HC102817R0047.pdf
PDF 2 MB Posted
- Attached to
- Department of Defense (DoD) Public Key Infrastructure (PKI) and Common Service Provider (CSP) Engineering
- Solicitation number
- HC102817R0047
- Issued by
-
Defense Information Systems Agency
About this file
Request for Proposal
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
HC102817R0047 11-Apr-2017
b. TELEPHONE NUMBER
618-229-9485
8. OFFER DUE DATE/LOCAL TIME
11:00 AM 11 May 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
HC10289. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
TARA D. SCHMITT
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
DISA/DITCO-SCOTT-PL83
2300 EAST DRIVE
SCOTT AFB IL 62225-5406
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE HC1047 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
DISA ID31
6914 COPPER AVENUE
FT. MEADE MD 20755
MATT ONTIVEROS
TEL: 301-225-8743 FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$27,500,000
NAICS:
541511
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot Labor - Firm Fixed Price
FFP
Non-Personal, Firm Fixed Price (FFP). The Contractor shall provide services to support labor in accordance with (IAW) the Performance Work Statement (PWS) tasks 6.1, 6.4, 6.5, 6.7, 6.8, 6.12, 6.14 and 6.19.
Period of Performance: To be determined at award. (Estimated July 31, 2017 - July 30, 2018).
Contractor shall invoice IAW the payment schedule.
FOB: Destination
NET AMT
0002 1 Lot Labor - Cost Plus Fixed Fee
CPFF
Non-Personal, Cost Plus Fixed Fee (CPFF). The Contractor shall provide services to support labor in accordance with (IAW) the Performance Work Statement (PWS) tasks 6.9, 6.10, 6.11 and 6.13.
The contractor is authorized to invoice monthly for actual cost incurred. All invoices shall be provided to the Contracting Officer's Representative (COR) for review/certification prior to submission for payment. Fixed fee shall be billed and paid in accordance with FAR 52.216-8(b). In addition, a monthly payment schedule for fixed fee is established at (TBD AT AWARD). Notwithstanding the terms of FAR 52.216-8(b), upon submission of a certified final indirect cost rate proposal covering the year of physical completion of this contract, the contractor may bill for 75% ($TBD) of the withholding. The balance of the withholding ($TBD) may be billed upon settlement of the final indirect rates and submission of a final invoice.
The contractor is also reminded of the reporting requirement under FAR 52.232- 20(b) and (c), which requires notification to the KO when task order cost approaches the prescribed limit.
Period of Performance: To be determined at award. (Estimated July 31, 2017 - July 30, 2018).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
0003 1 Lot Other Direct Costs - Hardware/Software
COST
The contractor shall provide Hardware and Software in support of PWS task 6.12.
The contractor shall obtain ODCs at the most advantageous prices available to the Government. ODCs shall be authorized by the COR, in writing, prior to purchase.
The ceiling price for this CLIN is $150,000.00
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0004 1 Lot Other Direct Costs
COST
The contractor shall obtain ODCs at the most advantageous prices available to the Government. ODCs shall be authorized by the COR, in writing, prior to purchase.
The ceiling price for this CLIN is $100,000.00
0005 1 Lot Travel
COST
Travel in support of the PWS. Travel shall be authorized in writing, by the COR, prior to performance and shall be in accordance with the Joint Travel Regulation
(JTR).
The ceiling price for this CLIN is $33,000.00
0006 1 Lot OPTION Optional Labor (Task 6.2)
CPFF
OPTIONAL Non-Personal, CPFF. The Contractor shall provide services to support labor IAW the PWS tasks 6.2.
The contractor is authorized to invoice monthly for actual cost incurred. All invoices shall be provided to the Contracting Officer's Representative (COR) for review/certification prior to submission for payment. Fixed fee shall be billed and paid in accordance with FAR 52.216-8(b). In addition, a monthly payment schedule for fixed fee is established at (TBD AT AWARD). Notwithstanding the terms of FAR 52.216-8(b), upon submission of a certified final indirect cost rate proposal covering the year of physical completion of this contract, the contractor may bill for 75% ($TBD) of the withholding. The balance of the withholding ($TBD) may be billed upon settlement of the final indirect rates and submission of a final invoice.
The contractor is also reminded of the reporting requirement under FAR 52.232- 20(b) and (c), which requires notification to the KO when task order cost approaches the prescribed limit.
0007 1 Lot OPTION Optional Labor (Task 6.3)
CPFF
OPTIONAL Non-Personal, CPFF. The Contractor shall provide services to support labor IAW the PWS tasks 6.3.
The contractor is authorized to invoice monthly for actual cost incurred. All invoices shall be provided to the Contracting Officer's Representative (COR) for review/certification prior to submission for payment. Fixed fee shall be billed and paid in accordance with FAR 52.216-8(b). In addition, a monthly payment schedule for fixed fee is established at (TBD AT AWARD). Notwithstanding the terms of FAR 52.216-8(b), upon submission of a certified final indirect cost rate proposal covering the year of physical completion of this contract, the contractor may bill for 75% ($TBD) of the withholding. The balance of the withholding ($TBD) may be billed upon settlement of the final indirect rates and submission of a final invoice.
The contractor is also reminded of the reporting requirement under FAR 52.232- 20(b) and (c), which requires notification to the KO when task order cost approaches the prescribed limit.
0008 1 Lot OPTION Optional Labor (Task 6.13.3)
FFP
OPTIONAL Non-Personal, FFP. The Contractor shall provide services to support labor IAW the PWS tasks 6.13.3.
Period of Performance: To be determined at award. (Estimated July 31, 2017 - July 30, 2018).
0009 1 Lot OPTION Optional Labor (Task 6.15)
FFP
OPTIONAL Non-Personal, FFP. The Contractor shall provide services to support labor IAW the PWS tasks 6.15.
Period of Performance: To be determined at award. (Estimated July 31, 2017 - July 30, 2018).
0010 1 Lot OPTION Optional Labor (Task 6.16)
FFP
OPTIONAL Non-Personal, FFP. The Contractor shall provide services to support labor IAW the PWS tasks 6.16.
Period of Performance: To be determined at award. (Estimated July 31, 2017 - July 30, 2018).
0011 1 Lot OPTION Optional Labor (Task 6.17)
FFP
OPTIONAL Non-Personal, FFP. The Contractor shall provide services to support labor IAW the PWS tasks 6.17.
Period of Performance: To be determined at award. (Estimated July 31, 2017 - July 30, 2018).
0012 1 Lot OPTION Optional Labor (Task 6.18)
FFP
OPTIONAL Non-Personal, FFP. The Contractor shall provide services to support labor IAW the PWS tasks 6.18.
Period of Performance: To be determined at award. (Estimated July 31, 2017 - July 30, 2018).
1001 1 Lot OPTION Labor - Firm Fixed Price
FFP
Non-Personal, Firm Fixed Price (FFP). The Contractor shall provide services to support labor in accordance with (IAW) the Performance Work Statement (PWS) tasks 6.1, 6.4, 6.5, 6.7, 6.8, 6.12, 6.14, and 6.19.
Period of Performance: To be determined at award. (Estimated July 31, 2018 - July 30, 2019).
1002 1 Lot OPTION Labor - Cost Plus Fixed Fee
CPFF
Non-Personal, Cost Plus Fixed Fee (CPFF). The Contractor shall provide services to support labor in accordance with (IAW) the Performance Work Statement (PWS) tasks 6.9, 6.10, 6.11 and 6.13.
The contractor is authorized to invoice monthly for actual cost incurred. All invoices shall be provided to the Contracting Officer's Representative (COR) for review/certification prior to submission for payment. Fixed fee shall be billed and paid in accordance with FAR 52.216-8(b). In addition, a monthly payment schedule for fixed fee is established at (TBD AT AWARD). Notwithstanding the terms of FAR 52.216-8(b), upon submission of a certified final indirect cost rate proposal covering the year of physical completion of this contract, the contractor may bill for 75% ($TBD) of the withholding. The balance of the withholding ($TBD) may be billed upon settlement of the final indirect rates and submission of a final invoice.
The contractor is also reminded of the reporting requirement under FAR 52.232- 20(b) and (c), which requires notification to the KO when task order cost approaches the prescribed limit.
Period of Performance: To be determined at award. (Estimated July 31, 2018 - July 30, 2019).
1003 1 Lot OPTION Other Direct Costs - Hardware/Software
COST
The contractor shall provide Hardware and Software in support of PWS task 6.12.
The contractor shall obtain ODCs at the most advantageous prices available to the Government. ODCs shall be authorized by the COR, in writing, prior to purchase.
The ceiling price for this CLIN is $150,000.00
1004 1 Lot OPTION Other Direct Costs
COST
The contractor shall obtain ODCs at the most advantageous prices available to the
1005 1 Lot OPTION Travel
COST
Travel in support of the PWS. Travel shall be authorized in writing, by the COR, prior to performance and shall be in accordance with the Joint Travel Regulation
(JTR).
The ceiling price for this CLIN is $33,000.00
1006 1 Lot OPTION Optional Labor (Task 6.2)
CPFF
OPTIONAL Non-Personal, CPFF. The Contractor shall provide services to support labor IAW the PWS tasks 6.2.
The contractor is authorized to invoice monthly for actual cost incurred. All invoices shall be provided to the Contracting Officer's Representative (COR) for review/certification prior to submission for payment. Fixed fee shall be billed and paid in accordance with FAR 52.216-8(b). In addition, a monthly payment schedule for fixed fee is established at (TBD AT AWARD). Notwithstanding the terms of FAR 52.216-8(b), upon submission of a certified final indirect cost rate proposal covering the year of physical completion of this contract, the contractor may bill for 75% ($TBD) of the withholding. The balance of the withholding ($TBD) may be billed upon settlement of the final indirect rates and submission of a final invoice.
The contractor is also reminded of the reporting requirement under FAR 52.232- 20(b) and (c), which requires notification to the KO when task order cost approaches the prescribed limit.
1007 1 Lot OPTION Optional Labor (Task 6.3)
CPFF
OPTIONAL Non-Personal, CPFF. The Contractor shall provide services to support labor IAW the PWS tasks 6.3.
The contractor is authorized to invoice monthly for actual cost incurred. All invoices shall be provided to the Contracting Officer's Representative (COR) for review/certification prior to submission for payment. Fixed fee shall be billed and paid in accordance with FAR 52.216-8(b). In addition, a monthly payment schedule for fixed fee is established at (TBD AT AWARD). Notwithstanding the terms of FAR 52.216-8(b), upon submission of a certified final indirect cost rate proposal covering the year of physical completion of this contract, the contractor may bill for 75% ($TBD) of the withholding. The balance of the withholding ($TBD) may be billed upon settlement of the final indirect rates and submission of a final invoice.
The contractor is also reminded of the reporting requirement under FAR 52.232- 20(b) and (c), which requires notification to the KO when task order cost approaches the prescribed limit.
1008 1 Lot OPTION Optional Labor (Task 6.6.1 and 6.6.3)
CPFF
OPTIONAL Non-Personal, CPFF. The Contractor shall provide services to support labor IAW the PWS tasks 6.6.1 and 6.6.3.
The contractor is authorized to invoice monthly for actual cost incurred. All invoices shall be provided to the Contracting Officer's Representative (COR) for review/certification prior to submission for payment. Fixed fee shall be billed and paid in accordance with FAR 52.216-8(b). In addition, a monthly payment schedule for fixed fee is established at (TBD AT AWARD). Notwithstanding the terms of FAR 52.216-8(b), upon submission of a certified final indirect cost rate proposal covering the year of physical completion of this contract, the contractor may bill for 75% ($TBD) of the withholding. The balance of the withholding ($TBD) may be billed upon settlement of the final indirect rates and submission of a final invoice.
The contractor is also reminded of the reporting requirement under FAR 52.232- 20(b) and (c), which requires notification to the KO when task order cost approaches the prescribed limit.
1009 1 Lot OPTION Optional Labor (Task 6.6.2)
CPFF
OPTIONAL Non-Personal, FFP. The Contractor shall provide services to support labor IAW the PWS tasks 6.6.2.
The contractor is authorized to invoice monthly for actual cost incurred. All invoices shall be provided to the Contracting Officer's Representative (COR) for review/certification prior to submission for payment. Fixed fee shall be billed and paid in accordance with FAR 52.216-8(b). In addition, a monthly payment schedule for fixed fee is established at (TBD AT AWARD). Notwithstanding the terms of FAR 52.216-8(b), upon submission of a certified final indirect cost rate proposal covering the year of physical completion of this contract, the contractor may bill for 75% ($TBD) of the withholding. The balance of the withholding ($TBD) may be billed upon settlement of the final indirect rates and submission of a final invoice.
The contractor is also reminded of the reporting requirement under FAR 52.232- 20(b) and (c), which requires notification to the KO when task order cost approaches the prescribed limit.
Period of Performance: To be determined at award. (Estimated July 31, 2018 - July 30, 2019).
1010 1 Lot OPTION Optional Labor (Task 6.13.3)
FFP
OPTIONAL Non-Personal, FFP. The Contractor shall provide services to support labor IAW the PWS tasks 6.13.3.
Period of Performance: To be determined at award. (Estimated July 31, 2018 - July 30, 2019).
1011 1 Lot OPTION Optional Labor (Task 6.15)
FFP
OPTIONAL Non-Personal, FFP. The Contractor shall provide services to support labor IAW the PWS tasks 6.15.
Period of Performance: To be determined at award. (Estimated July 31, 2018 - July 30, 2019).
1012 1 Lot OPTION Optional Labor (Task 6.16)
FFP
OPTIONAL Non-Personal, FFP. The Contractor shall provide services to support labor IAW the PWS tasks 6.16.
Period of Performance: To be determined at award. (Estimated July 31, 2018 - July 30, 2019).
1013 1 Lot OPTION Optional Labor (Task 6.17)
FFP
OPTIONAL Non-Personal, FFP. The Contractor shall provide services to support labor IAW the PWS tasks 6.17.
Period of Performance: To be determined at award. (Estimated July 31, 2018 - July 30, 2019).
1014 1 Lot OPTION Optional Labor (Task 6.18)
FFP
OPTIONAL Non-Personal, FFP. The Contractor shall provide services to support labor IAW the PWS tasks 6.18.
Period of Performance: To be determined at award. (Estimated July 31, 2018 - July 30, 2019).
2001 1 Lot OPTION Labor - Firm Fixed Price
FFP
Non-Personal, Firm Fixed Price (FFP). The Contractor shall provide services to support labor in accordance with (IAW) the Performance Work Statement (PWS) tasks 6.1, 6.4, 6.5, 6.7, 6.8, 6.12, 6.14, and 6.19.
Period of Performance: To be determined at award. (Estimated July 31, 2019 - July 30, 2020).
2002 1 Lot OPTION Labor - Cost Plus Fixed Fee
CPFF
Non-Personal, Cost Plus Fixed Fee (CPFF). The Contractor shall provide services to support labor in accordance with (IAW) the Performance Work Statement (PWS) tasks 6.9, 6.10, 6.11 and 6.13.
The contractor is authorized to invoice monthly for actual cost incurred. All invoices shall be provided to the Contracting Officer's Representative (COR) for review/certification prior to submission for payment. Fixed fee shall be billed and paid in accordance with FAR 52.216-8(b). In addition, a monthly payment schedule for fixed fee is established at (TBD AT AWARD). Notwithstanding the terms of FAR 52.216-8(b), upon submission of a certified final indirect cost rate proposal covering the year of physical completion of this contract, the contractor may bill for 75% ($TBD) of the withholding. The balance of the withholding ($TBD) may be billed upon settlement of the final indirect rates and submission of a final invoice.
The contractor is also reminded of the reporting requirement under FAR 52.232- 20(b) and (c), which requires notification to the KO when task order cost approaches the prescribed limit.
Period of Performance: To be determined at award. (Estimated July 31, 2019 - July 30, 2020).
2003 1 Lot OPTION Other Direct Costs - Hardware/Software
COST
The contractor shall provide Hardware and Software in support of PWS task 6.12.
The contractor shall obtain ODCs at the most advantageous prices available to the Government. ODCs shall be authorized by the COR, in writing, prior to purchase.
The ceiling price for this CLIN is $150,000.00
2004 1 Lot OPTION Other Direct Costs
COST
The contractor shall obtain ODCs at the most advantageous prices available to the
2005 1 Lot OPTION Travel
COST
Travel in support of the PWS. Travel shall be authorized in writing, by the COR, prior to performance and shall be in accordance with the Joint Travel Regulation
(JTR).
The ceiling price for this CLIN is $33,000.00
2006 1 Lot OPTION Optional Labor (Task 6.2)
CPFF
OPTIONAL Non-Personal, CPFF. The Contractor shall provide services to support labor IAW the PWS tasks 6.2.
The contractor is authorized to invoice monthly for actual cost incurred. All invoices shall be provided to the Contracting Officer's Representative (COR) for review/certification prior to submission for payment. Fixed fee shall be billed and paid in accordance with FAR 52.216-8(b). In addition, a monthly payment schedule for fixed fee is established at (TBD AT AWARD). Notwithstanding the terms of FAR 52.216-8(b), upon submission of a certified final indirect cost rate proposal covering the year of physical completion of this contract, the contractor may bill for 75% ($TBD) of the withholding. The balance of the withholding ($TBD) may be billed upon settlement of the final indirect rates and submission of a final invoice.
The contractor is also reminded of the reporting requirement under FAR 52.232- 20(b) and (c), which requires notification to the KO when task order cost approaches the prescribed limit.
2007 1 Lot OPTION Optional Labor (Task 6.3)
CPFF
OPTIONAL Non-Personal, CPFF. The Contractor shall provide services to support labor IAW the PWS tasks 6.3.
The contractor is authorized to invoice monthly for actual cost incurred. All invoices shall be provided to the Contracting Officer's Representative (COR) for review/certification prior to submission for payment. Fixed fee shall be billed and paid in accordance with FAR 52.216-8(b). In addition, a monthly payment schedule for fixed fee is established at (TBD AT AWARD). Notwithstanding the terms of FAR 52.216-8(b), upon submission of a certified final indirect cost rate proposal covering the year of physical completion of this contract, the contractor may bill for 75% ($TBD) of the withholding. The balance of the withholding ($TBD) may be billed upon settlement of the final indirect rates and submission of a final invoice.
The contractor is also reminded of the reporting requirement under FAR 52.232- 20(b) and (c), which requires notification to the KO when task order cost approaches the prescribed limit.
2008 1 Lot OPTION Optional Labor (Task 6.6.1 and 6.6.3)
CPFF
OPTIONAL Non-Personal, CPFF. The Contractor shall provide services to support labor IAW the PWS tasks 6.6.1 and 6.6.3.
The contractor is authorized to invoice monthly for actual cost incurred. All invoices shall be provided to the Contracting Officer's Representative (COR) for review/certification prior to submission for payment. Fixed fee shall be billed and paid in accordance with FAR 52.216-8(b). In addition, a monthly payment schedule for fixed fee is established at (TBD AT AWARD). Notwithstanding the terms of FAR 52.216-8(b), upon submission of a certified final indirect cost rate proposal covering the year of physical completion of this contract, the contractor may bill for 75% ($TBD) of the withholding. The balance of the withholding ($TBD) may be billed upon settlement of the final indirect rates and submission of a final invoice.
The contractor is also reminded of the reporting requirement under FAR 52.232- 20(b) and (c), which requires notification to the KO when task order cost approaches the prescribed limit.
2009 1 Lot OPTION Optional Labor (Task 6.6.2)
CPFF
OPTIONAL Non-Personal, FFP. The Contractor shall provide services to support labor IAW the PWS tasks 6.6.2.
The contractor is authorized to invoice monthly for actual cost incurred. All invoices shall be provided to the Contracting Officer's Representative (COR) for review/certification prior to submission for payment. Fixed fee shall be billed and paid in accordance with FAR 52.216-8(b). In addition, a monthly payment schedule for fixed fee is established at (TBD AT AWARD). Notwithstanding the terms of FAR 52.216-8(b), upon submission of a certified final indirect cost rate proposal covering the year of physical completion of this contract, the contractor may bill for 75% ($TBD) of the withholding. The balance of the withholding ($TBD) may be billed upon settlement of the final indirect rates and submission of a final invoice.
The contractor is also reminded of the reporting requirement under FAR 52.232- 20(b) and (c), which requires notification to the KO when task order cost approaches the prescribed limit.
Period of Performance: To be determined at award. (Estimated July 31, 2019 - July 30, 2020).
2010 1 Lot OPTION Optional Labor (Task 6.13.3)
FFP
OPTIONAL Non-Personal, FFP. The Contractor shall provide services to support labor IAW the PWS tasks 6.13.3.
Period of Performance: To be determined at award. (Estimated July 31, 2019 - July 30, 2020).
2011 1 Lot OPTION Optional Labor (Task 6.15)
FFP
OPTIONAL Non-Personal, FFP. The Contractor shall provide services to support labor IAW the PWS tasks 6.15.
Period of Performance: To be determined at award. (Estimated July 31, 2019 - July 30, 2020).
2012 1 Lot OPTION Optional Labor (Task 6.17)
FFP
OPTIONAL Non-Personal, FFP. The Contractor shall provide services to support labor IAW the PWS tasks 6.17.
Period of Performance: To be determined at award. (Estimated July 31, 2019 - July 30, 2020).
2013 1 Lot OPTION Optional Labor (Task 6.18)
FFP
OPTIONAL Non-Personal, FFP. The Contractor shall provide services to support labor IAW the PWS tasks 6.18.
Period of Performance: To be determined at award. (Estimated July 31, 2019 - July 30, 2020).
3001 1 Lot OPTION Labor - Firm Fixed Price
FFP
Non-Personal, Firm Fixed Price (FFP). The Contractor shall provide services to support labor in accordance with (IAW) the Performance Work Statement (PWS) tasks 6.1, 6.4, 6.5, 6.7, 6.8, 6.12, 6.14, and 6.19.
Period of Performance: To be determined at award. (Estimated July 31, 2020 - July 30, 2021).
3002 1 Lot OPTION Labor - Cost Plus Fixed Fee
CPFF
Non-Personal, Cost Plus Fixed Fee (CPFF). The Contractor shall provide services to support labor in accordance with (IAW) the Performance Work Statement (PWS) tasks 6.9, 6.10, 6.11 and 6.13.
The contractor is authorized to invoice monthly for actual cost incurred. All invoices shall be provided to the Contracting Officer's Representative (COR) for review/certification prior to submission for payment. Fixed fee shall be billed and paid in accordance with FAR 52.216-8(b). In addition, a monthly payment schedule for fixed fee is established at (TBD AT AWARD). Notwithstanding the terms of FAR 52.216-8(b), upon submission of a certified final indirect cost rate proposal covering the year of physical completion of this contract, the contractor may bill for 75% ($TBD) of the withholding. The balance of the withholding ($TBD) may be billed upon settlement of the final indirect rates and submission of a final invoice.
The contractor is also reminded of the reporting requirement under FAR 52.232- 20(b) and (c), which requires notification to the KO when task order cost approaches the prescribed limit.
Period of Performance: To be determined at award. (Estimated July 31, 2020 - July 30, 2021).
3003 1 Lot OPTION Other Direct Costs - Hardware/Software
COST
The contractor shall provide Hardware and Software in support of PWS task 6.12.
The contractor shall obtain ODCs at the most advantageous prices available to the Government. ODCs shall be authorized by the COR, in writing, prior to purchase.
The ceiling price for this CLIN is $150,000.00
3004 1 Lot OPTION Other Direct Costs
COST
The contractor shall obtain ODCs at the most advantageous prices available to the
3005 1 Lot OPTION Travel
COST
Travel in support of the PWS. Travel shall be authorized in writing, by the COR, prior to performance and shall be in accordance with the Joint Travel Regulation
(JTR).
The ceiling price for this CLIN is $33,000.00
3006 1 Lot OPTION Optional Labor (Task 6.6.1 and 6.6.3)
FFP
OPTIONAL Non-Personal, FFP. The Contractor shall provide services to support labor IAW the PWS tasks 6.6.1 and 6.6.3.
Period of Performance: To be determined at award. (Estimated July 31, 2020 - July 30, 2021).
3007 1 Lot OPTION Optional Labor (Task 6.6.2)
CPFF
OPTIONAL Non-Personal, CPFF. The Contractor shall provide services to support labor IAW the PWS tasks 6.6.2.
The contractor is authorized to invoice monthly for actual cost incurred. All invoices shall be provided to the Contracting Officer's Representative (COR) for review/certification prior to submission for payment. Fixed fee shall be billed and paid in accordance with FAR 52.216-8(b). In addition, a monthly payment schedule for fixed fee is established at (TBD AT AWARD). Notwithstanding the terms of FAR 52.216-8(b), upon submission of a certified final indirect cost rate proposal covering the year of physical completion of this contract, the contractor may bill for 75% ($TBD) of the withholding. The balance of the withholding ($TBD) may be billed upon settlement of the final indirect rates and submission of a final invoice.
The contractor is also reminded of the reporting requirement under FAR 52.232- 20(b) and (c), which requires notification to the KO when task order cost approaches the prescribed limit.
3008 1 Lot OPTION Optional Labor (Task 6.13.3)
FFP
OPTIONAL Non-Personal, CPFF. The Contractor shall provide services to support labor IAW the PWS tasks 6.13.3.
Period of Performance: To be determined at award. (Estimated July 31, 2020 - July 30, 2021).
3009 1 Lot OPTION Optional Labor (Task 6.17)
FFP
OPTIONAL Non-Personal, FFP. The Contractor shall provide services to support labor IAW the PWS tasks 6.17.
Period of Performance: To be determined at award. (Estimated July 31, 2020 - July 30, 2021).
3010 1 Lot OPTION Optional Labor (Task 6.18)
FFP
OPTIONAL Non-Personal, FFP. The Contractor shall provide services to support labor IAW the PWS tasks 6.18.
Period of Performance: To be determined at award. (Estimated July 31, 2020 - July 30, 2021).
4001 1 Lot OPTION Labor - Firm Fixed Price
FFP
Non-Personal, Firm Fixed Price (FFP). The Contractor shall provide services to support labor in accordance with (IAW) the Performance Work Statement (PWS) tasks 6.1, 6.4, 6.5, 6.7, 6.8, 6.12, 6.14, and 6.19.
Period of Performance: To be determined at award. (Estimated July 31, 2021 - July 30, 2022).
4002 1 Lot OPTION Labor - Cost Plus Fixed Fee
CPFF
Non-Personal, Cost Plus Fixed Fee (CPFF). The Contractor shall provide services to support labor in accordance with (IAW) the Performance Work Statement (PWS) tasks 6.9, 6.10, 6.11 and 6.13.
The contractor is authorized to invoice monthly for actual cost incurred. All invoices shall be provided to the Contracting Officer's Representative (COR) for review/certification prior to submission for payment. Fixed fee shall be billed and paid in accordance with FAR 52.216-8(b). In addition, a monthly payment schedule for fixed fee is established at (TBD AT AWARD). Notwithstanding the terms of FAR 52.216-8(b), upon submission of a certified final indirect cost rate proposal covering the year of physical completion of this contract, the contractor may bill for 75% ($TBD) of the withholding. The balance of the withholding ($TBD) may be billed upon settlement of the final indirect rates and submission of a final invoice.
The contractor is also reminded of the reporting requirement under FAR 52.232- 20(b) and (c), which requires notification to the KO when task order cost approaches the prescribed limit.
Period of Performance: To be determined at award. (Estimated July 31, 2021 - July 30, 2022).
4003 1 Lot OPTION Other Direct Costs - Hardware/Software
COST
The contractor shall provide Hardware and Software in support of PWS task 6.12.
The contractor shall obtain ODCs at the most advantageous prices available to the Government. ODCs shall be authorized by the COR, in writing, prior to purchase.
The ceiling price for this CLIN is $150,000.00
4004 1 Lot OPTION Other Direct Costs
COST
The contractor shall obtain ODCs at the most advantageous prices available to the
4005 1 Lot OPTION Travel
COST
Travel in support of the PWS. Travel shall be authorized in writing, by the COR, prior to performance and shall be in accordance with the Joint Travel Regulation
(JTR).
The ceiling price for this CLIN is $33,000.00
4006 1 Lot OPTION Optional Labor (Task 6.6.1 and 6.6.3)
FFP
OPTIONAL Non-Personal, CPFF. The Contractor shall provide services to support labor IAW the PWS tasks 6.6.1 and 6.6.3.
Period of Performance: To be determined at award. (Estimated July 31, 2021 - July 30, 2022).
4007 1 Lot OPTION Optional Labor (Task 6.6.2)
CPFF
OPTIONAL Non-Personal, CPFF. The Contractor shall provide services to support labor IAW the PWS tasks 6.6.2.
The contractor is authorized to invoice monthly for actual cost incurred. All invoices shall be provided to the Contracting Officer's Representative (COR) for review/certification prior to submission for payment. Fixed fee shall be billed and paid in accordance with FAR 52.216-8(b). In addition, a monthly payment schedule for fixed fee is established at (TBD AT AWARD). Notwithstanding the terms of FAR 52.216-8(b), upon submission of a certified final indirect cost rate proposal covering the year of physical completion of this contract, the contractor may bill for 75% ($TBD) of the withholding. The balance of the withholding ($TBD) may be billed upon settlement of the final indirect rates and submission of a final invoice.
The contractor is also reminded of the reporting requirement under FAR 52.232- 20(b) and (c), which requires notification to the KO when task order cost approaches the prescribed limit.
4008 1 Lot OPTION Optional Labor (Task 6.13.3)
FFP
OPTIONAL Non-Personal, CPFF. The Contractor shall provide services to support labor IAW the PWS tasks 6.13.3.
The contractor is authorized to invoice monthly for actual cost incurred. All invoices shall be provided to the Contracting Officer's Representative (COR) for review/certification prior to submission for payment. Fixed fee shall be billed and paid in accordance with FAR 52.216-8(b). In addition, a monthly payment schedule for fixed fee is established at (TBD AT AWARD). Notwithstanding the terms of FAR 52.216-8(b), upon submission of a certified final indirect cost rate proposal covering the year of physical completion of this contract, the contractor may bill for 75% ($TBD) of the withholding. The balance of the withholding ($TBD) may be billed upon settlement of the final indirect rates and submission of a final invoice.
The contractor is also reminded of the reporting requirement under FAR 52.232- 20(b) and (c), which requires notification to the KO when task order cost approaches the prescribed limit.
4009 1 Lot OPTION Optional Labor (Task 6.17)
FFP
OPTIONAL Non-Personal, FFP. The Contractor shall provide services to support labor IAW the PWS tasks 6.17.
Period of Performance: To be determined at award. (Estimated July 31, 2021 - July 30, 2022).
4010 1 Lot OPTION Optional Labor (Task 6.18)
FFP
OPTIONAL Non-Personal, FFP. The Contractor shall provide services to support labor IAW the PWS tasks 6.18.
Period of Performance: To be determined at award. (Estimated July 31, 2021 - July 30, 2022).
Section C - Descriptions and Specifications
PWS
PERFORMANCE WORK STATEMENT (PWS)
as of December 25, 2016
Contract Number: To be determined Task Order (TO) Number: To be determined Tracking Number: HC1028-17-R-0047 Follow-on to Previous Contract and TO Number:
HC1028-15-F-0282
1 Contracting Officer’s Representative (COR)
a. Primary COR.
Name:
Organization:
Department of Defense Activity Address Code (DODAAC):
Address:
Phone Number:
Fax Number:
E-Mail Address:
b. Alternate COR.
Organization:
c. Alternate COR
Organization:
2 Contract or TO Title
Department of Defense (DoD) Public Key Infrastructure (PKI) and Common Service Provider (CSP) Engineering and Technical Support
3 Background The Net Centric Assurance capabilities includes the Department of Defense (DoD) PKI as the mechanism for providing Public Key (PK) certificates that support mission critical DoD applications. PKI satisfies the DoD’s Information Assurance (IA) requirement for confidentiality and authentication of network transactions, identification and verification of data integrity, and non-repudiation of communications or transactions. Since 1998, the PKI program has evolved into an operational program consolidated under a single Program Management Office (PMO), which oversees the DoD-wide effort to identify and PK enable applications to take advantage of the PKI security services by providing guidance and a capability for interoperability testing.
As PKI capabilities have expanded and become more ubiquitous, requirements for its security benefits and systems enhancements have increased in order to better meet the reliability and availability requirements of the DoD community. As a result, there is now an increased demand for high assurance operation of the DoD PKI systems, requiring the infrastructure to be modernized and secured against evolving threats.
4 Objectives To specify the system engineering and technical support necessary to strengthen the security postures and technical capability for the DoD PKI.
5 Scope The scope of this TO requires support in the form of subject matter experts responsible for reviewing system engineering documentation and developing software to support PKI. This TO will be executed in accordance with the current DoD X.509 Certificate Policy and the appropriate DoD approved architectures, program standards and guidelines such as Defense Information Infrastructure (DII), Defense Information Systems Network (DISN), and Global Information Grid (GIG). The scope of this effort includes the following areas:
Task Area 1 - Task Management and Support Task Area 2 - Integration Engineering of NPE into NIPRNet and SIPRNet enclaves
(Optional) Task Area 3 - Integration Engineering of NEATS into NIPRNet and SIPRNet enclaves
(Optional) Task Area 4 - Combination of Token Management System (TMS) and Common Service
Provider (CSP) Task Area 5 - Develop issuance interface for SIPR REL DMZ delegated identity Task Area 6 - Dogtag Certificate System development (Optional) Task Area 7 - Support Security enhancements
Task Area 8 - Review and patch the Red Hat Certificate System source code for defects Task Area 9 - Notification of issuance events to users Task Area 10 - Research and Deploy an Alternate Certificate Management products Task Area 11 - Mobile Device Derived Credential Issuance Support Task Area 12 - Procure Hardware and Software Task Area 13 - CSP design and implementation Task Area 14 - Development Lab Support Task Area 15 - Robust Certificate Validation System (RCVS) Reengineering (Optional) Task Area 16 - Web Based Bulk Revoker (WBBR) Reengineering(Optional) Task Area 17 - PKE Engineering Support (Optional) Task Area 18 - Cyber Threat Security Plan Task Area 19 - Transition Task (Optional) Task Area 20 - Supply Chain Risk Management (SCRM)
6 Performance Requirements
6.1 Task Management and Support (FFP)
6.1.1 Task Management Control and Planning (FFP)
The contractor shall hold quarterly Program Management Reviews (PMRs) and monthly In- Process Reviews (IPRs). The contractor shall conduct each PMR and IPR with a coordinated agenda, briefing materials, document minutes of the PMRs and IPRs and provide information regarding TO status, e.g., work progress, price and/or cost of travel/materials, schedule data, projected tasks with completion status and areas of concern. PMRs and IPRs shall provide for interchanges between the Government and the contractor. The IPRs shall provide a forum to address technical and programmatic topics of the TO.
The contractor shall develop a single initial Integrated Master Schedule (IMS) to include each exercised task area that contains all of the technical and functional activities required to complete the tasking and deliver the IMS within 30 days of contract award.
The contractor shall update the IMS monthly to include updated tasking, current progress and any recently exercised task areas, and deliver the updated IMS to the Government.
The contractor shall submit an initial organizational report to include an overarching organization personnel hierarchy, and a subsequent page with an employee/personnel listing to show name, email and phone number within 30 days of contract award. The contractor shall submit an updated organizational report within 30 days of an employee gain.
The contractor shall provide a monthly financial and cost based reports and activity based cost report which covers all tasks under this effort. These monthly reports will record the progress, issues and cost expenditures for the reporting period.
Deliverables:
PMR/IPR Report (Monthly, Power Point (PPT) Slides or Portable Document Format (PDF) document)
Initial IMS (Delivered within 15 days of award, Microsoft (MS) Project) Updated IMS (Monthly, MS Project) Organizational Report (Delivered within 30 days of award, Quarterly after initial delivery, MS Word) Monthly Financial, Cost Based and Activity Based Cost Report (Monthly, Contractor Format)
6.1.2 Task Reporting (FFP)
The contractor shall provide a monthly status report (MSR) that describes the status and progress of the efforts on each of the exercised task areas against the IMS.
The information in the MSR shall include the following information:
• Description of activities completed and deliverables provided during the current month for the TO.
• Brief description of issues, challenges, or problems identified during the reporting period.
• Description of the outcome of any trips, technical visit, and related results for the reporting period.
Deliverables:
Contractor’s MSR (Monthly, PDF)
6.1.3 Meeting Support (FFP)
The contractor shall host, prepare the meeting agenda and briefing materials, conduct, and be an active participant in meetings to include Weekly PKI Status meetings, Weekly PKE status meetings, and an informal daily 30 minute call to support PKI engineering activities. The contractor shall produce minutes for all meetings including synopses of technical discussions, and lists of open/closed action items.
Deliverables:
Briefing materials (Weekly, various formats) Meeting Minutes (Within seven days after meeting, PDF)
6.2 Integration Engineering of NPE into NIPRNet and SIPRNet enclaves (Optional)
(CPFF)
The effort to conduct this tasking requires experience with the configuration of network appliances, Red Hat Enterprise Linux 5, 6, and 7, Red Hat Enterprise Linux Kernel Virtualization Module, mod_security, mod_tact, Hewlett Packard (HP) DL580 servers, Red Hat Certificate System 8 and 9, Red Hat Directory Server 8, 9, and 10, Red Hat Satellite, Tomcat 5, 6, and 7, Puppet, SELinux, and PKI certificate validation.
The Acquisition Category 1(ACAT-1) Increment 2 NPE capability is currently being developed , but will require integration into the existing DoD PKI enclaves on both NIPRNet and SIPRNet.
This capability expects to add additional HP DL580 servers, disk storage, and operating environments into the new enclave.
The contractor shall analyze the ACAT-1 Increment 2 NPE capability as released and develop a Software Integration Plan in accordance with Data Item Description (DID) DID DI-SESS-82044 to be delivered to the Government according to the IMS. The contractor shall develop and document change requests (CRs) needed to modify the software and hardware configurations of the NIPRNet and SIPRNet enclaves to support the NPE capability and deliver a report detailing the CR order of execution to the Government according to the IMS.
The contractor shall develop System Integration Tests for the NPE capability in accordance with DID DI-IPSC-41438A to be delivered to the Government according to the IMS. The contractor shall configure existing network appliances, software, and systems to host the NPE capability.
The contractor shall execute the System Integration Tests, document the results and deliver a test report to the Government in accordance with DID DI-IPSC81440A within 15 days after test execution.
The contractor shall provide documentation to support the IA accreditation to include the Security Technical Implementation Guide (STIG) checklists, and CR documentation for DoD PKI Authority to operate (ATO).
The contractor shall support the transition of the NPE capability from development to operational sustainment for up to 60 days to correct any errors identified during the transition and provide system design documents and user manuals.
Deliverables:
NPE Software Integration Plan (Once according to IMS, MS Word) NPE System Integration Tests (Once according to IMS, Contractor Format) NPE Software Test Report (15 days after test execution, MS Word) List of new CRs with all attachments (Once according to IMS, MS Word) NPE User Documentation (Once, MS Word) STIG Checklist (Once according to IMS, STIG Checklist Viewer format)
6.3 Integration Engineering of NEATS into NIPRNet and SIPRNet enclaves (Optional)
(CPFF)
The effort to conduct this tasking requires experience with the configuration of network appliances, Red Hat Enterprise Linux 5, 6, and 7, Red Hat Enterprise Linux Kernel Virtualization Module, mod_security, mod_tact, HP DL580 servers, Red hat Certificate System 8 and 9, Red Hat Directory Server 8, 9, and 10, Red Hat Satellite, Tomcat 5, 6, and 7, Puppet, SELinux, and PKI certificate validation.
The ACAT-1 Increment 2 NEATS capability is being currently being developed, but will require integration into the existing DoD PKI enclaves on both NIPRNet and SIPRNet.
The contractor shall analyze the ACAT-1 Increment 2 NEATS capability as released and develop a Software Integration Plan in accordance with DID DI-SESS-82044 to be delivered to the Government according to the IMS. The contractor shall develop and document CRs needed to modify the software and hardware configurations of the NIPRNet and SIPRNet enclaves to support the NEATS capability and deliver a report detailing the CR order of execution to the Government according to the IMS.
The contractor shall develop System Integration Tests for the NEATS capability in accordance with DID DI-IPSC-41438A to be delivered to the Government according to the IMS. The contractor shall configure existing network appliances, software, and systems to host the NEATS capability. The contractor shall execute the System Integration Tests, document the results and deliver a test report to the Government in accordance with DID DI-IPSC81440A within 15 days after test execution.
The contractor shall provide documentation to support the IA accreditation to include the STIG checklists and CR documentation for DoD PKI ATO.
The contractor shall support the transition of the NEATS capability from development to operational sustainment for up to 60 days to correct any errors identified during the transition and provide system design documents and user manuals.
Deliverables:
NEATS Software Integration Plan (Once according to IMS, MS Word) NEATS System Integration Tests (Once according to IMS, Contractor Format) NEATS Software Test Report (15 days after test execution, MS Word) List of new change requests with all attachments (Once according to IMS, MS Word) NEATS User Documentation (Once, MS Word) STIG Checklist (Once according to IMS, STIG Checklist Viewer format)
6.4 Combination of TMS and CSP (CPFF)
The contractor shall analyze the existing CSP and TMS hardware and software architecture and develop a Combination Plan that meets the existing technical and functional requirements while striving for maximum economies of scale through the combination of the systems.
The contractor shall develop a new Database Design Description in accordance with DID DI- IPSC-81437A based on the Combination Plan that details the proposed hardware and software configurations.
Once the new design is approved by the Government, the contractor shall decommission the old CSP and TMS equipment that will not be used in the combined system and return it to the Government. The contractor shall purchase new servers to support the combined system to be placed in existing Government owned labs.
Once the new design is approved by the Government, the contractor shall develop and document CRs needed to modify the new and existing software baselines and hardware configurations to support the combined system.
The contractor shall develop System Integration Tests for the combined system in accordance with DID DI-IPSC-41438A to be delivered to the Government according to the IMS.
The contractor shall configure the new and existing network appliances, software, and systems to host the combined system.
The contractor shall execute the System Integration Tests, document the results and deliver a test report to the Government in accordance with DID DI-IPSC81440A within 15 days after test execution.
The contractor shall provide documentation to support the IA accreditation to include the STIG checklists and CR documentation for DoD PKI ATO.
The contractor shall support the transition of the combined CSP and TMS system from development to operational sustainment for up to 60 days to correct any errors identified during the transition and provide system design documents and user manuals.
Deliverables:
Combined Database Design Documentation (Once according to IMS, MS Word) Combined System Integration Tests (Once according to IMS, Contractor Format) Combined Software Test Report (15 days after test execution, MS Word) List of new CRs with all attachments (Once according to IMS, MS Word) Combined User Documentation (Once, MS Word) STIG Checklist (Once according to IMS, STIG Checklist Viewer format)
6.5 Develop issuance interface for SIPR REL DMZ delegated identity (CPFF) The contractor shall analyze SIPR REL DMZ delegated identity infrastructure and develop a Database Design Description in accordance with DID DI-IPSC-81437A based on the Combination Plan that details the proposed hardware and software configurations. This infrastructure is a new development activity for DoD PKI. The delegated identity infrastructure issues a delegated identity credential to the SIPR REL DMZ proxy.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .