encl2d_pws_Ogden_Furniture_Mods.doc

DOC document 134 KB Posted

Attached to
Haworth Furniture for DISA DECC Ogden
Solicitation number
HC1028-16-T-0224
Issued by

About this file

PWS

View the file

Other files

File Type Posted
Questions_and_Responses_for_DHQCSD16MPA0206.docx DOCX document
Ogden_-_Furniture_Mod_-_Concept_Layouts.pdf PDF
HC1028-16-T-0224.pdf PDF
Brand_Name_Rationale.pdf PDF
encl6_qasp_DECC_Ogden_Furniture_Mods.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

As of 6 July 2016

Contract Number:
TBD
Task Order Number:
TBD
Tracking Number:
TBD
Follow-on to Previous Contract and Task Order Number:
NA

1. Contracting Officer’s Representative (COR), Technical POC and Site POC:

a. Primary COR.

Name:
Rodney Placzek
Organization:
DISA WMD /MPE2

Department of Defense Activity Address Code (DODAAC):

H98249

Address:
P.O. Box 4598, Greenwood Village, CO 80155-4598
Phone Number:
303-224-1759
Fax Number:
303-224-1627 (DSN 926)
E-Mail Address:
rodney.c.placzek.civ@mail.mil

b. DISA’s Technical POC.

Name:
Michael A. Cook
Organization:
WMD / MPE2
DODAAC:
H98249
Address:
P.O. Box 4598, Greenwood Village, CO 80155-4598
Phone Number:
303-224-1841 (DSN 926)
Fax Number:
303-224-1627 (DSN 926)
E-Mail Address:
Michael.a.cook242.civ@mail.mil

c. Site POC.

Name:
Lee Jensen
Organization:
DECC Ogden
DODAAC:
H98297
Address:
7879 Wardleigh Road, Bldg. 891

Hill AFB, UT 84056-5996

Phone Number:
801.605.7441

Fax Number:

E-Mail Address:
Leroy.m.jenson.civ@mail.mil

2. Contract or Task Order Title. DECC Ogden – Furniture Modifications

3. Background. DECC Ogden needs to increase seating by approximately 75 seats to support mission requirements. DECC Ogden has been converting existing three person pods to four person pods, but does not have the remaining bench stock to support converting additional pods. The DECC is requesting additional materials to support converting 75 existing three person pods to four person pods.

Defense Information Systems Agency (DISA) Enterprise Services (ES) datacenters provide routine and mission-critical computer processing resources and support to numerous government agencies on a 24 hours-per-day, seven (7) days-a-week basis. DISA’s operational goal is to provide high availability and redundancy to all supported programs and workloads at a Tier III redundant datacenter.

4. Objectives: To purchase and delivery materials to DECC Ogden to support the converting of 75 three person pods to four person pods.

4.1 Site Visit – The vendor shall arrange a site visit with the Site POC to review proposed plans and verify required materials/parts.

5. Scope. Vendor shall purchase and deliver parts/materials listed below. The proposed parts/materials shall match and be 100% compatible with the existing system furniture.

5.1 Existing System Furniture – The existing furniture is Unigroup by Haworth Inc., color: ORA331487RM2627, panel color code is FJ-AJ Savoy Maya TR-R Beige

5.2 Submittals – Vendor shall prepare and submit for review a complete parts list of all materials. In addition, the vendor shall provide physical color samples of the proposed furniture colors.

6. Performance Requirements.

6.1 Task 1 – Project Schedule, Existing Conditions and Submittals 6.1.1 Subtask 1 - Project Schedule – Vendor shall provide a delivery schedule to the Site POC.

6.1.2 Subtask 2 - Existing Conditions - The vendor investigate the existing conditions and review the proposed plan and perform a site visit to gain a complete understanding of the scope of work required for the project. The vendor shall make a sufficient site investigation to evaluate all existing conditions related to this project.

6.1.3 Subtask 3 – Submittals – Vendor shall prepare and submit for Government review the following:

6.1.3.1 Parts List – Complete parts list of all required parts to meet the proposed layout.

6.1.3.2 Color Samples – Submit physical color samples of all proposed parts/materials.

6.2 Task 2 - Delivery of Parts/Materials 6.2.1 Delivery of Parts/Materials – Upon receiving the Government’s written approval of the part list and color samples, the vendor shall order and delivery parts/materials to the Site POC.

6.2.1.1 Parts/Material – The vendor shall purchase and deliver the following materials:

Item Number
Quantity
Description
1
66
36 X 36 CORNER WORKS - Worksurface,Corner,36Dx36W,Lam,TMold,Std Core,Notched,24,24
2
200
24 X 24 WORK SURFACE - Work surface, Rect,24Dx24W,Lam,TMold,Std Core, Notched
3
300
PAIR SURFACE BRACKET - Unigroup/Too/Places,Cntlvr Brkt,Standard,16.5In.D,Bh
4
75
REAR CORNER BRACKET - Work surface, Rear-Corner Bracket, if, Svc
5
150
FLUSH MOUNT KIT - Flush Mount Plate
6
110
MAKE A CORNER - Make A Corner
7
75
24 X 64 NON POWER - Unigroup Fabric Panel No-Power 24In.Wx64In.H,Base Trim,Asmb
8
75
24 X 64 POWER PNL - Unigroup Fabric Panel Power,3 Cir,332,24In.Wx64In.H,Base Trim,Asmb
9
30
36 X 64 NON POWER - Unigroup Fabric Panel No-Power 36In.Wx64In.H,Base Trim,Asmb
10
75
36 X 64 POWER PNL - Unigroup Fabric Panel Power,3 Cir 332,36In.Wx64In.H,Base Trim,Asmb

6.2.1.2 The vendor shall verify the proposed list of parts/materials against the proposed layout. If the required part/material list to support the proposed layout differs from the above list notify the COR and Technical POC.

6.2.1.3 All parts/materials shall be made with a single delivery, unless otherwise arranged with the Site POC.

Deliverables:

Project Delivery Schedule

Submittals – Parts List & Color Samples Delivery of Parts/Materials

7. Performance Standards.

Performance Standard
Acceptable Quality Level (AQL)
Method of Surveillance
6.1.1 Subtask 1 - Project Schedule
Project schedule meet the period of performance and PWS.
Review of proposed schedule
6.1.3.1 Parts/Materials List
Part list shall include all parts/materials required to meet the proposed layout and the existing furniture system
Technical compliance review by Technical POC and Site POCs.
6.1.3.2 Color Samples
Color Samples shall match existing system furniture
Technical compliance review by Technical POC and Site POCs.
6.2 Task 2 - Delivery of Parts/Materials
All parts/materials are delivered to the site without damage or items missing.
100% Inspection of delivered parts/materials

8. Incentives. This is a fixed price contract; therefore, the incentives are embodied in the pricing.

9. Place of Performance.

DECC Ogden

7879 Wardleigh Road, Building 891

Hill AFB, UT 84056

10. Period of Performance. The current expectation is that all the parts/materials shall be delivered 120 calendar days upon the award of the project to meet operational requirements.

11. Delivery Schedule.

PWS Task#
Deliverable Title
Format
Due Date
Distribution/Copies
Frequency and Remarks
6.1.1
Project Schedule
PDF
7 calendar days after award
Standard Distribution*
Once, if changed resubmit
6.1.3.1
Parts List
PDF
7 calendar days after award

Standard Distribution*

6.1.3.2
Color Sample
Physical samples of materials
7 calendar days after award

Site POC, copy of transmittal to COR and Technical POC

*Standard Distribution: 1 copy of the transmittal letter without the deliverable to the Contracting Officer; 1 copy of the transmittal letter with the deliverable to the Primary COR, Site POC and Technical POC.

12. Security Requirements. Work is UNCLASSIFIED. The Contractor will forward a Visit Authorization Letter (VAL) on all their employees that will deliver parts/materials to the DISA Field Security Office identified below:

DECC Ogden

7879 Wardleigh Road, Bldg. 891

Hill AFB, UT 84056

Attn: Jim Barlow, phone 801-605-7442 and

Attn: Cindy Poll, phone 801.510.6671 The VAL shall be on company letterhead or pre-fabricated form and contain the following information:

Contract number with start and end dates

Company point of contact (POC) and telephone number

Government Task Monitor name and telephone number

Complete legal name of employee(s)

Social Security Number

Vendor personnel must comply with local security requirements for entry and exit control for personnel and property at the government facility.

Vendor employees will be required to comply with all Government security regulations and requirements. Initial and periodic security training and briefings will be provided by Government security personnel. Failure to comply with security requirements can be cause for termination of facility access.

The Vendor shall not divulge any information about DoD files, data processing activities or functions, user identifications, passwords, or any other knowledge that may be gained, to anyone who is not authorized to have access to such information. The Contractor shall observe and comply with the security provisions in effect at the DoD facility. Identification shall be worn and displayed as required.

DISA retains the right to request removal of vendor’s personnel regardless of prior clearance or adjudication status, whose actions, while assigned to this contract, clearly conflict with the interest of the Government. The reason for removal will be fully documented in writing by the Contracting Officer (CO). When and if such removal occurs, the contractor shall, within 15 working days, assign qualified personnel to the vacancy(ies) thus created.

All personnel working in the facility shall be escorted and must comply with facility security policies and guidelines. Personal electronic devices, including cell phones, are not allowed in most areas of the building. All personnel must attend a security briefing on site prior to accessing the facility.

13. Government Furnished Property (GFP)/Government-Furnished Equipment (GFE)/ Government-Furnished Information (GFI). None, this PWS is the purchase and delivery of parts/materials only.

14. Other Pertinent Information or Special Considerations.

a. Identification of Possible Follow-on Work. None

b. Identification of Potential Conflicts of Interest (COI). None

c. Identification of Non-Disclosure Requirements. None

d. Packaging, Packing and Shipping Instructions. POB Destination

e. Inspection and Acceptance Criteria. The Government inspection and acceptance of all parts and materials will take place upon delivery to the Site POC.

f. Property Accountability. None

g. Supply Chain Risk Management (SCRM). Not Applicable

15. Section 508 Accessibility Standards. The following Section 508 Accessibility Standard(s) (Technical Standards and Functional Performance Criteria) are applicable (if box is checked) to this acquisition.

Technical Standards

FORMCHECKBOX

1194.21 - Software Applications and Operating Systems

FORMCHECKBOX

1194.22 - Web Based Intranet and Internet Information and Applications

FORMCHECKBOX

1194.23 - Telecommunications Products

FORMCHECKBOX

1194.24 - Video and Multimedia Products

FORMCHECKBOX

1194.25 - Self-Contained, Closed Products

FORMCHECKBOX

1194.26 - Desktop and Portable Computers

FORMCHECKBOX

1194.41 - Information, Documentation and Support

The Technical Standards above facilitate the assurance that the maximum technical standards are provided to the Offerors. Functional Performance Criteria is the minimally acceptable standards to ensure Section 508 compliance. This block is checked to ensure that the minimally acceptable electronic and information technology (E&IT) products are proposed.

Functional Performance Criteria

FORMCHECKBOX

1194.31 - Functional Performance Criteria

Enclosure 4a, PWS

Page 1 of 4 Pages

2015/Version 9

PAGE

Page 1 of 1 Pages