Attachment_3___Volume_I_Quantico_Cost_Breakout_Quantico_HDEC0819R0010.xls
XLS spreadsheet 266 KB Posted
- Solicitation number
- HDEC0819R0010
- Issued by
-
Defense Commissary Agency
About this file
This document contains cost breakout worksheets and instructions for submitting proposals in response to solicitation number HDEC0819R0010 for shelf stocking, receiving/storage/holding area (RSHA), RSHA custodial, and meat custodial operations at the Quantico MCB Commissary. Offerors must submit cost breakouts using the provided templates, which include worksheets for direct labor, fringe benefits, supplies and equipment, holidays and vacations, and annual and five-year totals. The worksheets include sample occupational titles and wage rates for shelf stockers, RSHA material handlers and forklift operators, custodians, and calculation of loaded hourly rates. Instructions are provided on printing the protected Excel files.
Attachment 3, Volume I, Cost Breakout
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Breakout
| Attachment 3 |
| HDEC0819R0010 |
| VOLUME I |
| COST BREAKOUT |
| Offerors are required to submit their cost breakout in accordance with provision |
| 52.215-4509, "Proposal Submission," paragraph (b)(4), located in Section L of the |
| solicitation. |
| The tabs below contain worksheets for Shelf Stocking, Custodial, Receiving/Storage Holding |
| Area, Yearly Totals, and 5 Year totals as well as Printing Instructions for these worksheets. |
| The worksheets for Shelf Stocking, Custodial, and Receiving/Storage/Holding Area |
| contain "sample" occupational titles and the applicable minimum wage rates. |
&C
Printing Instructions
| BASIC INSTRUCTIONS | ||||
| This icon and/or disk contains the required forms and formats for submitting proposals in response to the | ||||
| solicitation. Some of the forms have protected formats and cells, however the necessary inputs are "unprotected" | ||||
| and may be changed as needed to adequately reflect your proposal. Formulas are included where appropriate | ||||
| to automatically generate various computations. The offer is ultimately responsible for the accuracy of all calculations. | ||||
| If there are calculation differences between the hard copy and the computer files, the hard copy shall take precedence. | ||||
| PRINTING PARAMETERS | ||||
| In order to print these spreadsheets you must use print ranges and titles as they are described in your | ||||
| software manual. The ranges have been defined and named. The range names are listed below. | ||||
| Range Names | Size | Titles | Orientation | Topics |
| SS_PAGE1 | Fit Columns to Page | B:A1..B:A8 | Portrait | Shelf Stocking Direct Labor, Health & Welfare Sheet |
| SS_PAGE2 | Fit Columns to Page | B:A1..B:A8 | Portrait | Shelf Stocking Holidays & Vacations Sheet |
| SS_PAGE3 | Fit Columns to Page | B:A1..B:A8 | Portrait | Shelf Stocking Fringe Calculations Sheet |
| SS_PAGE4 | Fit Columns to Page | B:I1..B:I19 | Portrait | Shelf Stocking Supplies & Equipment Sheet |
| SS_PAGE5 | Fit Columns to Page | None | Portrait | Shelf Stocking Summary Sheet |
| CS_PAGE1 | Fit Columns to Page | C:A1..C:A8 | Portrait | Custodial Direct Labor, Health & Welfare Sheet |
| CS_PAGE2 | Fit Columns to Page | C:A1..C:A8 | Portrait | Custodial Holidays & Vacations Sheet |
| CS_PAGE3 | Fit Columns to Page | C:A1..C:A8 | Portrait | Custodial Fringe Calculations Sheet |
| CS_PAGE4 | Fit Columns to Page | C:I1..C:I19 | Portrait | Custodial Supplies & Equipment Sheet |
| CS_PAGE5 | Fit Columns to Page | None | Portrait | Custodial Summary Sheet |
| WH_PAGE1 | Fit Columns to Page | D:A1..D:A8 | Portrait | RSH Direct Labor, Health & Welfare Sheet |
| WH_PAGE2 | Fit Columns to Page | D:A1..D:A8 | Portrait | RSH Holidays & Vacations Sheet |
| WH_PAGE3 | Fit Columns to Page | D:A1..D:A8 | Portrait | RSH Fringe Calculations Sheet |
| WH_PAGE4 | Fit Columns to Page | D:I1..D:I19 | Portrait | RSH Supplies & Equipment Sheet |
| WH_PAGE5 | Fit Columns to Page | None | Portrait | RSH Summary Sheet |
| GRANDS | Fit Columns to Page | None | Portrait | Totals of Shelf Stocking , Custodial,RSH and Residual Grocery |
| GRAND_TOTALS | Fit Columns to Page | None | Landscape | 5 year totals of Shelf Stocking , Custodial, and RSHA |
| You may also use the macro "Print1" to print a group of pages. Make the sheet you wish to print active. Run the macro and it will print | ||||
| the group of spreadsheets for you. This macro currently works only in Excel. The macro can also be activated by pressing the Print | ||||
| button on each sheet. |
Shelf Stocking
| SOLICITATION NUMBER: | HDEC0819R0010 | SOLICITATION NUMBER: | HDEC0819R0010 | SOLICITATION NUMBER: | HDEC0819R0010 | ||||||||||||
| COMMISSARY: | Quantico MCB | COMMISSARY: | Quantico MCB | COMMISSARY: | Quantico MCB | ||||||||||||
| CONTRACTOR NAME: | CONTRACTOR NAME: | CONTRACTOR NAME: | |||||||||||||||
| Shelf Stocking Operations Work Sheet | Shelf Stocking Operations Work Sheet | Shelf Stocking Operations Work Sheet | |||||||||||||||
| Direct Labor | Contractor Proposed | DOLLAR TOTALS | |||||||||||||||
| Shelf Stocking Supplies & Equipment | ================ | ||||||||||||||||
| WDR | |||||||||||||||||
| COST ELEMENT | Hours X | Rates = | Labor Cost | (The elements listed below are SAMPLES and are not considered | |||||||||||||
| = | = | = | = | = | a requirement of the solicitation.) | ||||||||||||
| Store Worker I | 0 | 14.12 | $0.00 | COST ELEMENT | DOLLARS | ||||||||||||
| Project Manager | 0 | 0.00 | $0.00 | = | = | ||||||||||||
| 0 | 0.00 | $0.00 | Qty. | Unit/ | Extended | ` | DIRECT LABOR | $0.00 | |||||||||
| 0 | 0.00 | $0.00 | Elements | Yearly | Price | Price | HEALTH & WELFARE | $0.00 | |||||||||
| 0 | 0.00 | $0.00 | = | = | = | = | = | = | = | = | |||||||
| 0 | 0.00 | $0.00 | Blades, Carton Cutter | 0 | 0.00 | $0.00 | SUB-TOTAL | $0.00 | |||||||||
| - | - | - | - | Cutter, Carton | 0 | 0.00 | $0.00 | ||||||||||
| TOTALS | 0 | $0 | Dispenser, Tape | 0 | 0.00 | $0.00 | HOLIDAYS & VACATIONS | $0.00 | |||||||||
| = | = | = | = | Safety Shoes | 0 | 0.00 | $0.00 | HOL & VAC. HEALTH & WELFARE | $0.00 | ||||||||
| Indirect Labor Hours (Non-Working) | 0 | Tape Masking | 0 | 0.00 | $0.00 | = | = | ||||||||||
| = | Back Brace | 0 | 0.00 | $0.00 | SUB-TOTAL | $0.00 | |||||||||||
| Direct Labor Hours (Productive/Working) | 0 | Cart, Bushel | 0 | 0.00 | $0.00 | ||||||||||||
| = | Cart, Stocking | 0 | 0.00 | $0.00 | FRINGES | $0.00 | |||||||||||
| Pallet Jacks | 0 | 0.00 | $0.00 | ||||||||||||||
| Direct Labor Health & Welfare | 0 | 0.00 | $0.00 | EQUIPMENT & SUPPLIES | $0.00 | ||||||||||||
| 0 | 0.00 | $0.00 | - | ||||||||||||||
| H&W | H&W | 0 | 0.00 | $0.00 | SUB-TOTAL | $0.00 | |||||||||||
| COST ELEMENT | Hours X | Rates = | Cost | 0 | 0.00 | $0.00 | = | ||||||||||
| = | = | = | = | = | 0 | 0.00 | $0.00 | G&A | 0.00% | $0.00 | |||||||
| Store Worker I | 0 | 4.18 | $0.00 | 0 | 0.00 | $0.00 | |||||||||||
| Project Manager | 0 | 4.18 | $0.00 | 0 | 0.00 | $0.00 | PROFIT | 0.00% | $0.00 | ||||||||
| 0 | 4.18 | $0.00 | 0 | 0.00 | $0.00 | ||||||||||||
| 0 | 4.18 | $0.00 | 0 | 0.00 | $0.00 | = | = | ||||||||||
| 0 | 4.18 | $0.00 | 0 | 0.00 | $0.00 | GRAND TOTAL | $0.00 | ||||||||||
| 0 | 4.18 | $0.00 | 0 | 0.00 | $0.00 | = | = | = | = | ||||||||
| - | - | - | - | 0 | 0.00 | $0.00 | ANNUAL CASES | 1,120,452 | |||||||||
| TOTALS | 0 | $0 | 0 | 0.00 | $0.00 | = | = | = | |||||||||
| = | = | = | = | 0 | 0.00 | $0.00 | CASE PRICE | 0.0000 | |||||||||
| Holidays and Vacations | 0 | 0.00 | $0.00 | = | = | = | |||||||||||
| 0 | 0.00 | $0.00 | |||||||||||||||
| Holidays | 0 | 0.00 | $0.00 | ||||||||||||||
| Vacations | 0 | 0.00 | $0.00 | ||||||||||||||
| COST ELEMENT | Holidays | Vacations | Dollars | 0 | 0.00 | $0.00 | |||||||||||
| = | = | = | = | = | 0 | 0.00 | $0.00 | ||||||||||
| Store Worker I | 10 | 10 | $0.00 | ( (Holidays + Vacations) * 8) | 0 | 0.00 | $0.00 | ||||||||||
| Project Manager | 10 | 10 | $0.00 | times Work Hours | = | = | = | = | = | = | |||||||
| 10 | 10 | $0.00 | divided by ( 2080 hours - | TOTALS | 0 | $0.00 | |||||||||||
| 10 | 10 | $0.00 | ( (Holidays + Vacations) * 8) ) | = | = | = | = | = | = | ||||||||
| 10 | 10 | $0.00 | times the hourly rate | ||||||||||||||
| 10 | 10 | $0.00 | in each category | ||||||||||||||
| - | - | - | - | ||||||||||||||
| TOTALS | 60 | $0 | |||||||||||||||
| = | = | = | = | ||||||||||||||
| Holidays and Vacations Health & Welfare | |||||||||||||||||
| Holidays | |||||||||||||||||
| Vacations | H&W | H&W | |||||||||||||||
| COST ELEMENT | Hours X | Rates = | Cost | ||||||||||||||
| = | = | = | = | = | |||||||||||||
| Store Worker I | 0 | 4.18 | $0.00 | ||||||||||||||
| Project Manager | 0 | 4.18 | $0.00 | ||||||||||||||
| 0 | 4.18 | $0.00 | |||||||||||||||
| 0 | 4.18 | $0.00 | |||||||||||||||
| 0 | 4.18 | $0.00 | |||||||||||||||
| 0 | 4.18 | $0.00 | |||||||||||||||
| - | - | - | - | ||||||||||||||
| TOTALS | 0 | $0.00 | |||||||||||||||
| = | = | = | = | ||||||||||||||
| FRINGE CALCULATIONS | |||||||||||||||||
| COST ELEMENT | DOLLARS | ||||||||||||||||
| = | = | = | = | = | = | ||||||||||||
| DIRECT LABOR | $0.00 | ||||||||||||||||
| DIRECT LABOR HEALTH & WELFARE | $0.00 | ||||||||||||||||
| HOLIDAYS AND VACATIONS | $0.00 | ||||||||||||||||
| HOLIDAYS AND VACATIONS HEALTH & WELFARE | $0.00 | ||||||||||||||||
| - | - | - | - | - | - | ||||||||||||
| SUBTOTAL | $0.00 | ||||||||||||||||
| = | = | = | = | = | = | ||||||||||||
| FICA | X | 7.65% | = | $0.00 | |||||||||||||
| FUTA | X | 0.00% | = | $0.00 | |||||||||||||
| SUTA | X | 0.00% | = | $0.00 | |||||||||||||
| Workman's Compensation | X | 0.00% | = | $0.00 | |||||||||||||
| Employer's Liability | X | 0.00% | = | $0.00 | |||||||||||||
| Comprehensive General Liability | X | 0.00% | = | $0.00 | |||||||||||||
| Other | X | 0.00% | = | $0.00 | |||||||||||||
| Other | X | 0.00% | = | $0.00 | |||||||||||||
| - | - | - | - | - | - | ||||||||||||
| TOTAL FRINGES | $0.00 | ||||||||||||||||
| = | = | = | = | = | = |
Click Here to Print
RSHA
| SOLICITATION NUMBER: | HDEC0819R0010 | SOLICITATION NUMBER: | HDEC0819R0010 | SOLICITATION NUMBER: | HDEC0819R0010 | |||||||||||
| COMMISSARY: | Quantico MCB | COMMISSARY: | Quantico MCB | COMMISSARY: | Quantico MCB | |||||||||||
| CONTRACTOR NAME: | CONTRACTOR NAME: | CONTRACTOR NAME: | ||||||||||||||
| R/S/H Operations Work Sheet | R/S/H Operations Work Sheet | R/S/H Operations Work Sheet | ||||||||||||||
| Direct Labor | Contractor Proposed | DOLLAR TOTALS | ||||||||||||||
| R/S/H Supplies & Equipment | ================ | |||||||||||||||
| WDR | ||||||||||||||||
| COST ELEMENT | Hours X | Rates = | Labor Cost | (The elements listed below are SAMPLES and are not to be considered | ||||||||||||
| = | = | = | = | = | a requirement of the solicitation.) | |||||||||||
| Material Handler | 0 | 13.83 | $0.00 | COST ELEMENT | DOLLARS | |||||||||||
| Forklift Operator | 0 | 20.25 | $0.00 | = | = | |||||||||||
| Warehouse Specialist | 0 | 20.25 | $0.00 | Qty. | Unit/ | Extended | DIRECT LABOR | 0.00 | ||||||||
| Project Manager | 0 | 0.00 | $0.00 | Elements | Yearly | Price | Price | HEALTH & WELFARE | 0.00 | |||||||
| 0 | 0.00 | $0.00 | = | = | = | = | = | = | = | = | ||||||
| 0 | 0.00 | $0.00 | Blades, Carton Cutter | 0 | 0.00 | $0.00 | SUB-TOTAL | 0.00 | ||||||||
| - | - | - | - | Cutter, Carton | 0 | 0.00 | $0.00 | |||||||||
| TOTALS | 0 | $0.00 | Dispenser, Tape | 0 | 0.00 | 0.00 | HOLIDAYS & VACATIONS | 0.00 | ||||||||
| = | = | = | = | Safety Shoes | 0 | 0.00 | 0.00 | HOL & VAC. HEALTH & WELFARE | 0.00 | |||||||
| Indirect Labor Hours (Non-Working) | 0 | Tape Masking | 0 | 0.00 | 0.00 | = | = | |||||||||
| = | Back Brace | 0 | 0.00 | 0.00 | SUB-TOTAL | 0.00 | ||||||||||
| Direct Labor Hours (Productive/Working) | 0 | Cart, Bushel | 0 | 0.00 | 0.00 | |||||||||||
| = | Cart, Stocking | 0 | 0.00 | 0.00 | FRINGES | 0.00 | ||||||||||
| Pallet Jacks | 0 | 0.00 | 0.00 | |||||||||||||
| Direct Labor Health & Welfare | 0 | 0.00 | 0.00 | EQUIPMENT & SUPPLIES | 0.00 | |||||||||||
| 0 | 0.00 | 0.00 | - | |||||||||||||
| H&W | H&W | 0 | 0.00 | 0.00 | SUB-TOTAL | 0.00 | ||||||||||
| COST ELEMENT | Hours X | Rates = | Cost | 0 | 0.00 | 0.00 | = | |||||||||
| = | = | = | = | = | 0 | 0.00 | 0.00 | G&A | 0.00% | 0.00 | ||||||
| Material Handler | 0 | 4.18 | $0.00 | 0 | 0.00 | 0.00 | ||||||||||
| Forklift Operator | 0 | 4.18 | $0.00 | 0 | 0.00 | 0.00 | PROFIT | 0.00% | 0.00 | |||||||
| Warehouse Specialist | 0 | 4.18 | $0.00 | 0 | 0.00 | 0.00 | ||||||||||
| Project Manager | 0 | 4.18 | $0.00 | 0 | 0.00 | 0.00 | = | = | ||||||||
| 0 | 4.18 | $0.00 | 0 | 0.00 | 0.00 | GRAND TOTAL | 0.00 | |||||||||
| 0 | 4.18 | $0.00 | 0 | 0.00 | 0.00 | = | = | = | = | |||||||
| - | - | - | - | 0 | 0.00 | 0.00 | MO. PRICE | 0.00 | ||||||||
| TOTALS | 0 | $0.00 | 0 | 0.00 | 0.00 | = | = | = | ||||||||
| = | = | = | = | 0 | 0.00 | 0.00 | ||||||||||
| Holidays and Vacations | 0 | 0.00 | 0.00 | |||||||||||||
| 0 | 0.00 | 0.00 | ||||||||||||||
| Holidays | 0 | 0.00 | 0.00 | |||||||||||||
| Vacations | 0 | 0.00 | 0.00 | |||||||||||||
| COST ELEMENT | Holidays | Vacations | Dollars | 0 | 0.00 | 0.00 | ||||||||||
| = | = | = | = | = | 0 | 0.00 | 0.00 | |||||||||
| Material Handler | 10 | 10 | $0.00 | ( (Holidays + Vacations) * 8) | 0 | 0.00 | 0.00 | |||||||||
| Forklift Operator | 10 | 10 | $0.00 | times Work Hours | = | = | = | = | = | |||||||
| Warehouse Specialist | 10 | 10 | $0.00 | divided by ( 2080 hours - | TOTALS | 0 | $0.00 | |||||||||
| Project Manager | 10 | 10 | $0.00 | ( (Holidays + Vacations) * 8) ) | = | = | = | = | = | = | ||||||
| 10 | 10 | $0.00 | times the hourly rate | |||||||||||||
| 10 | 10 | $0.00 | in each category | |||||||||||||
| - | - | - | - | |||||||||||||
| TOTALS | 60 | $0 | ||||||||||||||
| = | = | = | = | |||||||||||||
| Holidays and Vacations Health & Welfare | ||||||||||||||||
| Holidays | ||||||||||||||||
| Vacations | H&W | H&W | ||||||||||||||
| COST ELEMENT | Hours X | Rates = | Cost | |||||||||||||
| = | = | = | = | = | ||||||||||||
| Material Handler | 0 | 4.18 | $0.00 | |||||||||||||
| Forklift Operator | 0 | 4.18 | $0.00 | |||||||||||||
| Warehouse Specialist | 0 | 4.18 | $0.00 | |||||||||||||
| Project Manager | 0 | 4.18 | $0.00 | |||||||||||||
| 0 | 4.18 | $0.00 | ||||||||||||||
| 0 | 4.18 | $0.00 | ||||||||||||||
| - | - | - | - | |||||||||||||
| TOTALS | 0 | $0.00 | ||||||||||||||
| = | = | = | = | |||||||||||||
| FRINGE CALCULATIONS | ||||||||||||||||
| COST ELEMENT | DOLLARS | |||||||||||||||
| = | = | = | = | = | = | |||||||||||
| DIRECT LABOR | $0.00 | |||||||||||||||
| DIRECT LABOR HEALTH & WELFARE | $0.00 | |||||||||||||||
| HOLIDAYS AND VACATIONS | $0.00 | |||||||||||||||
| HOLIDAYS AND VACATIONS HEALTH & WELFARE | $0.00 | |||||||||||||||
| - | - | - | - | - | - | |||||||||||
| SUBTOTAL | $0.00 | |||||||||||||||
| = | = | = | = | = | = | |||||||||||
| FICA | X | 7.65% | = | $0.00 | ||||||||||||
| FUTA | X | 0.00% | = | $0.00 | ||||||||||||
| SUTA | X | 0.00% | = | $0.00 | ||||||||||||
| Workman's Compensation | X | 0.00% | = | $0.00 | ||||||||||||
| Employer's Liability | X | 0.00% | = | $0.00 | ||||||||||||
| Comprehensive General Liability | X | 0.00% | = | $0.00 | ||||||||||||
| Other | X | 0.00% | = | $0.00 | ||||||||||||
| Other | X | 0.00% | = | $0.00 | ||||||||||||
| - | - | - | - | - | - | |||||||||||
| TOTAL FRINGES | $0.00 | |||||||||||||||
| = | = | = | = | = | = |
Click Here to Print
RSHA Custodial
| SOLICITATION NUMBER: | HDEC0819R0010 | SOLICITATION NUMBER: | HDEC0819R0010 | SOLICITATION NUMBER: | HDEC0819R0010 | |||||||||||
| COMMISSARY: | Quantico MCB | COMMISSARY: | Quantico MCB | COMMISSARY: | Quantico MCB | |||||||||||
| CONTRACTOR NAME: | CONTRACTOR NAME: | CONTRACTOR NAME: | ||||||||||||||
| RSHA & Outside Areas Custodial Operations Work Sheet | RSHA & Outside Areas Custodial Operations Work Sheet | RSHA & Outside Areas Custodial Operations Work Sheet | ||||||||||||||
| Direct Labor | Contractor Proposed | DOLLAR TOTALS | ||||||||||||||
| Custodial Supplies & Equipment | ================ | |||||||||||||||
| WDR | ||||||||||||||||
| COST ELEMENT | Hours X | Rates = | Labor Cost | (The elements listed below are SAMPLES and are not to be considered | ||||||||||||
| = | = | = | = | = | a requirement of the solicitation.) | |||||||||||
| Janitor ( RSHA & Outside Areas) | 0 | 13.50 | $0.00 | COST ELEMENT | DOLLARS | |||||||||||
| Project Manager | 0 | 0.00 | $0.00 | = | = | |||||||||||
| 0 | 0.00 | $0.00 | Qty. | Unit/ | Extended | DIRECT LABOR | 0.00 | |||||||||
| 0 | 0.00 | $0.00 | Elements | Yearly | Price | Price | HEALTH & WELFARE | 0.00 | ||||||||
| 0 | 0.00 | $0.00 | = | = | = | = | = | = | = | = | ||||||
| 0 | 0.00 | $0.00 | Bowl, Cleaner | 0 | 0.00 | $0.00 | SUB-TOTAL | 0.00 | ||||||||
| - | - | - | - | Cartridges | 0 | 0.00 | $0.00 | |||||||||
| TOTALS | 0 | $0.00 | Cleaner, Carpet | 0 | 0.00 | 0.00 | HOLIDAYS & VACATIONS | 0.00 | ||||||||
| = | = | = | = | Cleaner, Compound | 0 | 0.00 | 0.00 | HOL & VAC. HEALTH & WELFARE | 0.00 | |||||||
| Indirect Labor Hours (Non-Working) | 0 | Cleaner, Glass | 0 | 0.00 | 0.00 | = | = | |||||||||
| = | Cleaner, Neutral | 0 | 0.00 | 0.00 | SUB-TOTAL | 0.00 | ||||||||||
| Direct Labor Hours (Productive/Working) | 0 | Disinfectant | 0 | 0.00 | 0.00 | |||||||||||
| = | Dust Cloths | 0 | 0.00 | 0.00 | FRINGES | 0.00 | ||||||||||
| Dust Mop Heads | 0 | 0.00 | 0.00 | |||||||||||||
| Direct Labor Health & Welfare | Floor Finish | 0 | 0.00 | 0.00 | EQUIPMENT & SUPPLIES | 0.00 | ||||||||||
| Floor Sealer | 0 | 0.00 | 0.00 | - | ||||||||||||
| H&W | H&W | Floor Stripper | 0 | 0.00 | 0.00 | SUB-TOTAL | 0.00 | |||||||||
| COST ELEMENT | Hours X | Rates = | Cost | Gloves | 0 | 0.00 | 0.00 | = | ||||||||
| = | = | = | = | = | Gloves, Latex | 0 | 0.00 | 0.00 | G&A | 0.00% | 0.00 | |||||
| Janitor ( RSHA & Outside Areas) | 0 | 4.18 | $0.00 | Kintowel Wiper | 0 | 0.00 | 0.00 | |||||||||
| Project Manager | 0 | 4.18 | $0.00 | LiquidLive | 0 | 0.00 | 0.00 | PROFIT | 0.00% | 0.00 | ||||||
| 0 | 4.18 | $0.00 | Masks | 0 | 0.00 | 0.00 | ||||||||||
| 0 | 4.18 | $0.00 | Mop Head, Wet | 0 | 0.00 | 0.00 | = | = | ||||||||
| 0 | 4.18 | $0.00 | Neutralizer | 0 | 0.00 | 0.00 | GRAND TOTAL | 0.00 | ||||||||
| 0 | 4.18 | $0.00 | Pads, Aqua 27" | 0 | 0.00 | 0.00 | = | = | = | = | ||||||
| - | - | - | - | Pads, Buffing | 0 | 0.00 | 0.00 | MONTHLY PRICE | 0.00 | |||||||
| TOTALS | 0 | $0.00 | Pads, Doodle Bug | 0 | 0.00 | 0.00 | = | = | = | |||||||
| = | = | = | = | Polish, Furniture | 0 | 0.00 | 0.00 | |||||||||
| Holidays and Vacations | Polish, Metal | 0 | 0.00 | 0.00 | ||||||||||||
| Propane | 0 | 0.00 | 0.00 | |||||||||||||
| Holidays | Rain Suit | 0 | 0.00 | 0.00 | ||||||||||||
| Vacations | Respirators | 0 | 0.00 | 0.00 | ||||||||||||
| COST ELEMENT | Holidays | Vacations | Dollars | Retainer | 0 | 0.00 | 0.00 | |||||||||
| = | = | = | = | = | Safety Shoes | 0 | 0.00 | 0.00 | ||||||||
| Janitor ( RSHA & Outside Areas) | 10 | 10 | $0.00 | ( (Holidays + Vacations) * 8) | Sanitizer, Compound D2 | 0 | 0.00 | 0.00 | ||||||||
| Project Manager | 10 | 10 | $0.00 | times Work Hours | Soap, Hand, Liquid | 0 | 0.00 | 0.00 | ||||||||
| 10 | 10 | $0.00 | divided by ( 2080 hours - | Sponges | 0 | 0.00 | 0.00 | |||||||||
| 10 | 10 | $0.00 | ( (Holidays + Vacations) * 8) ) | Spray Bottle | 0 | 0.00 | 0.00 | |||||||||
| 10 | 10 | $0.00 | times the hourly rate | Spray Bottle Trigger | 0 | 0.00 | 0.00 | |||||||||
| 10 | 10 | $0.00 | in each category | Spray Buff | 0 | 0.00 | 0.00 | |||||||||
| - | - | - | - | Toilet Tissue, 96rl | 0 | 0.00 | 0.00 | |||||||||
| TOTALS | 60 | $0 | Towels, Pop-Up | 0 | 0.00 | 0.00 | ||||||||||
| = | = | = | = | Trash Liners, Lg | 0 | 0.00 | 0.00 | |||||||||
| Trash Liners, Sm | 0 | 0.00 | 0.00 | |||||||||||||
| Holidays and Vacations Health & Welfare | Vaccuum Belts | 0 | 0.00 | 0.00 | ||||||||||||
| Visors | 0 | 0.00 | 0.00 | |||||||||||||
| Holidays | Battery Charger | 0 | 0.00 | 0.00 | ||||||||||||
| Vacations | H&W | H&W | Buffer, High Speed | 0 | 0.00 | 0.00 | ||||||||||
| COST ELEMENT | Hours X | Rates = | Cost | Burnisher High Speed | 0 | 0.00 | 0.00 | |||||||||
| = | = | = | = | = | Burnisher, 21" Propane | 0 | 0.00 | 0.00 | ||||||||
| Janitor ( RSHA & Outside Areas) | 0 | 4.18 | $0.00 | Caddy, Maid | 0 | 0.00 | 0.00 | |||||||||
| Project Manager | 0 | 4.18 | $0.00 | Carpet Extractor | 0 | 0.00 | 0.00 | |||||||||
| 0 | 4.18 | $0.00 | Floor Scrubber, Low Speed | 0 | 0.00 | 0.00 | ||||||||||
| 0 | 4.18 | $0.00 | Scrubber, 20" | 0 | 0.00 | 0.00 | ||||||||||
| 0 | 4.18 | $0.00 | Scrubber, Auto | 0 | 0.00 | 0.00 | ||||||||||
| 0 | 4.18 | $0.00 | Vacuum, Wet/Dry | 0 | 0.00 | 0.00 | ||||||||||
| - | - | - | - | Washer, Pressure | 0 | 0.00 | 0.00 | |||||||||
| TOTALS | 0 | $0.00 | 0 | 0.00 | 0.00 | |||||||||||
| = | = | = | = | 0 | 0.00 | 0.00 | ||||||||||
| = | = | = | = | = | = | |||||||||||
| TOTALS | $0.00 | |||||||||||||||
| FRINGE CALCULATIONS | = | = | = | = | = | = | ||||||||||
| COST ELEMENT | DOLLARS | |||||||||||||||
| = | = | = | = | = | = | |||||||||||
| DIRECT LABOR | $0.00 | |||||||||||||||
| DIRECT LABOR HEALTH & WELFARE | $0.00 | |||||||||||||||
| HOLIDAYS AND VACATIONS | $0.00 | |||||||||||||||
| HOLIDAYS AND VACATIONS HEALTH & WELFARE | $0.00 | |||||||||||||||
| - | - | - | - | - | - | |||||||||||
| SUBTOTAL | $0.00 | |||||||||||||||
| = | = | = | = | = | = | |||||||||||
| FICA | X | 7.65% | = | $0.00 | ||||||||||||
| FUTA | X | 0.00% | = | $0.00 | ||||||||||||
| SUTA | X | 0.00% | = | $0.00 | ||||||||||||
| Workman's Compensation | X | 0.00% | = | $0.00 | ||||||||||||
| Employer's Liability | X | 0.00% | = | $0.00 | ||||||||||||
| Comprehensive General Liability | X | 0.00% | = | $0.00 | ||||||||||||
| Other | X | 0.00% | = | $0.00 | ||||||||||||
| Other | X | 0.00% | = | $0.00 | ||||||||||||
| - | - | - | - | - | - | |||||||||||
| TOTAL FRINGES | $0.00 | |||||||||||||||
| = | = | = | = | = | = |
Click Here to Print
Meat Custodial
| SOLICITATION NUMBER: | HDEC0819R0010 | SOLICITATION NUMBER: | HDEC0819R0010 | SOLICITATION NUMBER: | HDEC0819R0010 | |||||||||||
| COMMISSARY: | Quantico MCB | COMMISSARY: | Quantico MCB | COMMISSARY: | Quantico MCB | |||||||||||
| CONTRACTOR NAME: | CONTRACTOR NAME: | CONTRACTOR NAME: | ||||||||||||||
| Meat Custodial Operations Work Sheet | Meat Custodial Operations Work Sheet | Meat Custodial Operations Work Sheet | ||||||||||||||
| Direct Labor | Contractor Proposed | DOLLAR TOTALS | ||||||||||||||
| Custodial Supplies & Equipment | ================ | |||||||||||||||
| WDR | ||||||||||||||||
| COST ELEMENT | Hours X | Rates = | Labor Cost | (The elements listed below are SAMPLES and are not to be considered | ||||||||||||
| = | = | = | = | = | a requirement of the solicitation.) | |||||||||||
| Janitor (Meat) | 0 | 13.50 | $0.00 | COST ELEMENT | DOLLARS | |||||||||||
| Project Manager | 0 | 0.00 | $0.00 | = | = | |||||||||||
| 0 | 0.00 | $0.00 | Qty. | Unit/ | Extended | DIRECT LABOR | 0.00 | |||||||||
| 0 | 0.00 | $0.00 | Elements | Yearly | Price | Price | HEALTH & WELFARE | 0.00 | ||||||||
| 0 | 0.00 | $0.00 | = | = | = | = | = | = | = | = | ||||||
| 0 | 0.00 | $0.00 | Bowl, Cleaner | 0 | 0.00 | $0.00 | SUB-TOTAL | 0.00 | ||||||||
| - | - | - | - | Cartridges | 0 | 0.00 | $0.00 | |||||||||
| TOTALS | 0 | $0.00 | Cleaner, Carpet | 0 | 0.00 | 0.00 | HOLIDAYS & VACATIONS | 0.00 | ||||||||
| = | = | = | = | Cleaner, Compound | 0 | 0.00 | 0.00 | HOL & VAC. HEALTH & WELFARE | 0.00 | |||||||
| Indirect Labor Hours (Non-Working) | 0 | Cleaner, Glass | 0 | 0.00 | 0.00 | = | = | |||||||||
| = | Cleaner, Neutral | 0 | 0.00 | 0.00 | SUB-TOTAL | 0.00 | ||||||||||
| Direct Labor Hours (Productive/Working) | 0 | Disinfectant | 0 | 0.00 | 0.00 | |||||||||||
| = | Dust Cloths | 0 | 0.00 | 0.00 | FRINGES | 0.00 | ||||||||||
| Dust Mop Heads | 0 | 0.00 | 0.00 | |||||||||||||
| Direct Labor Health & Welfare | Floor Finish | 0 | 0.00 | 0.00 | EQUIPMENT & SUPPLIES | 0.00 | ||||||||||
| Floor Sealer | 0 | 0.00 | 0.00 | - | ||||||||||||
| H&W | H&W | Floor Stripper | 0 | 0.00 | 0.00 | SUB-TOTAL | 0.00 | |||||||||
| COST ELEMENT | Hours X | Rates = | Cost | Gloves | 0 | 0.00 | 0.00 | = | ||||||||
| = | = | = | = | = | Gloves, Latex | 0 | 0.00 | 0.00 | G&A | 0.00% | 0.00 | |||||
| Janitor (Meat) | 0 | 4.18 | $0.00 | Kintowel Wiper | 0 | 0.00 | 0.00 | |||||||||
| Project Manager | 0 | 4.18 | $0.00 | LiquidLive | 0 | 0.00 | 0.00 | PROFIT | 0.00% | 0.00 | ||||||
| 0 | 4.18 | $0.00 | Masks | 0 | 0.00 | 0.00 | ||||||||||
| 0 | 4.18 | $0.00 | Mop Head, Wet | 0 | 0.00 | 0.00 | = | = | ||||||||
| 0 | 4.18 | $0.00 | Neutralizer | 0 | 0.00 | 0.00 | GRAND TOTAL | 0.00 | ||||||||
| 0 | 4.18 | $0.00 | Pads, Aqua 27" | 0 | 0.00 | 0.00 | = | = | = | = | ||||||
| - | - | - | - | Pads, Buffing | 0 | 0.00 | 0.00 | MONTHLY PRICE | 0.00 | |||||||
| TOTALS | 0 | $0.00 | Pads, Doodle Bug | 0 | 0.00 | 0.00 | = | = | = | |||||||
| = | = | = | = | Polish, Furniture | 0 | 0.00 | 0.00 | |||||||||
| Holidays and Vacations | Polish, Metal | 0 | 0.00 | 0.00 | ||||||||||||
| Propane | 0 | 0.00 | 0.00 | |||||||||||||
| Holidays | Rain Suit | 0 | 0.00 | 0.00 | ||||||||||||
| Vacations | Respirators | 0 | 0.00 | 0.00 | ||||||||||||
| COST ELEMENT | Holidays | Vacations | Dollars | Retainer | 0 | 0.00 | 0.00 | |||||||||
| = | = | = | = | = | Safety Shoes | 0 | 0.00 | 0.00 | ||||||||
| Janitor (Meat) | 10 | 10 | $0.00 | ( (Holidays + Vacations) * 8) | Sanitizer, Compound D2 | 0 | 0.00 | 0.00 | ||||||||
| Project Manager | 10 | 10 | $0.00 | times Work Hours | Soap, Hand, Liquid | 0 | 0.00 | 0.00 | ||||||||
| 10 | 10 | $0.00 | divided by ( 2080 hours - | Sponges | 0 | 0.00 | 0.00 | |||||||||
| 10 | 10 | $0.00 | ( (Holidays + Vacations) * 8) ) | Spray Bottle | 0 | 0.00 | 0.00 | |||||||||
| 10 | 10 | $0.00 | times the hourly rate | Spray Bottle Trigger | 0 | 0.00 | 0.00 | |||||||||
| 10 | 10 | $0.00 | in each category | Spray Buff | 0 | 0.00 | 0.00 | |||||||||
| - | - | - | - | Toilet Tissue, 96rl | 0 | 0.00 | 0.00 | |||||||||
| TOTALS | 60 | $0 | Towels, Pop-Up | 0 | 0.00 | 0.00 | ||||||||||
| = | = | = | = | Trash Liners, Lg | 0 | 0.00 | 0.00 | |||||||||
| Trash Liners, Sm | 0 | 0.00 | 0.00 | |||||||||||||
| Holidays and Vacations Health & Welfare | Vaccuum Belts | 0 | 0.00 | 0.00 | ||||||||||||
| Visors | 0 | 0.00 | 0.00 | |||||||||||||
| Holidays | Battery Charger | 0 | 0.00 | 0.00 | ||||||||||||
| Vacations | H&W | H&W | Buffer, High Speed | 0 | 0.00 | 0.00 | ||||||||||
| COST ELEMENT | Hours X | Rates = | Cost | Burnisher High Speed | 0 | 0.00 | 0.00 | |||||||||
| = | = | = | = | = | Burnisher, 21" Propane | 0 | 0.00 | 0.00 | ||||||||
| Janitor (Meat) | 0 | 4.18 | $0.00 | Caddy, Maid | 0 | 0.00 | 0.00 | |||||||||
| Project Manager | 0 | 4.18 | $0.00 | Carpet Extractor | 0 | 0.00 | 0.00 | |||||||||
| 0 | 4.18 | $0.00 | Floor Scrubber, Low Speed | 0 | 0.00 | 0.00 | ||||||||||
| 0 | 4.18 | $0.00 | Scrubber, 20" | 0 | 0.00 | 0.00 | ||||||||||
| 0 | 4.18 | $0.00 | Scrubber, Auto | 0 | 0.00 | 0.00 | ||||||||||
| 0 | 4.18 | $0.00 | Vacuum, Wet/Dry | 0 | 0.00 | 0.00 | ||||||||||
| - | - | - | - | Washer, Pressure | 0 | 0.00 | 0.00 | |||||||||
| TOTALS | 0 | $0.00 | 0 | 0.00 | 0.00 | |||||||||||
| = | = | = | = | 0 | 0.00 | 0.00 | ||||||||||
| = | = | = | = | = | = | |||||||||||
| TOTALS | $0.00 | |||||||||||||||
| FRINGE CALCULATIONS | = | = | = | = | = | = | ||||||||||
| COST ELEMENT | DOLLARS | |||||||||||||||
| = | = | = | = | = | = | |||||||||||
| DIRECT LABOR | $0.00 | |||||||||||||||
| DIRECT LABOR HEALTH & WELFARE | $0.00 | |||||||||||||||
| HOLIDAYS AND VACATIONS | $0.00 | |||||||||||||||
| HOLIDAYS AND VACATIONS HEALTH & WELFARE | $0.00 | |||||||||||||||
| - | - | - | - | - | - | |||||||||||
| SUBTOTAL | $0.00 | |||||||||||||||
| = | = | = | = | = | = | |||||||||||
| FICA | X | 7.65% | = | $0.00 | ||||||||||||
| FUTA | X | 0.00% | = | $0.00 | ||||||||||||
| SUTA | X | 0.00% | = | $0.00 | ||||||||||||
| Workman's Compensation | X | 0.00% | = | $0.00 | ||||||||||||
| Employer's Liability | X | 0.00% | = | $0.00 | ||||||||||||
| Comprehensive General Liability | X | 0.00% | = | $0.00 | ||||||||||||
| Other | X | 0.00% | = | $0.00 | ||||||||||||
| Other | X | 0.00% | = | $0.00 | ||||||||||||
| - | - | - | - | - | - | |||||||||||
| TOTAL FRINGES | $0.00 | |||||||||||||||
| = | = | = | = | = | = |
Click Here to Print
Year Totals
| SOLICITATION NUMBER: | HDEC0819R0010 | |
| COMMISSARY: | Quantico MCB | |
| CONTRACTOR NAME: | ||
| BASE YEAR GRAND TOTALS | ||
| DOLLAR TOTALS | ||
| ================ | ||
| COST ELEMENT | DOLLARS | |
| = | = | |
| DIRECT LABOR | 0.00 | |
| DIRECT LABOR HEALTH & WELFARE | 0.00 | |
| = | = | |
| TOTAL | 0.00 | |
| HOLIDAYS AND VACATIONS | 0.00 | |
| HOLIDAYS AND VACATIONS HEALTH & WELFARE | 0.00 | |
| = | = | |
| TOTAL | 0.00 | |
| FRINGE CALCULATIONS | 0.00 | |
| SUPPLIES & EQUIPMENT | 0.00 | |
| SUB-TOTAL | 0.00 | |
| G&A | 0.00 | |
| PROFIT | 0.00 | |
| = | = | |
| GRAND TOTAL | 0.00 | |
| = | = |
Click Here to Print
5 Yr. Totals
| SOLICITATION NUMBER: | HDEC0819R0010 | |||||
| COMMISSARY: | Quantico MCB | |||||
| CONTRACTOR NAME: | ||||||
| GRAND TOTALS | ||||||
| BASE YEAR | OPTION 1 | OPTION 2 | OPTION 3 | OPTION 4 | GRAND | |
| COST ELEMENT | DOLLARS | DOLLARS | DOLLARS | DOLLARS | DOLLARS | TOTALS |
| = | = | = | = | = | = | = |
| DIRECT LABOR | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| DIRECT LABOR HEALTH & WELFARE | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| = | = | = | = | = | = | = |
| TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| HOLIDAYS AND VACATIONS | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| HOLIDAYS AND VACATIONS HEALTH & WELFARE | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| = | = | = | = | = | = | = |
| TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| FRINGE CALCULATIONS | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| SUPPLIES & EQUIPMENT | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| SUB-TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| G&A | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| PROFIT | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| = | = | = | = | = | = | = |
| GRAND TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| = | = | = | = | = | = | = |
| SOLICITATION NUMBER: | HDEC0819R0010 | |||||
| COMMISSARY: | Quantico MCB | |||||
| CONTRACTOR NAME: | ||||||
| ESCALATION FACTORS | ||||||
| OPTION 1 | OPTION 2 | OPTION 3 | OPTION 4 | |||
| COST ELEMENT | DOLLARS | DOLLARS | DOLLARS | DOLLARS | ||
| = | = | = | = | = | = | |
| DIRECT LABOR | 0.00% | 0.00% | 0.00% | 0.00% | ||
| DIRECT LABOR HEALTH & WELFARE | 0.00% | 0.00% | 0.00% | 0.00% | ||
| = | = | = | = | = | = | |
| TOTAL | ||||||
| HOLIDAYS AND VACATIONS | 0.00% | 0.00% | 0.00% | 0.00% | ||
| HOLIDAYS AND VACATIONS. HEALTH & WELFARE | 0.00% | 0.00% | 0.00% | 0.00% | ||
| = | = | = | = | = | = | |
| TOTAL | ||||||
| FRINGE CALCULATIONS | 0.00% | 0.00% | 0.00% | 0.00% | ||
| SUPPLIES & EQUIPMENT | 0.00% | 0.00% | 0.00% | 0.00% | ||
| SUB-TOTAL | ||||||
| G&A | 0.00% | 0.00% | 0.00% | 0.00% | ||
| PROFIT | 0.00% | 0.00% | 0.00% | 0.00% | ||
| = | = | = | = | = | = | |
| GRAND TOTAL | ||||||
| = | = | = | = | = | = |
Click Here to Print
Shelf Stocker Loaded Wage Rate
| Attachment 3 | Attachment 3 | Attachment 3 | ||||||||||||||
| SOLICITATION NUMBER: | HDEC0819R0010 | SOLICITATION NUMBER: | HDEC0819R0010 | SOLICITATION NUMBER: | HDEC0819R0010 | |||||||||||
| COMMISSARY: | Quantico MCB | COMMISSARY: | Quantico MCB | COMMISSARY: | Quantico MCB | |||||||||||
| CONTRACTOR NAME: | CONTRACTOR NAME: | CONTRACTOR NAME: | ||||||||||||||
| Shelf Stocker Loaded Wage Rate Work Sheet | Shelf Stocker Loaded Wage Rate Work Sheet | Shelf Stocker Loaded Wage Rate Work Sheet | ||||||||||||||
| Direct Labor | Contractor Proposed | DOLLAR TOTALS | ||||||||||||||
| Shelf Stocking Supplies & Equipment | ================ | |||||||||||||||
| WD | ||||||||||||||||
| COST ELEMENT | Hours X | Rates = | Labor Cost | |||||||||||||
| = | = | = | = | = | ||||||||||||
| Store Worker I | 1 | $14.12 | $14.12 | COST ELEMENT | DOLLARS | |||||||||||
| = | = | |||||||||||||||
| NOTE: A QUANTITY OF 1 HAS BEEN ENTERED TO | DIRECT LABOR | $14.12 | ||||||||||||||
| CALCULATE THE LOADED HOURLY RATE. PROCEED | DIRECT LABOR HEALTH & WELFARE | $4.18 | ||||||||||||||
| TO ENTER FRINGE, G&A, AND PROFIT PERCENTAGES | = | = | ||||||||||||||
| Qty. | Unit/ | Extended | SUB-TOTAL | $18.30 | ||||||||||||
| - | - | - | - | Elements | Yearly | Price | Price | |||||||||
| TOTALS | 1 | $14.12 | = | = | = | = | = | = | HOLIDAYS/SICK/VACATIONS | $1.38 | ||||||
| = | = | = | = | Supplies and Equipment Costs | 0 | 0.00 | $0.00 | HOL & VAC. HEALTH & WELFARE | $0.35 | |||||||
| Indirect Labor Hours (Non-Working) | are not included in the loaded | 0 | 0.00 | $0.00 | = | = | ||||||||||
| = | rate for Store Worker I | 0 | 0.00 | 0.00 | SUB-TOTAL | $1.73 | ||||||||||
| Direct Labor Hours (Productive/Working) | 1 | 0 | 0.00 | 0.00 | ||||||||||||
| = | 0 | 0.00 | 0.00 | FRINGES | $1.53 | |||||||||||
| 0 | 0.00 | 0.00 | ||||||||||||||
| 0 | 0.00 | 0.00 | EQUIPMENT & SUPPLIES | $0.00 | ||||||||||||
| Direct Labor Health and Welfare | 0 | 0.00 | 0.00 | - | ||||||||||||
| 0 | 0.00 | 0.00 | SUB-TOTAL | $21.56 | ||||||||||||
| H&W | H&W | 0 | 0.00 | 0.00 | = | |||||||||||
| COST ELEMENT | Hours | Rates | Cost | 0 | 0.00 | 0.00 | G&A | 0.00% | $0.00 | |||||||
| = | = | = | = | = | 0 | 0.00 | 0.00 | |||||||||
| Store Worker I | 1 | $4.18 | $4.18 | 0 | 0.00 | 0.00 | PROFIT | 0.00% | $0.00 | |||||||
| 0 | 0.00 | 0.00 | ||||||||||||||
| 0 | 0.00 | 0.00 | = | = | ||||||||||||
| 0 | 0.00 | 0.00 | GRAND TOTAL | $21.56 | ||||||||||||
| 0 | 0.00 | 0.00 | = | = | = | = | ||||||||||
| 0 | = | = | = | = | = | = | ||||||||||
| - | - | - | - | TOTALS | $0.00 | |||||||||||
| TOTALS | 1 | $4.18 | = | = | = | = | = | |||||||||
| = | = | = | = | |||||||||||||
| Holidays, Sick and Vacations | ||||||||||||||||
| Holidays, Sick, | ||||||||||||||||
| Sick/ | Vacations | |||||||||||||||
| COST ELEMENT | Holidays | Vacations | Dollars | |||||||||||||
| = | = | = | = | = | ||||||||||||
| Store Worker I | 10 | 10 | $1.38 | |||||||||||||
| (Work hours divided by ((2080 hours- | ||||||||||||||||
| (Holidays/Sick+ Vacations)*8))) * | ||||||||||||||||
| ((Closed Holidays*8*Hourly rate)+ | ||||||||||||||||
| (Holidays worked*8*Hourly rate* time & half))+ | ||||||||||||||||
| 0 | (Work Hours divided by(2080-((Holidays/Sick+ | |||||||||||||||
| - | - | - | - | Vacations)*8)))*(Vacations *8*Hourly rate) | ||||||||||||
| TOTALS | 10 | $1.38 | ||||||||||||||
| = | = | = | = | |||||||||||||
| Holidays and Vacations Health & Welfare | ||||||||||||||||
| Holidays/Sick/ | H&W | H&W | ||||||||||||||
| COST ELEMENT | Vacations | Rates | Cost | |||||||||||||
| = | = | = | = | = | ||||||||||||
| Store Worker I | 0.1 | $4.18 | $0.35 | |||||||||||||
| - | - | - | - | |||||||||||||
| TOTALS | 0 | $0.35 | ||||||||||||||
| = | = | = | = | |||||||||||||
| FRINGE CALCULATIONS | ||||||||||||||||
| COST ELEMENT | DOLLARS | |||||||||||||||
| = | = | = | = | = | = | |||||||||||
| DIRECT LABOR COST | $14.12 | |||||||||||||||
| DIRECT HEALTH & WELFARE COSTS | $4.18 | |||||||||||||||
| HOLIDAYS/SICK/VACATION | $1.38 | |||||||||||||||
| HOLIDAYS AND VACATIONS HEALTH & WELFARE | $0.35 | |||||||||||||||
| - | - | - | - | - | - | |||||||||||
| SUBTOTAL | $20.03 | |||||||||||||||
| = | = | = | = | = | = | |||||||||||
| FICA | X | 7.65% | = | $1.53 | ||||||||||||
| FUTA | X | 0.00% | = | $0.00 | ||||||||||||
| SUTA | X | 0.00% | = | $0.00 | ||||||||||||
| Workman's Compensation | X | 0.00% | = | $0.00 | ||||||||||||
| Employer's Liability | X | 0.00% | = | $0.00 | ||||||||||||
| Comprehensive General Liability | X | 0.00% | = | $0.00 | ||||||||||||
| Other | X | 0.00% | = | $0.00 | ||||||||||||
| Other | X | 0.00% | = | $0.00 | ||||||||||||
| - | - | - | - | - | - | |||||||||||
| TOTAL FRINGES | $1.53 | |||||||||||||||
| = | = | = | = | = | = |
Click Here to Print
WS & FO Loaded Wage Rate
| Attachment 4 | Attachment 4 | Attachment 4 | ||||||||||||||
| SOLICITATION NUMBER: | HDEC0819R0010 | SOLICITATION NUMBER: | HDEC0819R0010 | SOLICITATION NUMBER: | HDEC0819R0010 | |||||||||||
| COMMISSARY: | Quantico MCB | COMMISSARY: | Quantico MCB | COMMISSARY: | Quantico MCB | |||||||||||
| CONTRACTOR NAME: | CONTRACTOR NAME: | CONTRACTOR NAME: | ||||||||||||||
| Warehouse Specialist/Forklift Operator Loaded Wage Rate Work Sheet | Warehouse Specialist/Forklift Operator Loaded Wage Rate Work Sheet | Warehouse Specialist/Forklift Operator Loaded Wage Rate Work Sheet | ||||||||||||||
| Direct Labor | Contractor Proposed | DOLLAR TOTALS | ||||||||||||||
| R/S/H Supplies & Equipment | ================ | |||||||||||||||
| WD | ||||||||||||||||
| COST ELEMENT | Hours X | Rates = | Labor Cost | |||||||||||||
| = | = | = | = | = | ||||||||||||
| Forklift Operator/Warehouse Specialist | 1 | $20.25 | $20.25 | COST ELEMENT | DOLLARS | |||||||||||
| = | = | |||||||||||||||
| NOTE: A QUANTITY OF 1 HAS BEEN ENTERED TO | DIRECT LABOR | $20.25 | ||||||||||||||
| CALCULATE THE LOADED HOURLY RATE. PROCEED | DIRECT LABOR HEALTH & WELFARE | $4.48 | ||||||||||||||
| TO ENTER FRINGE, G&A, AND PROFIT PERCENTAGES | = | = | ||||||||||||||
| SUB-TOTAL | $24.73 | |||||||||||||||
| - | - | - | - | Qty. | Unit/ | Extended | ||||||||||
| TOTALS | 1 | $20.25 | Elements | Yearly | Price | Price | HOLIDAYS/SICK/VACATIONS | $1.98 | ||||||||
| = | = | = | = | = | = | = | = | = | = | HOL & VAC. HEALTH & WELFARE | $0.35 | |||||
| Indirect Labor Hours (Non-Working) | Supplies and Equipment Costs | 0 | 0.00 | $0.00 | = | = | ||||||||||
| = | are not included in the loaded | 0 | 0.00 | $0.00 | SUB-TOTAL | $2.33 | ||||||||||
| Direct Labor Hours (Productive/Working) | 1 | rate for Forklift Operator and/or Warehouse Specialist | 0 | 0.00 | 0.00 | |||||||||||
| = | 0 | 0.00 | 0.00 | FRINGES | $2.07 | |||||||||||
| 0 | 0.00 | 0.00 | ||||||||||||||
| 0 | 0.00 | 0.00 | EQUIPMENT & SUPPLIES | $0.00 | ||||||||||||
| Direct Labor Health and Welfare | 0 | 0.00 | 0.00 | - | ||||||||||||
| 0 | 0.00 | 0.00 | SUB-TOTAL | $29.13 | ||||||||||||
| H&W | H&W | 0 | 0.00 | 0.00 | = | |||||||||||
| COST ELEMENT | Hours | Rates | Cost | 0 | 0.00 | 0.00 | G&A | 0.00% | $0.00 | |||||||
| = | = | = | = | = | 0 | 0.00 | 0.00 | |||||||||
| Forklift Operator/Warehouse Specialist | 1 | $4.48 | $4.48 | 0 | 0.00 | 0.00 | PROFIT | 0.00% | $0.00 | |||||||
| $4.18 | 0 | 0.00 | 0.00 | |||||||||||||
| 0 | 0.00 | 0.00 | = | = | ||||||||||||
| 0 | 0.00 | 0.00 | GRAND TOTAL | $29.13 | ||||||||||||
| 0 | 0.00 | 0.00 | = | = | = | = | ||||||||||
| 0 | 0.00 | 0.00 | ||||||||||||||
| - | - | - | - | = | = | = | = | = | = | |||||||
| TOTALS | 1 | $4.48 | TOTALS | $0.00 | ||||||||||||
| = | = | = | = | = | = | = | = | = | ||||||||
| Holidays, Sick and Vacations | ||||||||||||||||
| Holidays, Sick, | ||||||||||||||||
| Sick/ | Vacations | |||||||||||||||
| COST ELEMENT | Holidays | Vacations | Dollars | |||||||||||||
| = | = | = | = | = | ||||||||||||
| Forklift Operator/Warehouse Specialist | 10 | 10 | $1.98 | |||||||||||||
| (Work hours divided by ((2080 hours- | ||||||||||||||||
| (Holidays/Sick+ Vacations)*8))) * | ||||||||||||||||
| ((Closed Holidays*8*Hourly rate)+ | ||||||||||||||||
| (Holidays worked*8*Hourly rate* time & half))+ | ||||||||||||||||
| (Work Hours divided by(2080-((Holidays/Sick+ | ||||||||||||||||
| - | - | - | - | Vacations)*8)))*(Vacations *8*Hourly rate) | ||||||||||||
| TOTALS | 10 | $1.98 | ||||||||||||||
| = | = | = | = | |||||||||||||
| Holidays and Vacations Health & Welfare | ||||||||||||||||
| Holidays/Sick/ | H&W | H&W | ||||||||||||||
| COST ELEMENT | Vacations | Rates | Cost | |||||||||||||
| = | = | = | = | = | ||||||||||||
| Forklift Operator/Warehouse Specialist | 0 | $4.18 | $0.35 | |||||||||||||
| - | - | - | - | |||||||||||||
| TOTALS | 0 | $0.35 | ||||||||||||||
| = | = | = | = | |||||||||||||
| FRINGE CALCULATIONS | ||||||||||||||||
| COST ELEMENT | DOLLARS | |||||||||||||||
| = | = | = | = | = | = | |||||||||||
| DIRECT LABOR COST | $20.25 | |||||||||||||||
| DIRECT HEALTH & WELFARE COSTS | $4.48 | |||||||||||||||
| HOLIDAYS/SICK/VACATION | $1.98 | |||||||||||||||
| HOLIDAYS AND VACATIONS HEALTH & WELFARE | $0.35 | |||||||||||||||
| - | - | - | - | - | - | |||||||||||
| SUBTOTAL | $27.06 | |||||||||||||||
| = | = | = | = | = | = | |||||||||||
| FICA | X | 7.65% | = | $2.07 | ||||||||||||
| FUTA | X | 0.00% | = | $0.00 | ||||||||||||
| SUTA | X | 0.00% | = | $0.00 | ||||||||||||
| Workman's Compensation | X | 0.00% | = | $0.00 | ||||||||||||
| Employer's Liability | X | 0.00% | = | $0.00 | ||||||||||||
| Comprehensive General Liability | X | 0.00% | = | $0.00 | ||||||||||||
| Other | X | 0.00% | = | $0.00 | ||||||||||||
| Other | X | 0.00% | = | $0.00 | ||||||||||||
| - | - | - | - | - | - | |||||||||||
| TOTAL FRINGES | $2.07 | |||||||||||||||
| = | = | = | = | = | = |
Click Here to Print
Material Handler Loaded Wage
| Attachment 4 | Attachment 4 | Attachment 4 | ||||||||||||||
| SOLICITATION NUMBER: | HDEC0819R0010 | SOLICITATION NUMBER: | HDEC0819R0010 | SOLICITATION NUMBER: | HDEC0819R0010 | |||||||||||
| COMMISSARY: | Quantico MCB | COMMISSARY: | Quantico MCB | COMMISSARY: | Quantico MCB | |||||||||||
| CONTRACTOR NAME: | CONTRACTOR NAME: | CONTRACTOR NAME: | ||||||||||||||
| MATERIAL HANDLER LOADED WAGE RATE WORK SHEET | MATERIAL HANDLER LOADED WAGE RATE WORK SHEET | MATERIAL HANDLER LOADED WAGE RATE WORK SHEET | ||||||||||||||
| Direct Labor | Contractor Proposed | DOLLAR TOTALS | ||||||||||||||
| R/S/H Supplies & Equipment | ================ | |||||||||||||||
| WD | ||||||||||||||||
| COST ELEMENT | Hours X | Rates = | Labor Cost | |||||||||||||
| = | = | = | = | = | ||||||||||||
| Material Handler | 1 | $13.83 | $13.83 | COST ELEMENT | DOLLARS | |||||||||||
| = | = | |||||||||||||||
| NOTE: A QUANTITY OF 1 HAS BEEN ENTERED TO | DIRECT LABOR | $13.83 | ||||||||||||||
| CALCULATE THE LOADED HOURLY RATE. PROCEED | DIRECT LABOR HEALTH & WELFARE | $4.18 | ||||||||||||||
| TO ENTER FRINGE, G&A, AND PROFIT PERCENTAGES | = | = | ||||||||||||||
| SUB-TOTAL | $18.01 | |||||||||||||||
| - | - | - | - | Qty. | Unit/ | Extended | ||||||||||
| TOTALS | 1 | $13.83 | Elements | Yearly | Price | Price | HOLIDAYS/SICK/VACATIONS | $1.35 | ||||||||
| = | = | = | = | = | = | = | = | = | = | HOL & VAC. HEALTH & WELFARE | $0.35 | |||||
| Indirect Labor Hours (Non-Working) | Supplies and Equipment Costs | 0 | 0.00 | $0.00 | = | = | ||||||||||
| = | are not included in the loaded | 0 | 0.00 | $0.00 | SUB-TOTAL | $1.70 | ||||||||||
| Direct Labor Hours (Productive/Working) | 1 | rate for Material Handler | 0 | 0.00 | 0.00 | |||||||||||
| = | 0 | 0.00 | 0.00 | FRINGES | $1.51 | |||||||||||
| 0 | 0.00 | 0.00 | ||||||||||||||
| 0 | 0.00 | 0.00 | EQUIPMENT & SUPPLIES | $0.00 | ||||||||||||
| Direct Labor Health and Welfare | 0 | 0.00 | 0.00 | - | ||||||||||||
| 0 | 0.00 | 0.00 | SUB-TOTAL | $21.22 | ||||||||||||
| H&W | H&W | 0 | 0.00 | 0.00 | = | |||||||||||
| COST ELEMENT | Hours | Rates | Cost | 0 | 0.00 | 0.00 | G&A | 0.00% | $0.00 | |||||||
| = | = | = | = | = | 0 | 0.00 | 0.00 | |||||||||
| Material Handler | 1 | $4.18 | $4.18 | 0 | 0.00 | 0.00 | PROFIT | 0.00% | $0.00 | |||||||
| 0 | 0.00 | 0.00 | ||||||||||||||
| 0 | 0.00 | 0.00 | = | = | ||||||||||||
| 0 | 0.00 | 0.00 | GRAND TOTAL | $21.22 | ||||||||||||
| 0 | 0.00 | 0.00 | = | = | = | = | ||||||||||
| 0 | 0.00 | 0.00 | ||||||||||||||
| - | - | - | - | = | = | = | = | = | = | |||||||
| TOTALS | 1 | $4.18 | TOTALS | $0.00 | ||||||||||||
| = | = | = | = | = | = | = | = | = | ||||||||
| Holidays, Sick and Vacations | ||||||||||||||||
| Holidays, Sick, | ||||||||||||||||
| Sick/ | Vacations | |||||||||||||||
| COST ELEMENT | Holidays | Vacations | Dollars | |||||||||||||
| = | = | = | = | = | ||||||||||||
| Material Handler | 10 | 10 | $1.35 | |||||||||||||
| $0.00 | (Work hours divided by ((2080 hours- | |||||||||||||||
| $0.00 | (Holidays/Sick+ Vacations)*8))) * | |||||||||||||||
| $0.00 | ((Closed Holidays*8*Hourly rate)+ | |||||||||||||||
| $0.00 | (Holidays worked*8*Hourly rate* time & half))+ | |||||||||||||||
| $0.00 | (Work Hours divided by(2080-((Holidays/Sick+ | |||||||||||||||
| - | - | - | - | Vacations)*8)))*(Vacations *8*Hourly rate) | ||||||||||||
| TOTALS | 10 | $1.35 | ||||||||||||||
| = | = | = | = | |||||||||||||
| Holidays and Vacations Health & Welfare | ||||||||||||||||
| Holidays/Sick/ | H&W | H&W | ||||||||||||||
| COST ELEMENT | Vacations | Rates | Cost | |||||||||||||
| = | = | = | = | = | ||||||||||||
| Material Handler | 0 | $4.18 | $0.35 | |||||||||||||
| - | - | - | - | |||||||||||||
| TOTALS | 0 | $0.35 | ||||||||||||||
| = | = | = | = | |||||||||||||
| FRINGE CALCULATIONS | ||||||||||||||||
| COST ELEMENT | DOLLARS | |||||||||||||||
| = | = | = | = | = | = | |||||||||||
| DIRECT LABOR COST | $13.83 | |||||||||||||||
| DIRECT HEALTH & WELFARE COSTS | $4.18 | |||||||||||||||
| HOLIDAYS/SICK/VACATION | $1.35 | |||||||||||||||
| HOLIDAYS AND VACATIONS HEALTH & WELFARE | $0.35 | |||||||||||||||
| - | - | - | - | - | - | |||||||||||
| SUBTOTAL | $19.71 | |||||||||||||||
| = | = | = | = | = | = | |||||||||||
| FICA | X | 7.65% | = | $1.51 | ||||||||||||
| FUTA | X | 0.00% | = | $0.00 | ||||||||||||
| SUTA | X | 0.00% | = | $0.00 | ||||||||||||
| Workman's Compensation | X | 0.00% | = | $0.00 | ||||||||||||
| Employer's Liability | X | 0.00% | = | $0.00 | ||||||||||||
| Comprehensive General Liability | X | 0.00% | = | $0.00 | ||||||||||||
| Other | X | 0.00% | = | $0.00 | ||||||||||||
| Other | X | 0.00% | = | $0.00 | ||||||||||||
| - | - | - | - | - | - | |||||||||||
| TOTAL FRINGES | $1.51 | |||||||||||||||
| = | = | = | = | = | = |
Click Here to Print
Janitor Loaded Wage Rate
| Attachment 4 | Attachment 4 | Attachment 4 | ||||||||||||||
| SOLICITATION NUMBER: | HDEC0819R0010 | SOLICITATION NUMBER: | HDEC0819R0010 | SOLICITATION NUMBER: | HDEC0819R0010 | |||||||||||
| COMMISSARY: | Quantico MCB | COMMISSARY: | Quantico MCB | COMMISSARY: | Quantico MCB | |||||||||||
| CONTRACTOR NAME: | CONTRACTOR NAME: | CONTRACTOR NAME: | ||||||||||||||
| Janitor Loaded Wage Rate Work Sheet | Janitor Loaded Wage Rate Work Sheet | Janitor Loaded Wage Rate Work Sheet | ||||||||||||||
| Direct Labor | Contractor Proposed | DOLLAR TOTALS | ||||||||||||||
| Custodial Supplies & Equipment | ================ | |||||||||||||||
| WD | ||||||||||||||||
| COST ELEMENT | Hours X | Rates = | Labor Cost | |||||||||||||
| = | = | = | = | = | ||||||||||||
| Janitor | 1 | $13.50 | $13.50 | COST ELEMENT | DOLLARS | |||||||||||
| = | = | |||||||||||||||
| NOTE: A QUANTITY OF 1 HAS BEEN ENTERED TO | DIRECT LABOR | $13.50 | ||||||||||||||
| CALCULATE THE LOADED HOURLY RATE. PROCEED | DIRECT LABOR HEALTH & WELFARE | $4.18 | ||||||||||||||
| TO ENTER FRINGE, G&A, AND PROFIT PERCENTAGES | = | = | ||||||||||||||
| SUB-TOTAL | $17.68 | |||||||||||||||
| - | - | - | - | Qty. | Unit/ | Extended | ||||||||||
| TOTALS | 1 | $13.50 | Elements | Yearly | Price | Price | HOLIDAYS/SICK/VACATIONS | $1.32 | ||||||||
| = | = | = | = | = | = | = | = | = | = | HOL & VAC. HEALTH & WELFARE | $0.35 | |||||
| Indirect Labor Hours (Non-Working) | Supplies and Equipment Costs | 0 | 0.00 | $0.00 | = | = | ||||||||||
| = | are not included in the loaded | 0 | 0.00 | $0.00 | SUB-TOTAL | $1.67 | ||||||||||
| Direct Labor Hours (Productive/Working) | 1 | rate for Janitor | 0 | 0.00 | 0.00 | |||||||||||
| = | 0 | 0.00 | 0.00 | FRINGES | $1.48 | |||||||||||
| 0 | 0.00 | 0.00 | ||||||||||||||
| 0 | 0.00 | 0.00 | EQUIPMENT & SUPPLIES | $0.00 | ||||||||||||
| Direct Labor Health and Welfare | 0 | 0.00 | 0.00 | - | ||||||||||||
| 0 | 0.00 | 0.00 | SUB-TOTAL | $20.83 | ||||||||||||
| H&W | H&W | 0 | 0.00 | 0.00 | = | |||||||||||
| COST ELEMENT | Hours | Rates | Cost | 0 | 0.00 | 0.00 | G&A | 0.00% | $0.00 | |||||||
| = | = | = | = | = | 0 | 0.00 | 0.00 | |||||||||
| Janitor | 1 | $4.18 | $4.18 | 0 | 0.00 | 0.00 | PROFIT | 0.00% | $0.00 | |||||||
| 0 | 0.00 | 0.00 | ||||||||||||||
| 0 | 0.00 | 0.00 | = | = | ||||||||||||
| 0 | 0.00 | 0.00 | GRAND TOTAL | $20.83 | ||||||||||||
| 0 | 0.00 | 0.00 | = | = | = | = | ||||||||||
| 0 | 0.00 | 0.00 | ||||||||||||||
| - | - | - | - | = | = | = | = | = | = | |||||||
| TOTALS | 1 | $4.18 | TOTALS | $0.00 | ||||||||||||
| = | = | = | = | = | = | = | = | = | ||||||||
| Holidays, Sick and Vacations | ||||||||||||||||
| Holidays, Sick, | ||||||||||||||||
| Sick/ | Vacations | |||||||||||||||
| COST ELEMENT | Holidays | Vacations | Dollars | |||||||||||||
| = | = | = | = | = | ||||||||||||
| Janitor | 10 | 10 | $1.32 | |||||||||||||
| (Work hours divided by ((2080 hours- | ||||||||||||||||
| (Holidays/Sick+ Vacations)*8))) * | ||||||||||||||||
| ((Closed Holidays*8*Hourly rate)+ | ||||||||||||||||
| (Holidays worked*8*Hourly rate* time & half))+ | ||||||||||||||||
| (Work Hours divided by(2080-((Holidays/Sick+ | ||||||||||||||||
| - | - | - | - | Vacations)*8)))*(Vacations *8*Hourly rate) | ||||||||||||
| TOTALS | 10 | $1.32 | ||||||||||||||
| = | = | = | = | |||||||||||||
| Holidays and Vacations Health & Welfare | ||||||||||||||||
| Holidays/Sick/ | H&W | H&W | ||||||||||||||
| COST ELEMENT | Vacations | Rates | Cost | |||||||||||||
| = | = | = | = | = | ||||||||||||
| Janitor | 0 | $4.18 | $0.35 | |||||||||||||
| - | - | - | - | |||||||||||||
| TOTALS | 0 | $0.35 | ||||||||||||||
| = | = | = | = | |||||||||||||
| FRINGE CALCULATIONS | ||||||||||||||||
| COST ELEMENT | DOLLARS | |||||||||||||||
| = | = | = | = | = | = | |||||||||||
| DIRECT LABOR COST | $13.50 | |||||||||||||||
| DIRECT HEALTH & WELFARE COSTS | $4.18 | |||||||||||||||
| HOLIDAYS/SICK/VACATION | $1.32 | |||||||||||||||
| HOLIDAYS AND VACATIONS HEALTH & WELFARE | $0.35 | |||||||||||||||
| - | - | - | - | - | - | |||||||||||
| SUBTOTAL | $19.35 | |||||||||||||||
| = | = | = | = | = | = | |||||||||||
| FICA | X | 7.65% | = | $1.48 | ||||||||||||
| FUTA | X | 0.00% | = | $0.00 | ||||||||||||
| SUTA | X | 0.00% | = | $0.00 | ||||||||||||
| Workman's Compensation | X | 0.00% | = | $0.00 | ||||||||||||
| Employer's Liability | X | 0.00% | = | $0.00 | ||||||||||||
| Comprehensive General Liability | X | 0.00% | = | $0.00 | ||||||||||||
| Other | X | 0.00% | = | $0.00 | ||||||||||||
| Other | X | 0.00% | = | $0.00 | ||||||||||||
| - | - | - | - | - | - | |||||||||||
| TOTAL FRINGES | $1.48 | |||||||||||||||
| = | = | = | = | = | = |
Click Here to Print
File details come from the government source that posted it. Updated .