terminal degree (e.g., MD/DO, DVM, PhD, Doctorate, Master's) or 3-5 years experience in a relevant technical field such as (but not limited

to) veterinary medicine; human medicine;

epidemiology; public health; microbiology;

molecular biology; laboratory biological safety and security.

0001, 1001, 2001, 3001 3-6 Foreign Local National: PACOM

Permanent resident to the local PACOM region, recognized as a resource in a relevant scientific discipline, having established a reputation for technical excellence to the local community. Acts as an advisor and provides technical expertise and support to complex and critical efforts that require scarce and highly specific investigative or leadership capability. Has the ability to act as a technical resource for collaboration of client-sponsored research activities in-country, and facilitation of development of research projects and training courses, to include the development of work plans, research project materials, and training curriculum/course material.

Terminal degree (e.g., MD/DO, DVM, PhD, Doctorate, Master's) or 3-5 years experience in a relevant technical field such as (but not limited

to) veterinary medicine; human medicine;

epidemiology; public health; microbiology;

molecular biology; laboratory biological safety and security.