m2P1_Section_M_for_Amend_0002.pdf
PDF 132 KB Posted
- Attached to
- milCloud 2 Phase 1
- Solicitation number
- HC1028-16-R-0020
- Issued by
-
Defense Information Systems Agency
About this file
Section M revised Amendment 0002
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised Per Amendment 0002 dated July 29, 2016
Evaluation Factors for Award
M.1.0 Source Selection
M.1.1 General
M.1.1.1 Solicitation Requirements, Terms, and Conditions. Offerors’ proposals shall sufficiently address the PWS. Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award.
M.1.1.2 Basis for Contract Award. This is a best value tradeoff source selection conducted IAW Federal Acquisition Regulation (FAR) 15.3, Source Selection, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the DISA Acquisition Regulation Supplement (DARS). These regulations are available electronically at http://www.ditco.disa.mil/hq/aqinfo.asp and http://farsite.hill.af.mil. The technical proposal should include all information the offeror wants the Government to consider regarding its company's ability to perform all required tasks and conform to all required terms and conditions. The proposal should address all aspects of the PWS, making special note of the evaluation factors in Section M.2 below. The stated qualifying factor listed in Section M.2.1.1 will be evaluated first to determine acceptability of the proposal. If determined to be acceptable the proposal will be evaluated further; if not, the proposal will not be further evaluated. Additionally, the subfactors identified in section M.2.1.2 will be evaluated as part of the best value trade off determination. In order to be eligible for award, the vendor must meet all of the qualifying criteria and meet or exceed the evaluated criteria for the subfactors identified.
The Offeror shall submit its proposal via electronic submission, IAW Section L.
Contract may be awarded to the offeror who is deemed responsible IAW the FAR, as supplemented. The Government seeks to award to the offeror who gives DISA the greatest confidence that it will best meet, or exceed, the requirements. The SSA will base the source selection decision on an integrated assessment of proposals against all source selection criteria in the solicitation (described below).
M.1.1.3 Number of Contracts to be Awarded
The Government intends to award a single Indefinite Delivery/Indefinite Quantity
(ID/IQ) contract, but reserves the right to make no award at all.
M.1.1.4 Evaluation
The Government will evaluate initial proposals IAW paragraph M.2 below.
M.1.1.5 Evaluation of Options
The Government will evaluate offers for award purposes by adding the total price for the base period and all option periods. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options http://www.ditco.disa.mil/hq/aqinfo.asp http://farsite.hill.af.mil/ shall not obligate the Government to exercise the option(s). The offeror shall propose unit prices for the three year base period and five 1-year options. All unit prices will be entered into the provided pricing spreadsheet at Section J, Exhibit J-3 entitled m2P1Cost
Model.
M.1.1.6 Clarifications and Communications
Offerors may be asked to clarify certain aspects of their proposal. Communication conducted to resolve minor or clerical errors will not constitute discussions and the KO reserves the right to award a contract without the opportunity for proposal revision.
M.1.1.7 Notice of Award
A written notice of award or acceptance of a proposal mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.
M.2.0 Evaluation Factors and Subfactors
(1) The following evaluation factors will be used to evaluate each proposal: Award will be made to the offeror whose proposal is the most advantageous to the Government based upon an integrated assessment of these criteria:
Factor 1: Technical/Management
Subfactor 1: Authority to Operate (ATO)
Subfactor 2: Scalability to Full Operation Capability (FOC)
Subfactor 3: Business Management
Factor 2: Past Performance
Factor 3: Small Business Participation
Factor 4: Cost/Price
Note: SCRM plan will be evaluated on an acceptable/unacceptable basis as part of the initial Technical/Management review.
(2) Relative Importance of Factors and Subfactors. The relative importance of each factor and subfactor is as follows: The Technical/Mangement factor is more important than Past Performance and Small Business Participation factors. Within the
Technical/Management factor, the subfactors are of equal importance.
IAW FAR 15.304(e), when combined, all evaluation factors other than cost/price, when combined, are significantly more important than cost/price.
M.2.1 Factor 1: Technical/Management Approach
M.2.1.1 Qualifying Criteria Rating
All proposals will initially be evaluated to determine whether their proposals are acceptable in meeting the following qualifying criteria. Offerors shall meet this qualifying criteria in order to be determined to be acceptable. Acceptable/unacceptable ratings are provided in Table M.1.
Qualifying Criteria: Offeror to provide certification of a Federal Risk and
Authorization Management Program (FedRAMP) Joint Authorization Board (JAB)
Provisional Authorization (PA) at either the High or Moderate Systems level.
Certification must be current (offeror’s company name is listed on the FedRAMP website having a JAB PA in IaaS or PaaS) and in effect at the time of initial Request For Proposal
(RFP) submission.
Table M.1 Qualifying Criteria Ratings
Rating Description
Acceptable Proposal clearly meets the qualifying criteria requirement of the solicitation
Unacceptable Proposal does not clearly meet the qualifying criteria requirement of the solicitation.
Only those offerors that meet the qualifying criteria and is determined to be acceptable will have their proposals further evaluated.
Note: Submissions from contractors with Agency FedRAMP Authorization or Cloud
Service Provider (CSP) Packages will not be accepted. The Contracting Officer will verify offeror status by visiting the FedRAMP site
(https://www.fedramp.gov/marketplace/compliant-systems/).
M.2.1.2 Technical/Management Rating
The Government will evaluate the technical/management solution documentation for those offeror’s proposals that met the compliance requirements in paragraph M.2.1.1.
The technical/management evaluation provides for two distinct but related assessments:
the technical/management rating and the technical/management risk rating.
(1) Technical/Management Rating. The technical/management rating provides an assessment of the offeror’s capability to satisfy the Government’s requirements. Each technical/management subfactor will receive one of the color ratings described in the
DoD Source Selection Procedures, Technical Ratings, excerpted on Table M.2 below.
The technical ratings focus on the strengths, deficiencies, and uncertainties of the offeror's proposal. The color rating depicts how well the offeror’s proposal meets the technical/management subfactor requirements. Subfactor ratings shall not be rolled up into an overall color rating for the technical/management factor.
Table M.2 Technical Ratings
Color Rating Description
BLUE Outstanding Proposal indicates an exceptional approach https://www.fedramp.gov/marketplace/compliant-systems/ and understanding of the requirements and contains multiple strengths.
PURPLE Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength.
GREEN Acceptable Proposal indicates an adequate approach and understanding of the requirements.
YELLOW Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements.
RED Unacceptable Proposal does not meet requirements of the solicitation and, thus, contains one or more deficiencies and is unawardable.
(2) Technical/Management Risk Rating. The Technical/Management Risk evaluation focuses on the weaknesses or significant weaknesses associated with an offeror's proposed approach and includes an assessment of the potential for disruption of schedule, increased cost, or degradation of performance, the need for increased Government oversight, and the likelihood of unsuccessful contract performance.
The technical/management subfactors will receive one of the risk ratings described in the
DoD Source Selection Procedures, Technical Risk Ratings, excerpted in Table M.3 below. The technical risk ratings focus on the risks, i.e., weaknesses and significant weaknesses, of the offeror’s proposed approach to each of the technical/management subfactors.
Table M.3. Technical Risk Ratings
Rating Description
Low Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.
Moderate Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
High Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.
Unacceptable Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.
The proposals shall be evaluated against the following subfactors identified below.
Subfactor ratings will not be rolled up into an overall color rating for the
Technical/Management factor:
The proposals shall be evaluated against the following subfactors:
Subfactor 1: Authority to Operate (ATO) - The Offeror will be evaluated on their approach to obtain ATO according to Performance Work Statement (PWS) section 6.1.14 within 9 months after contract award while meeting or exceeding the Key Performance
Parameters (KPPs) and Service Level Agreements (SLAs) identified in PWS 6.1.10.1 sub elements 1, 2, 3, and 4.
Subfactor 2: Scalability to Full Operation Capability (FOC) - The Offeror will be evaluated on their approach to scale the solution to FOC, as defined in PWS section 6.
5.1.1, within 24 months after Initial Operating Capability (IOC) while meeting or exceeding the KPPs and SLAs contained within PWS 6.1.10.1 sub element 1, 2, 3, and 4.
Subfactor 3: Business Management - The Offeror will be evaluated on how performance and resource usage tools meet or exceed the minimum requirements outlined in section 6.1.11.3 Sub elements 1-7 of the PWS.
Definitions: The following ratings terminology is applicable for Table M.2:
Strength - is an aspect of an offeror's proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the
Government during contract performance.
Weakness - means a flaw in the proposal that increases the risk of unsuccessful contract performance.
Significant Weakness - in the proposal is a flaw that appreciably increases the risk of unsuccessful contract performance.
Deficiency - is a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.
Uncertainty - is a doubt regarding whether an aspect of the proposal meets a material performance or capability requirement. It requires additional information from the offeror to further explain the proposal before the evaluator can complete his/her review and analysis and if the proposal remains in the competitive range it should generate the issuance of an Evaluation Notice (EN).
The ratings terminologies focus on the strengths, deficiencies, uncertainties, and weaknesses of the offeror's proposal. Subfactor ratings shall not be rolled up into an overall color rating for the technical/management factor.
M.2.2 Factor 2 - Past Performance
M.2.2.1 Past Performance will be rated on an “acceptable” or “unacceptable” basis using the ratings in Table M.4.
(a) The past performance evaluation is an assessment of the offeror’s probability of meeting the minimum past performance solicitation requirements. This assessment is based on the offeror’s record of relevant and recent past performance information that pertain to the products and/or services outlined in the solicitation requirements.
NOTE: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “acceptable.”
Table M.4 Past Performance Acceptable/Unacceptable Rating Method
Adjectival Rating Description
Acceptable Based on the offeror’s performance record, the
Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See note above) Unacceptable Based on the offeror’s performance record, the
Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.
(b) Sources of Past Performance Information for Evaluation
Sources are as follows:
1. Past performance information provided by the offeror in Volume III.
2. Past performance information obtained using the completed questionnaires, Attachment L-3.
3. Past performance information may also be utilized from established systems such as the Past Performance Information Retrieval System (PPIRS), Federal Awardee
Performance and Integrity Information System (FAPIIS), Electronic Subcontract
Reporting System (eSRS), or other databases; and may be obtained from other sources available to the Government, such as the Defense Contract Management
Agency; and interviews with Program Managers, KOs.
M.2.2.2 Recency and Relevancy. The past performance references submitted must adhere to the recent and relevant definitions below to be considered acceptable.
a. Recency. An assessment of the past performance information will be made to determine if it is recent. To be recent, the effort must be ongoing or must have been performed during the past three years from the original date of issuance of this solicitation. Past performance information that fails the recency condition will not be evaluated for relevancy or quality.
b. Relevancy. The Government will conduct an in-depth evaluation of all recent past performance submissions. For each recent past performance reference reviewed, the relevance of the work performed will be assessed. Relevant past performance means providing evidence demonstrating experience with past contracts in provision of cloud services of similar size and scope. Table M.5 below describes the ratings to be used for the relevant evaluation of each past performance reference.
Table M.5 Past Performance Relevancy Ratings
Rating Definition
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities to successfully perform the required effort.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities to successfully perform the required effort.
M.2.2.3 Performance Quality Assessment. The Government will consider the performance quality of each recent and relevant effort (i.e., how well the contractor performed on the contracts). For each recent, relevant past performance citation reviewed, the performance quality of the work performed will be assessed for acceptability or unacceptability. The quality assessment consists of an in-depth evaluation of the past performance questionnaire responses, PPIRS information, and/or interviews with Government customers. It may include interviews with DCMA officials or other sources known to the Government.
M.2.2.4 Assigning Ratings. As a result of the relevancy and performance quality assessments of the recent contracts evaluated, offerors will receive an integrated past performance rating at the factor level. The offeror will receive an overall “acceptable” or
“unacceptable” rating for the Past Performance factor based on the recent, relevant and quality assessment ratings of all past performance references. As noted in Section
M2.2.1, in the context of acceptability/unacceptability, any “unknown” rating shall be considered “acceptable.” If the overall Past Performance Factor is found to be unacceptable, the proposal will not be evaluated further and will not be considered at time of award.
M.2.3.0 Small Business Participation Evaluation
M.2.3.1 All Offerors shall submit a business participation commitment document and shall provide narrative to address the following areas for evaluation on their commitment to small business utilization:
(a) The use of initiatives that encourage preference for hiring veterans;
(b) Quantitative degree to which small businesses including firms defined in
FAR Part 19, will be utilized relative to the minimum quantitative requirement
(MQR) of 25% or better of the proposed pricing submitted by the offeror;
(c) The offeror provides a mitigation statement to ensure that the small business minimum quantitative requirement of 25% is met;
(d) Identification by name, type of business, products/services, dollar value, timeframe, and nature of commitment the small business utilization planned for this contract as outlined in the applicable Table L.4 in Section L. Offerors shall describe the nature of commitment (e.g., fully executed subcontracting agreement, planned purchase orders).
M.2.3.2 If other than small business, a Small Business Subcontracting Plan is also required. The subcontracting plan must clearly meet the requirements of FAR 52.219-9, Alt II and DFARS 252.219-7003 and shall affirmatively address all other small business subcontracting requirements in FAR 19.704 to be rated as acceptable.
Table M.6 Small Business Participation Rating
DESCRIPTION
Rating Definition
Acceptable Proposal indicates an adequate approach and understanding of the small business objectives
Unacceptable Proposal does not meet small business objectives.
M.2.4 Factor 4 - Cost/Price
M.2.4.1 For award purposes, the Offeror’s firm-fixed price cost/price proposal will be evaluated based upon the total evaluated price proposed for the base period and all option periods.
The Cost/Price volume will consist of the Government-provided Attachment J-3 Exhibit
B-1 m2P1 Cost Model which should be utilized by the Offerors for pricing their proposals. With the exception of selected cells within the “B-Table” tab of Attachment J-
3 Exhibit B-1 m2P1 Cost Model, the cost model is protected by the government and offerors shall not unprotect, alter or add to the cost model in any manner not directed in the instructions.
Offerors should only provide unit pricing, unless otherwise noted, in the B-Table tab of
Attachment J-3 Exhibit B-1 m2P1Cost Model for all of the government provided SLINs.
Unit pricing provided in the B-Table tab will populate into the Evaluation Quantities tab.
Unit pricing for all government provided SLINs will be included in the contract award.
For all m2P1 solutions, a complete standard solution to meet the minimum requirements of the PWS and Proposal Format must be demonstrated using the Government provided
SLINs. Supporting pricing data shall be made available to the Government upon request.
Offerors should not include any technical data in Volume IV – Cost/Price, to include
Attachment J-3 Cost Model, and any supplemental summaries. Technical data should only be included in Volume II of the offeror’s proposal.
The offeror’s price proposal will be evaluated based on the total evaluated price for the three year base period and the five 1-year option periods. Evaluation of the options shall not obligate the Government to exercise such options.
The offeror’s cost/price proposal will be evaluated, using one or more of the techniques defined in FAR 15.404, in order to determine if it is reasonable and complete. Normally, price reasonableness is established through cost and price analysis techniques as described in FAR 15.404. For additional information see FAR 31.201-3. For a price to be complete, all solicitation requirements must be priced, figures correctly calculated and costs presented in an adequate format. The Government reserves the right, but is not obligated, to perform a price realism analysis. The offeror shall provide a description of the details of each product proposed.
The total evaluated price is based on quantities of each required CLIN and SLIN, including the SIPR SLINs and Transition Labor with an aggressive growth schedule by year, including option years. The quantities will not be disclosed to the offerors prior to the evaluation. For pricing purposes, server and storage workload that is implemented each year is assumed to continue for the life of the contract including all option years. In addition to the transition labor in J_3, the Transition Tasks 3-7 in Section J-10 6 will also be evaluated for price and reasonableness. Note that CLINs 0004 Program Management, and 0005 Close Out are not separately priced.
M.3.0 Reserved
M.4.0 Organizational and Consultant Conflict of Interest (OCCI)
The Government’s review of the offeror’s OCCI Mitigation plan will consider: the degree to which the offeror’s addresses OCCI concerns; the offeror’s approach for mitigating OCCI issues; the adequacy of its OCCI training and oversight programs; the adequacy of its procedures, and whether or not the offeror’s OCCI plan and/or mitigation strategy complies with all regulatory and statutory requirements, including FAR Subpart
9.5.
The above elements and the OCCI plan will be evaluated on an acceptable/unacceptable basis. An acceptable plan is one that addresses the items above and does not present any actual or perceived conflicts of interest.
M.5.0 Solicitation Requirements, Terms and Conditions
Offerors are required to meet all solicitation terms and conditions, representations and certifications. Failure to meet a requirement may result in an offer being ineligible for award. No assumptions or exceptions will be entertained.
File details come from the government source that posted it. Updated .