HC102818R0022_Amend_0012.pdf

PDF 138 KB Posted

Attached to
Integrated Processor Capacity Services Federal contract opportunity
Solicitation number
HC102818R0022
Issued by
Defense Information Systems Agency

About this file

This modification amends an existing solicitation for the Integrated Processor Capacity Services contract to update cost models and performance work statements. The Defense Information Systems Agency seeks reliable and cost-effective integrated computing solutions and services, including hardware, software, maintenance, and support. Offerors must propose optional contract line items and subline items using an updated cost model table. The performance period is five base years with five one-year option periods. The proposal due date remains October 16, 2018, with award selection targeted for utilization of a best-value tradeoff process outlined in the Federal Acquisition Regulation Part 15.

Amendment 0012

View the file

Other files for this federal contract opportunity

Other files attached to Integrated Processor Capacity Services, newest first.
File Type Posted
Copy_of_Amend_0012_IPCS-X_Exhibit_B-1_Cost_Model.xlsx XLSX spreadsheet
HC102818R0022_Amend_0011.pdf PDF
HC102818R0022_Amend_0010.pdf PDF
HC102818R0022_Amend_0009.pdf PDF
HC102818R0022_Amend_0008.pdf PDF
HC102818R0022_Amend_0007.pdf PDF
HC102818R0022_Amend_0006.pdf PDF
HC102818R0022_Amend_0005.pdf PDF
HC102818R0022_Amend_0004.pdf PDF
HC102818R0022_Amend_0003.pdf PDF
HC102818R0022_Amend_0002.pdf PDF
HC102818R0022_Amend_0001.pdf PDF
HC102818R0022.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IPCS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment updates the IPCS-X Exhibit B-1 Cost Model. Additional lines have been added to the B-table tab for Offeror Proposed Optional CLINs/SLINs.

The proposal due date remains unchanged, 10:00 am CT October 16, 2018.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Oct-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HC102818R0022

X 9B. DATED (SEE ITEM 11)

16-Oct-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Oct-2018

CODE

DISA/DITCO-SCOTT-PL84

2300 EAST DRIVE

SCOTT AFB IL 62225

HC1084 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

HC102818R0022

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF EXHIBITS/ATTACHMENTS

EXHIBITS /

ATTACHMENTS

DESCRIPTION

Exhibit B-1 IPCS-X Cost Model – Revised October 12, 2018 Attachment C-1 Performance Work Statement (PWS) - Revised September 26, 2018

Appendix One Server Chipset Definitions Appendix Two Enterprise Management Products for Servers Appendix Three Technical Assistance and Consulting Support Appendix Four Facilities Rack and Power Details Appendix Five Call Order Activity Summary Sample (See

Attachment C-1.5) Appendix Six ADPE Maintenance Records/DISA Form 7

Instructions Appendix Seven Network Detail Appendix Eight Vendor Roles and Responsibilities Matrix

Attachment C-1.5 Appendix Five Call Order Activity Summary Sample Attachment C-2 Quality Assurance Surveillance Plan (QASP) - Revised September 21, Appendix One - Surveillance Matrix Appendix Two - Performance Assessment Report Appendix Three - Customer Complaint Record Appendix Four - Corrective Action Report

Attachment C-3 DD Form 254 – Contract Security Classification Specification Attachment C-4 Definitions - Revised May 24, 2018 Attachment C-5 Subcontracting Plan Review Checklist Revised October 05, 2018 Attachment L-1 Section L-Instructions, Conditions, and Notices to Offerors or

Respondents - Revised October 05, 2018 Attachment L-2 Question & Answer Template - Revised October 05, 2018 Attachment L-3 Past Performance Information Sheet Format Attachment L-4 Subcontractor/Teaming Partner consent Letter for the Release of Past

Performance Information to the Prime Contractor Attachment M-1 Section M: Evaluation Factors For Award - Revised September 07, HC102818R0022

Attachment M-2 Offeror Technical Specifications

(End of Summary of Changes)