Attachment 3 - Volume I Schedule B and Cost Breakout.xls

XLS spreadsheet 256 KB Posted

Attached to
Saratoga Springs Commissary: Shelf Stocking, Receiving Storage Holding Area (RSHA), Custodial Operations
Solicitation number
HDEC08-21-R-0014
Issued by

About this file

This document contains a cost breakout template and instructions for a shelf stocking, receiving, storage, and custodial services contract opportunity at the Saratoga Springs Commissary in New York. The solicitation seeks pricing for shelf stocking over 91,000 cases annually, receiving/storage operations, and full-service custodial work. The base period runs from January to December 2022 with four optional one-year extensions. Pricing is required for the base year and each option year. The North American Industry Classification System code is 561990 and the set-aside is for small businesses under $12 million in average annual receipts. Responses are due by September 28, 2021 following an August site visit.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule B

PRICING SCHEDULE
Saratoga Springs CommissaryFOR DECA USE ONLY
BASE YEAR: 1 January 22 - 31 December 22QUANTITYUNIT OF ISSUEUNIT PRICEAMOUNTREVISED UNIT PRICECORRECT AMOUNTSSRSHACI
0001AAShelf Stocking Services (Includes overwrites between 0% and 7%, IAW para 4.3.3.8 of the PWS)91,248Cases$0.00000$0.00$0.00000$0.00$0.00
0001ABOverwrites (cases that exceed 7% of the total monthly cases, IAW para 4.3.3.8 of PWS @ the unit price of 60% of the case price reflected in subline item AA above.)250Cases$0.00000$0.00$0.00000$0.00$0.00$0.00$0.00$0.00
0001ACInventory Preparation100Hours$0.00$0.00$0.00$0.00$0.00
0001ADRSHA Operations12Months$0.00$0.00$0.00$0.00$0.00
0001AEMaterial Handling Equipment (MHE) Support for Inventories16Hours$0.00$0.00$0.00$0.00$0.00
0001AFCustodial Services (exclusive of Meat Processing, Preparation and Wrapping Area, RSHA, and Outside Areas)12Months$0.00$0.00$0.00$0.00$0.00
0001AGCustodial Services (Meat Processing, Preparation and Wrapping Area)12Months$0.00$0.00$0.00$0.00$0.00
0001AHCustodial Services (RSHA and Outside Areas)12Months$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0001AJSnow and Ice Removal500Hours$0.00$0.00
Subtotal - Base Year$0.00$0.00
FOLLOW-ON YEAR ONE: 1 January 23 - 31 December 23QUANTITYUNIT OF ISSUEUNIT PRICEAMOUNTREVISED UNIT PRICECORRECT AMOUNTSSRSHACI
0002AAShelf Stocking Services (Includes overwrites between 0% and 7%, IAW para 4.3.3.8 of the PWS)91,248Cases$0.00000$0.00$0.00000$0.00$0.00
0002ABOverwrites (cases that exceed 7% of the total monthly cases, IAW para 4.3.3.8 of PWS @ the unit price of 60% of the case price reflected in subline item AA above.)250Cases$0.00000$0.00$0.00000$0.00$0.00
0002ACInventory Preparation100Hours$0.00$0.00$0.00$0.00$0.00
0002ADRSHA Operations12Months$0.00$0.00$0.00$0.00$0.00
0002AEMaterial Handling Equipment (MHE) Support for Inventories16Hours$0.00$0.00$0.00$0.00$0.00
0002AFCustodial Services (exclusive of Meat Processing, Preparation and Wrapping Area, RSHA, and Outside Areas)12Months$0.00$0.00$0.00$0.00$0.00
0002AGCustodial Services (Meat Processing, Preparation and Wrapping Area)12Months$0.00$0.00$0.00$0.00$0.00
0002AHCustodial Services (RSHA and Outside Areas)12Months$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0002AJSnow and Ice Removal500Hours$0.00$0.00
Subtotal - Follow-on Year One$0.00$0.00
FOLLOW-ON YEAR TWO: 1 January 24 - 31 December 24QUANTITYUNIT OF ISSUEUNIT PRICE.REVISED UNIT PRICECORRECT AMOUNTSSRSHACI
0003AAShelf Stocking Services (Includes overwrites between 0% and 7%, IAW para 4.3.3.8 of the PWS)91,248Cases$0.00000$0.00$0.00000$0.00$0.00
0003ABOverwrites (cases that exceed 7% of the total monthly cases, IAW para 4.3.3.8 of PWS @ the unit price of 60% of the case price reflected in subline item AA above.)250Cases$0.00000$0.00$0.00000$0.00$0.00
0003ACInventory Preparation100Hours$0.00$0.00$0.00$0.00$0.00
0003ADRSHA Operations12Months$0.00$0.00$0.00$0.00$0.00
0003AEMaterial Handling Equipment (MHE) Support for Inventories16Hours$0.00$0.00$0.00$0.00$0.00
0003AFCustodial Services (exclusive of Meat Processing, Preparation and Wrapping Area, RSHA, and Outside Areas)12Months$0.00$0.00$0.00$0.00$0.00
0003AGCustodial Services (Meat Processing, Preparation and Wrapping Area)12Months$0.00$0.00$0.00$0.00$0.00
0003AHCustodial Services (RSHA and Outside Areas)12Months$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0003AJSnow and Ice Removal500Hours$0.00$0.00
Subtotal - Follow-on Year Two$0.00$0.00
FOLLOW-ON YEAR THREE: 1 January 25 - 31 December 25QUANTITYUNIT OF ISSUEUNIT PRICEAMOUNTREVISED UNIT PRICECORRECT AMOUNTSSRSHACI
0004AAShelf Stocking Services (Includes overwrites between 0% and 7%, IAW para 4.3.3.8 of the PWS)91,248Cases$0.00000$0.00$0.00000$0.00$0.00
0004ABOverwrites (cases that exceed 7% of the total monthly cases, IAW para 4.3.3.8 of PWS @ the unit price of 60% of the case price reflected in subline item AA above.)250Cases$0.00000$0.00$0.00000$0.00$0.00
0004ACInventory Preparation100Hours$0.00$0.00$0.00$0.00$0.00
0004ADRSHA Operations12Months$0.00$0.00$0.00$0.00$0.00
0004AEMaterial Handling Equipment (MHE) Support for Inventories16Hours$0.00$0.00$0.00$0.00$0.00
0004AFCustodial Services (exclusive of Meat Processing, Preparation and Wrapping Area, RSHA, and Outside Areas)12Months$0.00$0.00$0.00$0.00$0.00
0004AGCustodial Services (Meat Processing, Preparation and Wrapping Area)12Months$0.00$0.00$0.00$0.00$0.00
0004AHCustodial Services (RSHA and Outside Areas)12Months$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0004AJSnow and Ice Removal500Hours$0.00$0.00
Subtotal - Follow-on Year Three$0.00$0.00
FOLLOW-ON YEAR FOUR: 1 January 26 - 31 December 26QUANTITYUNIT OF ISSUEUNIT PRICEAMOUNTREVISED UNIT PRICECORRECT AMOUNTSSRSHACI
0005AAShelf Stocking Services (Includes overwrites between 0% and 7%, IAW para 4.3.3.8 of the PWS)91,248Cases$0.00000$0.00$0.00000$0.00$0.00
0005ABOverwrites (cases that exceed 7% of the total monthly cases, IAW para 4.3.3.8 of PWS @ the unit price of 60% of the case price reflected in subline item AA above.)250Cases$0.00000$0.00$0.00000$0.00$0.00
0005ACInventory Preparation100Hours$0.00$0.00$0.00$0.00$0.00
0005ADRSHA Operations12Months$0.00$0.00$0.00$0.00$0.00
0005AEMaterial Handling Equipment (MHE) Support for Inventories16Hours$0.00$0.00$0.00$0.00$0.00
0005AFCustodial Services (exclusive of Meat Processing, Preparation and Wrapping Area, RSHA, and Outside Areas)12Months$0.00$0.00$0.00$0.00$0.00
0005AGCustodial Services (Meat Processing, Preparation and Wrapping Area)12Months$0.00$0.00$0.00$0.00$0.00
0005AHCustodial Services (RSHA and Outside Areas)12Months$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0005AJSnow and Ice Removal500Hours$0.00$0.00
Subtotal - Follow-on Year Four$0.00$0.00
Five-Year Total$0.00$0.00$ - 0$ - 0$ - 0$ - 0
$ - 0
$ - 0
$ - 0

&R&"Arial,Bold"Attachment 3

Cost Breakout

Attachment 3
HDEC0821R0014
VOLUME I
COST BREAKOUT
Offerors are required to submit their cost breakout in accordance with provision
52.215-4509, "Proposal Submission," paragraph (b)(4), located in Section L of the
solicitation.
The tabs below contain worksheets for Shelf Stocking, Custodial, Receiving/Storage Holding
Area, Yearly Totals, and 5 Year totals.
The worksheets for Shelf Stocking, Custodial, and Receiving/Storage/Holding Area
contain "sample" occupational titles and the applicable minimum wage rates.

&C

Shelf Stocking

SOLICITATION NUMBER:HDEC08-21-R-0014SOLICITATION NUMBER:HDEC08-21-R-0014SOLICITATION NUMBER:HDEC08-21-R-0014
COMMISSARY:Saratoga SpringsCOMMISSARY:Saratoga SpringsCOMMISSARY:Saratoga Springs
CONTRACTOR NAME:CONTRACTOR NAME:CONTRACTOR NAME:
Shelf Stocking Operations Work SheetShelf Stocking Operations Work SheetShelf Stocking Operations Work Sheet
Direct LaborContractor ProposedDOLLAR TOTALS
Shelf Stocking Supplies & Equipment================
WDR
COST ELEMENTHours XRates =Labor Cost(The elements listed below are SAMPLES and are not considered
=====a requirement of the solicitation.)
Store Worker I013.49$0.00COST ELEMENTDOLLARS
Project Manager00.00$0.00==
Alternate Project Manager00.00$0.00Qty.Unit/Extended`DIRECT LABOR$0.00
00.00$0.00ElementsYearlyPricePriceHEALTH & WELFARE$0.00
00.00$0.00========
00.00$0.00Blades, Carton Cutter00.00$0.00SUB-TOTAL$0.00
----Cutter, Carton00.00$0.00
TOTALS0$0Dispenser, Tape00.00$0.00HOLIDAYS, SICK & VACATIONS$0.00
====Safety Shoes00.00$0.00HOL, SICK & VAC. HEALTH & WELFARE$0.00
Indirect Labor Hours (Non-Working)0Tape Masking00.00$0.00==
=Back Brace00.00$0.00SUB-TOTAL$0.00
Direct Labor Hours (Productive/Working)0Cart, Bushel00.00$0.00
=Cart, Stocking00.00$0.00FRINGES$0.00
Pallet Jacks00.00$0.00
Direct Labor Health & Welfare00.00$0.00EQUIPMENT & SUPPLIES$0.00
00.00$0.00-
00.00$0.00SUB-TOTAL$0.00
COST ELEMENTHours XH&WH&W Cost00.00$0.00=
=====00.00$0.00G&A0.00%$0.00
Store Worker I04.23$0.0000.00$0.00
Project Manager04.23$0.0000.00$0.00PROFIT0.00%$0.00
Alternate Project Manager04.23$0.0000.00$0.00
0$0.0000.00$0.00==
0$0.0000.00$0.00GRAND TOTAL$0.00
0$0.0000.00$0.00====
----00.00$0.00ANNUAL CASES91,248
TOTALS0$0.0000.00$0.00===
====00.00$0.00CASE PRICE0.0000
Holidays, Sick, and Vacations00.00$0.00===
00.00$0.00
Holidays/00.00$0.00
Sick/Sick/Vacations00.00$0.00
COST ELEMENTHolidaysVacationsDollars00.00$0.00
=====00.00$0.00
Store Worker I100$0.00( (Holidays + Vacations) * 8)00.00$0.00
Project Manager100$0.00times Work Hours======
Alternate Project Manager100$0.00divided by ( 2080 hours -TOTALS0$0.00
100$0.00( (Holidays + Vacations) * 8) )======
100$0.00times the hourly rate
100$0.00in each category
----
TOTALS60$0.00
====
Holidays, Sick, and Vacations Health & Welfare
Holidays/Sick/
VacationsH&WH&W
COST ELEMENTHours XRatesCost
=====
Store Worker I04.23$0.00
Project Manager04.23$0.00
Alternate Project Manager04.23$0.00
04.23$0.00
04.23$0.00
04.23$0.00
----
TOTALS0$0.00
====
FRINGE CALCULATIONS
COST ELEMENTDOLLARS
======
DIRECT LABOR$0.00
DIRECT LABOR HEALTH & WELFARE$0.00
HOLIDAYS, SICK, AND VACATIONS$0.00
HOLIDAYS, SICK, AND VACATIONS HEALTH & WELFARE$0.00
------
SUBTOTAL$0.00
======
FICAX7.65%=$0.00
FUTAX0.00%=$0.00
SUTAX0.00%=$0.00
Workman's CompensationX0.00%=$0.00
Employer's LiabilityX0.00%=$0.00
Comprehensive General LiabilityX0.00%=$0.00
OtherX0.00%=$0.00
OtherX0.00%=$0.00
------
TOTAL FRINGES$0.00
======

RSH

SOLICITATION NUMBER:HDEC08-21-R-0014SOLICITATION NUMBER:HDEC08-21-R-0014SOLICITATION NUMBER:HDEC08-21-R-0014
COMMISSARY:Saratoga SpringsCOMMISSARY:Saratoga SpringsCOMMISSARY:Saratoga Springs
CONTRACTOR NAME:CONTRACTOR NAME:CONTRACTOR NAME:
R/S/H Operations Work SheetR/S/H Operations Work SheetR/S/H Operations Work Sheet
Direct LaborContractor ProposedDOLLAR TOTALS
R/S/H Supplies & Equipment================
WDR
COST ELEMENTHours XRates =Labor Cost(The elements listed below are SAMPLES and are not to be considered
=====a requirement of the solicitation.)
Forklift Operator020.85$0.00COST ELEMENTDOLLARS
Material Handling Laborer016.90$0.00==
Warehouse Specialist020.85$0.00Qty.Unit/ExtendedDIRECT LABOR0.00
Project Manager00.00$0.00ElementsYearlyPricePriceHEALTH & WELFARE0.00
Alternate Project Manager00.00$0.00========
00.00$0.00Blades, Carton Cutter00.00$0.00SUB-TOTAL0.00
----Cutter, Carton00.00$0.00
TOTALS0$0.00Dispenser, Tape00.000.00HOLIDAYS, SICK & VACATIONS0.00
====Safety Shoes00.000.00HOL, SICK & VAC. HEALTH & WELFARE0.00
Indirect Labor Hours (Non-Working)0Tape Masking00.000.00==
=Back Brace00.000.00SUB-TOTAL0.00
Direct Labor Hours (Productive/Working)0Cart, Bushel00.000.00
=Cart, Stocking00.000.00FRINGES0.00
Pallet Jacks00.000.00
Direct Labor Health & Welfare00.000.00EQUIPMENT & SUPPLIES0.00
00.000.00-
00.000.00SUB-TOTAL0.00
COST ELEMENTHours XH&WH&W Cost00.000.00=
=====00.000.00G&A0.00%0.00
Forklift Operator04.23$0.0000.000.00
Material Handling Laborer04.23$0.0000.000.00PROFIT0.00%0.00
Warehouse Specialist04.23$0.0000.000.00
Project Manager04.23$0.0000.000.00==
Alternate Project Manager04.23$0.0000.000.00GRAND TOTAL0.00
04.23$0.0000.000.00====
----00.000.00MO. PRICE0.00
TOTALS0$0.0000.000.00===
====00.000.00
Holidays, Sick, and Vacations00.000.00
00.000.00
Holidays/00.000.00
Sick/Sick/Vacations00.000.00
COST ELEMENTHolidaysVacationsDollars00.000.00
=====00.000.00
Forklift Operator100$0.00( (Holidays + Vacations) * 8)00.000.00
Material Handling Laborer100$0.00times Work Hours=====
Warehouse Specialist100$0.00divided by ( 2080 hours -TOTALS0$0.00
Project Manager100$0.00( (Holidays + Vacations) * 8) )======
Alternate Project Manager100$0.00times the hourly rate
100$0.00in each category
----
TOTALS60$0.00
====
Holidays, Sick, and Vacations Health & Welfare
Holidays/Sick/
VacationsH&WH&W
COST ELEMENTHours XRatesCost
=====
Forklift Operator04.23$0.00
Material Handling Laborer04.23$0.00
Warehouse Specialist04.23$0.00
Project Manager04.23$0.00
Alternate Project Manager04.23$0.00
04.23$0.00
----
TOTALS0$0.00
====
FRINGE CALCULATIONS
COST ELEMENTDOLLARS
======
DIRECT LABOR$0.00
DIRECT LABOR HEALTH & WELFARE$0.00
HOLIDAYS, SICK, AND VACATIONS$0.00
HOLIDAYS, SICK, AND VACATIONS HEALTH & WELFARE$0.00
------
SUBTOTAL$0.00
======
FICAX7.65%=$0.00
FUTAX0.00%=$0.00
SUTAX0.00%=$0.00
Workman's CompensationX0.00%=$0.00
Employer's LiabilityX0.00%=$0.00
Comprehensive General LiabilityX0.00%=$0.00
OtherX0.00%=$0.00
OtherX0.00%=$0.00
------
TOTAL FRINGES$0.00
======

Custodial

SOLICITATION NUMBER:HDEC08-21-R-0014SOLICITATION NUMBER:HDEC08-21-R-0014SOLICITATION NUMBER:HDEC08-21-R-0014
COMMISSARY:Saratoga SpringsCOMMISSARY:Saratoga SpringsCOMMISSARY:Saratoga Springs
CONTRACTOR NAME:CONTRACTOR NAME:CONTRACTOR NAME:
Custodial Operations Work SheetCustodial Operations Work SheetCustodial Operations Work Sheet
Direct LaborContractor ProposedDOLLAR TOTALS
Custodial Supplies & Equipment================
WDR
COST ELEMENTHours XRates =Labor Cost(The elements listed below are SAMPLES and are not to be considered
=====a requirement of the solicitation.)
Janitor014.33$0.00COST ELEMENTDOLLARS
Project Manager00.00$0.00==
Alternate Project Manager00.00$0.00Qty.Unit/ExtendedDIRECT LABOR0.00
00.00$0.00ElementsYearlyPricePriceHEALTH & WELFARE0.00
00.00$0.00========
00.00$0.00Bowl, Cleaner00.00$0.00SUB-TOTAL0.00
----Cartridges00.00$0.00
TOTALS0$0.00Cleaner, Carpet00.000.00HOLIDAYS, SICK & VACATIONS0.00
====Cleaner, Compound00.000.00HOL, SICK & VAC. HEALTH & WELFARE0.00
Indirect Labor Hours (Non-Working)0Cleaner, Glass00.000.00==
=Cleaner, Neutral00.000.00SUB-TOTAL0.00
Direct Labor Hours (Productive/Working)0Disinfectant00.000.00
=Dust Cloths00.000.00FRINGES0.00
Dust Mop Heads00.000.00
Direct Labor Health & WelfareFloor Finish00.000.00EQUIPMENT & SUPPLIES0.00
Floor Sealer00.000.00-
Floor Stripper00.000.00SUB-TOTAL0.00
COST ELEMENTHours XH&WH&W CostGloves00.000.00=
=====Gloves, Latex00.000.00G&A0.00%0.00
Janitor04.23$0.00Kintowel Wiper00.000.00
Project Manager04.23$0.00LiquidLive00.000.00PROFIT0.00%0.00
Alternate Project Manager04.23$0.00Masks00.000.00
04.23$0.00Mop Head, Wet00.000.00==
04.23$0.00Neutralizer00.000.00GRAND TOTAL0.00
04.23$0.00Pads, Aqua 27"00.000.00====
----Pads, Buffing00.000.00MONTHLY PRICE0.00
TOTALS0$0.00Pads, Doodle Bug00.000.00===
====Polish, Furniture00.000.00
Holidays, Sick, and VacationsPolish, Metal00.000.00
Propane00.000.00
Holidays/Rain Suit00.000.00
Sick/Sick/VacationsRespirators00.000.00
COST ELEMENTHolidaysVacationsDollarsRetainer00.000.00
=====Safety Shoes00.000.00
Janitor100$0.00( (Holidays + Vacations) * 8)Sanitizer, Compound D200.000.00
Project Manager100$0.00times Work HoursSoap, Hand, Liquid00.000.00
Alternate Project Manager100$0.00divided by ( 2080 hours -Sponges00.000.00
100$0.00( (Holidays + Vacations) * 8) )Spray Bottle00.000.00
100$0.00times the hourly rateSpray Bottle Trigger00.000.00
100$0.00in each categorySpray Buff00.000.00
----Toilet Tissue, 96rl00.000.00
TOTALS60$0.00Towels, Pop-Up00.000.00
====Trash Liners, Lg00.000.00
Trash Liners, Sm00.000.00
Holidays, Sick, and Vacations Health & WelfareVaccuum Belts00.000.00
Visors00.000.00
Holidays/Sick/Battery Charger00.000.00
VacationsH&WH&WBuffer, High Speed00.000.00
COST ELEMENTHours XRatesCostBurnisher High Speed00.000.00
=====Burnisher, 21" Propane00.000.00
Janitor04.23$0.00Caddy, Maid00.000.00
Project Manager04.23$0.00Carpet Extractor00.000.00
Alternate Project Manager04.23$0.00Floor Scrubber, Low Speed00.000.00
04.23$0.00Scrubber, 20"00.000.00
04.23$0.00Scrubber, Auto00.000.00
04.23$0.00Vacuum, Wet/Dry00.000.00
----Washer, Pressure00.000.00
TOTALS0$0.0000.000.00
====00.000.00
======
TOTALS$0.00
FRINGE CALCULATIONS======
COST ELEMENTDOLLARS
======
DIRECT LABOR$0.00
DIRECT LABOR HEALTH & WELFARE$0.00
HOLIDAYS, SICK, AND VACATIONS$0.00
HOLIDAYS, SICK, AND VACATIONS HEALTH & WELFARE$0.00
------
SUBTOTAL$0.00
======
FICAX7.65%=$0.00
FUTAX0.00%=$0.00
SUTAX0.00%=$0.00
Workman's CompensationX0.00%=$0.00
Employer's LiabilityX0.00%=$0.00
Comprehensive General LiabilityX0.00%=$0.00
OtherX0.00%=$0.00
OtherX0.00%=$0.00
------
TOTAL FRINGES$0.00
======

Year Totals

SOLICITATION NUMBER:HDEC08-21-R-0014
COMMISSARY:Saratoga Springs
CONTRACTOR NAME:
BASE YEAR GRAND TOTALS
DOLLAR TOTALS
================
COST ELEMENTDOLLARS
==
DIRECT LABOR0.00
DIRECT LABOR HEALTH & WELFARE0.00
==
TOTAL0.00
HOLIDAYS, SICK & VACATIONS0.00
HOL, SICK & VAC. HEALTH & WELFARE0.00
==
TOTAL0.00
FRINGE CALCULATIONS0.00
SUPPLIES & EQUIPMENT0.00
SUB-TOTAL0.00
G&A0.00
PROFIT0.00
==
GRAND TOTAL0.00
==

5 Yr. Totals

SOLICITATION NUMBER:HDEC08-21-R-0014
COMMISSARY:Saratoga Springs
CONTRACTOR NAME:
GRAND TOTALS
BASE YEAROPTION 1OPTION 2OPTION 3OPTION 4GRAND
COST ELEMENTDOLLARSDOLLARSDOLLARSDOLLARSDOLLARSTOTALS
=======
DIRECT LABOR0.000.000.000.000.000.00
DIRECT LABOR HEALTH & WELFARE0.000.000.000.000.000.00
=======
TOTAL0.000.000.000.000.000.00
HOLIDAYS, SICK & VACATIONS0.000.000.000.000.000.00
HOL, SICK & VAC. HEALTH & WELFARE0.000.000.000.000.000.00
=======
TOTAL0.000.000.000.000.000.00
FRINGE CALCULATIONS0.000.000.000.000.000.00
SUPPLIES & EQUIPMENT0.000.000.000.000.000.00
SUB-TOTAL0.000.000.000.000.000.00
G&A0.000.000.000.000.000.00
PROFIT0.000.000.000.000.000.00
=======
GRAND TOTAL0.000.000.000.000.000.00
=======
SOLICITATION NUMBER:HDEC08-21-R-0014
COMMISSARY:Saratoga Springs
CONTRACTOR NAME:
ESCALATION FACTORS
OPTION 1OPTION 2OPTION 3OPTION 4
COST ELEMENTDOLLARSDOLLARSDOLLARSDOLLARS
======
DIRECT LABOR0.00%0.00%0.00%0.00%
DIRECT LABOR HEALTH & WELFARE0.00%0.00%0.00%0.00%
======
TOTAL
HOLIDAYS AND VACATIONS0.00%0.00%0.00%0.00%
HOLIDAYS AND VACATIONS. HEALTH & WELFARE0.00%0.00%0.00%0.00%
======
TOTAL
FRINGE CALCULATIONS0.00%0.00%0.00%0.00%
SUPPLIES & EQUIPMENT0.00%0.00%0.00%0.00%
SUB-TOTAL
G&A0.00%0.00%0.00%0.00%
PROFIT0.00%0.00%0.00%0.00%
======
GRAND TOTAL
======

Store Worker I Loaded Wage Rate

Attachment 3Attachment 3Attachment 3
SOLICITATION NUMBER:HDEC08-21-R-0014SOLICITATION NUMBER:HDEC08-21-R-0014SOLICITATION NUMBER:HDEC08-21-R-0014
COMMISSARY:Saratoga SpringsCOMMISSARY:Saratoga SpringsCOMMISSARY:Saratoga Springs
CONTRACTOR NAME:CONTRACTOR NAME:CONTRACTOR NAME:
Store Worker I Loaded Wage Rate Work SheetStore Worker I Loaded Wage Rate Work SheetStore Worker I Loaded Wage Rate Work Sheet
Direct LaborContractor ProposedDOLLAR TOTALS
Shelf Stocking Supplies & Equipment================
WD
COST ELEMENTHours XRates =Labor Cost
=====
Store Worker I113.49$13.49COST ELEMENTDOLLARS
==
NOTE: A QUANTITY OF 1 HAS BEEN ENTERED TODIRECT LABOR$13.49
CALCULATE THE LOADED HOURLY RATE. PROCEEDDIRECT LABOR HEALTH & WELFARE$4.23
TO ENTER FRINGE, G&A, AND PROFIT PERCENTAGES==
Qty.Unit/ExtendedSUB-TOTAL$17.72
----ElementsYearlyPricePrice
TOTALS1$13.49======HOLIDAYS, SICK & VACATIONS$0.54
====Supplies and Equipment Costs00.00$0.00HOL, SICK & VAC. HEALTH & WELFARE$0.00
Indirect Labor Hours (Non-Working)are not included in the loaded00.00$0.00==
=rate for Store Worker I00.00$0.00SUB-TOTAL$0.54
Direct Labor Hours (Productive/Working)100.00$0.00
=00.00$0.00FRINGES$1.40
00.00$0.00
00.00$0.00EQUIPMENT & SUPPLIES$0.00
Direct Labor Health and Welfare00.00$0.00-
00.00$0.00SUB-TOTAL$19.66
00.00$0.00=
COST ELEMENTHoursH&WH&W Cost00.00$0.00G&A0.00%$0.00
=====00.00$0.00
Store Worker I14.23$4.2300.00$0.00PROFIT0.00%$0.00
00.00$0.00
00.00$0.00==
00.00$0.00GRAND TOTAL$19.66
00.00$0.00====
0======
----TOTALS$0.00
TOTALS1$4.23=====
====
Holidays, Sick, and Vacations
Holidays/
Sick/Sick/Vacations
COST ELEMENTHolidaysVacationsDollars
=====
Store Worker I100$0.54
( (Holidays + Vacations) * 8)
times Work Hours
divided by ( 2080 hours -
( (Holidays + Vacations) * 8) )
0times the hourly rate
----in each category
TOTALS10$0.54
====
Holidays, Sick, and Vacations Health & Welfare
Holidays/Sick/
VacationsH&WH&W
COST ELEMENTHours XRatesCost
=====
Store Worker I0.04.23$0.00
----
TOTALS0$0.00
====
FRINGE CALCULATIONS
COST ELEMENTDOLLARS
======
DIRECT LABOR COST$13.49
DIRECT HEALTH & WELFARE COSTS$4.23
HOLIDAYS, SICK, AND VACATIONS$0.54
HOLIDAYS, SICK, AND VACATIONS HEALTH & WELFARE$0.00
------
SUBTOTAL$18.26
======
FICAX7.65%=$1.40
FUTAX0.00%=$0.00
SUTAX0.00%=$0.00
Workman's CompensationX0.00%=$0.00
Employer's LiabilityX0.00%=$0.00
Comprehensive General LiabilityX0.00%=$0.00
OtherX0.00%=$0.00
OtherX0.00%=$0.00
------
TOTAL FRINGES$1.40
======

Janitor Loaded Wage Rate

Attachment 3Attachment 3Attachment 3
SOLICITATION NUMBER:HDEC08-21-R-0014SOLICITATION NUMBER:HDEC08-21-R-0014SOLICITATION NUMBER:HDEC08-21-R-0014
COMMISSARY:Saratoga SpringsCOMMISSARY:Saratoga SpringsCOMMISSARY:Saratoga Springs
CONTRACTOR NAME:CONTRACTOR NAME:CONTRACTOR NAME:
Janitor Loaded Wage Rate Work SheetJanitor Loaded Wage Rate Work SheetJanitor Loaded Wage Rate Work Sheet
Direct LaborContractor ProposedDOLLAR TOTALS
Custodial Supplies & Equipment================
WD
COST ELEMENTHours XRates =Labor Cost
=====
Janitor114.33$14.33COST ELEMENTDOLLARS
==
NOTE: A QUANTITY OF 1 HAS BEEN ENTERED TODIRECT LABOR$14.33
CALCULATE THE LOADED HOURLY RATE. PROCEEDDIRECT LABOR HEALTH & WELFARE$4.23
TO ENTER FRINGE, G&A, AND PROFIT PERCENTAGES==
SUB-TOTAL$18.56
----Qty.Unit/Extended
TOTALS1$14.33ElementsYearlyPricePriceHOLIDAYS, SICK & VACATIONS$0.57
==========HOL, SICK & VAC. HEALTH & WELFARE$0.00
Indirect Labor Hours (Non-Working)Supplies and Equipment Costs00.00$0.00==
=are not included in the loaded00.00$0.00SUB-TOTAL$0.57
Direct Labor Hours (Productive/Working)1rate for Janitor00.000.00
=00.000.00FRINGES$1.46
00.000.00
00.000.00EQUIPMENT & SUPPLIES$0.00
Direct Labor Health and Welfare00.000.00-
00.000.00SUB-TOTAL$20.59
00.000.00=
COST ELEMENTHoursH&WH&W Cost00.000.00G&A0.00%$0.00
=====00.000.00
Janitor14.23$4.2300.000.00PROFIT0.00%$0.00
00.000.00
00.000.00==
00.000.00GRAND TOTAL$20.59
00.000.00====
00.000.00
----======
TOTALS1$4.23TOTALS$0.00
=========
Holidays, Sick, and Vacations
Holidays/
Sick/Sick/Vacations
COST ELEMENTHolidaysVacationsDollars
=====
Janitor100$0.57
( (Holidays + Vacations) * 8)
times Work Hours
divided by ( 2080 hours -
( (Holidays + Vacations) * 8) )
times the hourly rate
----in each category
TOTALS10$0.57
====
Holidays, Sick, and Vacations Health & Welfare
Holidays/Sick/
VacationsH&WH&W
COST ELEMENTHours XRatesCost
=====
Janitor04.23$0.00
----
TOTALS0$0.00
====
FRINGE CALCULATIONS
COST ELEMENTDOLLARS
======
DIRECT LABOR COST$14.33
DIRECT HEALTH & WELFARE COSTS$4.23
HOLIDAYS/SICK/VACATION$0.57
HOLIDAYS AND VACATIONS HEALTH & WELFARE$0.00
------
SUBTOTAL$19.13
======
FICAX7.65%=$1.46
FUTAX0.00%=$0.00
SUTAX0.00%=$0.00
Workman's CompensationX0.00%=$0.00
Employer's LiabilityX0.00%=$0.00
Comprehensive General LiabilityX0.00%=$0.00
OtherX0.00%=$0.00
OtherX0.00%=$0.00
------
TOTAL FRINGES$1.46
======

Forklift Op & WH Sp Loaded Wage

Attachment 3Attachment 3Attachment 3
SOLICITATION NUMBER:HDEC08-21-R-0014SOLICITATION NUMBER:HDEC08-21-R-0014SOLICITATION NUMBER:HDEC08-21-R-0014
COMMISSARY:Saratoga SpringsCOMMISSARY:Saratoga SpringsCOMMISSARY:Saratoga Springs
CONTRACTOR NAME:CONTRACTOR NAME:CONTRACTOR NAME:
Forklift Operator Loaded Wage Rate Work SheetForklift Operator Loaded Wage Rate Work SheetForklift Operator Loaded Wage Rate Work Sheet
Direct LaborContractor ProposedDOLLAR TOTALS
R/S/H Supplies & Equipment================
WD
COST ELEMENTHours XRates =Labor Cost
=====
Forklift Operator/Warehouse Specialist120.85$20.85COST ELEMENTDOLLARS
==
NOTE: A QUANTITY OF 1 HAS BEEN ENTERED TODIRECT LABOR$20.85
CALCULATE THE LOADED HOURLY RATE. PROCEEDDIRECT LABOR HEALTH & WELFARE$4.23
TO ENTER FRINGE, G&A, AND PROFIT PERCENTAGES==
SUB-TOTAL$25.08
----Qty.Unit/Extended
TOTALS1$20.85ElementsYearlyPricePriceHOLIDAYS, SICK & VACATIONS$0.83
==========HOL, SICK & VAC. HEALTH & WELFARE$0.00
Indirect Labor Hours (Non-Working)Supplies and Equipment Costs00.00$0.00==
=are not included in the loaded00.00$0.00SUB-TOTAL$0.83
Direct Labor Hours (Productive/Working)1rate for Forklift Operator00.000.00
=or Warehouse Specialist00.000.00FRINGES$1.98
00.000.00
00.000.00EQUIPMENT & SUPPLIES$0.00
Direct Labor Health and Welfare00.000.00-
00.000.00SUB-TOTAL$27.89
00.000.00=
COST ELEMENTHoursH&WH&W Cost00.000.00G&A0.00%$0.00
=====00.000.00
Forklift Operator/Warehouse Specialist14.23$4.2300.000.00PROFIT0.00%$0.00
00.000.00
00.000.00==
00.000.00GRAND TOTAL$27.89
00.000.00====
00.000.00
----======
TOTALS1$4.23TOTALS$0.00
=========
Holidays, Sick, and Vacations
Holidays/
Sick/Sick/Vacations
COST ELEMENTHolidaysVacationsDollars
=====
Forklift Operator/Warehouse Specialist100$0.83
( (Holidays + Vacations) * 8)
times Work Hours
divided by ( 2080 hours -
( (Holidays + Vacations) * 8) )
times the hourly rate
----in each category
TOTALS10$0.83
====
Holidays, Sick, and Vacations Health & Welfare
Holidays/Sick/
VacationsH&WH&W
COST ELEMENTHours XRatesCost
=====
Forklift Operator/Warehouse Specialist04.23$0.00
----
TOTALS0$0.00
====
FRINGE CALCULATIONS
COST ELEMENTDOLLARS
======
DIRECT LABOR COST$20.85
DIRECT HEALTH & WELFARE COSTS$4.23
HOLIDAYS, SICK, AND VACATIONS$0.83
HOLIDAYS, SICK, AND VACATIONS HEALTH & WELFARE$0.00
------
SUBTOTAL$25.91
======
FICAX7.65%=$1.98
FUTAX0.00%=$0.00
SUTAX0.00%=$0.00
Workman's CompensationX0.00%=$0.00
Employer's LiabilityX0.00%=$0.00
Comprehensive General LiabilityX0.00%=$0.00
OtherX0.00%=$0.00
OtherX0.00%=$0.00
------
TOTAL FRINGES$1.98
======

Material Handling Laborer

Attachment 3Attachment 3Attachment 3
SOLICITATION NUMBER:HDEC08-21-R-0014SOLICITATION NUMBER:HDEC08-21-R-0014SOLICITATION NUMBER:HDEC08-21-R-0014
COMMISSARY:Saratoga SpringsCOMMISSARY:Saratoga SpringsCOMMISSARY:Saratoga Springs
CONTRACTOR NAME:CONTRACTOR NAME:CONTRACTOR NAME:
Material Handling Laborer Loaded Wage Rate Work SheetMaterial Handling Laborer Loaded Wage Rate Work SheetMaterial Handling Laborer Loaded Wage Rate Work Sheet
Direct LaborContractor ProposedDOLLAR TOTALS
Shelf Stocking Supplies & Equipment================
WD
COST ELEMENTHours XRates =Labor Cost
=====
Material Handling Laborer116.90$16.90COST ELEMENTDOLLARS
==
NOTE: A QUANTITY OF 1 HAS BEEN ENTERED TODIRECT LABOR$16.90
CALCULATE THE LOADED HOURLY RATE. PROCEEDDIRECT LABOR HEALTH & WELFARE$4.23
TO ENTER FRINGE, G&A, AND PROFIT PERCENTAGES==
Qty.Unit/ExtendedSUB-TOTAL$21.13
----ElementsYearlyPricePrice
TOTALS1$16.90======HOLIDAYS, SICK & VACATIONS$0.68
====Supplies and Equipment Costs00.00$0.00HOL, SICK & VAC. HEALTH & WELFARE$0.00
Indirect Labor Hours (Non-Working)are not included in the loaded00.00$0.00==
=rate for Store Worker I00.000.00SUB-TOTAL$0.68
Direct Labor Hours (Productive/Working)100.000.00
=00.000.00FRINGES$1.67
00.000.00
00.000.00EQUIPMENT & SUPPLIES$0.00
Direct Labor Health and Welfare00.000.00-
00.000.00SUB-TOTAL$23.48
00.000.00=
COST ELEMENTHoursH&WH&W Cost00.000.00G&A0.00%$0.00
=====00.000.00
Material Handling Laborer14.23$4.2300.000.00PROFIT0.00%$0.00
00.000.00
00.000.00==
00.000.00GRAND TOTAL$23.48
00.000.00====
0======
----TOTALS$0.00
TOTALS1$4.23=====
====
Holidays, Sick, and Vacations
Holidays/
Sick/Sick/Vacations
COST ELEMENTHolidaysVacationsDollars
=====
Material Handling Laborer10$0.68
( (Holidays + Vacations) * 8)
times Work Hours
divided by ( 2080 hours -
( (Holidays + Vacations) * 8) )
0times the hourly rate
----in each category
TOTALS10$0.68
====
Holidays, Sick, and Vacations Health & Welfare
Holidays/Sick/
VacationsH&WH&W
COST ELEMENTHours XRatesCost
=====
Material Handling Laborer0.04.23$0.00
----
TOTALS0$0.00
====
FRINGE CALCULATIONS
COST ELEMENTDOLLARS
======
DIRECT LABOR COST$16.90
DIRECT HEALTH & WELFARE COSTS$4.23
HOLIDAYS, SICK, AND VACATIONS$0.68
HOLIDAYS, SICK, AND VACATIONS HEALTH & WELFARE$0.00
------
SUBTOTAL$21.81
======
FICAX7.65%=$1.67
FUTAX0.00%=$0.00
SUTAX0.00%=$0.00
Workman's CompensationX0.00%=$0.00
Employer's LiabilityX0.00%=$0.00
Comprehensive General LiabilityX0.00%=$0.00
OtherX0.00%=$0.00
OtherX0.00%=$0.00
------
TOTAL FRINGES$1.67
======

File details come from the government source that posted it. Updated .