Attch_5_SOW_Lackland.docx
DOCX document 40 KB Posted
- Attached to
- Pest Control Services
- Solicitation number
- HDEC05-13-T-0034
- Issued by
-
Defense Commissary Agency
About this file
Attachment 5 SOW for Lackland
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attch_3_SOW_San_Diego March NorthIsland.docx | DOCX document | |
| HDEC05-13-T-0034.doc | DOC document | |
| Attach_7_PUP_2013.xls | XLS spreadsheet | |
| Attch_4_SOW_Albany.docx | DOCX document | |
| Attch_1_Past_Performance_Survey.docx | DOCX document | |
| Attch_2_SOW_for_Meade _Polk _Sill _Jack.docx | DOCX document | |
| Attch_6_Pricing_Spreadsheet_9.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR LACKLAND AFB AND LACKLAND ENGINEERING DIRECTORATE
PEST MANAGEMENT PROGRAM
All DoD Installations, including all contractors and tenants, must follow the requirements of DoD Instruction 4150.07 (DoD Pest Management Program, 29 May 2008). This is the primary instruction derived to comply with Federal regulations and statutes, including the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA).
Description of Program: This specification is part of a comprehensive Integrated Pest Management (IPM) program. Command pest management consultants shall review and approve contract documents for pest management operations, including augmentation contracts; to ensure that appropriate pest management standards and integrated pest management (IPM) are specified. Control strategies in an IPM program include:
a. Structural and procedural modifications will be done to reduce the exploitation of resources (food, water, and harborage) and access to facilities by pests.
b. Pesticide compounds, formulations, and application methods that are low toxicity and pest specific presenting the lowest hazard to humans and the environment.
c. Implementation of non-pesticide techniques includes cultural, physical, regulatory, behavioral, and physiological, into a comprehensive program.
d. Coordination/communication among all facilities management programs which have a bearing on pest management.
1. CONTRACTOR SERVICE REQUIREMENTS
a. The Contractor shall furnish all labor, supervision, tools, materials, equipment, and transportation necessary to provide pest management services using integrated pest management techniques (IPM) in accordance with contract requirements. Work includes the performance of nuisance, stored products, and other miscellaneous pest management services. The Contractor shall also provide detailed, site-specific recommendations for structural and procedural modifications to aid in pest prevention.
b. The following actions shall be taken by the Contractor each time services are rendered under the contract:
(1) A complete inspection shall be made of the site. Active surveillance methods include, but are not limited to visual determination of general sanitation levels, structural discrepancies, and signs of pest accesses/harborages.
(2) Pest(s), visible pest damage, and any potential for pest infestation shall be identified.
(3) The extent of the pest problem shall be determined. All findings are to be reported to management in verbal and written form. Contractor shall advise of improvements necessary in sanitation, waste handling, and other measures beyond the Contractor’s purview, which impact effective pest management.
(4) Corrective action(s) will be discussed with Commissary management and the Engineering Directorate and shall be taken as appropriate to control, prevent, or otherwise mitigate the pest problems.
(5) The Contractor shall use non-chemical techniques as the primary method of control. When pesticide use is necessary, the Contractor shall employ the least hazardous material, most precise application technique, and minimum quantity of pesticide necessary to achieve control.
(6) The effectiveness of the service provided shall be evaluated and corrective actions taken until the specified levels of control are achieved.
c. The Contractor shall be licensed by the Texas State’s licensing agency in the categories in which the pest control service is performed. The Contractor shall submit the Contractor's license in accordance with Department of Defense Instruction (DoDI) 4150.07 par. 5.4.20.5 and updates as necessary. The Contractor shall submit proof of liability insurance, effective in the State where the pest control service is performed.
2. SAFETY AND HEALTH
a. The Contractor shall observe all safety precautions throughout the performance of the contract. All work shall be in strict accordance with all applicable Federal, State, and local safety and health requirements. Where there is a conflict between applicable regulations, the most stringent will apply. The Contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining the health and safety of personnel during the execution of work.
b. The Contractor shall only use those pesticide products approved by the Government for use on the Installation. The current list of approved pesticides (Pesticide Use Proposal) is available from the Integrated Pest Management Coordinator (IPMC) in the Directorate of Public Works (DPW).
c. All pesticides shall be procured, maintained, handled, and applied in strict accordance with the manufacturer's label as registered with the EPA and the (insert applicable State here) pursuant to the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA), applicable MSDS, and manufacturer instructions. Each product shall be so registered for use under the particular environmental conditions under which it is applied. The Contractor shall obtain and comply with State and local permits required for the procurement, use, and disposal of any pesticide used under this Contract.
d. The Contractor shall maintain a file of EPA-approved labels for all pesticides used and have it readily available at the Contractor's pest control facility. A current and legible copy of the label for each pesticide product possessed by the Contractor’s application personnel shall be kept readily available at all times during the performance of their duties. Whenever the Contractor acquires a new pesticide product, all Contractor personnel shall review the product label and ensure that they understand all the requirements for the use of that product.
e. Material Safety Data Sheets (MSDS) shall be maintained and readily available for each pesticide product possessed by the Contractor’s application personnel. Whenever the Contractor acquires a new pesticide product, all Contractor personnel shall review the product MSDS and ensure that they understand all safety requirements for the use of that product.
f. The Contractor shall dispose of chemicals and containers in accordance with the manufacturers' labels, EPA standards, and AR 200-1. No pesticide waste shall be disposed of on (insert applicable installation name here).
g. The Contractor shall use caution when applying chemicals in hazardous or sensitive areas, such as near electrical fixtures, open flames, stoves, heaters, food bins, refrigerators, open bodies of water, people, and non-target organisms, or during adverse weather conditions. No space treatments (fogging or ultra-low volume) shall be made in occupied spaces. The Contractor shall ensure that the area is properly prepared before treatment.
h. The use of ultrasonic, electromagnetic, or electronic pest control devices for repelling or controlling pests is not permitted. The use of automated or time-controlled pesticide application devices is prohibited.
i. Contractor-owned vehicles used in the performance of services on this Installation shall be suitably marked to identify the Contractor. The Contractor will comply with all applicable requirements of the installation. Motor vehicles entering Lackland AFB shall have a valid State license and proof of vehicle insurance. State license and registration shall be maintained current during the time the vehicle is in use on this Installation. Contractor personnel operating motor vehicles on the Installation shall have a valid State operator's license for the category of vehicle operated. Contractor personnel or any representative of the Contractor entering Lackland AFB shall abide by all security regulations and shall be subject to security checks and property search and seizure.
j. Vehicles used to transport pesticides shall be labeled for pesticide use. Such vehicles shall be equipped with a fire extinguisher, spill and decontamination kit, and emergency wash water. Fire extinguisher shall be a “B” or a “C” dry chemical type with a 10-pound capacity. Extinguisher shall be mounted and easily accessible. Decontamination spill kit shall conform to Armed Forces Pest Management Board (AFPMB) Technical Guide (TG) No. 15. At a minimum, appropriate safety equipment shall include a backflow preventer, protective clothing and cap, rubber gloves, rubber boots, OSHA-approved respirator, rubber apron, and goggles. The Contractor shall place and maintain copies of the current approved label and MSDS in each Contractor-operated vehicle containing pesticides. Pesticide products will be transported in a lockable exterior compartment of the vehicle. Pest control vehicles shall not be left unattended at any time unless properly locked and secured. Transportation of all pesticides shall be accomplished in accordance with 49 CFR 172. All vehicles used to transport pesticides shall be maintained free of pesticide spillage or residue. Vehicles shall not be cleaned or washed on Government property.
k. All pesticide spills shall be contained and cleaned up in accordance with the Lackland AFB Spill Contingency Plan and AFPMB Technical Guide (TG) No.15. The Contractor shall immediately contain any pesticide spills, as defined by the Spill Plan, and report to the appropriate offices as required by the Spill Plan. Waste material from minor spills will be transported off of Lackland AFB by the Contractor for disposal. Disposal of waste material from pesticide spill that is not suitable for transport off of Lackland AFB shall be consistent with the AFPMB TG No. 21, ‘Pesticide Disposal Guide for Pest Control Shops’ (current version), at Contractor expense.
l. All Contractor personnel working in or around buildings shall wear distinctive uniform clothing. The Contractor shall determine the need for and provide any personal protective items required for the safe performance of work. Protective clothing, equipment, and devices shall conform to OSHA standards for the products used.
3. PESTS INCLUDED AND EXCLUDED
a. Pests Included:
(1) Indoor populations of rodents and arthropods.
(2) Outdoor populations of potentially indoor-infesting species that are within the property boundaries of the specified buildings.
(3) Nests of stinging insects within the property boundaries of the specified buildings.
(4) Incidental invaders to include feral vertebrate animals and seasonal arthropods (i.e. stinging insects and arachnids).
b. Pests Excluded:
(1) Termites and other wood-destroying organisms.
(2) Mosquitoes/biting flies.
(3) Herbivorous pests (primarily arthropods).
4. INITIAL BUILDING INSPECTIONS
a. The Contractor shall complete a thorough site visit of the commissary andEngineering Directorate and surrounding area at the time specified in the solicitation for each location. The purpose of the site visit/initial inspection is for the Contractor to evaluate the pest control needs of the commissary and Engineering Directorate and submit an appropriate IPM plan with their quote.
b. The Store Director, Engineering Directorate or his/her representative (Pest Management Coordinator (PMC)) will coordinate building access.
c. The Store Director and/or Engineering Directorate will inform the Contractor of any restrictions or areas requiring special scheduling.
5. PEST MANAGEMENT PLAN
a. The Contractor shall submit to the Contracting Officer a Pest Management Plan with submission of their quote. Upon receipt of the Pest Management Plan, the Contracting Officer will render a decision regarding its acceptability prior to contract award. A copy of the accepted plan shall be kept in the facility and with the contractor to be referenced as needed.
b. The Pest Management Coordinator (PMC) shall be responsible for carrying out work according to the approved Pest Management Plan. The PMC shall receive the concurrence of Management prior to implementing any changes to the approved Pest Management Plan, including additional or replacement pesticides and on-site service personnel.
c. The PMC shall be responsible for providing a copy of the approved Pest Management Plan, including labels and MSDS sheets for all pesticides used in the building, brand names of all pest control devices and equipment used in the building, and the Contractors’ service schedule for both the commissary and the Engineering Directorate to the respective Directors within 5 working days after contract award.
d. The Pest Management Plan shall adhere to the following:
(1) Pesticide application shall be according to an “as needed” basis and not by schedule. Application of pesticides in any inside or outside area shall not occur unless visual or monitoring devices indicate the presence of pests in that specific area. All requests for preventive pesticide treatments where surveillance indicates a potential insect or rodent infestation will be evaluated by the respective Director on a case-by-case basis. Written approval is required.
(2) All pesticide usage shall be in strict conformance with label directions. The Contractor shall not apply any pesticide that has not been included in the Pest Management Plan or approved in writing by the Store Director, Engineering Directorate and Host Installation. No pesticide storage in DeCA stores is allowed. In addition, no water will be provided to the Contractor for any aspects of pesticide mixing under this contract.
(3) The Contractor shall describe site-specific solutions for observed sources of pest food, water, harborage, and access.
(4) The Contractor shall describe methods and procedures to be used for identifying sites of pest harborage and access, and for making objective assessments of pest population levels throughout the term of the contract.
(5) Proposed schedules for each scheduled service, covering the entire term of the contract, shall be submitted to the Store Director and Engineering Directorate for approval at least 5 working days after contract award. The Contractor shall provide complete service schedules that include frequency of Contractor visits, specific day(s) of the week of Contractor visits, and approximate duration of each visit. Approved schedules shall be strictly adhered to. All scheduled services shall be included in the firm fixed-price portion of the contract.
6. RECORD KEEPING
a. The Contractor shall prepare, submit, and maintain records and reports as specified, to include a pest control logbook or file for each site specified in the contract. Additionally, all recommendations provided by the Pest Contractor shall be in writing and annotated as acceptable/non-acceptable by the Store Director and/or Engineering Directorate. These recommendations and reports shall be maintained by the contractor for the duration of the contract.
b. The Contractor shall maintain daily records of ALL pest management operations, both chemical and nonchemical, including surveillance, using the NOPRS system.
c. Records shall be completed daily as operations are performed; all entries must be accomplished within 24 hours of performance.
d. Records shall be made available upon request for inspection, and copies shall be forwarded to the Store Director and Engineering Directorate following the month of service.
e. Contractor must provide the IPMC, Donald Lauer at donald.lauer@us.af.mil, chemical application record of each time a pesticide is applied.
7. MANNER AND TIME TO CONDUCT SERVICE
a. Time Frame of Service Visits:
(1) The Contractor's project manager shall be the Government's central point of contact concerning contract work performance and shall be available during the Government's regular working hours for discussion. A single local or toll-free telephone number shall be provided to the PMC, Store Director, and Engineering Directorate for receipt of all calls. The project manager shall be able to read, speak, and write the English language. The name of the individual designated as the project manager shall be provided with submission of the quote. Advance written notification is required prior to any project manager change.
(2) The Contractor shall implement all necessary work control procedures to ensure fully adequate and timely completion of work requirements, as well as to permit tracking of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements with regard to the established time limits and quality standards. Verbal scheduling and status reports shall be provided when requested by the Store Director and Engineering Directorate.
(3) Except as otherwise specified, all routine pest control services shall be performed during regular working hours of commissary store. The Contractor shall schedule and arrange work so as to cause the least interference with the normal occurrence of Government business and mission. In those cases where some interference is unavoidable, the Contractor shall make every effort to minimize the impact. All required work schedules shall be submitted to and approved by the Store Director and Engineering Directorate. Reviewing traps, when possible, should occur before store opening or after its closing. If the Contractor desires to work on Sunday, holidays, or outside regular working hours, he/she must obtain the written approval of the Store Director and/or Engineering Directorate. This notification must occur at least (1) one day in advance.
(4) Check In/Check Out Requirements. The Contractor's project manager shall check in prior to the commencement of work and check out at the completion of work, at a site designated by the Store Director and Engineering Directorate . At the time of check in/check out, the project manager shall indicate:
(a) The services planned to be provided during the day;
(b) The location of the planned services;
(c) Planned services, which were not completed during the day; and
(d) Schedule of proposed follow-up treatments identified during the day.
8. SPECIAL REQUESTS AND EMERGENCY SERVICE
The Contractor shall provide miscellaneous unscheduled pest control services as specified below:
a. Emergency Calls. Service calls will be classified as emergency at the discretion of the Store Director orEngineering Directorate . Generally, emergency calls will consist of obtaining control of pests, which could affect the health or well-being of personnel. The Contractor shall respond immediately and must be on site to provide an initial inspection and treatment within three (3) hours after receipt of the emergency call request.
b. Routine Calls. All non-emergency service calls will be classified by the Store Director or Engineering Directorate as routine. The Contractor shall complete the initial inspection and treatment for each routine service call within three (3) working days after receipt.
c. The Contractor shall perform corrective action requests within 24 hours (except Sundays and holidays) after receipt of notice from the Store Director or Engineering Directorate that inspection has revealed control limits have been exceeded. Callbacks shall be made at no additional cost to the Government; there is no limit to the number of callbacks.
d. The Contractor shall provide pest control services on a service call (fixed-price) basis in buildings covered by scheduled pest control services, around the exterior of buildings, and in adjacent exterior areas (up to five feet radius from the exterior walls) for the control of arthropods, rodents, and other crawling and flying pests. IPM practices shall be used to treat the area(s) specified in the work authorization, perform follow-up inspections, and, if needed, re-treatment at no additional cost to the Government until the acceptable level of control is achieved.
e. The Contractor is not liable for equipment damaged or destroyed due to negligence of Store or Engineering Directorate personnel. The Contractor will be reimbursed with the respective organizations GPC for such equipment replacement as it is not covered under this contract.
9. CONTRACTOR PERSONNEL
a. Contractor shall provide all equipment, materials, and services to perform the requirements of this contract. Such equipment and the use of that equipment shall be subject to the inspection and approval of the Director, Engineering Directorate . The Contractor shall maintain a label book of pesticides used, and have it readily available for the Director's inspection at all times. Material Safety Data Sheets (MSDS) shall be provided for all pesticides used.
b. Licensing and Certification. The Contractor shall be licensed in the appropriate category by the State of Texas to provide pest control in accordance with this contract. Only commercially certified applicators are authorized to apply insecticides and any license that has the individual as an apprentice or technician is not authorized to apply pesticides on government property. The Contractor shall provide photocopies of State-issued Commercial Pesticide Applicator Certificates or Licenses for every Contractor employee who will be performing on-site service under this contract.
c. Base Access – Security: The contractor shall be responsible for obtaining applicable installation passes and inspections for vehicles and personnel at no additional cost to the government. Contractor employees may be subject to background security checks/clearances in order to obtain credentials for passes. Some installations are using programs such as RAPIDGate at a cost to the contractor. Any costs associated with obtaining passes must be included in the proposed contract pricing prior to award of any resultant contract.
10. USE OF PESTICIDES
a. When pesticide use is necessary, the Contractor shall employ the least hazardous material, most precise application technique, and minimum quantity of pesticide necessary to achieve control. The Contractor shall provide all EPA-registered and labeled pesticides necessary to perform the services of this contract. The pesticides must be in original form and containers without alteration or contamination. All pesticides used by the Contractor shall be delivered to the specific work site or facility in securely closed containers as supplied by the manufacturer or formulator, unless otherwise approved by the Contractor Officer. Containers shall be in good condition without leaks or corrosion, with tight fitting seals or covers and with labels that are intact and legible. The Contractor shall use all pesticides in accordance with label directions on the container.
b. Technical Specification Changes. As new materials and methods become available, it may become necessary to alter the technical specifications of this contract to accommodate such changes, such as those which would reduce reliance on pesticides, or use safer materials. The Contractor shall recommend specification changes to the Store Director and/or Engineering Directorate when:
(1) Newer, safer, and more effective methods become available;
(2) More selective pesticides become available; and
(3) Less toxic and less persistent pesticides become available.
c. Proposed changes to the initial Pesticide Use Proposal (PUP) must receive approval from the Installation IPMC prior to usage of any new product. To obtain approval for an additional product, the Contractor shall submit the EPA-approved label, MSDS, target pest, and application site to the IPMC through the COR. The IPMC shall submit the request to the Command Pest Management Consultant for review and notify the COR once a determination has been made.
d. Application of insecticides to exposed surfaces or space sprays (fogging) shall be restricted to exceptional circumstances where no alternative measures are practical. The Contractor shall obtain prior approval from the Store Director, Engineering Directorate and Host Installation before any application of this nature. The Contractor, if permission is granted, must ensure all necessary precautions are taken to ensure tenant personnel and employee safety, and that all steps are taken to ensure containment of the pesticide to the specified site.
e. As a general rule, the Contractor shall apply all insecticides as “crack and crevice” treatments only as needed, defined as treatments in which the formulated insecticide is not visible to a bystander during or after the application process.
f. Portable vacuums rather than pesticide sprays shall be the standard method for initial cleanouts of cockroach infestations, swarming ants, termites, and for control of spiders in webs.
g. Trapping devices rather than pesticide sprays shall be the standard method for indoor fly control. Electric grid light traps are authorized for capturing/treating flying insects.
h. Bait formulations shall be the standard pesticide technology for cockroach and ant control, with alternate formulations restricted to unique situations where baits are not practical.
i. Sticky traps shall be used to guide and evaluate indoor insect control efforts wherever necessary.
11. INSECT MANAGEMENT
a. Cockroaches: Cockroach control shall be consistently maintained as determined by active (visual) and passive (trapping) surveillance. Control is defined as two or less spots (an area of 2 square feet) infestations in any part of the Commissary or Engineering Directorate and no more than three cockroaches found in any one spot. Surveillance results shall be reported in writing to the Store Director or Engineering Directorate and a log maintained at the store. If more than two spot infestations are found or more than three cockroaches are found in any one spot, a call back request will be issued by the Store Director or Engineering Directorate.
b. Ants: Control shall be established within 15 calendar days after the start date of the contract. Control is defined as keeping areas virtually free of any infestation for the duration of the contract. If an infestation is located by the Contractor during a scheduled inspection/treatment, and a followup inspection/treatment is required to ensure that control has been obtained, the followup service shall be scheduled and the schedule provided to the Store Director or Engineering Directorate.
c. Other Arthropod Pests (silverfish, spiders, and crickets): Control shall be achieved within two services. Control is defined as less than two sightings of the target pest during a 30 calendar day period.
12. RODENT CONTROL
a. As a general rule, rodent control inside buildings shall be accomplished with trapping devices only. All such devices shall be concealed out of general view and in protected areas so as not to be affected by routine cleaning and other operations. Trapping devices shall be monitored on a schedule approved by the Store Director and Engineering Directorate. The Contractor is responsible for disposing of all trapped rodents and all rodent carcasses in an appropriate manner.
b. Rodenticides are not permitted by label in sales areas where open food may be present. The only acceptable areas for rodenticide use shall be the warehouse area. In exceptional circumstances, when rodenticides are deemed essential for adequate rodent control, Contractor shall obtain approval of the Store Director and/or Engineering Directorate prior to making any rodenticide treatment. All rodenticides, regardless of packaging, shall be placed either in locations not accessible to children, pets, wildlife, and domestic animals, or in EPA-approved, tamper resistant bait boxes. Outdoor rodenticide application shall emphasize the direct treatment of rodent burrows wherever feasible. Indoor control of rodents is limited to glue boards, snap traps, and multi-catch traps (i.e. tin cats).
c. Bait boxes shall be maintained in accordance with EPA regulations, with an emphasis on safety of non-target organisms. All bait boxes shall be placed out of general views. Bait stations shall remain free of insect infestation and shall not be placed in food service or food preparation areas. The lids shall be securely locked or fastened shut. Bait boxes shall be securely attached or anchored to the floor, ground, wall, or other immovable surface. Bait shall be secured in the feeding chamber of the box. Bait boxes shall be labeled on the inside with the Contractor’s business name and address, and dated by the contractor’s technician at the time of installation and each servicing.
d. The use of glue boards, snap traps, and other non-poisonous control methods shall be emphasized. Rodenticides shall be placed only in distinctly marked, spill-proof, tamper-proof bait stations, which are inaccessible to children, pets, and non-target wildlife; or in burrows, which shall be closed immediately after treatment. Control shall be established within 30 calendar days after the start date of the contract. Control is defined as keeping areas free of infestation for the duration of the contract. Physical signs of rodent infestation, such as active burrows, fecal material, urine stains, commodity damage, etc., shall be evidence of lack of control. When noxious odors indicate the presence of a dead rodent resulting from Contractor operations, Contractor shall locate and remove carcass. If the carcass is located in an inaccessible area, apply an effective deodorizer.
13. STORED PRODUCTS PEST CONTROL
a. The Contractor shall place appropriate pheromone or food attractant traps at suitable locations. (The most common pest is the Indian Meal Moth. Pheromone traps specific for saw-toothed grain beetle and Tribolium spp are generally not needed as traps for warehouse beetle/Trogoderma will also attract them.) Written results of monthly trap surveillance shall be provided to the Store Director and Engineering Directorate.
b. Residual Insecticide Applications. This is generally not needed in a commissary. Proper sanitation will usually suffice. The Contractor shall control food-infesting pests. Control is defined as no visible pest activity up to 72 hours after treatment. Pesticides shall not be applied to exposed food materials, packaging, or food handling equipment.
c. Acceptable Level of Control. One hundred percent kill of all insects, including egg stage, is required. The area around the infested product shall be monitored for the presence of all insect life stages.
14. STRUCTURAL MODIFICATIONS AND RECOMMENDATIONS
a. The Contractor shall be responsible for advising the Store Director or Engineering Directorate about any structural, sanitary, or procedural changes that would reduce pest food, water, harborage, or access.
b. The Contractor shall be responsible for adequately suppressing all pests included in the contract. Cooperation with the Pest Management Contractor on recommended changes is required to ensure a successful pest management program.
c. The Contractor will not be held responsible for carrying out structural changes as part of the pest management effort. However, minor applications of caulk and other sealing materials by the Contractor to eliminate pest harborage or access may be approved by the Store Director and/or Engineering Directorate on a case-by-case basis.
d. The Contractor shall obtain prior approval from the Store Director or Engineering Directorate before applying any sealing material or other structural change.
15. QUALITY CONTROL PROGRAM
a. The Contractor shall establish a complete quality control program to ensure the requirements of the contract are provided as specified. The Contractor shall submit a copy of this program with submission of their quote. The program shall include at least the following items:
(1) Inspection System – The Contractor’s quality control inspection system shall cover all the services stated in this contract. The purpose of the system is to detect and correct deficiencies in the quality of services before the level of performance becomes unacceptable and/or the Store Director or Engineering Directorate identifies the deficiencies.
(2) Checklist – A quality control checklist shall be used in evaluating contract performance during regularly scheduled and unscheduled inspections. The checklist shall include every building or site serviced by the Contractor as well as every task required to be performed.
(3) File – A quality control file shall contain a record of all inspections conducted by the Contractor and any corrective action taken. The file shall be maintained throughout the term of the contract and made available to the Contracting Officer, PMC, Store Director, or Engineering Directorate upon request.
(4) Inspector (s) – The Contractor shall state the name (s) of the individual (s) responsible for performing the quality control inspections.
OPTIONAL OR AS-NEEDED REQUIREMENTS:
1. NUISANCE BIRDS
a. Nuisance birds are often found visiting or inhabiting the building or areas surrounding the buildings. While it is generally true that prevention methods are most effective in managing nuisance bird problems and may be solved without direct intervention by the pest control contractor (i.e. pest control performing the actual work of installing prevention devices), it is crucial to receive consultation from the contractor before performing any work. Additionally, proper installation of netting, spikes, etc. is critical in management and must be performed by knowledgeable individuals (i.e. the pest contractor).
b. Nuisance birds shall be prevented from nesting, roosting, or loafing on exterior and interior surfaces of all buildings and structures. A nuisance bird generally refers to pigeons, starlings, and house sparrows. The Contractor shall remove nests (including contents) and control ectoparasites such as ticks, mites, and lice, when present. No native species or their nests shall be touched or harmed without prior written approval of the Installation Integrated Pest Management Coordinator.
c. Bird management programs may include trapping, physical removal, non-lethal repellents, physical barriers, and depredation. Dead and dying birds resulting from the control program shall be disposed of off the installation by the Contractor.
d. House sparrows, starlings, pigeons, and other non-native bird species can be removed without a USFWS (United States Fish & Wildlife Service) permit. Nests of native birds, other than State and Federally listed species, may be removed as long as there are no eggs or nestlings present. A special USFWS permit is required to remove bird nests which contain eggs or nestlings, or take an adult migratory bird. Any native bird recovered unharmed from inside a structure as a result of nuisance wildlife control operations shall be released outdoors in the general vicinity of the structure. Any injured native bird recovered as a result of nuisance wildlife control operations will be turned over to a licensed wildlife rehabilitator of the Contractor’s choosing.
e. In order to perform nuisance bird control services, Contractor personnel shall possess a Nuisance Wildlife Control Permit issued by (applicable State authority). The Contractor shall be aware of and conduct training for all employees in the requirements for the handling, transportation, and (if required) euthanasia of removed nuisance birds.
d. Control shall be established within 30 calendar days after the contract start date, and maintained for the duration of the contract. Control is defined as no more than five (5) pigeons and no more than eight (8) birds total (all nuisance species combined) sighted on a building or structure at one time, and no birds sighted within the store.
2. MISCELLANEOUS PEST CONTROL
a. Animal Control.
(1) Contractor shall provide pest control services for the removal from the commissary of wild and feral animals, including squirrels, skunks, opossums, snakes, cats, bats, and dogs. The Contractor shall use cage-type live traps or other techniques that do not harm the captured animal. Leg-hold steel traps shall not be used. Trapping, if needed, shall be performed out of sight from the public to avoid potential public relations problems.
(2) All captured feral house-pets and exotic wildlife shall be taken to the installation animal control facility, unless otherwise directed by the Installation Veterinarian or the Military Police. Carnivores (squirrels, skunks, raccoons, bats, foxes, etc.) will be taken to Veterinary Services only if they exhibited unusual behavior or have been in contact with humans.
(3) All captured native wildlife will be released on Government property, outside of the cantonment area.
(4) In order to perform nuisance wildlife control services, Contractor personnel shall possess a Commercial Trapping License and Nuisance Wildlife Control Permit issued by (insert applicable State authority). The Contractor shall be aware of and conduct training for all employees in the requirements for the handling, transportation, and (if required) euthanasia of removed nuisance animals.
b. Odor Control: The Contractor shall eliminate or effectively counteract or mask undesirable odors associated with live animals.
DEFINITIONS TECHNICAL.
a. As used throughout this contract, the following terms shall have the meanings set forth below:
(1) Integrated Pest Management (IPM). A planned program incorporating continuous monitoring, education, record keeping, and communication to prevent pests and disease vectors from causing unacceptable damage to operations, people, property, material, or the environment. IPM uses targeted, sustainable (effective, economical, environmentally sound) methods including education, habitant modification, biological control, genetic control, cultural control, mechanical control, physical control, regulatory control, and where necessary, the judicious use of least-hazardous pesticides.
(2) Pesticide. Any substance or mixture of substances intended for preventing, destroying, repelling, or mitigating any pest, and any substance or mixture of substances intended for use as a plant regulator, defoliant, or desiccant.
(3) Contracting Officer (KO). The Contracting Officer is a person with the authority to enter into, administer, and/or terminate contracts and make related modifications, determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
(4) Contractor. The term Contractor refers to both the prime Contractor and subcontractors. The prime Contractor shall ensure that his/her subcontractors comply with the provisions of this contract.
(5) Call Back. A request for additional service or re-treatment following the initial service that has not provided the control required. Repeated callbacks are possible and shall be provided at no additional charge to the Government.
(6) Environmental Protection Agency (EPA). That federal agency delegated authority to enforce the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA).
(7) Regular Working Hours. The regular (normal) working hours as established locally, except federal holidays and other days specifically designated by the Store Director and/or Engineering Directorate.
(8) Response Time. The time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work site, with appropriate tools, equipment, and materials, ready to perform the work required.
NOTE: Any installation requirements not covered in this Statement of Work may be incorporated under Clause 52.212-4(c): Contract Terms and Conditions – Commercial Items (Changes)
File details come from the government source that posted it. Updated .