encl6_qasp_DECC_Ogden_Furniture_Mods.docx
DOCX document 26 KB Posted
- Attached to
- Haworth Furniture for DISA DECC Ogden
- Solicitation number
- HC1028-16-T-0224
- Issued by
-
Defense Information Systems Agency
About this file
QASP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_Responses_for_DHQCSD16MPA0206.docx | DOCX document | |
| Ogden_-_Furniture_Mod_-_Concept_Layouts.pdf | ||
| encl2d_pws_Ogden_Furniture_Mods.doc | DOC document | |
| HC1028-16-T-0224.pdf | ||
| Brand_Name_Rationale.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1. Contract or Task Order Title DECC Ogden Furniture Modifications DECC Ogden
2. Work Requirements:
· Task 1 – Project Schedule, Existing Conditions, and Submittals
· Task 2 – Delivery of Parts/Materials
3. Primary Method of Surveillance: There will be Customer Input, Parts/Material List Review and Periodic Inspection for Task 1. There will be 100% inspection of Task 2.
· 100 Percent Inspection. This is usually only the most appropriate method for infrequent tasks or tasks with stringent performance requirements, e.g., where safety or health is a concern. With this method, performance is inspected/evaluated at each occurrence. One hundred percent inspection is too expensive to be used in most cases.
· Random Sampling. This is usually the most appropriate method for recurring tasks. With random sampling, services are sampled to determine if the level of performance is acceptable. Random sampling works best when the number of instances of the services being performed is very large and a statistically valid sample can be obtained. Computer programs may be available to assist in establishing sampling procedures.
· Periodic Inspection: These services are monitored weekly, monthly, quarterly, semiannually, annually, etc. Periodic types of activities are perfect for periodic inspection because not only are they infrequent, but there is normally a predetermined, specified time frame within which the tasks must be accomplished. Therefore, you know exactly when to conduct the evaluations. Periodic inspections automatically become 100 percent evaluations or "100 percent checks." Inspections should be divided and scheduled by frequency: annual, semiannual, quarterly, monthly, weekly and as required. Sometimes services are required for which the time or frequency cannot be predicted, such as accident investigations, one-time special tasking by higher headquarters, etc. These would be labeled "as required inspections." Others are known and predictable such as the quarterly status report or the monthly travel report currently included in some DISA service contracts.
· Customer Input. Although usually not a primary method, this is a valuable supplement to more systematic methods. For example, in a case where random sampling indicates unsatisfactory service, customer complaints can be used as substantiating evidence. In certain situations where customers can be relied upon to complain consistently when the quality of performance is poor, e.g., dining facilities, building services, customer surveys and customer complaints may be a primary surveillance method, and customer satisfaction an appropriate performance standard. In all cases, complaints should be documented, preferably on a standard form.
4. Scope of Performance: The selected vendor will be required to craft a design that meets the criteria provided in this PWS. Purchase and install electrical equipment as described
5. Performance Standards:
| Performance Standard |
| Acceptable Quality Level (AQL) |
| Method of Surveillance |
| 6.1.1 Subtask 1- Project Schedule |
| Project schedule meet the period of performance and PWS. |
| Review of proposed schedule |
| 6.1.3.1 Part List |
| Proposed parts/materials list to support proposed layout. |
| Review of proposed parts/material list. |
| 6.1.3.2 – Color Sample |
| Proposed exposed parts/materials shall match existing furniture. |
| Technical compliance review by Technical POC and Site POCs. |
| 6.2 Task 2 – Delivery of Parts/Material |
| Materials are delivered as scheduled with minimum 95% materials delivered. |
| 100% inspection of delivered parts/materials |
6. Mandatory or regulatory compliance items: The contractor will provide initial proof of compliance with regulatory and compliance items contained in the contract. The Contracting Officer's Representative (COR) and the Contracting Officer (KO) will evaluate the initial submission and will conduct ad hoc reviews of the contractor's compliance throughout the remainder of the contract. The contractor will monitor compliance as required by FAR 52.222-50, Combating Trafficking in Persons, and report any issues to the KO.
7. Acceptable Quality Level (AQL):
· 100% equipment provided and functioning as required.
· No major deficiencies noted.
· On time
8. Evaluation Method:
There will be a 100% review of the submittals by Technical POC and Site POC. Once the package has been approved of and all comments have been addressed, the contractor can proceed to ordering the materials and delivery to the site. Materials will be 100% inspected upon delivery. Any deficiencies shall be addressed in a timely manner.
9. Incentives (Positive and/or Negative): None Enclosure 6, Page 1 of 2 Pages 17Jul2013/Version 2
Page 1 of 2 Pages
File details come from the government source that posted it. Updated .