encl2d_pws_Ogden_Furniture_Mods.doc
DOC document 134 KB Posted
- Attached to
- Haworth Furniture for DISA DECC Ogden
- Solicitation number
- HC1028-16-T-0224
- Issued by
-
Defense Information Systems Agency
About this file
PWS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_Responses_for_DHQCSD16MPA0206.docx | DOCX document | |
| Ogden_-_Furniture_Mod_-_Concept_Layouts.pdf | ||
| HC1028-16-T-0224.pdf | ||
| Brand_Name_Rationale.pdf | ||
| encl6_qasp_DECC_Ogden_Furniture_Mods.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
As of 6 July 2016
| Contract Number: |
| TBD |
| Task Order Number: |
| TBD |
| Tracking Number: |
| TBD |
| Follow-on to Previous Contract and Task Order Number: |
| NA |
1. Contracting Officer’s Representative (COR), Technical POC and Site POC:
a. Primary COR.
| Name: |
| Rodney Placzek |
| Organization: |
| DISA WMD /MPE2 |
Department of Defense Activity Address Code (DODAAC):
H98249
| Address: |
| P.O. Box 4598, Greenwood Village, CO 80155-4598 |
| Phone Number: |
| 303-224-1759 |
| Fax Number: |
| 303-224-1627 (DSN 926) |
| E-Mail Address: |
| rodney.c.placzek.civ@mail.mil |
b. DISA’s Technical POC.
| Name: |
| Michael A. Cook |
| Organization: |
| WMD / MPE2 |
| DODAAC: |
| H98249 |
| Address: |
| P.O. Box 4598, Greenwood Village, CO 80155-4598 |
| Phone Number: |
| 303-224-1841 (DSN 926) |
| Fax Number: |
| 303-224-1627 (DSN 926) |
| E-Mail Address: |
| Michael.a.cook242.civ@mail.mil |
c. Site POC.
| Name: |
| Lee Jensen |
| Organization: |
| DECC Ogden |
| DODAAC: |
| H98297 |
| Address: |
| 7879 Wardleigh Road, Bldg. 891 |
Hill AFB, UT 84056-5996
| Phone Number: |
| 801.605.7441 |
Fax Number:
| E-Mail Address: |
| Leroy.m.jenson.civ@mail.mil |
2. Contract or Task Order Title. DECC Ogden – Furniture Modifications
3. Background. DECC Ogden needs to increase seating by approximately 75 seats to support mission requirements. DECC Ogden has been converting existing three person pods to four person pods, but does not have the remaining bench stock to support converting additional pods. The DECC is requesting additional materials to support converting 75 existing three person pods to four person pods.
Defense Information Systems Agency (DISA) Enterprise Services (ES) datacenters provide routine and mission-critical computer processing resources and support to numerous government agencies on a 24 hours-per-day, seven (7) days-a-week basis. DISA’s operational goal is to provide high availability and redundancy to all supported programs and workloads at a Tier III redundant datacenter.
4. Objectives: To purchase and delivery materials to DECC Ogden to support the converting of 75 three person pods to four person pods.
4.1 Site Visit – The vendor shall arrange a site visit with the Site POC to review proposed plans and verify required materials/parts.
5. Scope. Vendor shall purchase and deliver parts/materials listed below. The proposed parts/materials shall match and be 100% compatible with the existing system furniture.
5.1 Existing System Furniture – The existing furniture is Unigroup by Haworth Inc., color: ORA331487RM2627, panel color code is FJ-AJ Savoy Maya TR-R Beige
5.2 Submittals – Vendor shall prepare and submit for review a complete parts list of all materials. In addition, the vendor shall provide physical color samples of the proposed furniture colors.
6. Performance Requirements.
6.1 Task 1 – Project Schedule, Existing Conditions and Submittals 6.1.1 Subtask 1 - Project Schedule – Vendor shall provide a delivery schedule to the Site POC.
6.1.2 Subtask 2 - Existing Conditions - The vendor investigate the existing conditions and review the proposed plan and perform a site visit to gain a complete understanding of the scope of work required for the project. The vendor shall make a sufficient site investigation to evaluate all existing conditions related to this project.
6.1.3 Subtask 3 – Submittals – Vendor shall prepare and submit for Government review the following:
6.1.3.1 Parts List – Complete parts list of all required parts to meet the proposed layout.
6.1.3.2 Color Samples – Submit physical color samples of all proposed parts/materials.
6.2 Task 2 - Delivery of Parts/Materials 6.2.1 Delivery of Parts/Materials – Upon receiving the Government’s written approval of the part list and color samples, the vendor shall order and delivery parts/materials to the Site POC.
6.2.1.1 Parts/Material – The vendor shall purchase and deliver the following materials:
| Item Number |
| Quantity |
| Description |
| 1 |
| 66 |
| 36 X 36 CORNER WORKS - Worksurface,Corner,36Dx36W,Lam,TMold,Std Core,Notched,24,24 |
| 2 |
| 200 |
| 24 X 24 WORK SURFACE - Work surface, Rect,24Dx24W,Lam,TMold,Std Core, Notched |
| 3 |
| 300 |
| PAIR SURFACE BRACKET - Unigroup/Too/Places,Cntlvr Brkt,Standard,16.5In.D,Bh |
| 4 |
| 75 |
| REAR CORNER BRACKET - Work surface, Rear-Corner Bracket, if, Svc |
| 5 |
| 150 |
| FLUSH MOUNT KIT - Flush Mount Plate |
| 6 |
| 110 |
| MAKE A CORNER - Make A Corner |
| 7 |
| 75 |
| 24 X 64 NON POWER - Unigroup Fabric Panel No-Power 24In.Wx64In.H,Base Trim,Asmb |
| 8 |
| 75 |
| 24 X 64 POWER PNL - Unigroup Fabric Panel Power,3 Cir,332,24In.Wx64In.H,Base Trim,Asmb |
| 9 |
| 30 |
| 36 X 64 NON POWER - Unigroup Fabric Panel No-Power 36In.Wx64In.H,Base Trim,Asmb |
| 10 |
| 75 |
| 36 X 64 POWER PNL - Unigroup Fabric Panel Power,3 Cir 332,36In.Wx64In.H,Base Trim,Asmb |
6.2.1.2 The vendor shall verify the proposed list of parts/materials against the proposed layout. If the required part/material list to support the proposed layout differs from the above list notify the COR and Technical POC.
6.2.1.3 All parts/materials shall be made with a single delivery, unless otherwise arranged with the Site POC.
Deliverables:
Project Delivery Schedule
Submittals – Parts List & Color Samples Delivery of Parts/Materials
7. Performance Standards.
| Performance Standard |
| Acceptable Quality Level (AQL) |
| Method of Surveillance |
| 6.1.1 Subtask 1 - Project Schedule |
| Project schedule meet the period of performance and PWS. |
| Review of proposed schedule |
| 6.1.3.1 Parts/Materials List |
| Part list shall include all parts/materials required to meet the proposed layout and the existing furniture system |
| Technical compliance review by Technical POC and Site POCs. |
| 6.1.3.2 Color Samples |
| Color Samples shall match existing system furniture |
| Technical compliance review by Technical POC and Site POCs. |
| 6.2 Task 2 - Delivery of Parts/Materials |
| All parts/materials are delivered to the site without damage or items missing. |
| 100% Inspection of delivered parts/materials |
8. Incentives. This is a fixed price contract; therefore, the incentives are embodied in the pricing.
9. Place of Performance.
DECC Ogden
7879 Wardleigh Road, Building 891
Hill AFB, UT 84056
10. Period of Performance. The current expectation is that all the parts/materials shall be delivered 120 calendar days upon the award of the project to meet operational requirements.
11. Delivery Schedule.
| PWS Task# |
| Deliverable Title |
| Format |
| Due Date |
| Distribution/Copies |
| Frequency and Remarks |
| 6.1.1 |
| Project Schedule |
| 7 calendar days after award |
| Standard Distribution* |
| Once, if changed resubmit |
| 6.1.3.1 |
| Parts List |
| 7 calendar days after award |
Standard Distribution*
| 6.1.3.2 |
| Color Sample |
| Physical samples of materials |
| 7 calendar days after award |
Site POC, copy of transmittal to COR and Technical POC
*Standard Distribution: 1 copy of the transmittal letter without the deliverable to the Contracting Officer; 1 copy of the transmittal letter with the deliverable to the Primary COR, Site POC and Technical POC.
12. Security Requirements. Work is UNCLASSIFIED. The Contractor will forward a Visit Authorization Letter (VAL) on all their employees that will deliver parts/materials to the DISA Field Security Office identified below:
DECC Ogden
7879 Wardleigh Road, Bldg. 891
Hill AFB, UT 84056
Attn: Jim Barlow, phone 801-605-7442 and
Attn: Cindy Poll, phone 801.510.6671 The VAL shall be on company letterhead or pre-fabricated form and contain the following information:
Contract number with start and end dates
Company point of contact (POC) and telephone number
Government Task Monitor name and telephone number
Complete legal name of employee(s)
Social Security Number
Vendor personnel must comply with local security requirements for entry and exit control for personnel and property at the government facility.
Vendor employees will be required to comply with all Government security regulations and requirements. Initial and periodic security training and briefings will be provided by Government security personnel. Failure to comply with security requirements can be cause for termination of facility access.
The Vendor shall not divulge any information about DoD files, data processing activities or functions, user identifications, passwords, or any other knowledge that may be gained, to anyone who is not authorized to have access to such information. The Contractor shall observe and comply with the security provisions in effect at the DoD facility. Identification shall be worn and displayed as required.
DISA retains the right to request removal of vendor’s personnel regardless of prior clearance or adjudication status, whose actions, while assigned to this contract, clearly conflict with the interest of the Government. The reason for removal will be fully documented in writing by the Contracting Officer (CO). When and if such removal occurs, the contractor shall, within 15 working days, assign qualified personnel to the vacancy(ies) thus created.
All personnel working in the facility shall be escorted and must comply with facility security policies and guidelines. Personal electronic devices, including cell phones, are not allowed in most areas of the building. All personnel must attend a security briefing on site prior to accessing the facility.
13. Government Furnished Property (GFP)/Government-Furnished Equipment (GFE)/ Government-Furnished Information (GFI). None, this PWS is the purchase and delivery of parts/materials only.
14. Other Pertinent Information or Special Considerations.
a. Identification of Possible Follow-on Work. None
b. Identification of Potential Conflicts of Interest (COI). None
c. Identification of Non-Disclosure Requirements. None
d. Packaging, Packing and Shipping Instructions. POB Destination
e. Inspection and Acceptance Criteria. The Government inspection and acceptance of all parts and materials will take place upon delivery to the Site POC.
f. Property Accountability. None
g. Supply Chain Risk Management (SCRM). Not Applicable
15. Section 508 Accessibility Standards. The following Section 508 Accessibility Standard(s) (Technical Standards and Functional Performance Criteria) are applicable (if box is checked) to this acquisition.
Technical Standards
FORMCHECKBOX
1194.21 - Software Applications and Operating Systems
FORMCHECKBOX
1194.22 - Web Based Intranet and Internet Information and Applications
FORMCHECKBOX
1194.23 - Telecommunications Products
FORMCHECKBOX
1194.24 - Video and Multimedia Products
FORMCHECKBOX
1194.25 - Self-Contained, Closed Products
FORMCHECKBOX
1194.26 - Desktop and Portable Computers
FORMCHECKBOX
1194.41 - Information, Documentation and Support
The Technical Standards above facilitate the assurance that the maximum technical standards are provided to the Offerors. Functional Performance Criteria is the minimally acceptable standards to ensure Section 508 compliance. This block is checked to ensure that the minimally acceptable electronic and information technology (E&IT) products are proposed.
Functional Performance Criteria
FORMCHECKBOX
1194.31 - Functional Performance Criteria
Enclosure 4a, PWS
Page 1 of 4 Pages
2015/Version 9
PAGE
Page 1 of 1 Pages
File details come from the government source that posted it. Updated .