Site Visit Q As

View the file

Other files

File Type Posted
Amendment_0009_m2P1_-_Att_j_3_08SEP2016.xlsx XLSX spreadsheet
Amendment_0009_HC102816R0020_SF_30.pdf PDF
Amendment_0009_m2P1_Attachment_M-1.pdf PDF
Amendment_0009_m2P1_RFP_Questions_and_Answers_1_to_188.pdf PDF
Amend_0008_HC102816R0020_2SEP16.pdf PDF
Amendment_0008_m2P1_-_Att_j_3_02SEP2016.xlsx XLSX spreadsheet
Amend_0008_-_Questions_and_Answers_for_m2P1_(_186)_2SEP16.pdf PDF
Amendment_0007_m2P1_Section_L-1.pdf PDF
HC102816R0020_Amd_0007_SF_30.pdf PDF
Amendment_0006_m2P1_Atch_J-1_PWS_m2P1.pdf PDF
Amendment_0006_m2P1_Section_Atch_L-1.pdf PDF
Amendment_0006_m2P1_Section_Atch_M-1.pdf PDF
Amendment_0006_m2P1_Atch_J-6_Transition_Support_Tasks_M2P1.pdf PDF
Amendment_0006_m2P1_RFP_Questions_and_Answers_1_to_185.pdf PDF
Amendment_0006_m2P1_-_Att_j_3_30AUG2016.xlsx XLSX spreadsheet
SF_30_HC102816R0020_Amendment_0006.pdf PDF
Amendment_0005_m2P1_Section_L.pdf PDF
Amendment_0005_m2P1_DD254_Revised.pdf PDF
Amendment_0005_m2P1_RFP_Questions_and_Answers_1_to_155.pdf PDF
Amendment_0005_m2P1_Atch_J-1_PWS.pdf PDF
Amendment_0004_m2P1_Section_M.pdf PDF
Amendment_0004_m2P1_Atch_J-1_PWS.pdf PDF
HC102816R0020_Amendment_0004_Conformed_Copy.pdf PDF
Amendment_0004_m2P1_Atch_J-6_Transition_Support_Tasks.pdf PDF
Amendment_0004_m2P1_-_Att_J_3_22AUG2016.xlsx XLSX spreadsheet
Amendment_0004_m2P1_Att_j_5_Labor_Category_Descriptions.pdf PDF
Amendment_0004_SF_30_with_Summary_of_Changes.pdf PDF
Amendment_0004_m2P1_Section_L.pdf PDF
Amendment_0004_m2P1_RFP_Questions_and_Answers_1_to_147.pdf PDF
HC102816R0020_Amend_0003_Ext_Prop_Due_Date_to_31AUG16.pdf PDF
m2P1_RFP_Questions_and_Answers_Amendment_0002_July_29.pdf PDF
m2P1_Section_M_for_Amend_0002.pdf PDF
HC102816R0020_Amendment_0002.pdf PDF
m2P1_Section_L_for_Amend_0002.pdf PDF
m2P1_Section_M_Amend_0001_12JUL16.pdf PDF
m2P1_Section_L_Amend_0001_12JUL16.pdf PDF
RFP_Q A__1_for_MilCloud_2_0_12JUL16.pdf PDF
Amend_0001_HC102816R0020_12JUL16.docx DOCX document
m2P1_-_Att_J_3_FIINAL_8JUL16_(2).xlsx XLSX spreadsheet
m2P1_J_6_Transition_Support_tasks_FINAL_8JUL2016.docx DOCX document
m2P1_-_DD254_Signed.pdf PDF
HC102816R0020_m2P1_RFP_Final_8JUL16.docx DOCX document
m2P1_PWS_FINAL_8JUL16.doc DOC document
DITCO_Response_m2P1Question_about_NIH_29JUN16.pdf PDF
m2P1_Draft_PWS_Questions__Answers_28_Jun_2016.pdf PDF
MILCLOUD_2_Industry_Day_Script_Jun_2016.docx DOCX document
m2PI_Industry_Site_Visit_Participant_Listing.xlsx XLSX spreadsheet
MilCloud_2.0_Site_Visit.docx DOCX document
m2P1_DRAFT_PWS_for_posting_23_May_2016.doc DOC document
m2P1_Draft_PWS_Q A_template.doc DOC document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A for DECC Montgomery Site Visit for HC1028-16-R-0020

Reference
Questions
Government Response
1.
All questions received during the Site Visit
What are the preferred rack/cab widths?

There are no preferred rack widths.

2.

What is the floor height of the DC?

The floor master plan with preinstalled cable conveyance limits rack height to 78.4 inches.

3.

Is there a cabinet/ row quantity limitation?

Yes, however, we will provide sufficient space for vendor equipment.

4.

Do the rack/cab PDUs need to be manageable?

Vendor will need to be able to manage the power for their workload. DISA will manage the power at the PDU level.

5.

Is there is size restrictions or recommendation for cabinet width?

There is no size restriction for cabinet width.

6.

Can the vendor get a remote access view to the BASL system, specifically the data points associated with location of the vendor equipment for environmental monitoring?

We do not allow third party access to DoD BAS.

7.

Who provides the cabling for the racks? DISA or the contractor?

The connection to the DODIN is DISA responsibility. Cabling within or between the racks is the contractor’s responsibility.

8.

What is the specific demarcation point between work the contractor installs and maintains vs what DISA installs and maintains? Ex. Who provides additional floor tiles, cabling, racks, and cable looming, etc?

Rack is the responsibility Cabling (see #7) Floor tiles and vendor specified cut outs are provided by DISA

9.

When are the Q&A's from the draft going to be released? Prior to Final or addressed within the Final?

Responses will be released as soon as possible, and those that could not be answered will be addressed in the Final RFP release.

10.

Has the government considered creating two separate contracts: one for the IAAS and one for the technical engineering services?
Final acquisition strategy will be outlined in the Final RFP.

11.

What is the power capacity of the proposed site?

Reserved 150kw. If additional power is needed, please give us specific requirements.

12.

What is the capacity in pounds of the freight elevators?

DECC Montgomery freight elevator capacity is 16,000 lbs.

DECC Oklahoma City is only on one floor. No elevator is required.

13.

What is impact to cost to bidders who may desire/require high density compute i.e. 24kw or more per rack

Overall solution is expected to fit into the reserved 150 kw, however, if vendor solution requires high density racks greater than 6 kw then additional coordination with DISA will be required.

14.

Raised floor depth? Per data center

Not applicable.

15.

Does DISA have a requirement for archive of data disk, tape, other?

Recovery time and recovery point objectives?

Will be outlined in the PWS.

17.

Is a staging area available for unboxing HW?

Yes.

18.

Will DISA release list of attending vendor companies?

Yes, for those companies who have signed a release.

19.

Would you please put out draft section L&M before final?

No.

20.

Recommend 60 days submission timeline for responses?

The Government will take this into consideration.

21.

Can DISA provide the floor space allocated for the initial deployment of the Milcloud 2.0?
1500 square feet per site.

22.

Can DISA provide the annual growth rate of the compute capacity and storage for Milcloud 2.0?
No, however, the contract allows for significant growth.

23.

Can DISA provide the details of the small, medium and large VM sizes?
Dependent on the vendor solution.

24.

Can DISA provide the data center for DR capability?
Two sites have been identified for this effort. DECC Montgomery, and DECC Oklahoma City.

25.

Will both primary and DR data centers have active workloads?
Both sites will have active workloads.

26.

What bandwidths will be available between primary and DR data centers?
Will be provided in the PWS.

27.

Is DISA considering availability zones for the data centers such as in Montgomery Data Center?
A comparable zone will be available in DECC Oklahoma City.

28.

Does DISA have any hardware standards for the Milcloud 2.0?
Cloud Service Providers decision.

29.

Can DISA provide the application characteristics of the target applications to be deployed in Milcloud 2.0?
We will provide characteristics for the IOC candidate applications. After IOC remaining applications will be identified at the task order level.

30.

What is the final requirement? Want to ensure this phase is scalable to meet future growth.
Scale up based on growth.

31.

During the survey, “zones” were referenced. What comprises a zone? How many zones will be used per phase?
Zones are defined by the number of racks paired with its PDU’s and Computer Room Air Handler (CRAH). The number of zones will be determined by vendor solution.

32.

The NIPR will be deployed first, then SIPR. How are these to be separated physically/logically?
They will be separated physically.

33.

How much total space will be available (square footage)? Is this a private cloud or a hybrid cloud solution?
1500 sq ft with growth potential. Private cloud - as per the NIST definition.

34.

What are the expected lines of demarcation between the government and contractor for the services to be provided?
Responsibilities will be outlined in the PWS.

35.

What are the expected workloads (OS and volumes) to migrate to Milcloud 2.0 and expected timing?
Contract allows for significant growth.

36.

Will the government provide space for personnel and spare equipment at the DECC?
Vendor will be allowed to have a secure locker (wall locker).

Personnel will be granted access to the equipment.

37.

Who will have keys to our equipment racks? More specifically does the government need keys to the vendor’s equipment racks?
Yes, designated government representative will require keys to the equipment racks.

38.

Is 208v single phase power available in addition to standard 3 phase?
DISA will install 3 phase power to all racks. The vendor can separate power within the rack through the MPDU.

39.

Is contractor permitted to run copper/fiber in overhead basket trays?
Yes.

40.

Is the contractor required to power-up equipment prior to installing on the raised floor?
There is no requirement from DISA to power-up equipment prior to installation on the DECC floor. This requirement is up to the vendor.

41.

Will DISA pay an upfront fee for IOC in addition to resource consumption fees?
Will be addressed in the RFP

42.

Will a workspace be provided for onsite support resources?
Defer

43.

Will short and/or long term storage be provided?
Space for secure wall locker will be provided. Space for long term storage is not available.

44.

Is there an opportunity to explore “local hands” support from the DECC teams? This will help keep costs down.
No. All vendor equipment will be managed by the vendor.

45.

Is there a current arrangement for offsite storage, for example, Iron Mountain, that could be leveraged?
This is the vendor’s responsibility. There is no arrangement for offsite storage for this RFP.

46.

Is there a requirement for offsite tape storage as well as tape capacity in each enclave that the vendor needs to provide?
Storage of backups should be followed as per SRG Appendix D.

47.

Is Contractor permitted to provide structured cable build-out as part of the installation?

Expectation is that the vendor will use the existing cabling conveyance.

48.

I think it would be good for industry (and DISA) to provide what the equivalent/comparable cost from DISA would be for the defined workloads in the RFP, either from DISA capacity or Milcloud or better yet, both.

The PWS will provide additional information regarding DISA fees.