HC104720R0011_QA_ response.docx
DOCX document 27 KB Posted
- Attached to
- Electromagnetic Spectrum (EMS) Services, Operations, Electromagnetic Environmental Effects (E3) Program, and Strategic Planning Support, the Applied Engineering and Mobile Service Provider (MSP) Support Federal contract opportunity
- Solicitation number
- HC104720R0011
- Issued by
- Defense Information Systems Agency
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HC104720R0011.pdf | ||
| DD254.pdf | ||
| HC104720R0011 Amd01.pdf | ||
| ATTACHMENT L2- Past Performance Questionaire.docx | DOCX document | |
| L3- Pricing Template.xlsx | XLSX spreadsheet | |
| HC104720R0011.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question Technical / Management Questions / Comments
RFP
Reference
Government Response
RFP
Change Required (Y/N) Location of Change
| T-001 |
| Is the listed budget able to be applied to Tasks 2 & 3? Or is it only allocated for Task 1? |
| The Budget/Funding Information listed in L.1.1 would apply to all tasks. |
| No |
| T-002 |
| Post award, do we need to perform coverage analysis for commercial MSP? For example, if the DSO recommends mitigation via power reduction this will impact MSP coverage. Who will conduct analysis on MSP coverage to ensure that it has sufficient coverage for users within the DoD bases? |
| 6.1 Task-1 Mobile Service Providers |
| The DSO has never been asked to perform coverage analyses after performing an MSP analysis. Should the vendor ask the DSO to perform such an analysis beyond the original requirement, the DSO would require additional funding from the vendor to perform such an analysis. It would be the vendor’s responsibility to ensure that MSP coverage is accomplished. |
| No |
| T-003 |
| The current incumbent supporting DSO MSP has institutional knowledge and access to various resources (e.g. manuals, documentation specific to the MSP tool). To level the playing field, could the government please provide applicable resource materials such as supply access, manuals, and/or documentation on the Mobile Service Provider (MSP) tool. |
| Subfactor 2 Technical Approach: |
Subfactor Element 5, Page 90 of RFP
Section 12 GFI states that “Spectrum analysis tools developed and maintained under separate DSO contracts” will be provided. This includes the MSP Tool. The MSP Tool analyses INR and IM interactions.
The MSP Tool does not have a user’s manual.
No
| T-004 |
| Will government operated private 5G networks deployed on federal property be evaluated using the MSP program? |
| Commercial 5G networks deployed on federal property will be evaluated using the MSP process. If the government purchases 5G networks for use on federal property, the service has responsibility for EMC. |
| No |
| T-005 |
| Please provide the details of Standards (FCC, NTIA, MIL-STD, etc.) to be followed for IM, INR, RADHZ analysis. |
Subfactor 2 Technical Approach:
Subfactor Element 1, Page 90 of RFP RADHAZ Standards: DoD Instruction 6055.11, USAF TO 31Z-10-4, AFI 91-208 NAVSEA OP 3565/NAVAIR 16-1-529, IEEE Standard for Safety Levels with Respect to Human Exposure to Radio Frequency Electromagnetic Fields, 3 kHz to 300 GHz. Appendix D. IEEE Standard C95.1™2005. No standards exist for INR or IM.
No
| T-006 |
| Did the incumbent contract include Tasks for Training and Model Maintenance/Enhancement (Tasks 2 and 3 of the current PWS)? If not, were these tasks performed via other contract vehicles? |
No, the current contract does not include tasks for Training or Model Maintenance/Enhancement.
No, these tasks were not part of another contact.
No
| T-007 |
| The current incumbent supporting DSO MSP has institutional knowledge and access to various resources (e.g. manuals, documentation specific to the MSP tool). To level the playing field, could the government please supply access, manuals, and/or documentation for RADHAZ? |
Subfactor 2 Technical Approach:
Subfactor Element 1, Page 90 of RFP The MSP Tool is not used to evaluate RADHAZ. The proposer would have to show expertise in how they would evaluate RADHAZ.
RADHAZ Standards: DoD Instruction 6055.11, USAF TO 31Z-10-4, AFI 91-208 NAVSEA OP 3565/NAVAIR 16-1-529, IEEE Standard for Safety Levels with Respect to Human Exposure to Radio Frequency Electromagnetic Fields, 3 kHz to 300 GHz. Appendix D. IEEE Standard C95.1™2005.
No
| T-008 |
| Will the funding for the new contract be a mixture of funding from carriers (those requesting/requiring an analysis be performed) and DSO funding for Tasks 2 and 3? Would the Government consider CPFF versus FP costing/pricing for Task 3? |
Funding for Task 1 will come from the carriers. Funding for Tasks 2 and 3 will come from the DSO.
The government will not consider CPFF for task 3.
No
| T-009 |
| Will the contractor be expected to perform field measurements? If so, would field measurements expected for all the analyses? |
| 2.1 Task 1 – Mobile Service Providers (PWS 6.1) |
| No, MSP analyses do not require field measurements. |
| No |
| T-010 |
| For pricing/costing purposes, will the Government please provide statistics on the number of analysis types (e.g., IM, INR, RADHAZ) and the total number of analyses performed during the incumbent contract? |
| Approximately 300 MSP analyses. The majoirty included IM, INR, and RADHAZ. |
| No |
| T-011 |
| What is the current status of the analysis tools? In what language are they written? What requirements, design, test, and use documentation artifacts exist? Will the government provide the requirements and design documents for the tool prior to submission so that the competition isn’t unfairly biased towards the incumbent? |
The MSP Tool is written in Access.
There is no user’s manual.
RADHAZ analyses are performed by the engineers using an Excel spreadsheet.
Requirements documents for the MSP Tool Maintenance have not been finalized yet.
No
| T-012 |
| Is the listed budget able to be applied to Tasks 2 & 3? Or is it only allocated for Task 1? |
| The Budget/Funding Information listed in L.1.1 of the Solicitation would apply to all tasks. |
| No |
| T-013 |
| Will the government consider multiple pricing options based on the potential execution of optional tasks? |
| All tasks awarded under this IDIQ contract will be priced and awarded under separate Task orders |
| No |
| T-014 |
| Is there an existing product backlog for items to address in task 3? Will the government please provide that prior to submission to ensure a common understanding of task 3 among all offerers? |
No, there is no backlog.
No
Past Performance Questions / Comments
RFP
Reference
Government Response
RFP
Change Required (Y/N) Location of Change
| PP-001 |
| Will past performance entries for subcontractors be considered? |
| No |
| No |
| PP-002 |
| Section L.5.1 General states that each offeror shall submit a past performance volume with its proposal, containing past performance information in accordance with the format contained in Attachment L.2 Past and Present Performance Information. Attachment L.2 Past and Present Performance Information appears to the Questionnaire. |
For the 3 pages each submittal, Limit 5 submittals, does the Government have a template that vendors should use for the recent/ relevant past performance writeups (appears that 5.1 should have cited another Attachment?)
| Section L.2.2., Table L.1 Volume III – Past Performance & L.5.1 General. |
| Attachment L2 PAST AND PRESENT PERFORMANCE QUESTIONNAIRE (pg 84 of the solicitation) is to be used for submittal. There is no other attachment |
| No |
| PP-003 |
| Please confirm that the consent letter executed by each subcontractor, teaming partner, and/or JV to authorize release of past performance information to the offeror will not count towards the 15 page limit, but should be included in the volume. |
| L5.0 Past Performance |
| Volume III- Past Performance allows for 3 pgs each submittal, Limit 5 submittals. Consent letters will not count towards the page limit |
| No |
| PP-004 |
| For Attachment L.2 Past and Present Performance Questionnaire, Section IV. Return of Completed Form. |
Could the government please provide the name, mailing address, email address, and fax number of the person responsible for past performance evaluation.
| Attachment L.2 Past and Present Performance Questionnaire |
| Completed forms are to be submitted under Volume III to KO/CS |
| No |
| PP-005 |
| Will past performance entries for subcontractors be considered? |
| No, past performance will be evaluated for Primaries only |
| No |
| PP-006 |
| For the purposes of a past performance submission, would the Government accept an option year from an IDIQ contract as its own unique past performance? Specifically, can a vendor submit option year 2 from an IDIQ as one past performance and option year 3 as a second past performance? Alternatively, should a contractor submit the entirety of an IDIQ as 1 past performance as Contractors are not required to submit up to the maximum of 5 past performances? |
| L.5.2 |
| Past performance examples should be for different contracts/orders. Using different years is not acceptable |
| No |
Cost / Price Questions / Comments
RFP
Reference
Government Response
RFP
Change Required (Y/N) Location of Change
| C-001 |
| Section L6.2.1 Price Narrative states to include table of contents; summary descriptions of accounting, estimating, and purchasing systems; and changes to estimating or accounting practices as applicable to this solicitation. |
Please confirm if TOCs should be included in this section or if the TOC can appear immediately after the Cover Page.
| Price Narrative (L6.2.1 |
| TOC can be provided after the cover page |
| No |
Contractual Questions / Comments
RFP
Reference
Government Response
RFP
Change Required (Y/N) Location of Change
| K-001 |
| Can the government please clarify are we to provide an OCI Mitigation Plan in Volume V – Contract Documentation if we do not have any OCI issues at this time? |
| L.2.1.6, Table L1 |
| If you don’t have any OCI issues, a plan is not required, but should provide a statement to address that. |
| No |
| K-002 |
| Can the government please provide a DD254 doc that is not embedded in the RFP doc so that we can fill it out and submit with our Volume V? |
| L.2.1.7 and Attachment J2 |
| Template will be provided as a separate attachment |
| No |
| K-003 |
| In section L.2.2 table L.1 it appears we are to provide a full list of our TOC for each volume in Volume V Contract Documentation. However, in Section L.3.2 under Volume I Executive Summary it appears we are to provide it in this volume. Can the government please clarify which volume the TOC for all volumes should be included in? |
| L.2.2, Table L.1 and L.3.2 |
| Provide under Volume V to reference the whole proposal |
L.3.3 states “Include a master table of contents of the entire proposal.”
No
| K-004 |
| Can the government tell us what your email size limitation is? |
| L.2.3.c |
| Email size limit is 25mb |
| No |
| K-005 |
| Can the government clarify regarding the “readme” file if this should be a stand-alone file, or should this be included in the actual Volume I document after the 2-page Executive Summary? |
| L.2.3.h |
| Please provide as separate file in Volume I submittal |
| No |
| K-006 |
| Under section L.7.1.6 references Attachment J4. It appears that J4 is missing. Can the Government please provide Attachment J4 or indicate whether it is preferred for responders to use their own format/outline? |
| L.7.1.6 |
| J4- OCCI Mitigation Plan is to be submitted by the offeror, and will be incorporated into the contract Section J. There is no template established |
| No |
| K-007 |
| In Table L1 Proposal Organization, Volume I–Executive Summary has a 2 page limit. |
And, L.3.0 requires L.3.1 Narrative Summary and L.3.2 Table of Contents.
Will the Government please confirm that the allocated 2 pages is solely for the Narrative Summary and there is no page count for the Table of Contents as a master table of contents is required for the entire proposal.
| L.2.2 Organization/ Number of Copies / Page Limits and L.3.0 Executive Summary |
| Correct, Table of Contents and Master table don’t have a page linit. Narrative Summary is limited to 2 pgs. |
| No |
| K-008 |
| Is the External Certification Authority (ECA) requirement required for this proposal submission? The instructions state to submit proposals via email to the KO and CS. |
If it is, will an IGC Medium Hardware Certification from IdenTrust meet this requirement? Does DSO accept this?
If not, could the Government please provide an extension to meet this requirement.
| L.2.3.a. Electronic Offers |
| offers should be submitted via email IAW the instructions in the solicitation. Additionally, documents should be screened with antivirus and submitted in the proper format |
| No |
| K-009 |
| Please confirm that the Cross Reference Matrix is outside page count for all volumes |
| L.2.2.6 |
| Yes, it is outside page count |
| No |
| K-010 |
| Please confirm that the typical proposal restrictive legend is allowed as long as copying/ pasting is not restricted upon contract award. |
| L.2.3.b |
| Yes, legend is allowed. However Pasting is not restrictive to use as reference. When responding to evaluation criteria, offerors should not just simply copy and paste, but rather provide an actual response |
| No |
K-011
| Please confirm that the zip file name reference is associated with Section L.2.2 and not L.2.5.1 as noted in the solicitation. |
| L.2.3.c |
| Correct, please use Table L1 for naming reference (Section L.2.2) |
| Yes |
| L.2.3.c |
| K-012 |
| The offeror is required to provide a “read me” file in Volume I. May vendors use the Master Table of Contents (L.3.2) to add/details to describe the .zip file names here? |
Or does the Government wish for this to be a separate section in Volume I?
| L.2.3.h |
| Please provide as separate sections |
| No |
| K-013 |
| Could the Government provide the referenced Attachment J4 for the OCCI Mitigation Plan? |
| Attachment J4 |
| Yes, attachment will be provided as separate attachment |
| No |
| K-014 |
| Would the Government please confirm Attachment J2 – DD254 Security Classification Form shall be completed and that vendors shall submit the completed form as an attachment to Volume V (i.e. separate file) versus into the actual section within the volume, for processing and eventual incorporation within Section J of the resulting contract. |
| Attachment J2 |
| Yes, DD254 should be submitted under Volume V |
| No |
| K-015 |
| Section L4.2.2 (Technical/ Management). Please confirm that the 15 pages has been assigned to the subfactors and that items |
(1) Table of Contents,
(2) List of Table and Drawings, and
(3) Glossary are outside the page count.
L.4.2.2 Volume Organization:
(1) Table of Contents,
(2) List of Table and Drawings,
(3) Glossary Yes, the 15 pages count only applies to the Technical/ Management portion.
(1) Table of Contents,
(2) List of Table and Drawings, and
(3) Glossary are outside the page count.