HDEC05-13-T-0034.doc
DOC document 2 MB Posted
- Attached to
- Pest Control Services
- Solicitation number
- HDEC05-13-T-0034
- Issued by
-
Defense Commissary Agency
About this file
Pest Control Services
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attch_5_SOW_Lackland.docx | DOCX document | |
| Attch_3_SOW_San_Diego March NorthIsland.docx | DOCX document | |
| Attach_7_PUP_2013.xls | XLS spreadsheet | |
| Attch_4_SOW_Albany.docx | DOCX document | |
| Attch_1_Past_Performance_Survey.docx | DOCX document | |
| Attch_2_SOW_for_Meade _Polk _Sill _Jack.docx | DOCX document | |
| Attch_6_Pricing_Spreadsheet_9.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section SF 1449 - CONTINUATION SHEET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Pest Mngt Program – Fort Meade
FFP
Contractor shall provide pest management services using Integrated Pest Management (IPM) techniques in accordance with the Statement of Work (SOW) and with incorporated Contractor's IPM Plan.
Any chemical not previously submitted on a PUP must be submitted to the Commissary Director for approval prior to use.
LOCATION:
Fort Meade Commissary
MacArthur Rd. & Mapes Rd., Bldg 2786
Fort Meade, MD 20755
POC: Betty Makell (301) 677-6345
Base Period: January 1, 2014 through December 31, 2014
FOB: Destination
PURCHASE REQUEST NUMBER: HQCNEN31750000000
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AA
| 1 |
| Lot |
Initial Setup - Fort Meade
Initial Materials consist of installation of secured exterior tamper resistant bait stations and interior mechanical traps to include bait stations, tin cats, glue boards, snap traps and inceptors, and lights, as needed.
Replacement cost of initial equipment and materials shall be included in the scheduled monthly service cost.
Contractor shall provide separate breakdown of proposed equipment, materials, labor and transportation for initial set-up.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AB
| 12 |
| Each |
Scheduled Services - Fort Meade
Contractor to provide pest management services once per month to include changing glueboards in accordance with the SOW and contractors incorporated IPM.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AC
| 1 |
| Lot |
Unscheduled Services - Fort Meade
Special requests and emergency service, such as animal control, bird baiting/trapping, special equipment, etc. that are required outside the normal scheduled services to maintain the IPM Plan in accordance with the SOW.
Hourly Rate: $____________ x 10 hours = $____________ (A)
(indicate days of week ________thru_______and time ______ to _____)
Overtime Rate: $____________ x 5 hours = $____________ (B)
(Other than normal duty hours, to include holidays)
Trip Charge: $__________ x10 trips = $____________ (C)
(Round Trip from Contractor's Business to commissary and return)
Total of A + B + C (above) = $______________
The above hours are estimated amounts for evaluation purposes only and are not to be construed as guaranteed quantities or actual number of hours. The Government will insert a Not To Exceed (NTE) amount for Unscheduled Pest Control at the time of award.
The contractor may request to be reimbursed for materials and supplies furnished or used while performing Unscheduled Service Calls, unless the supplies are due to the Contractor's negligence or they are already covered under another CLIN. Cost for materials and supplies will be no greater than that charged to the Contractor's commercial customer. Materials and supplies shall be itemized and billed as separate items on the Contractor's invoice in addition to the hourly rate.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AD
| 1 |
| Lot |
Contractor Manpower Reptng - Fort Meade
Enterprise-wide Contractor Manpower Reporting
(Note: This CLIN is provided to capture contractor cost for completing the administrative process of reporting)
The contractor shall report ALL labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Defense Commissary Agency (DeCA) via a secure data collection site for fiscal year 2014. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. All data shall be reported NLT October 31, 2014.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Pest Mngt Program – Fort Polk
Contractor shall provide pest management services using Integrated Pest Management (IPM) techniques in accordance with the Statement of Work (SOW) and with incorporated Contractor's IPM Plan.
Any chemical not previously submitted on a PUP must be submitted to the Commissary Director for approval prior to use.
LOCATION:
Fort Polk Commissary
7906 Colorado Ave., Fort Polk, LA 71459
POC: Breane Ross (337) 531-2747
Base Period: January 1, 2014 through December 31, 2014
FOB: Destination
NSN: S207
PURCHASE REQUEST NUMBER: HQCSKB31690000000
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AA
| 1 |
| Lot |
Initial Setup - Fort Polk
Initial Materials consist of installation of secured exterior tamper resistant bait stations and interior mechanical traps to include bait stations, tin cats, glue boards, snap traps and inceptors, and lights, as needed.
Replacement cost of initial equipment and materials shall be included in the scheduled monthly service cost.
Contractor shall provide separate breakdown of proposed equipment, materials, labor and transportation for initial set-up.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AB
| 12 |
| Each |
Scheduled Services - Fort Polk
Contractor to provide pest management services once per month to include changing glueboards in accordance with the SOW and contractors incorporated IPM.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AC
| 1 |
| Lot |
Unscheduled Services - Fort Polk
Special requests and emergency service, such as animal control, bird baiting/trapping, special equipment, etc. that are required outside the normal scheduled services to maintain the IPM Plan in accordance with the SOW.
Hourly Rate: $____________ x 10 hours = $____________ (A)
(indicate days of week ________thru_______and time ______ to _____)
Overtime Rate: $____________ x 5 hours = $____________ (B)
(Other than normal duty hours, to include holidays)
Trip Charge: $__________ x10 trips = $____________ (C)
(Round Trip from Contractor's Business to commissary and return)
Total of A + B + C (above) = $______________
The above hours are estimated amounts for evaluation purposes only and are not to be construed as guaranteed quantities or actual number of hours. The Government will insert a Not To Exceed (NTE) amount for Unscheduled Pest Control at the time of award.
The contractor may request to be reimbursed for materials and supplies furnished or used while performing Unscheduled Service Calls, unless the supplies are due to the Contractor's negligence or they are already covered under another CLIN. Cost for materials and supplies will be no greater than that charged to the Contractor's commercial customer. Materials and supplies shall be itemized and billed as separate items on the Contractor's invoice in addition to the hourly rate.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AD
| 1 |
| Lot |
Contractor Manpower Reporting-Ft. Polk
(Note: This CLIN is provided to capture contractor cost for completing the administrative process of reporting)
The contractor shall report ALL labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Defense Commissary Agency (DeCA) via a secure data collection site for fiscal year 2014. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. All data shall be reported NLT October 31, 2014.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Pest Mngt Program – Fort Sill
Contractor shall provide pest management services using Integrated Pest Management (IPM) techniques in accordance with the Statement of Work (SOW) and with incorporated Contractor's IPM Plan.
Any chemical not previously submitted on a PUP must be submitted to the Commissary Director for approval prior to use.
LOCATION:
Fort Sill Commissary
1719 Mabcomb Rd., Bldg 1719, Fort Sill, OK 73503
POC: Kathleen Love (580) 442-2305
Base Period: January 1, 2014 through December 31, 2014
PURCHASE REQUEST NUMBER: HQCMCQ31990000000
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0003AA
| 1 |
| Lot |
Initial Setup - Fort Sill
Initial Materials consist of installation of secured exterior tamper resistant bait stations and interior mechanical traps to include bait stations, tin cats, glue boards, snap traps and inceptors, and lights, as needed.
Replacement cost of initial equipment and materials shall be included in the scheduled monthly service cost.
Contractor shall provide separate breakdown of proposed equipment, materials, labor and transportation for initial set-up.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0003AB
| 52 |
| Each |
Scheduled Services - Fort Sill
Contractor to provide weekly pest management services to include changing glueboards in accordance with the SOW and contractors incorporated IPM.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0003AC
| 52 |
| Each |
Flying Insect Program - Fort Sill
Contractor shall provide trapping devices for indoor fly/moth control per the SOW when required. Initial cost for trap is to be included in the initial set up cost. This item covers the cost of the monthly/weekly service per trap.
Number of estimated traps required: _______________
Weekly service cost per trap: $_______________
Additional trapping devices shall be preapproved by Commissary Management and Contracting Officer.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0003AD
| 1 |
| Lot |
Unscheduled Services - Fort Sill
Special requests and emergency service, such as animal control, bird baiting/trapping, special equipment, etc. that are required outside the normal scheduled services to maintain the IPM Plan in accordance with the SOW.
Hourly Rate: $____________ x 10 hours = $____________ (A)
(indicate days of week ________thru_______and time ______ to _____)
Overtime Rate: $____________ x 5 hours = $____________ (B)
(Other than normal duty hours, to include holidays)
Trip Charge: $__________ x10 trips = $____________ (C)
(Round Trip from Contractor's Business to commissary and return)
Total of A + B + C (above) = $______________
The above hours are estimated amounts for evaluation purposes only and are not to be construed as guaranteed quantities or actual number of hours. The Government will insert a Not To Exceed (NTE) amount for Unscheduled Pest Control at the time of award.
The contractor may request to be reimbursed for materials and supplies furnished or used while performing Unscheduled Service Calls, unless the supplies are due to the Contractor's negligence or they are already covered under another CLIN. Cost for materials and supplies will be no greater than that charged to the Contractor's commercial customer. Materials and supplies shall be itemized and billed as separate items on the Contractor's invoice in addition to the hourly rate.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0003AE
| 1 |
| Lot |
Contractor Manpower Reporting-Ft. Sill
Enterprise-wide Contractor Manpower Reporting
(Note: This CLIN is provided to capture contractor cost for completing the administrative process of reporting)
The contractor shall report ALL labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Defense Commissary Agency (DeCA) via a secure data collection site for fiscal year 2014. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. All data shall be reported NLT October 31, 2014.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Pest Mngt Program – Jacksonville
Contractor shall provide pest management services using Integrated Pest Management (IPM) techniques in accordance with the Statement of Work (SOW) and with incorporated Contractor's IPM Plan.
Any chemical not previously submitted on a PUP must be submitted to the Commissary Director for approval prior to use.
LOCATION:
Jacksonville Commissary
951 Allegheny Ave., NAS Jacksonville, FL 32212
POC: Jose Ferrer-Sanchez (904) 542-5311
Base Period: January 1, 2014 through December 31, 2014
PURCHASE REQUEST NUMBER: HQCSJL31830000000
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0004AA
| 1 |
| Lot |
Initial Setup - Jacksonville
Initial Materials consist of installation of secured exterior tamper resistant bait stations and interior mechanical traps to include bait stations, tin cats, glue boards, snap traps and inceptors, and lights, as needed.
Replacement cost of initial equipment and materials shall be included in the scheduled monthly service cost.
Contractor shall provide separate breakdown of proposed equipment, materials, labor and transportation for initial set-up.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0004AB
| 12 |
| Each |
Scheduled Services - Jacksonville
Contractor to provide pest management services once per month to include changing glueboards in accordance with the SOW and contractors incorporated IPM.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0004AC
| 12 |
| Each |
Flying Insect Program - Jacksonville
Contractor shall provide trapping devices for indoor fly/moth control per the SOW when required. Initial cost for trap is to be included in the initial set up cost. This item covers the cost of the monthly/weekly service per trap.
Number of estimated traps required: _______________
Monthly service cost per trap: $_______________
Additional trapping devices shall be preapproved by Commissary Management and Contracting Officer.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0004AD
| 1 |
| Lot |
Unscheduled Services - Jacksonville
Special requests and emergency service, such as animal control, bird baiting/trapping, special equipment, etc. that are required outside the normal scheduled services to maintain the IPM Plan in accordance with the SOW.
Hourly Rate: $____________ x 10 hours = $____________ (A)
(indicate days of week ________thru_______and time ______ to _____)
Overtime Rate: $____________ x 5 hours = $____________ (B)
(Other than normal duty hours, to include holidays)
Trip Charge: $__________ x10 trips = $____________ (C)
(Round Trip from Contractor's Business to commissary and return)
Total of A + B + C (above) = $______________
The above hours are estimated amounts for evaluation purposes only and are not to be construed as guaranteed quantities or actual number of hours. The Government will insert a Not To Exceed (NTE) amount for Unscheduled Pest Control at the time of award.
The contractor may request to be reimbursed for materials and supplies furnished or used while performing Unscheduled Service Calls, unless the supplies are due to the Contractor's negligence or they are already covered under another CLIN. Cost for materials and supplies will be no greater than that charged to the Contractor's commercial customer. Materials and supplies shall be itemized and billed as separate items on the Contractor's invoice in addition to the hourly rate.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0004AE
| 1 |
| Lot |
Contractor Manpower Reporting - Jacksonv
(Note: This CLIN is provided to capture contractor cost for completing the administrative process of reporting)
The contractor shall report ALL labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Defense Commissary Agency (DeCA) via a secure data collection site for fiscal year 2014. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. All data shall be reported NLT October 31, 2014.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Pest Mngt Program -March
Contractor shall provide pest management services using Integrated Pest Management (IPM) techniques in accordance with the Statement of Work (SOW) and with incorporated Contractor's IPM Plan.
Any chemical not previously submitted on a PUP must be submitted to the Commissary Director for approval prior to use.
LOCATION:
March AFB Commissary
15150 6th St., Riverside, CA 92518
POC: Erlinda Nauta (951) 653-2206
Base Period: January 1, 2014 through December 31, 2014
PURCHASE REQUEST NUMBER: HQCKLY31680000000
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0005AA
| 1 |
| Lot |
Initial Setup - March AFB
Initial Materials consist of installation of secured exterior tamper resistant bait stations and interior mechanical traps to include bait stations, tin cats, glue boards, snap traps and inceptors, and lights, as needed.
Replacement cost of initial equipment and materials shall be included in the scheduled monthly service cost.
Contractor shall provide separate breakdown of proposed equipment, materials, labor and transportation for initial set-up.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0005AB
| 52 |
| Each |
Scheduled Services - March AFB
Contractor to provide weekly pest management services to include changing glueboards in accordance with the SOW and contractors incorporated IPM.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0005AC
| 1 |
| Lot |
Unscheduled Services - March AFB
Special requests and emergency service, such as animal control, bird baiting/trapping, special equipment, etc. that are required outside the normal scheduled services to maintain the IPM Plan in accordance with the SOW.
Hourly Rate: $____________ x 10 hours = $____________ (A)
(indicate days of week ________thru_______and time ______ to _____)
Overtime Rate: $____________ x 5 hours = $____________ (B)
(Other than normal duty hours, to include holidays)
Trip Charge: $__________ x10 trips = $____________ (C)
(Round Trip from Contractor's Business to commissary and return)
Total of A + B + C (above) = $______________
The above hours are estimated amounts for evaluation purposes only and are not to be construed as guaranteed quantities or actual number of hours. The Government will insert a Not To Exceed (NTE) amount for Unscheduled Pest Control at the time of award.
The contractor may request to be reimbursed for materials and supplies furnished or used while performing Unscheduled Service Calls, unless the supplies are due to the Contractor's negligence or they are already covered under another CLIN. Cost for materials and supplies will be no greater than that charged to the Contractor's commercial customer. Materials and supplies shall be itemized and billed as separate items on the Contractor's invoice in addition to the hourly rate.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0005AD
| 1 |
| Lot |
Contractor Manpower Reporting - March
(Note: This CLIN is provided to capture contractor cost for completing the administrative process of reporting)
The contractor shall report ALL labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Defense Commissary Agency (DeCA) via a secure data collection site for fiscal year 2014. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. All data shall be reported NLT October 31, 2014.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Pest Mngt Program – North Island
Contractor shall provide pest management services using Integrated Pest Management (IPM) techniques in accordance with the Statement of Work (SOW) and with incorporated Contractor's IPM Plan.
Any chemical not previously submitted on a PUP must be submitted to the Commissary Director for approval prior to use.
LOCATION: North Island Commissary
Bldg 2017, NAS North Island, CA 92135
POC: Serrano Renato (619) 545-6560
Base Period: January 1, 2014 through December 31, 2014
PURCHASE REQUEST NUMBER: HQCKMR32530000000
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0006AA
| 1 |
| Lot |
Initial Setup - North Island
Initial Materials consist of installation of secured exterior tamper resistant bait stations and interior mechanical traps to include bait stations, tin cats, glue boards, snap traps and inceptors, and lights, as needed.
Replacement cost of initial equipment and materials shall be included in the scheduled monthly service cost.
Contractor shall provide separate breakdown of proposed equipment, materials, labor and transportation for initial set-up.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0006AB
| 24 |
| Each |
Scheduled Services - North Island
Contractor to provide pest management services twice per month to include changing glue boards in accordance with the SOW and contractors incorporated IPM.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0006AC
| 1 |
| Lot |
Unscheduled Services - North Island
Special requests and emergency service, such as animal control, bird baiting/trapping, special equipment, etc. that are required outside the normal scheduled services to maintain the IPM Plan in accordance with the SOW.
Hourly Rate: $____________ x 10 hours = $____________ (A)
(indicate days of week ________thru_______and time ______ to _____)
Overtime Rate: $____________ x 5 hours = $____________ (B)
(Other than normal duty hours, to include holidays)
Trip Charge: $__________ x10 trips = $____________ (C)
(Round Trip from Contractor's Business to commissary and return)
Total of A + B + C (above) = $______________
The above hours are estimated amounts for evaluation purposes only and are not to be construed as guaranteed quantities or actual number of hours. The Government will insert a Not To Exceed (NTE) amount for Unscheduled Pest Control at the time of award.
The contractor may request to be reimbursed for materials and supplies furnished or used while performing Unscheduled Service Calls, unless the supplies are due to the Contractor's negligence or they are already covered under another CLIN. Cost for materials and supplies will be no greater than that charged to the Contractor's commercial customer. Materials and supplies shall be itemized and billed as separate items on the Contractor's invoice in addition to the hourly rate.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0006AD
| 1 |
| Lot |
Manpower Reporting - North Island
(Note: This CLIN is provided to capture contractor cost for completing the administrative process of reporting)
The contractor shall report ALL labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Defense Commissary Agency (DeCA) via a secure data collection site for fiscal year 2014. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. All data shall be reported NLT October 31, 2014.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Pest Mngt Program – San Diego
Contractor shall provide pest management services using Integrated Pest Management (IPM) techniques in accordance with the Statement of Work (SOW) and with incorporated Contractor's IPM Plan.
Any chemical not previously submitted on a PUP must be submitted to the Commissary Director for approval prior to use.
LOCATION:
San Diego Commissary
Bldg 3629, 2525 Callagan Hwy., San Diego, CA 92136
POC: Gary Line (619) 556-8657
Base Period: January 1, 2014 through December 31, 2014
PURCHASE REQUEST NUMBER: HQCKL831690001000
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0007AA
| 1 |
| Lot |
Initial Setup - San Diego
Initial Materials consist of installation of secured exterior tamper resistant bait stations and interior mechanical traps to include bait stations, tin cats, glue boards, snap traps and inceptors, and lights, as needed.
Replacement cost of initial equipment and materials shall be included in the scheduled monthly service cost.
Contractor shall provide separate breakdown of proposed equipment, materials, labor and transportation for initial set-up.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0007AB
| 12 |
| Each |
Scheduled Services - San Diego
Contractor to provide pest management services once per month to include changing glueboards in accordance with the SOW and contractors incorporated IPM.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0007AC
| 12 |
| Each |
Flying Insect Program - San Diego
Contractor shall provide trapping devices for indoor fly/moth control per the SOW when required. Initial cost for trap is to be included in the initial set up cost. This item covers the cost of the monthly/weekly service per trap.
Number of estimated traps required: _______________
Monthly service cost per trap: $_______________
Additional trapping devices shall be preapproved by Commissary Management and Contracting Officer.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0007AD
| 1 |
| Lot |
Unscheduled Services - San Diego
Special requests and emergency service, such as animal control, bird baiting/trapping, special equipment, etc. that are required outside the normal scheduled services to maintain the IPM Plan in accordance with the SOW.
Hourly Rate: $____________ x 10 hours = $____________ (A)
(indicate days of week ________thru_______and time ______ to _____)
Overtime Rate: $____________ x 5 hours = $____________ (B)
(Other than normal duty hours, to include holidays)
Trip Charge: $__________ x10 trips = $____________ (C)
(Round Trip from Contractor's Business to commissary and return)
Total of A + B + C (above) = $______________
The above hours are estimated amounts for evaluation purposes only and are not to be construed as guaranteed quantities or actual number of hours. The Government will insert a Not To Exceed (NTE) amount for Unscheduled Pest Control at the time of award.
The contractor may request to be reimbursed for materials and supplies furnished or used while performing Unscheduled Service Calls, unless the supplies are due to the Contractor's negligence or they are already covered under another CLIN. Cost for materials and supplies will be no greater than that charged to the Contractor's commercial customer. Materials and supplies shall be itemized and billed as separate items on the Contractor's invoice in addition to the hourly rate.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0007AE
| 1 |
| Lot |
Contractor Manpower Reporting-San Diego
Enterprise-wide Contractor Manpower Reporting
(Note: This CLIN is provided to capture contractor cost for completing the administrative process of reporting)
The contractor shall report ALL labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Defense Commissary Agency (DeCA) via a secure data collection site for fiscal year 2014. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. All data shall be reported NLT October 31, 2014.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Pest Mngt Program – Albany
Contractor shall provide pest management services using Integrated Pest Management (IPM) techniques in accordance with the Statement of Work (SOW) and with incorporated Contractor's IPM Plan.
Any chemical not previously submitted on a PUP must be submitted to the Commissary Director for approval prior to use.
LOCATION:
Albany Commissary
814 Radford Ave., Ste. 20327
Albany, GA 31704
POC: Earnest Hicks (229) 435-1721
Base Period: January 1, 2014 through December 31, 2014
PURCHASE REQUEST NUMBER: HQCSJU32530000000
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0008AA
| 1 |
| Lot |
Initial Setup - Albany
Initial Materials consist of installation of secured exterior tamper resistant bait stations and interior mechanical traps to include bait stations, tin cats, glue boards, snap traps and inceptors, and lights, as needed.
Replacement cost of initial equipment and materials shall be included in the scheduled monthly service cost.
Contractor shall provide separate breakdown of proposed equipment, materials, labor and transportation for initial set-up.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0008AB
| 24 |
| Each |
Scheduled Services - Albany
Contractor to provide pest management services twice per month to include changing glueboards in accordance with the SOW and contractors incorporated IPM.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0008AC
| 1 |
| Lot |
Unscheduled Services - Albany
Special requests and emergency service, such as animal control, bird baiting/trapping, special equipment, etc. that are required outside the normal scheduled services to maintain the IPM Plan in accordance with the SOW.
Hourly Rate: $____________ x 10 hours = $____________ (A)
(indicate days of week ________thru_______and time ______ to _____)
Overtime Rate: $____________ x 5 hours = $____________ (B)
(Other than normal duty hours, to include holidays)
Trip Charge: $__________ x10 trips = $____________ (C)
(Round Trip from Contractor's Business to commissary and return)
Total of A + B + C (above) = $______________
The above hours are estimated amounts for evaluation purposes only and are not to be construed as guaranteed quantities or actual number of hours. The Government will insert a Not To Exceed (NTE) amount for Unscheduled Pest Control at the time of award.
The contractor may request to be reimbursed for materials and supplies furnished or used while performing Unscheduled Service Calls, unless the supplies are due to the Contractor's negligence or they are already covered under another CLIN. Cost for materials and supplies will be no greater than that charged to the Contractor's commercial customer. Materials and supplies shall be itemized and billed as separate items on the Contractor's invoice in addition to the hourly rate.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0008AD
| 1 |
| Lot |
Contractor Manpower Reporting - Albany
Enterprise-wide Contractor Manpower Reporting
(Note: This CLIN is provided to capture contractor cost for completing the administrative process of reporting)
The contractor shall report ALL labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Defense Commissary Agency (DeCA) via a secure data collection site for fiscal year 2014. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. All data shall be reported NLT October 31, 2014.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Pest Mngt Program – Lackland AFB
Contractor shall provide pest management services using Integrated Pest Management (IPM) techniques in accordance with the Statement of Work (SOW) and with incorporated Contractor's IPM Plan.
Any chemical not previously submitted on a PUP must be submitted to the Commissary Director for approval prior to use.
LOCATION:
Lackland AFB Commissary
2250 Foulois St., Ste 1, Bldg 8400
Lackland AFB, TX 78236
POC: Amelia Reyez (210) 671-2838
Base Period: January 1, 2014 through December 31, 2014
PURCHASE REQUEST NUMBER: HQCMC631690000000
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AA
| 1 |
| Lot |
Initial Setup - Lackland AFB
Initial Materials consist of installation of secured exterior tamper resistant bait stations and interior mechanical traps to include bait stations, tin cats, glue boards, snap traps and inceptors, and lights, as needed.
Replacement cost of initial equipment and materials shall be included in the scheduled monthly service cost.
Contractor shall provide separate breakdown of proposed equipment, materials, labor and transportation for initial set-up.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AB
| 52 |
| Each |
Scheduled Services - Lackland AFB
Contractor to provide weekly pest management services to include changing glueboards in accordance with the SOW and contractors incorporated IPM.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AC
| 12 |
| Each |
Flying Insect Program - Lackland AFB
Contractor shall provide trapping devices for indoor fly/moth control per the SOW when required. Initial cost for trap is to be included in the initial set up cost. This item covers the cost of the monthly/weekly service per trap.
Number of estimated traps required: _______________
Monthly service cost per trap: $_______________
Additional trapping devices must be preapproved by Commissary Management and Contracting Officer.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AD
| 1 |
| Lot |
Unscheduled Services - Lackland AFB
Special requests and emergency service, such as animal control, nuisance birds, special equipment, etc. that are required outside the normal scheduled services to maintain the IPM Plan in accordance with the SOW.
Hourly Rate: $____________ x 10 hours = $____________ (A)
(8:00 am to 5:00 pm, Monday - Friday)
Overtime Rate: $____________ x 5 hours = $____________ (B)
(Other than normal duty hours, to include holidays)
Trip Charge: $__________ x 10 trips = $____________ (C)
(Round Trip from Contractor's Business to commissary and return)
Total of A + B + C (above) = $______________
The above hours are estimated amounts for evaluation purposes only and are not to be construed as guaranteed quantities or actual number of hours. The Government will insert a Not To Exceed (NTE) amount for Unscheduled Pest Control at the time of award.
The contractor may request to be reimbursed for materials and supplies furnished or used while performing Unscheduled Service Calls, unless the supplies are due to the Contractor's negligence. Cost for materials and supplies will be no greater than that charged to the Contractor's commercial customer. Materials and supplies shall be itemized and billed as separate items on the Contractor's invoice in addition to the hourly rate.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AE
| 52 |
| Each |
Engineer Office Pest Control
Contractor to provide weekly service, concurrent with the service provided to the commissary:
DeCA Engineer Office
2250 Foulois St., Suite 2
Lackland AFB, TX 78236
POC: Yolanda Murray (210) 671-3305
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AF
| 1 |
| Lot |
Contractor Manpower Reporting-Lackland A
Enterprise-wide Contractor Manpower Reporting
(Note: This CLIN is provided to capture contractor cost for completing the administrative process of reporting)
The contractor shall report ALL labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Defense Commissary Agency (DeCA) via a secure data collection site for fiscal year 2014. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. All data shall be reported NLT October 31, 2014.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Pest Mngt Program – Fort Meade |
FFP
Contractor shall provide pest management services using Integrated Pest Management (IPM) techniques in accordance with the Statement of Work (SOW) and with incorporated Contractor's IPM Plan.
Any chemical not previously submitted on a PUP must be submitted to the Commissary Director for approval prior to use.
LOCATION:
Fort Meade Commissary
MacArthur Rd. & Mapes Rd., Bldg 2786
Fort Meade, MD 20755
POC: Betty Makell (301) 677-6345
First Option Period: January 1, 2015 through December 31, 2015
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AA
| 12 |
| Each |
| OPTION |
| Scheduled Services - Fort Meade |
FFP
Contractor to provide pest management services once per month to include changing glue boards in accordance with the SOW and contractors incorporated IPM.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AB
| 1 |
| Lot |
| OPTION |
| Unscheduled Services - Fort Meade |
FFP
Special requests and emergency service, such as animal control, bird baiting/trapping, special equipment, etc. that are required outside the normal scheduled services to maintain the IPM Plan in accordance with the SOW.
Hourly Rate: $____________ x 10 hours = $____________ (A)
(indicate days of week ________thru_______and time ______ to _____)
Overtime Rate: $____________ x 5 hours = $____________ (B)
(Other than normal duty hours, to include holidays)
Trip Charge: $__________ x10 trips = $____________ (C)
(Round Trip from Contractor's Business to commissary and return)
Total of A + B + C (above) = $______________
The above hours are estimated amounts for evaluation purposes only and are not to be construed as guaranteed quantities or actual number of hours. The Government will insert a Not To Exceed (NTE) amount for Unscheduled Pest Control at the time of award.
The contractor may request to be reimbursed for materials and supplies furnished or used while performing Unscheduled Service Calls, unless the supplies are due to the Contractor's negligence or they are already covered under another CLIN. Cost for materials and supplies will be no greater than that charged to the Contractor's commercial customer. Materials and supplies shall be itemized and billed as separate items on the Contractor's invoice in addition to the hourly rate.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AC
| 1 |
| Lot |
| OPTION |
| Contractor Manpower Reporting-Ft. Meade |
FFP
(Note: This CLIN is provided to capture contractor cost for completing the administrative process of reporting)
The contractor shall report ALL labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Defense Commissary Agency (DeCA) via a secure data collection site for fiscal year 2015. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. All data shall be reported NLT October 31, 2015.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Pest Mngt Program – Fort Polk |
FFP
Contractor shall provide pest management services using Integrated Pest Management (IPM) techniques in accordance with the Statement of Work (SOW) and with incorporated Contractor's IPM Plan.
Any chemical not previously submitted on a PUP must be submitted to the Commissary Director for approval prior to use.
LOCATION:
Fort Polk Commissary
7906 Colorado Ave., Fort Polk, LA 71459
POC: Breane Ross (337) 531-2747
First Option Period: January 1, 2015 through December 31, 2015
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AA
| 12 |
| Each |
| OPTION |
| Scheduled Services - Fort Polk |
FFP
Contractor to provide pest management services once per month to include changing glueboards in accordance with the SOW and contractors incorporated IPM.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AB
| 1 |
| Lot |
| OPTION |
| Unscheduled Services - Fort Polk |
FFP
Special requests and emergency service, such as animal control, bird baiting/trapping, special equipment, etc. that are required outside the normal scheduled services to maintain the IPM Plan in accordance with the SOW.
Hourly Rate: $____________ x 10 hours = $____________ (A)
(indicate days of week ________thru_______and time ______ to _____)
Overtime Rate: $____________ x 5 hours = $____________ (B)
(Other than normal duty hours, to include holidays)
Trip Charge: $__________ x10 trips = $____________ (C)
(Round Trip from Contractor's Business to commissary and return)
Total of A + B + C (above) = $______________
The above hours are estimated amounts for evaluation purposes only and are not to be construed as guaranteed quantities or actual number of hours. The Government will insert a Not To Exceed (NTE) amount for Unscheduled Pest Control at the time of award.
The contractor may request to be reimbursed for materials and supplies furnished or used while performing Unscheduled Service Calls, unless the supplies are due to the Contractor's negligence or they are already covered under another CLIN. Cost for materials and supplies will be no greater than that charged to the Contractor's commercial customer. Materials and supplies shall be itemized and billed as separate items on the Contractor's invoice in addition to the hourly rate.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AC
| 1 |
| Lot |
| OPTION |
| Contractor Manpower Reporting-Ft. Polk |
FFP
(Note: This CLIN is provided to capture contractor cost for completing the administrative process of reporting)
The contractor shall report ALL labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Defense Commissary Agency (DeCA) via a secure data collection site for fiscal year 2015. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. All data shall be reported NLT October 31, 2015.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Pest Mngt Program – Fort Sill |
FFP
Contractor shall provide pest management services using Integrated Pest Management (IPM) techniques in accordance with the Statement of Work (SOW) and with incorporated Contractor's IPM Plan.
Any chemical not previously submitted on a PUP must be submitted to the Commissary Director for approval prior to use.
LOCATION:
Fort Sill Commissary
1719 Mabcomb Rd., Bldg 1719, Fort Sill, OK 73503
POC: Kathleen Love (580) 442-2305
First Option Period: January 1, 2015 through December 31, 2015
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1003AA
| 52 |
| Each |
| OPTION |
| Scheduled Services - Fort Sill |
FFP
Contractor to provide weekly pest management services to include changing glueboards in accordance with the SOW and contractors incorporated IPM.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1003AB
| 52 |
| Each |
| OPTION |
| Flying Insect Program - Fort Sill |
FFP
Contractor shall provide trapping devices for indoor fly/moth control per the SOW when required. Initial cost for trap is to be included in the initial set up cost. This item covers the cost of the monthly/weekly service per trap.
Number of estimated traps required: _______________
Weekly service cost per trap: $_______________
Additional trapping devices shall be preapproved by Commissary Management and Contracting Officer.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1003AC
| 1 |
| Lot |
| OPTION |
| Unscheduled Services - Fort Sill |
FFP
Special requests and emergency service, such as animal control, bird baiting/trapping, special equipment, etc. that are required outside the normal scheduled services to maintain the IPM Plan in accordance with the SOW.
Hourly Rate: $____________ x 10 hours = $____________ (A)
(indicate days of week ________thru_______and time ______ to _____)
Overtime Rate: $____________ x 5 hours = $____________ (B)
(Other than normal duty hours, to include holidays)
Trip Charge: $__________ x10 trips = $____________ (C)
(Round Trip from Contractor's Business to commissary and return)
Total of A + B + C (above) = $______________
The above hours are estimated amounts for evaluation purposes only and are not to be construed as guaranteed quantities or actual number of hours. The Government will insert a Not To Exceed (NTE) amount for Unscheduled Pest Control at the time of award.
The contractor may request to be reimbursed for materials and supplies furnished or used while performing Unscheduled Service Calls, unless the supplies are due to the Contractor's negligence or they are already covered under another CLIN. Cost for materials and supplies will be no greater than that charged to the Contractor's commercial customer. Materials and supplies shall be itemized and billed as separate items on the Contractor's invoice in addition to the hourly rate.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1003AD
| 1 |
| Lot |
| OPTION |
| Contractor Manpower Reporting-Ft. Sill |
FFP
Enterprise-wide Contractor Manpower Reporting
(Note: This CLIN is provided to capture contractor cost for completing the administrative process of reporting)
The contractor shall report ALL labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Defense Commissary Agency (DeCA) via a secure data collection site for fiscal year 2015. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. All data shall be reported NLT October 31, 2015.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Pest Mngt Program – Jacksonville |
FFP
Contractor shall provide pest management services using Integrated Pest Management (IPM) techniques in accordance with the Statement of Work (SOW) and with incorporated Contractor's IPM Plan.
Any chemical not previously submitted on a PUP must be submitted to the Commissary Director for approval prior to use.
LOCATION:
Jacksonville Commissary
951 Allegheny Ave., NAS Jacksonville, FL 32212
POC: Jose Ferrer-Sanchez (904) 542-5311
First Option Period: January 1, 2015 through December 31, 2015
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1004AA
| 12 |
| Each |
| OPTION |
| Scheduled Services - Jacksonville |
FFP
Contractor to provide pest management services once per month to include changing glueboards in accordance with the SOW and contractors incorporated IPM.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1004AB
| 12 |
| Each |
| OPTION |
| Flying Insect Program - Jacksonville |
FFP
Contractor shall provide trapping devices for indoor fly/moth control per the SOW when required. Initial cost for trap is to be included in the initial set up cost. This item covers the cost of the monthly/weekly service per trap.
Number of estimated traps required: _______________
Monthly service cost per trap: $_______________
Additional trapping devices shall be preapproved by Commissary Management and Contracting Officer.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1004AC
| 1 |
| Lot |
| OPTION |
| Unscheduled Services - Jacksonville |
FFP
Special requests and emergency service, such as animal control, bird baiting/trapping, special equipment, etc. that are required outside the normal scheduled services to maintain the IPM Plan in accordance with the SOW.
Hourly Rate: $____________ x 10 hours = $____________ (A)
(indicate days of week ________thru_______and time ______ to _____)
Overtime Rate: $____________ x 5 hours = $____________ (B)
(Other than normal duty hours, to include holidays)
Trip Charge: $__________ x10 trips = $____________ (C)
(Round Trip from Contractor's Business to commissary and return)
Total of A + B + C (above) = $______________
The above hours are estimated amounts for evaluation purposes only and are not to be construed as guaranteed quantities or actual number of hours. The Government will insert a Not To Exceed (NTE) amount for Unscheduled Pest Control at the time of award.
The contractor may request to be reimbursed for materials and supplies furnished or used while performing Unscheduled Service Calls, unless the supplies are due to the Contractor's negligence or they are already covered under another CLIN. Cost for materials and supplies will be no greater than that charged to the Contractor's commercial customer. Materials and supplies shall be itemized and billed as separate items on the Contractor's invoice in addition to the hourly rate.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1004AD
| 1 |
| Lot |
| OPTION |
| Contractor Manpower Reporting - Jacksonv |
FFP
(Note: This CLIN is provided to capture contractor cost for completing the administrative process of reporting)
The contractor shall report ALL labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Defense Commissary Agency (DeCA) via a secure data collection site for fiscal year 2015. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. All data shall be reported NLT October 31, 2015.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Integrated Pest Mngt Services-March |
FFP
Contractor shall provide pest management services using Integrated Pest Management (IPM) techniques in accordance with the Statement of Work (SOW) and with incorporated Contractor's IPM Plan.
Any chemical not previously submitted on a PUP must be submitted to the Commissary Director for approval prior to use.
LOCATION:
March AFB Commissary
15150 6th St., Riverside, CA 92518
POC: Erlinda Nauta (951) 653-2206
First Option Period: January 1, 2015 through December 31, 2015
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1005AA
| 52 |
| Each |
| OPTION |
| Scheduled Services - March AFB |
FFP
Contractor to provide weekly pest management services to include changing glueboards in accordance with the SOW and contractors incorporated IPM.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1005AB
| 1 |
| Lot |
| OPTION |
| Unscheduled Services - March AFB |
FFP
Special requests and emergency service, such as animal control, bird baiting/trapping, special equipment, etc. that are required outside the normal scheduled services to maintain the IPM Plan in accordance with the SOW.
Hourly Rate: $____________ x 10 hours = $____________ (A)
(indicate days of week ________thru_______and time ______ to _____)
Overtime Rate: $____________ x 5 hours = $____________ (B)
(Other than normal duty hours, to include holidays)
Trip Charge: $__________ x10 trips = $____________ (C)
(Round Trip from Contractor's Business to commissary and return)
Total of A + B + C (above) = $______________
The above hours are estimated amounts for evaluation purposes only and are not to be construed as guaranteed quantities or actual number of hours. The Government will insert a Not To Exceed (NTE) amount for Unscheduled Pest Control at the time of award.
The contractor may request to be reimbursed for materials and supplies furnished or used while performing Unscheduled Service Calls, unless the supplies are due to the Contractor's negligence or they are already covered under another CLIN. Cost for materials and supplies will be no greater than that charged to the Contractor's commercial customer. Materials and supplies shall be itemized and billed as separate items on the Contractor's invoice in addition to the hourly rate.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1005AC
| 1 |
| Lot |
| OPTION |
| Contractor Manpower Reporting - March |
FFP
(Note: This CLIN is provided to capture contractor cost for completing the administrative process of reporting)
The contractor shall report ALL labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Defense Commissary Agency (DeCA) via a secure data collection site for fiscal year 2015. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. All data shall be reported NLT October 31, 2015.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Pest Mngt Program – North Island |
FFP
Contracto…