HCPW Big Bull Landing Concrete Pump Truck Quote Request.pdf
PDF 136 KB Posted
- Solicitation number
- Not on record
- Issued by
- Horry County, South Carolina
About this file
The document is a Best Price Procurement Quotation Request Form from Horry County Public Works in South Carolina for the Big Bull Landing Road Project. The county is seeking a contractor to provide a pump truck and operator for concrete pouring, specifically requiring a truck capable of reaching approximately 50 feet to pour a 12-foot high headwall. The project involves 2 to 3 separate concrete pours and is estimated to take 3 days or less.
The quotation form requires vendors to submit their pricing, contact information, and potential cooperative purchasing contract details. The form includes space for unit pricing, subtotals, taxes, and other charges, with a disclaimer that if no quote validity date is specified, the quote will remain valid for 30 calendar days. The contact person for this procurement is Matt Sutphin, who can be reached at (843) 915-5410 or Sutphin.Matthew@horrycountysc.gov, with the return address located at 4401 Privetts Rd. Conway, SC 29526.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BEST PRICE PROCUREMENT QUOTATION REQUEST FORM
Return Quote Request Form To: For Big Bull Landing Rd. Project
Department: Public Works Contact Person: Matt Sutphin
Phone: (843) 915-5410 Email: Sutphin.Matthew@horrycountysc.gov
Address: 4401 Privetts Rd. Conway, SC 29526
Vendor Name: Contact Person:
Phone: Fax:
Address:
Payment Terms: Quote Valid Until: / /
Products will be received in # of days after order is received
COOPERATIVE PURCHASING
Contract Type (i.e. GSA)
Contract Number
Contract Expiration Date / /
Item to be shipped to Department Address Above Customer Pickup
QUANTITY UNIT OF MEASURE DESCRIPTION UNIT PRICE SUBTOTAL
3 Day Requesting operator and pump truck. Pump truck must be able to reach approximately 50 ft to pour a 12 ft high headwall. Project will be in 2 to 3 separate pours and may take 3 days or less
Explanation:
SUBTOTAL $
OTHER CHARGES $
L
SHIPPING (FOB DESTINATION ONLY) $
SUBTOTA $
TAX 8 $
TOTAL $
Authorized Vendor Signature Date / /
Disclaimer: If “Quote Valid Until” date is not filled in, quote is valid for 30 calendar days. Horry County Purchase Order Terms and Conditions will govern this purchase.
Grey areas to be filled in by vendor mailto:Sutphin.Matthew@horrycountysc.gov
File details come from the government source that posted it. Updated .