HDEC03-12-R-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

Amendment 0001 to Solicitation HDEC03-12-R-0002 – New London new Commissary

1. Changes the due date of this solicitation FROM 2:00 pm April 23, 2012 TO 2:00 pm May 8, 2012.

2. Replace DOL General Decision Building CT20100027 dated 03/09/2012 with DOL General Decision Building CT20100027 dated 04/06/2012. (Attachment 1)

3. Replace DOL General Decision Highway CT20100003 dated 01/20/2012 with DOL General Decision

Highway CT20100003 dated 04/06/2012. (Attachment 2)

4. Incorporate New London Civil Clarifications. (Attachment 3)

5. Incorporate Pre-proposal conference minutes. (Attachment 4)

6. Incorporate Pre-proposal conference sign-in sheet (Attachment 5)

7. Incorporate Questions and Answers (Attachment 6)

8. All other terms and conditions remain the same.

Attachments to Amendment 0001:

NO. DOCUMENT PAGES DATE

1 DOL General Decision BLDG CT20100027 8 04/06/2012

2 DOL General Decision HGWY CT20100006 7 04/06/2012

3 New London Civil Clarifications 1 4/4/2012

4 New London Pre-Bid Meeting Minutes 5 4/4/2012

5 New London Pre-Bid Meeting Sign-In Sheet 7 4/4/2012

6 New London Q&A #1 10 04/3–16/ 2012

(End of Summary of Changes)

General Decision Number: CT120024 04/06/2012 CT24

Superseded General Decision Number: CT20100027

State: Connecticut

Construction Type: Building

County: New London County in Connecticut.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date 0 01/06/2012 1 01/20/2012 2 01/27/2012 3 02/03/2012 4 03/09/2012 5 04/06/2012

BOIL0237-001 01/01/2012

Rates Fringes

BOILERMAKER......................$ 34.65 24.10

BRCT0001-008 04/01/2011

Rates Fringes

TILE SETTER......................$ 32.00 21.44

BRCT0001-013 10/03/2011

Rates Fringes

BRICKLAYER.......................$ 32.50 24.20

a.PAID HOLIDAY: Employees shall receive 4 hours for Chirstmas Eve holiday provided the employee works the regularly scheduled day before and after the holiday. Employers may schedule work on Christmas Eve and employees shall receive pay for actual hours worked on that day in addition to holiday pay.

BRCT0001-014 09/14/2011

Rates Fringes

CEMENT MASON/CONCRETE

FINISHER (Including Caulking)....$ 32.50 24.20 a.PAID HOLIDAY: Employees shall receive 4 hours for Christmas Eve holiday provided the employee works the regularly scheduled day before and after the holiday.

Employers may schedule work on Christmas Eve and employees shall receive pay for actual hours worked on that day in addition to holiday pay.

4/12/2012http://www.wdol.gov/wdol/scafiles/davisbacon/CT24.dvb

HDEC03-12-R-0002 New London - Amendment 01 Atch 1 - DOL General Decision Building 4-6-2012

BRCT0001-016 10/03/2011

Rates Fringes

TILE FINISHER....................$ 25.50 24.20

BRCT0001-021 10/03/2011

Rates Fringes

PLASTERER........................$ 32.50 24.20

CARP0024-012 05/02/2011

Rates Fringes

CARPENTER (Including Drywall Hanging, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, Metal Stud Installation, Form Work and Scaffold Building)...........$ 29.11 20.29

CARP0024-013 05/02/2011

Rates Fringes

MILLWRIGHT.......................$ 30.01 20.18

ELEC0035-010 06/01/2011

Bozrah, Colchester, Franklin, Griswold, Lebanon, Ledyard, Lisbon, Montville, North Stonington, Norwich, Preston, Salem, Sprague, Stonington and Voluntown

Rates Fringes

ELECTRICIAN (Including Low Voltage Wiring)..................$ 36.40 21.31

ELEC0090-009 06/01/2011

East Lyme, Groton, New London, Old Lyme, Waterford, plus the part of Ledyard wherein the property of the Submarine Base is located

ELECTRICIAN (Including Low Voltage Wiring)..................$ 35.70 21.52

ELEV0091-001 01/01/2012

ELEVATOR MECHANIC................$ 45.97 23.535+a+b

4/12/2012http://www.wdol.gov/wdol/scafiles/davisbacon/CT24.dvb

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day, plus the Friday after Thanksgiving.

b. VACATION: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.

* ENGI0478-013 04/01/2012

Rates Fringes

POWER EQUIPMENT OPERATOR:

Asphalt Paver...............$ 33.46 20.50+a Asphalt Roller..............$ 32.81 20.50+a Backhoe/Excavator 2 cubic yards and over..............$ 35.18 20.50+a Backhoe/Excavator under 2 cubic yards; Grader/Blade;

Rubber Tire Backhoe/Excavator...........$ 34.44 20.50+a Bobcat/Skid Loader;

Forklift....................$ 31.98 20.50+a Bulldozer (Rough Grade Dozer)......................$ 33.15 20.50+a Bulldozer Fine Grade(includes slopes, shaping, laser or gps)......$ 34.44 20.50+a Concrete Pump...............$ 33.46 20.50+a Crane handling or erecting structural steel or stone...$ 35.50 20.50+a Cranes (100 ton capacity & over).......................$ 35.18 20.50+a Cranes (under 100 ton rated capacity).............$ 34.44 20.50+a Earth Roller................$ 29.94 20.50+a Front End Loader (3 cubic yards up to 7 cubic yards)..$ 33.15 20.50+a Front End Loader (7 cubic yards or over)..............$ 35.50 20.50+a Front End Loader (under 3 cubic yards)................$ 31.98 20.50+a Maintenance Engineer/Oiler..$ 27.10 20.50+a Mechanic....................$ 32.41 20.50+a Vibratory Hammer............$ 29.94 20.50+a

a. PAID HOLIDAYS: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, the working day before and the working day after the holiday.

b. Crane with boom, including jib, 150 feet - $1.50 extra .

Crane with boom, including jib, 200 feet- $2.50 extra.

Crane with boom, including jib, 250 feet - $5.00 extra.

Crane with boom, including jib, 300 feet - $7.00 extra.

Crane with boom, including jib, 400 feet - $10.00 extra.

IRON0015-006 01/02/2012

4/12/2012http://www.wdol.gov/wdol/scafiles/davisbacon/CT24.dvb

IRONWORKER, ORNAMENTAL,

REINFORCING AND STRUCTURAL.......$ 33.50 27.03+a

a. PAID HOLIDAY: Labor Day provided employee has been on the payroll for the 5 consecutive work days prior to Labor Day.

* LABO0056-010 04/01/2012

Rates Fringes

LABORERS

Group 1.....................$ 25.80 16.45 Group 2.....................$ 26.05 16.45 Group 3.....................$ 26.30 16.45 Group 4.....................$ 26.55 16.45 Group 5.....................$ 26.80 16.45 Group 6.....................$ 28.80 16.45 Group 7.....................$ 16.00 16.45

Classifications

Group 1: Laborers, Acetylene Burners, Carpenter Tenders, Concrete Specialists, Fire Watchers, Wrecking Laborers and Top Men

Group 2: Morter Mixer, Pipelayers, Plaster Tenders, Power Buggy Operator, Powderman, Fireproofer/Mixer/Nozzleman

Group 3: Jack Hammer/Pavement Breaker, Mason Tender, Bottom Men

Group 4: Air Track Operator, Sand Blasters

Group 5: Asbestos/Lead Removal

Group 6: Blasters, Toxic Waste Removal

Group 7: Traffic Control Signalman

PAIN0011-012 06/01/2011

Rates Fringes

GLAZIER..........................$ 32.73 16.35+A

a. PAID HOLIDAYS: Labor Day and Christmas Day.

PAIN0011-019 06/01/2011

Rates Fringes

PAINTER

Brush and Roller............$ 28.47 15.40 Drywall Finishing/Taping Only........................$ 29.92 16.35 Paperhanger Only............$ 28.97 15.40 Spray Only..................$ 31.47 15.40

4/12/2012http://www.wdol.gov/wdol/scafiles/davisbacon/CT24.dvb

PLUM0777-006 06/01/2011

Rates Fringes

PIPEFITTER, Including HVAC Pipe Installation................$ 38.67 24.46

PLUM0777-008 06/01/2011

Rates Fringes

PLUMBER (Excluding HVAC Pipe Installation)....................$ 38.67 24.46

ROOF0009-005 01/01/2012

Rates Fringes

ROOFER

Composition.................$ 31.11 16.94 Slate and Tile..............$ 31.61 16.94

SFCT0676-002 01/01/2010

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 40.50 16.85+a

a. PAID HOLIDAYS: Memorial Day, July 4th, Labor Day, Thanksgiving Day and Christmas Day, provided the employee has been in the employment of a contractor 20 working days prior to any such paid holiday.

SHEE0040-004 07/01/2011

Rates Fringes

SHEETMETAL WORKER, Including HVAC Duct Installation...........$ 32.27 28.23

SUCT2009-008 04/15/2009

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 24.25 10.76

LABORER: Airtool Operator.......$ 17.04 6.90

LABORER: Landscape..............$ 19.97 2.70

LABORER: Fence Erector...........$ 20.16 6.13

LINE CONSTRUCTION: Groundman....$ 10.00 2.17

LINE CONSTRUCTION: Lineman......$ 22.09 6.18

OPERATOR: Asphalt Spreader......$ 25.05 8.90

4/12/2012http://www.wdol.gov/wdol/scafiles/davisbacon/CT24.dvb

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: CT120002 04/06/2012 CT2

Superseded General Decision Number: CT20100003

State: Connecticut

Construction Type: Highway

County: New London County in Connecticut.

HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 01/06/2012 1 01/20/2012 2 04/06/2012

* BRCT0001-003 03/31/2012

Rates Fringes

BRICKLAYER

BRICKLAYERS, CEMENT

MASONS, CEMENT FINISHERS,

PLASTERERS, STONE MASONS....$ 32.50 24.55

CARP0024-002 05/02/2011

Rates Fringes

Carpenters:

Carpenters, Piledrivers.....$ 29.11 20.29 Diver Tenders...............$ 29.11 20.29 Divers......................$ 37.57 20.29

ELEC0035-003 06/01/2011

Rates Fringes

Electricians:

Bozrah, Colchester, Franklin, Griswold, Lebanon, Ledyard, Lisbon, Montville, North Stonington, Norwich, Preston, Salem, Sprague, Stonington and Voluntown....$ 36.40 21.31

ELEC0090-003 06/01/2010

East Lyme, Groton, New London, Old Lyme, Waterford, plus the part of Ledyard wherein the property of the Submarine Base is located

ELECTRICIAN......................$ 35.20 20.51

* ENGI0478-002 04/01/2012

4/12/2012http://www.wdol.gov/wdol/scafiles/davisbacon/CT2.dvb

Atch 2 - DOL General Decision Highway 4-6-2012

Power equipment operators:

GROUP 1....................$ 35.50 20.50+a GROUP 2....................$ 35.18 20.50+a GROUP 3....................$ 34.44 20.50+a GROUP 4....................$ 34.05 20.50+a GROUP 5....................$ 33.46 20.50+a GROUP 6....................$ 33.15 20.50+a GROUP 7....................$ 32.81 20.50+a GROUP 8....................$ 32.41 20.50+a GROUP 9....................$ 31.98 20.50+a GROUP 10....................$ 29.94 20.50+a GROUP 11....................$ 29.94 20.50+a GROUP 12....................$ 29.88 20.50+a GROUP 13....................$ 31.41 20.50+a GROUP 14....................$ 29.30 20.50+a GROUP 15....................$ 28.99 20.50+a GROUP 16....................$ 28.16 20.50+a GROUP 17....................$ 27.75 20.50+a GROUP 18....................$ 27.10 20.50+a

Hazardous waste premium $3.00 per hour over classified rate.

Crane with 150 ft. boom (including jib): $1.50 extra.

Crane with 200 ft. boom (including jib): $2.50 extra.

Crane with 250 ft. boom (including jib): $5.00 extra.

Crane with 300 ft. boom (including jib): $7.00 extra.

Crane with 400 ft. boom (including jib); $10.00 extra.

a. PAID HOLIDAYS: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, the working day before and the working day after the holiday.

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Crane Handling or Erecting Structural Steel or tone; Hoisting Engineer (2 drums or over); Front End Loader (7 cubic yards or over) Work Boat 26 ft. & over.

GROUP 2: Cranes (100 ton rated capacity and over); Excavator over 2 cubic yards; Piledriver ($3.00 premium when operator controls hammer).

GROUP 3: Excavator; Cranes (under 100 ton rated capacity), Gradall; Master Mechanic; Hoisting Engineer (all types of equipment where a drum and cable are used to hoist or drag material regardless of motive power of operation), Rubber tire Excavator (Drott-1085 or similar); Grader Operator;

Bulldozer Fine Grade (slopes. shaping, laser or GPS, etc.)

GROUP 4: Trenching machines; Lighter Derrick; Concrete Finishing Machine, cmi Machine or Similar; Koehring Loader Skooper).

GROUP 5: Specialty Railroad Equipment; Asphalt Spreader;

4/12/2012http://www.wdol.gov/wdol/scafiles/davisbacon/CT2.dvb

Asphalt Reclaiming achine; Line Grinder; Concrete Pumps;

Drills with Self Contained Power Units; Boring Machine;

Post Hole Digger; Auger; Pounder; Well Digger; Milling Machine (over 24" Mandrell); Side Boom; Combination Hoe and Loader; Directional Driller.

GROUP 6: Front End Loader (3 cu. yds. up to 7 cubic yards);

Bulldozer (Rough grade dozer).

GROUP 7: Asphalt Roller; Concrete Saws and Cutters (Ride on Types); Vermeer Concrete Cutter; Stump Grinder; Scraper;

Snooper; Skidder; Milling Machine (24" and Under Mandrel).

GROUP 8: Mechanic; Grease Truck Operator; Hydroblaster;

Barrier Mover; Power Stone Spreader; Welder; Work Boat Under 26 ft.; Transfer Machine.

GROUP 9: Front End Loader (under 3 cubic yards); Skid Steer Loader (regardless of attachments); (Bobcat or similar);

Fork Lift; Power Chipper; Landscape Equipment (including Hydroseeder).

GROUP 10: Vibratory Hammer, Ice Machine, Diesel and Air Hammer, etc.

GROUP 11: Conveyor; Earth Roller; Power Pavement Breaker (Whiphammer); Robot Demolition Equipment.

GROUP 12: Wellpoint Operator.

GROUP 13: Portable Asphalt Plant Operator; Portable Concrete Plant Operator; Portable Crusher Plant Operator.

GROUP 14: Compressor Battery Operator.

GROUP 15: Power Safety Boat; Vacuum Truck; Zim Mixer;

Sweeper; (Minimum for any job requiring a CDL License)

GROUP 16: Elevator Operator; Tow Motor Operator (Solid Tire No Rough Terrain).

GROUP 17: Generator Operator; Compressor Operator; Pump Operator; Welding Machine Operator; Heater operator.

GROUP 18: Maintenance Engineer.

IRON0015-003 01/02/2012

Rates Fringes

Ironworkers: (Reinforcing & Structural)......................$ 33.50 27.03+a

a. PAID HOLIDAY: Labor Day provided employee has been on the payroll for the 5 consecutive work days prior to Labor Day.

* LABO0056-003 04/01/2012

4/12/2012http://www.wdol.gov/wdol/scafiles/davisbacon/CT2.dvb

Laborers:

GROUP 1.....................$ 25.80 16.45

GROUP 2.....................$ 26.05 16.45

GROUP 3.....................$ 26.30 16.45

GROUP 4.....................$ 26.80 16.45

GROUP 5.....................$ 27.55 16.45

GROUP 6.....................$ 27.80 16.45

GROUP 7.....................$ 16.00 16.45

LABORERS CLASSIFICATIONS

GROUP 1: Laborers (Unskilled), acetylene burner, concrete specialist

GROUP 2: Chain saw operators, fence and guard rail erectors, pneumatic tool operators and powdermen.

GROUP 3: Pipelayers, Jackhammer/Pavement breaker (handheld), mason tenders/catch basin builders, asphalt rakers, air track operators, block paver and curb setter

GROUP 4: Asbestos/lead removal

GROUP 5: Blasters

GROUP 6: Toxic waste remover

GROUP 7: Traffic control signalman

PAIN0011-002 06/01/2011

Rates Fringes

Painters:

Blast and Spray.............$ 32.17 16.35 Brush and Roll..............$ 29.17 16.35 Tanks, Towers, Swing........$ 31.17 16.35

PAIN0011-003 06/01/2011

Rates Fringes

Painters: (BRIDGE

CONSTRUCTION)

Brush, Roller, Blasting (Sand, Water, etc.) Spray...$ 41.35 16.35

* TEAM0064-003 04/01/2012

Rates Fringes

Truck drivers:

2 Axle Ready Mix............$ 27.98 17.22+a 2 Axle......................$ 27.88 17.22+a 3 Axle Ready Mix............$ 28.03 17.22+a 3 Axle......................$ 27.98 17.22+a 4 Axle Ready Mix............$ 28.13 17.22+a 4 Axle......................$ 28.08 17.22+a Heavy Duty Trailer 40 tons

4/12/2012http://www.wdol.gov/wdol/scafiles/davisbacon/CT2.dvb and over....................$ 28.33 17.22+a Heavy Duty Trailer up to 40 tons.....................$ 28.08 17.22+a Specialized (Earth moving equipment other than conventional type on-the-road trucks and semi-trailers, including Euclids)....................$ 28.13 17.22+a

Hazardous waste removal work receives additional $1.25 per hour.

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day and Good Friday, provided the employee has at least 31 calendar days of service and works the last scheduled day before and the first scheduled day after the holiday, unless excused.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the

4/12/2012http://www.wdol.gov/wdol/scafiles/davisbacon/CT2.dvb rate.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

HDEC03‐12‐R‐0002 New London ‐ Amendment 01 Atch 3 – New London Civil Clarifications

The following points of clarifications and emphasis were presented at the Pre‐Bid meeting for the New Commissary at NSB New London on April 4, 2012 by the design civil engineer.

1. The contractors' attention was called to the fact that this site has been redeveloped numerous times. The contract documents are the best effort to properly reflect below grade improvements remaining from the previous improvements, however it is likely that deviations will be found. The base bid should be made based upon the solicitation documents. Differing site conditions will be addressed, if they occur, as outlined in the

RFP.

2. There are existing railroad tracks to be removed indicated on the plans. It is not known to what extent these tracks may have been removed by previous construction.

3. There a numerous utilities in the area of the new Commissary, including secure communication lines and high voltage power facilities. The contractors were cautioned of these conditions and were urged to use extreme caution when excavating in the area.

4. It was pointed out that there were two site demolition drawings contained in the solicitation documents, one for surface improvements and one for subsurface improvements. This was done to increase clarity based on the amount of removals necessary.

5. All pavement removal indicated on the plan is labeled as "Bituminous Pavement Removal". It is likely that areas of concrete exist below the bituminous pavement, however specific locations cannot be identified. It is the intent of the contract documents that all pavement removal, regardless of material, be included in the base bid.

6. It is believed that all foundations from previous buildings have been removed to a depth where they should not interfere with the proposed construction. If abandoned foundations are discovered and they conflict with construction, necessary removals will be considered for additional compensation.

7. The contractors' attention is called to the site phasing plans. The area considered to be Growler Avenue behind the new and existing Commissary must be passable at all times.

Additionally, the loading function for the existing Commissary and Exchange toward the northwest corner of the building must be maintained at all times. This will involve installation of temporary pavement and fencing which is outlined on the Site Staging Plan.

8. The Installation is currently designing a project adjacent to the Commissary site which will possibly under construction at the same time as the Commissary. The project, a scrap metal recycling center, is not anticipated to conflict with the Commissary construction, but there will likely need to be coordination between the two projects.

9. There is no construction yard or lay‐down area indicated on the solicitation documents.

An area to be used for these purposes will be determined in discussions with the Installation and will be conveyed to contractors prior to submission of bids.

Atch 4 – New London Pre-Bid Minutes

PRE-PROPOSAL CONFERENCE AGENDA

HDEC03-12-R-9002

New Commissary, New London, CT

04 APR, 2012

9:00 am

INTRODUCTION

A Mr. Stephen Peterson, HQ DeCA Contract Administrator B. Mr. Rick Baes, HQ DeCA, Program Manager

WELCOME - We would like to welcome all of you to the pre-proposal conference for the new commissary facility at New London, CT.

GENERAL

Attendance Register – Being circulated. Please ensure you sign in on one of the attendance rosters being circulated.

We ask that all questions raised during these proceedings be written down and passed forward. The written questions aid us in being able to evaluate and provide a written response to the question.

The questions and answers will be included in an amendment. However, If there is a conflict between a verbal answer received today and a written answer provided by amendment, the written answer prevails.

I will provide information you need for submitting your proposal. At the conclusion of my presentation Mr. Baes will go through technical portions of the project. At the conclusion of Mr. Baes presentation we will entertain any questions. Then, we will adjourn to the project site.

THE SOLICITATION

1. The magnitude of construction for this project is between $10,000,000 and $25,000,000.00.

2. Section B. There is one bid schedule for this project (AKA Schedule B). This bid schedule consists of four CLIN’s Sitework, Construction, Equipment & Décor (see Pages 3 & 4 of the solicitation document) all of which will be awarded as a single contract.

We ask that you be very careful to get the proper work in the proper line item. This is very important- Please ensure that each line item adds up to the total amount and that the money is apportioned correctly. If there is doubt as to whether it should be construction or equipment, please reflect the cost in equipment

Any taxes, permits etc are the contractor’s responsibility. It is your responsibility to identify the tax laws and permitting requirements in this state. If you are required to pay any sort of permits or taxes ie, state, local, county, city, federal or local these should be included in your total proposal price. Your price must include all costs associated to perform this project.

We will not entertain these costs as a separate charge later.

3. Offerors are reminded to submit their best and complete proposal the first time around as we anticipate award without discussions.

The date and time set for receipt of offers is 2:00 P.M., 23 Apr 12 at 2250 Foulois Street, Suite 3, Bldg 8400, Lackland AFB TX 78236-1007. At this time we do not anticipate any extensions for the closing date of proposals and again, we anticipate award without discussions.

4. Proposals received after the time and date specified on the solicitation will be considered late and unacceptable. Proposals should be submitted to ensure they will arrive prior to the closing time and date at Block 13.A. of the SF1442. This also includes any and all proposals sent via express mail services.

5. Minutes of this meeting will be posted in an amendment and will be available via FedBizOpps. Today’s Attendance Register will be included in the amendment. Its contents will include the Minutes of this meeting and Questions and Answers

6. All offerors should read the RFP carefully and thoroughly and submit any questions in writing to the Contracting Officer (CO) immediately.

7. The acceptance period for this solicitation is 120 days.

8. Section K: Section K should be submitted with your price proposal. Check and double check that each block is appropriately marked. Have someone else in your company review and double-check each block.

9. Offerors are reminded that they must be registered in the Central Contractor Registry to be awarded a contract with the government. Lack of registration will make you ineligible for award.

10. Large Business Offerors are required to submit a Subcontracting Plan in accordance with FAR Part 19. Failure to submit a subcontracting plan for approval shall make the offeror ineligible for award of a contract

11. Offerors must submit their Bid Bonds with their proposals to be eligible for award. The bid bond shall be submitted based on the total amount of your proposal, however, after award Performance and Payment Bonds will be required. Performance and payments bonds must be received and approved prior to issuance of the Notice-To-Proceed.

12. Amendments can be acknowledged by filling in Block 19 of SF 1442, or by signing and returning each amendment with your proposal.

13. Required clauses in this contract include:

Davis Bacon Act Buy American Act, NAFTA, Free Trade Agreements

Miller Act – Bid, Performance and Payment Bonds Value Engineering (55/45 split)

Liquidated Damages in the sum of $1623.00 will be assessed for each day of delay. (Section I page 17 of 45)

Payments Under Fixed Price Construction Contracts – For the DeCA contract - Payments are made through Wide

Area Workflow based on percentage of work completed as designated by the government’s technical inspector. It is not our policy to pay for stored material or material not yet installed/completed.

Also – the Prompt Payment for Construction Contracts – Monthly progress payments payment should be made within 14 days after receipt of a proper invoice; 30 days for final invoice.

15. Section L, Atch 5 entitled Instructions to Offerors -

Proposal Preparation Addendum to FAR 52.215-1. This section tells you what you need to know regarding preparation and submission of your proposal. Please follow the instructions very closely and carefully.

To be considered, a complete proposal package must be received not later than the date and time specified. Fax or e-mail proposal packages will not be considered.

This Section provides instructions for submission of the Preliminary Summary Project Schedule, Project Organizational Chart, Personnel Qualification Narratives, Resumes, Past Experience and Management Plan and this Section requires submission of the following documents:

SF 1442 – Original and 1 copy Bid Bond – Original and 1 copy Schedule B (Price Proposal) – Original and 1 copy Technical Proposal – Original and 3 copies Past Performance - Original and 3 copies

This list may not be inclusive of all required documents, please comply, in full, with Section L of the solicitation to ensure your proposal package is complete.

Section M, Atch 6 entitled Evaluation Factors For Award

This section addresses and defines the acceptable and unacceptable ratings for your technical proposals and past performance. This Section contains 3 pages consisting of Technical Evaluation and Past Performance evaluation factors. These factors reflect the minimum standards required to receive acceptable ratings. You must receive an acceptable rating for every factor to be considered for award.

A select number of the lowest priced proposals will be provided to the Technical and Past Performance evaluation panels for them to determine acceptability. The number of proposals selected will be dependent on the total number and quality of proposals received. If an acceptable proposal is not found in the first group submitted, then more proposals will be forwarded. Based on this process, some of the proposals may not be evaluated beyond the price ranking stage. Note: The technical and past performance evaluation panels may be the same personnel

Award decision will be made on an all or none basis to the Lowest Price Technically Acceptable offer. This will represent an integrated assessment of the evaluated offerors considering price, technical, and past performance.

One last thing: Don’t forget

SF 1442,

Bid Bond Representations and Certifications Sub-Contracting Plan (Large Business Only)

Price Proposal Technical Proposal Past Performance

Unless there are any questions for me, that concludes my portion of the presentation but I would like to tell each and every one of you who pursue this project GOOD LUCK!

Again, if there are any questions – please write them down

TECHNICAL TEAM REMARKS

Mr. Rick Baes

QUESTIONS

SITE VISIT

Atch 5 - Pre-Bid Meeting Sign In Sheet

HDEC03-12-R-0002 New London – Amendment 01 Attachment 6 – Q&A #1

New London Solicitation Questions #1 April 04 – 16, 2012

Q: Is it possible to substitute cast in place reinforced concrete for the CMU envelope walls on this structure?

A: No - Cast in place reinforced concrete walls cannot be substituted for the designed CMU walls.

Q: Is there a limit on the construction CLIN?

A: No

Q: Part III: Past Performance Information states Provide a minimum of three (3) and a maximum of five (5) of the most relevant contracts performed within the last five (5) years. Would DeCA consider extending the past performance period to projects completed in the last seven (7) years instead of five (5)?

A: Prepare your past performance in accordance with Sections L & M of the solicitation. Past performance information outside of the defined parameters may or may not be reviewed or considered.

Q: Part III: Past Performance Information states: To be considered relevant, the

Prime Contractor must have completed projects with a contract value of at least

10.5 M per project. Would DeCA allow projects greater than $5m that involve Commissary or supermarket experience. We request this change as renovations are far more challenging than new construction and many renovations are less than $10.5m.

solicitation. Past performance information outside of the defined parameters may or may not be reviewed or considered.

Reference: Part II: Technical Proposal states under the evaluation criteria:

"(e) Provide Past Experience of key subcontractors and demonstrate the ability to perform in the local market. Past experience should demonstrate a minimum three year history in relevant projects and ability to mobilize and perform at the project location. The Technical Evaluation Checklist in Section M establishes the minimum requirements."

Also, the Technical Evaluation Checklist in Section M item #10 states: 10 All key subcontractors identified demonstrate a minimum three year history of relevant project experience and an ability to mobilize and work at the project site.

Q: These statements are ambiguous as to which subcontractors we will have to list and provide information about in our proposals. Can DeCA please provide a list of what "Key Subcontractors" you will expect Past Experience qualifications from? (i.e. Mechanical, Electrical, Refrigeration, etc) (SEE REFERENCE

ABOVE)

A: Based on your organizational structure, please list “Key Subcontractors” as you define them relevant to this project.

Q: Will the subcontractor Past Experience have to be in the local market or can their past performance be other relevant projects and provide a capability statement demonstrating their ability to perform at various locales? (SEE

REFERENCE ABOVE)

A: The location of past performance is not specified; just demonstrate the ability to mobilize to a project location.

Q: If Past Experience forms are required for key subcontractors, can they not be counted against the page limit for the proposals? Multiple qualified contractors could be utilized on the project and these experience forms will take up a significant portion of the page count. Please either increase the number of pages in the proposal or make the Subcontractor Past Experience not count toward the overall page count. (SEE REFERENCE ABOVE)

A: Prepare your proposal in accordance with sections L & M.

Q: Past Performance Evaluation Factor, No. 2 states: To be considered relevant (as stated in Section M, Past Performance Evaluation Factor, No 2) the prime contractor must have completed projects with a contract value of at least $10.5M per project, and projects are for construction of retail buildings, and the prime contractor or key subcontractor experience includes installation or replacement of supermarket product refrigeration systems and refrigeration monitoring and control systems. Performance on contracts must have been satisfactory or better. We would like to request this amount reduced to $8.5M per project as recently done for the New Commissary at Coraopolis, PA.

solicitation. Past performance information outside of the defined parameters may or may not be reviewed or considered.

Q: Specifications call for sub-cooling on the low temp racks but the refrigeration schedule does not reflect this type of design. The specs are the latest version of the DeCA refrigeration specs but the drawings have not been changed to reflect that design. Based on the northern location of this project and the design temperatures we do not recommend the use of sub-cooling for this project. We recommend that the specs delete the sub-cooling requirement for the low temp racks.

A: No sub cooling required.

Q: The mechanical center drawings show a gas fired heater to provide additional heat for the mechanical center. We would like to furnish an electric KW type heater instead. This is shown on the drawing of the mechanical center. We recommend the use of the KW electric heater in this project. This would delete the requirement for a gas line to the mechanical center.

A: Electric heater is acceptable.

Q: Looking over the various drawing for the compressor racks in the mechanical centers there is some call for CS1 and CS1 in MC-1 and CS-3 and CS-4 in MC-2 but on other drawings and details it shows them to be not arranged in that way i.e. R3.1 Mechanical Center Schedule which shows CS1 and CS4 in MC-1 and CS2 and CS-3 in MC-2. Please confirm actual which rack is in which MC. This will great affect the design and costs of the equipment.

A: Sheet R3.1, Mechanical centers: MC1 shall contain CS1 and CS2, MC2 shall contain CS3 and CS4 as shown on the floor plan and roof plan.

Q: The Heat Reclaim Coil Schedule on sheet R3.1 shows CS2 and CS3 as the racks on the HRC-1. The other areas of sheet R3.1 show racks CS3 and CS4 as the HRC-1 circuit which is correct based on past jobs. Please verify and correct.

A: CS3 and CS4 are connected to HRC1.

Q: A note #10 on the one-line diagram on Page R2.1 shows the refrigeration electrical panels located in a mezzanine. They are to be located in MC1and

MC2.

A: Locate panels in the Mechanical Center.

Q: The weather proof receptacle for the temporary trailers is shown on the DP 208v 60 Hz 3ph panel. Previous information for the temporary trailers plug has indicates it operates on 460v 60Hz 3ph. Does this need to be relocated to panel CP 460v panel?

A: 208 volt is correct.

Q: Note 17 on the one line diagram for the refrigeration needs to be deleted. This is a new store.

A: Correct.

Q: The room temp shown on R3.1 for the unit cooler schedule for the walk-in freezer is 6 degrees needs to be at -5 degrees.

A: -6 degrees.

Q: On sheet R3.1 on circuit CS3-38A it shows it as a 1G25 and on the plans it shows a 1G24. In the 15651 specs it shows a 1G25 as the option but lists the items in 1.b.1 as lengths as 1G24.

A: Change all references to 1G24 to read 1G25.

Q: In the 15651 Product Refrigeration System specs at 2.1.A it states that the capacity steps need to be between 8 and 12% but on sheet R3.1 for the compressor schedule its shows a larger step between compressor sizes in some instances. Please verify the intent.

A: Compressor sizes shown in drawing sheet R3.1 are provided to show the typical size configurations to allow step capacity control. Refrigeration suppliers are responsible to design actual compressor sizes to meet capacity requirements and meet the design intent of capacity steps. Due to the small store size at Mitchell Field capacity steps of up to 15% will be accepted.

Q: In the 15651 PRS specs at 2.1.A what is the intent of the statement to have the loads at plus 5%.

A: It is intended that low temperature compressor racks for frozen food and ice cream have approximately 5% excess capacity. No excess capacity is required for medium temperature racks.

Q: In 15651 PRS 2.1.D.11 it states the use of EEPR shall be used as indicated on the refrigeration schedule drawing R3.1. The sheet R3.1 Refrigeration Schedule indicates the use of EPR’s. Is it the intent of DeCA to use EPR’s or EEPR’s for this project?

A: EEPR valves are required.

Q: In 15651 PRS 2.3.C it is requesting that the remote condensers be of Micro-channel style. In 15651-2.3.I it calls for 50/50 split. The design of the micro channel condensers comes in pairs of fans tied into a common header. Therefore the actual use of a 50/50 split cannot happen. We can drop of the units in pairs of fans only.

A: The requirement for split headers is deleted.

Q: On sheet R3.1 it is asking for copper/copper finned condensers. The use of Micro channel design does not allow us to supply a copper/copper material. It is only available in aluminum. We do offer the aluminum in Electro-finned coating as a better finish than just aluminum.

A: The requirement for copper materials in condensers is deleted. Aluminum Micro channel condensers are desired.

Q: In 15651 PRS in 2.8.A.18 Display cases it states display lights to be LED. Does this apply to ALL cases or just the glass doors?

A: All refrigerated display cases must have LED lighting

Q: In 15651.2.8.J.d it asks for 20” deep shelves. In the past we have seen the specs ask for 22” shelves. Does DeCA want 20” or 22” shelves in the 1P07 cases?

A: Please provide 22” deep shelves

Q: In the 15651 specs it keeps relating to Division 23 Section which is not part of the

15651 specs at this time.

A: All references to “Division 23” in this specification should read “Division 15”.

Q: In 15651-2.9.D and E this case is not shown on the floor plan or the equipment list on A1.0.

A: Only those cases scheduled and/or shown on the drawings are required.

Q: In 15651-2.9.H and I It does not show the requirement for it to be dual temp.

The drawing R3.1 shows it as a small footnote on the drawing. Is the 1G06 and 1G07 cases need to be dual-temp.

A: No dual temperature cases are required.

Q: In 1651 case specs it lists a 1M07-F which does not show up on the layout or in R3.1. Please verify and revise as needed.

A: Only those cases scheduled and/or shown on the drawings are required.

Q: In Attachment 5, page 3, section 2 (b), the requirements are requesting we provide a proposed organizational chart for the project. Listed in the minimum key personnel to be included is a “Project Scheduler” that is not mentioned in the specifications. Can the Project Manager or Assistant Project Manager or other key person serve as the Project Scheduler or does this have to be a separate person entirely?

A: The Project Scheduler can be combined with another job title on the Project, or hired part time independent of the Contractor.

Q: Attachment 5, Page 3, section 2(b) a “Safety Manager” is mentioned. Is this position intended to be full time or part time? Also, can this position be combined with the Quality Control Manager or Project Superintendent Positions?

A: The Safety Manager needs to be a separate person and not the same as the Quality

Control or Project Superintendent.

Q: On products that are Government Supplied/ Government Installed, will the GC be responsible for any unloading, handling or storage of these products?

A: The GC may be asked to help unload a truck (sometimes store personnel will do this) and store the equipment in the Commissary warehouse when it is delivered to the project. This does not happen until late in the project, near the Grand Opening or 60 days earlier.

Q: Will sales tax need to be carried on this project?

A: GC is required to pay sales tax.

Q: Are there any prohibitions or mitigating factors to completing the project in substantially less time than the specified 540 day schedule duration?

A: The 540 day project duration is an estimate, however the successful contractor will submit a schedule submitted for Government approval which will become the basis for tracking project progress.

Q: Where does the Silver Paracube Grid go that is referenced in Section 06402?

A: At cove light, see detail A / A9.1

Q: Who is responsible for builders risk insurance? If by the contractor, can you specify the requirements, terms, and limits?

A: See 52.228-4502 Other Insurance Requirements, page 11 of the solicitation.

Q: Sheet key notes on A12.1 (and others) indicate ID drawings. For example, note 4 references Sheets ID4.2-ID4.8. Are these drawings available? They are not referenced on the Index of Drawings.

A: See general note 1, Adaptive Uniform Décor Package is available at http://www.decafacilities.com/DeCADesign/AppendixD.aspx

Q: Can you specify the required wind load (in PSF) for the overhead coiling doors?

A: See specification 08331 - 1.3.4.a.(1) for wind loading criteria.

Q: Will the Pre-Bid Meeting minutes and sign in sheet be made available?

A: This information will be incorporated into this solicitation with this amendment.

Q: Does the Coiling Counter door (Door #15AB) get a countertop? Is it similar to details F & G/A10.4 for Window Type 9?

A: See details H and J / A10.3

Q: The paving details describe variable depths for “compacted sub-grade”. Please clarify.

A: All subgrade should be compacted to a depth of 12”

Q: Please provide details for the fire pump building & backflow preventer.

A: See sheet FP2.2 and Specification

Q: Please advise on number of copies required for each of Part 1, Part II, and Part

III. Section L and SF1442 have conflicting requirements on the number of copies.

A: Refer to Section L , “D-Specific Instructions” for specific guidance on copy requirements.

Q: Can you verify the sinks in rooms 16B & 34? Sheet P-1.2 indicates

2K02/4CKFD. Sheet P2.2 indicates 4CKFD/4CKFD. Sheets P4.1 and A1.2 indicate 4CKT/4CKT-D. We did not find any information on the schedule or specs for 4CKt & 4CKT-D.

A: 4CKFD is the correct designation for the sink. 4CKT/4CKT-D is the casework and counter top designation.

Q: Can you provide information on the two (2) CB-1’s in Room 36/37? Detail

15/S3.3 references to Plumbing Drawings for Lid & Frame, but CB-1 is not noted on the schedules on Sheet P0.0.

A: CB-1 is a cast in place catch basin. See detail 4 / P3.1 for lid and frame requirements

Q: Water Heater Detail on Sheet P3.2 indicates WH-1 as a gas WH. The Schedule on P0.0 only shows an EWH-1 electric water heater. Please verify which is correct.

A: Electric is correct.

Q: Water Heater Detail on Sheet P3.2 also indicates a Hot Water Storage Tank ST-

1, but it is not on the P0.0 Plumbing Schedules. Note #4 indicates to be used when required to meet capacity. Please advise.

A: Hot Water Storage Tank ST-1 is not required.

Q: Reference Drawing E5.1, Feeder Schedule. “MARK #1” Specifies primary conduit size to…