Amendment_0004_m2P1_Atch_J-6_Transition_Support_Tasks.pdf
PDF 1 MB Posted
- Attached to
- milCloud 2 Phase 1
- Solicitation number
- HC1028-16-R-0020
- Issued by
-
Defense Information Systems Agency
About this file
Atch J-6 Transition Support
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0004, dated August 22, 2016
Attachment J-6
Transition support tasks Tasks 1 and 2 are sample tasks of potential workloads for migration to allow the Contractor to propose a technical solution. Tasks 3 through 6 are existing milCloud workloads scheduled to be transitioned to milCloud 2.0 as part of the
Initial Operating Capability (IOC). The Contractor will provide a technical solution for each task (Tasks 1-6) with estimated level of effort including the proposed number of labor hours by labor category required to perform a successful transition for each task from the current state to the proposed cloud environment. Definitions of the Labor
Categories are included in Attachment J-5. Technical solution format may be determined by the Contractor, but Labor
Category Lists shall be in a Microsoft Excel spreadsheet. Actual task orders for transition of IOC workloads will be negotiated with the successful Contractor after contract award. No pricing data will be included in the response to section J-6.
Travel to the Consumer location will be performed using cost-reimbursable ODCs in accordance with standards identified in FAR Part 31 and the Joint Travel Regulations (JTR). Contractors will not be evaluated for travel costs. If the
Contractor feels that some or all of the labor should be performed at the Consumer’s current location, they will define the hours for the tasks which must be performed at the Consumer’s location, and the hours that should be performed at the Contractor’s location or the DISA Cloud Hosting location. .
The Contractor will also include in each solution all compute, storage and services necessary to meet the IaaS capacity required to support the systems in each task. The Contractor will also include capacity required by the Contractor’s solution to meet any COOP and elasticity requirements included in the task description. Original Consumer input for tasks 3-6 were collected on System Requirement Forms (SRF). The Government has extracted the information relevant to the Contractor from the Consumer provided requirements documents including the SRF, and provided assumed answers for data that was not included in the original documents. All Contractors will be able to respond to the same baseline data. The original SRF documents are included in this document (pages 14-61) for background.
The Transition Support solution for each task will provide a description of the work to be performed and the tools and methodology to be used, plus a Labor estimate to perform the following tasks:
A. Technical Analysis - Analyze the current environment to include network connectivity, server performance, virtualization requirements and application design.
B. Transition Program Plan - Develop plan to transition to cloud environment including resource capacity, funding assessment, architectural support, mitigation of workload or data portability issues, testing, risk planning, recommended server sizes, OS and application changes related to the target environment.
C. Virtualize - Transition all physical and virtual servers to images suitable for the target virtual format.
D. Extract, Transform and Load (ETL) of data stores, for migration to the infrastructure services, when applicable.
E. Migrate - Transport all images and data to the infrastructure services.
F. Import - Import or Export images and data into the Consumer’s purchased infrastructure services.
G. Turn-over - Ensure connectivity for Consumer management personnel to target servers.
H. Testing of DoD Consumer mission capabilities after migration.
I. Aid consumer in understanding the use of service APIs, CLIs, and infrastructure service management consoles.
J. Support in using operational features such as machine image snapshotting and image libraries.
K. Support in Consumer IA accreditation efforts for their transitioned workloads.
L. Additional tasks as defined by the offeror.
Each task description below will define the current environment including any CSP relevant data needed for the solution.
Task 1 Legacy application with physical servers
Task 1 CSP Relevant Requirements
Item Data Comment
Project Name Legacy Application with Physical servers
Description
This is an example of an existing DoD legacy project with staff with low level technical knowledge. They will require Transition support for all phases of the transition. The application has a Private (.mil only) facing web tier containing two small Red Hat 6.x servers. The application must be available 24/7/365, and is not designed for elasticity. There are two application servers running Windows Server 2008 R2, and two clustered database servers running Red Hat 6.x and using a shared database. All servers are currently rack mounted physical servers operating at the Consumer location.
The application operates at a single site, with no COOP or failover to an external site. Standard backup is required to provide 24 Hour RTO, and 24 Hour RPO for all storage. Privileged administrative users are at a combination of .mil DoD and .com contractor sites.
MAC Level III
Confidentiality Level Private
Network NIPR
Current Accreditation ATO
PPSM Registered Yes
Tools Required ACAS, HBSS
CND Alignment DISA
Special Data Reqt None
Required Backup Type Standard
COOP (Y/N) Yes
RTO 24 hour
RPO 24 hour
Local HA Required Yes, app is clustered
Remote HA Required No
Automated Patch Management
Yes
Non Standard Requirements
None
Task 1 Existing Servers
Server CPU Cores Mem
GB
OS and App
Storage Disk -
(Usable
GB)
Additional Tier 1 Data
Storage (Usable
GB)
Object Store
(Usable
GB)
Web 01 - Red Hat 1 2 75 0
Web 02 - Red Hat 1 2 75 0
App 01 - Windows 2 12 75 100
App 02 - Windows 2 12 75 100
DB 01 - Red Hat 8 32 75 1000
DB 02 - Red Hat 8 32 75 0
Object Storage 1000
Task 1 Support Labor
Year 1 Labor Category List Function Contractor
Location
DISA
Cloud
Hosting Site
Consumer Location
Trips Travel Days
Required
Travel
Windows SA
Linux SA
DBA
Network Engineer
Virtualization Specialist
Cloud Specialist
Project Manager
Cybersecurity Analyst
Task 2 Virtualized Legacy System
Task 2 CSP Relevant Requirements
Project Name Virtualized Legacy System
Description
Task 2 is an Air Force legacy system operating on Microsoft Hyper-V. It is in a small center on an Air Force base. The personnel are knowledgeable about virtualization and their application. They will require some support on all aspects of the transition. The application must be available 24/7. The developers want to add the ability to horizontally expand the Web and App tiers which is a capability of the application. This is to meet expected increased demand for the application during business hours, and to allow for surge processing in the event of a deployment. The Consumer wants to manage their own backup of the database. Failing servers will be restored from existing templates for OS and Application software. The Consumer plans to provide their own services including logging, VPN, CND and scanning from their existing datacenter via a lobe extension. The lobe extension will exist in the COLO (co-located network devices) at the site of the milCloud 2.0 instance. The COLO will be DISA designed and managed.
Privileged administrative users are at .mil DoD sites. The application is impact level 5, and requires internal failover, and RPO and RTO of no more than 8 hours.
MAC Level II
Confidentiality Level Private
Network NIPR
Current Accreditation ATO
PPSM Registered Yes
Tools Required None - Self provided
CND Alignment Air Force
Special Data Reqt No
Required Backup Type Self managed
COOP (Y/N) No - self provided
RTO
RPO
Local HA Required Yes
Remote HA Required No
Automated Patch Management
No
Non Standard
Lobe extension, DISA will design
Task 2 Virtualized Legacy System
GB
OS and App
Storag e Disk - (Usable
GB)
Additiona l Tier 1 Data
Storage (Usable
GB)
Tier 2 Storag e (Usable
GB)
Tier 3 Storag e (Usable
GB)
Object Store (Usabl e GB)
Web 01 - Windows 1 4 75 0
Web 02 - Windows 1 4 75
App 01 - Windows 2 10 75 100
App 02 - Windows 2 10 75 100
DB 01 - Windows 8 32 75 1000
DB 02 - Windows 8 32 75 0
Task 2 Support Labor
Location
DISA
Cloud
Hosting Site
Consumer Location
Trips Travel Days
Required
Travel
Windows SA
Linux SA
DBA
Network Engineer
Virtualization
Specialist
Cloud Specialist
Cybersecurity
Analyst
Task 3 IRIS Test System in RACE
Task 3 CSP Relevant Requirements
Project Name IRIS Legacy T&D
Description T&D application that migrated from DISA RACE to DISA milCloud 1.0. Development system for DITCO
Confidentiality Level Public
Network NIPR
Current Accreditation IATT DISA AO
PPSM Registered Yes
Tools Required HBSS, ACAS
CND Alignment DISA
Special Data Reqt No
Required Backup Type Standard
COOP (Y/N) No
RTO
RPO
Local HA Required No
Remote HA Required No
Automated Patch Management
No
Non Standard
No
Task 3 Servers
GB
OS and App
Storage Disk -
(Usable
GB)
Additiona l Tier 1 Data
Storage (Usable
GB)
Tier 2 Storag e (Usable
GB)
Tier 3 Storag e (Usable
GB)
Object Store (Usabl e GB)
N_RUJ03R_70_131 - Windows
1 2 100
N_RUJ03R_70_163 - Windows
1 2 100
Task 3 Support Labor
Year 1 Labor Category List
Function Contractor Location
DISA
Cloud
Hosting Site
Consumer Location
Trips Travel Days
Required
Travel
Windows SA
Linux SA
DBA
Network Engineer
Virtualization Specialist
Cloud Specialist
Cybersecurity Analyst
Task 4 PSD Development and Test Systems
Task 4 CSP Relevant Requirements
Project Name PSD Development and Test Systems
Description
PSD is two environments, Development and Test, that have recently transitioned from RACE to two separate VDCs in milCloud 1.0. The data below has been extracted from their transition requests. There are separate support teams for each environment, and they are billed separately. Transition may be billed on a single Task Order. The Mission Partner requested an estimate to detail the total cost of support services provided with the milCloud Plus service offering rate for the PSD Legacy Applications. Seven (7) milCloud Central
Processing Units (CPUs), 18 gigabytes (GB) of Random Access Memory (RAM) and 1220 GBs of usable storage. The PSD
Legacy Applications Development environment consists of three (3) development Virtual Operating Environments
(VOEs). To meet the requirements of this request, the Service Provider would provide the services outlined in Enclosure 1 with the milCloud Plus service rate to three (3) development VOEs milCloud Plus service offering rate for the PSD Legacy Test RACE/milCloud environment. 12 milCloud Central Processing
Units (CPUs), 26 gigabytes (GB) of Random Access Memory (RAM) and 2,600 GBs of usable storage. The PSD Legacy Test environment consists of five (5) test and development Virtual
Operating Environments (VOEs).
Logically separated Development and Test enclaves
MAC Level III
Confidentiality Level Public
Network NIPR
Current Accreditation IATO For Test only
PPSM Registered Yes Test only
Tools Required HBSS, ACAS
CND Alignment DISA
Special Data Reqt No
Required Backup Type Standard
COOP (Y/N) N
RTO
RPO
Local HA Required No
Remote HA Required No
Automated Patch Management
Yes
Non Standard
None
Task 4 Servers
GB
OS and App
Storag e Disk
(Usabl e GB)
Addition al Tier 1
Data Storage (Usable
GB)
Tier 2 Storag e (Usabl e GB)
Tier 3 Storag e (Usabl e GB)
Object Store (Usabl e GB)
Development
N_DIT01R_65_131 Windows 2008 2 8 120
N_DIT01R_65_165 Windows 2008 1 2 100
N_DIT01R_65_196 Windows 2008 4 8 1000
Test:
N_DIT02R_78_195 Windows 2008 2 4 300
N_DIT02R_78_227 Windows 2008 2 4 1200
N_DIT02R_78_162 Windows 2008 2 4 300
N_DIT02R_78_194 Windows 2008 2 6 300
N_DIT02R_78_226 Windows 2008 2 8 500
Task 4 Support Labor
Location
DISA
Cloud
Hosting Site
Consumer Location
Trips Travel Days
Required
Travel
Windows SA
Linux SA
Task 5 CMIS
Task 5 CSP Relevant Requirements
Project Name CMIS
Description
Task 5 is for the CMIS program Development and Test systems that were recently implemented in milCloud 1.0.
Development and Test systems are in a single VDC in milCloud, but are logically separated except as noted in the following SRF document.
Confidentiality Level Sensitive
Network NIPR
Current Accreditation ATO
PPSM Registered Yes
Tools Required HBSS, ACAS
CND Alignment DISA
Special Data Reqt PII, HIPAA
Required Backup Type Standard
COOP (Y/N) No
RTO
RPO
Local HA Required No
Remote HA Required No
Automated Patch Management
Yes
Non Standard
DISA provides IA/SA support - Will require OOB access
Task 5 Servers
GB
OS and App
Storag e Disk
(Usabl e GB)
Addition al Tier 1
Data Storage (Usable
GB)
Tier 2 Storag e (Usabl e GB)
Tier 3 Storag e (Usabl e GB)
Object Store (Usabl e GB)
Test Web Windows 2012 R2 4 12 60
Test DB Windows 2012 R2 8 16 60 40
Dev Web Windows 2012 R2 4 12 60
Dev DB Windows 2012 R2 8 16 60 40
Test DC Windows 2012 R2 4 32 60
Dev DC Windows 2012 R2 4 32 60
Task 5 Support Labor
Location
DISA
Cloud
Hosting Site
Consumer Location
Trips Travel Days
Required
Travel
Windows SA
Linux SA
Task 6 VAA Scanning Systems
Task 6 CSP Relevant Requirements
Project Name VAA Scanning System
Description
Task 6 is for the VAA Scanners that currently operate in milCloud. These are Nessus ACAS scanners that are used by the DISA IA personnel to scan all DISA DECCs for security risks. They are configured as noted in the following SRF document. Red Hat OE VM to host Nessus Scanners for the purpose of scanning DISA DoD CNDSP
Customers
Production ACAS Scanners
MAC Level III
Confidentiality Level Sensitive
Network NIPR
Current Accreditation ATO
PPSM Registered Yes
Tools Required HBSS
CND Alignment DISA
Special Data Reqt None
Required Backup Type Standard
COOP (Y/N) N
RTO
RPO
Local HA Required None
Remote HA Required None
Automated Patch Management
None
Non Standard
Task 6 Servers
GB
OS and App
Storag e Disk - (Usabl e GB)
Additiona l Tier 1 Data
Storage (Usable
GB)
Tier 2 Storag e (Usabl e GB)
Tier 3 Storag e (Usabl e GB)
Object Store (Usabl e GB)
VAA1 2 4 60
VAA2 2 4 60
VAA3 2 4 60
VAA4 2 4 60
VAA5 2 4 60
VAA6 2 4 60
VAA7 2 4 60
VAA8 2 4 60
VAA9 2 4 60
VAA10 2 4 60
VAA11 2 4 60
VAA12 2 4 60
VAA13 2 4 60
VAA14 2 4 60
NSSC 2 4 60
Task 6 Support Labor
Location
DISA
Cloud
Hosting Site
Consumer Location
Trips Travel Days
Required
Travel
Windows SA
Linux SA
SRF Forms below included for background information
ONLY (14-61 pages):
Task 3IRIS Test System in RACE IRIS is a DISA Test system that recently transitioned from DISA’s RACE environment to milCloud 1.0. The following is a
System Requirements Form (SRF) that was extracted from their transition request. IRIS has two servers.
Part 1 - Project Overview
Project Identification
1. System/Application
Name
2. Mission
Partner
3. Project Title 4. Service Provider
Tracking Number
5. Priority
IRIS Legacy RACE Dev
DISA IRIS 3914 Normal
6. Designated Hosting Site tbd 7. Managing Site Tbd
8. Project Description – Describe project details, dependencies, and constraints below. Attach any relevant design specifications or documentation to this section.
The Mission Partner requested an estimate to detail the total cost support services provided with the milCloud
Plus service offering rate for the legacy RACE PLD environment. The Mission Partner would order through the milCloud portal two (2) milCloud Central Processing Units (CPUs), 4 gigabytes (GB) of Random Access
Memory (RAM) and 200 GBs of usable storage. The IRIS environment consists of two (2) development Virtual
Operating Environments (VOEs)
9. System/Application Description
Test systems for DITCO
10. Operational Impact
Development System
11. CIC/ASC/BAN 12. MAC Level 13. Confidentiality Level 14. DoD Network
III
Public
Classified
Sensitive
NIPRNet
SIPRNet
Mission Partner DAA Accredited Enclave
(CDAE)
15. System DAA (Name, Title, Org, Email, Phone) DISA AO
16. Accreditation Status
17. If System/Application is NOT accredited, what is Mission Partner’s plan for achieving accreditation?
IATT
IATO
ATO
Not Accredited
18. Accrediting Agency 19. Accreditation Expiration 20. System DITPR Number
DISA
21. Accreditation
Repository
22. Residual Risk 23. VMS Registration eMASS Other Yes No Yes No Program Name:
24. PPSM ID Number 25. PPS Utilized 26. Application Development Environment
TBD Standard Non-Standard STIG’d Non-STIG’d
27. Critical Plans (select all that exist) 28. Reviews/Assessments (select all that exist)
Configuration Management Plan
Risk Management Plan
Vulnerability Management Plan
Patch Management Plan
Incident Response Plan
Continuity of Operations Plan
Disaster Recovery Plan
DoD 8500.2 IA Control Review
Location of Review:
Application Security and Development Review
Location of Review: AFNIC
Privacy Impact Assessment
Location of Assessment: AFMC/A6 XI
29. Tool Compatibility
HBSS Yes No Unknown
ESM Software Yes No Unknown
30. Open Source Software Yes No Unknown
CDSP - DoDD O-8530.01 and in support of CJCSI 6510.01F and CJCSI 6211.02D, require all DoD information systems and networks that process, store, transmit, display, or receive DoD information to be aligned in writing to an accredited Tier II CDSP.
The Mission Partner is required to obtain/maintain compliance with this requirement. DISA is able to provide this service or another provider can be used. In the case that another CDSP provider is chosen, a copy of the current SLA must be provided so that DISA analysts are able to provide TIPPER notifications the chosen CDSP.
31. Will the information system/application/network process, store, transmit, display, receive or disseminate DoD information
Yes No
32. Will the Mission Partner system connect to a DECC infrastructure?
Yes No
33. Does the Mission Partner intend to leverage the DISA
DECC Network Infrastructure?
Yes No
34. Does the Mission Partner intend to align to DISA for
CDSP services?
Yes No
35. If not aligned to DISA CDSP, provide name of other
CDSP. Please also provide SLA to <insert applicable
DISA office here> AND letterkenny.re.list.cdsp-requests@mail.mil
Mission Partner CDSP
CDSP POC
CDSP Email
Special Compliance Information (select all that apply)
36. PII 37. HIPAA 38. Financial System/ Application 39. Nuclear Information
Yes No Yes No Yes No Yes No
40. Data Access 41. CAC Enabled (Restricted/Private)
Unrestricted (unauthenticated)
Restricted (authenticated .com)
Private (access from .mil only)
Yes
No
42. Cyber Compliance
Yes No
Special Audits, Inspections, Assessments, and Tests (select all that apply)
43. SSAE 16 44. FISCAM 45. PCI 46. C&A
Yes No Yes No Yes No Yes No
47. Incident Response 48. Penetration Testing
Yes No Yes No
49. Points of Contact Name
Office and
Physical
Address Phone Email
Mission Partner Program POC Barbara Biebl
Mission Partner Technical POC
Mission Partner Financial POC
Mission Partner IA POC
Service Provider Team Lead
Service Provider Project Manager
Service Provider Technical Lead
Service Provider Customer Account
Rep (CAR)
Service Provider IA Technical
Advisor
Service Provider Network Lead
Service Provider Software Engineer
Target Dates
Initial Operation Environment (IOE) Date – date that Operating Environments (OEs) are turned over to the application administrators for application load
Initial Operating Capability (IOC) Date – date that OEs are configured for production users
50. Target Letter Estimate Date 51. Target Funding Date 52. Target IOE Date 53. Target IOC Date
Risk Assessment
Note: IA risk can only be determined by the IA Technical Advisor
54. Technical 55. Schedule 56. IA
High
Medium
Low
High
Medium
Low
High
Medium
Low
57. Enter Details of Any “High” or ‘Medium” Risks Noted:
N/A
Part 2 - Implementation and Cutover Support Requirements
1. Implementation Contacts
Role Name and Contact Information
Mission Partner Lead Technical POC
Mission Partner Lead Management POC
(Authority to approve changes)
Vendor or Integrator SME
Other Implementation POC (specify)
2. Migration Requirements
OE/File System Name Size of File(s) or
Image Being
Migrated
(usable storage in GB)
Type
(e.g., DB Export, Flat
File, OVA Image)
File Transmission Method
(Offline Copy, Online Copy
(SFTP), Array-to-Array
Replication, Application
Replication)
Migration Method
(Import, Overlay, Mirror, OVA)
N_RUJ03R_70_131 100
N_RUJ03R_70_163 100
3. Cutover Requirements
Describe the cutover window in terms of length and timing constraints:
Describe the Mission Partner, integrator, and vendor resources necessary to support cutover:
Describe any system-specific post-cutover acceptance criteria:
Describe any post-cutover parallel processing requirements:
4. Performance Metrics
Provide any performance metrics that must be attained for systems migrating to the Service
Provider:
5. Global Service Desk Level 1 Support Information
Approximate number of concurrent end-users:
Approximate Service Desk contact volume and frequency:
Part 3 - Technical Requirements
1. Mission Partner Disposition – Which of these statements best describes the Partner’s view of their technical requirements?
The Mission Partner is providing a detailed specification for computing infrastructure that they expect to deliver without modification.
The Mission Partner is providing detailed technical requirements based on an existing environment but acknowledges the design may not be optimal for Cloud hosting and is willing to engage the Cloud Service Provider to explore design alternatives.
The Mission Partner is providing general technical description and requires the Cloud Service Provider technical assistance to define technical requirements.
Other (fill in here):
Server Name
(hostname or unique identifier if not known)
Server
Function
(e.g., web, database, app)
Environment
(Production, Test, COOP)
Estimated
Availability
Requirement
(Metered
Billing)
OS OS
Version
32-bit or 64-bit
# of vCPUR eq
Req RAM
(GB)
N_RUJ03R_7
0_131
DEV 24/7/365
Windo ws 2008 64 1 2
N_RUJ03R_7
0_163
DEV 24/7/365
Windo ws 2008 64 1 2
2. OE Storage Requirements – Specify the storage that is required by each OE (usable storage in GB)
Server Name and
Function
Allocation for
Application
Allocation for
Database
Allocation for
Logs
Allocation for
Flat Files
Desired Storage
Tier Or performance
Level
Total (GB)
N_RUJ03R_70_131 100 Tier 1 100
N_RUJ03R_70_163 100 Tier 1 100
Object Storage – Not tied to specific server
Total Usable Storage Required (in GBs): 200
3. Web Interfaces – Identify URLs required and their attributes
Public – Any service intended to provide unclassified and non-sensitive information accessible from outside the NIPRNet, to include anonymous access.
Restricted – Any service intended to be accessible from the Internet and serves sensitive information to a limited set of users.
Access controls are in place to limit the user set who can access the service.
Private – Any service meant to be accessed only from the NIPRNet or SIPRNet, respectively (.mil only).
URL Name Application Public/Restricted/Private
(see definitions above)
Load-balanced to Multiple
Web Servers (Yes/No)
4. External System Communication Requirements – List the OEs that require communication with any external system.
Specify the ports and protocols used by each. This does not include external access for administration by privileged users.
Internal Server or
Enclave Name
Function External Server or System
Name and Domain
Party Initiating
Communication
Ports Protocols Notes
NA
5. Internal System Communication Requirements – List the OEs that require communication with other OEs within the enclave. Specify the ports and protocols used by each.
Internal Server Function Target Internal
Server
Party Initiating
Communication
Ports Protocols Workload
Characterization tbd
6. Software Requirements – List all application software, tools and accessories. Do not include Cloud Service Provider-provided Enterprise Systems Management (ESM) software.
Server Name Software
Vendor
Software
Name
Detail Version
Information
Software License
Provided/Procured by
Licensing or Acquisition
Notes
7. Open Source Software Requirements – List all open source software used. For open source, indicate whether or not the software has been DAA-approved. List additional information (i.e. licensing, vendor support, etc.) in the Notes column.
Software
Vendor
Software
Name
Version
Information
DAA-Approved Licensing, Acquisition, Support Notes
Yes No
Yes No
Yes No
8. User Authentication Requirements
Does user authentication / authorization require access to a remote resource (e.g., LDAP, AD)? Yes No
If Yes, who will manage the authentication / authorization database? .
9. Networking & Security
Describe any specific data protection requirements (e.g., data at rest) specified by the data owner.
N/A
Describe any interconnection requirements among DoD applications operating at different classification levels
(e.g., SIPRNet to NIPRNet or vice versa).
Describe any system-to-system interfaces with government agencies, commercial companies, foreign countries, etc.
N/A
Are any network VPNs required to secure system-to-system interfaces? Yes No
If Yes, network VPNs required, remote sites are: .com .mil .gov
Characterize anticipated aggregate bandwidth requirements (data center inbound/outbound).
Load Balancing: Describe any local or global application and/or server load balancing requirements.
10. Local High Availability Requirements – Does the system require any specific local high availability feature for any specific OEs or functions (e.g., clustering, Oracle RAC)?
If Yes, please elaborate on the requirement (if possible identify the OEs to be clustered and the type of clustering required, e.g., active, passive, RAC) below:
11. Remote or Second Site High Availability Requirements – Does the system require remote or second site high availability feature for any specific OEs or functions (e.g., remote failover, clustering, Oracle RAC)?
Yes No
If Yes, please elaborate on the requirement (if possible identify the OEs to be clustered and the type of clustering required, e.g., synchronous, asynchronous, RAC) below:
Part 4 - Standard and Optional Rate-Based Services
1. Core Services – Every workload hosted in milCloud 2.0 is based on the amount of Compute capacity.
Compute Compute is the basic Infrastructure as a Service capability provided by the CSP. This include virtual CPU, Memory and storage at the rates identified by the CSP. This also includes a Client OS license for a supported OS.
Describe any requested deviations from these core services:
2. Optional CSP Services –The below services may be acquired from the CSP These may have prerequisites in terms of connectivity and root control of the OS. Review and check any requested optional services:
Automated Patch Management – Automated Patch Management provides an automated patching service for supported client OS’s. This service may be limited to security and system patching and may include prerequisite levels of system access and scheduling.
3. Optional Value Add Services –The below services may be acquired from DISA. These may have prerequisites in terms of connectivity and root control of the OS. These may include any of the “Optional” service shown below. Review and check any requested optional services:
milCloud Plus – milCloud Plus includes System Administration (on-site support during normal business hours (8x5) with two-hour on-call response outside of normal hours), Security, Facilities Support, Standard OE (SOE) core software, Power, and Communications (local infrastructure/shared communications), and Level II Service Desk services. Level 1 and Level 3 services are not provided in Basic Services. Basic Services is assessed by OE.
Application Support – Tier 2 Service Desk support of a dedicated application. Examples include running special jobs on behalf of users, re-running aborted jobs, loading new releases of functional-user software, etc. If application support is selected, it will be applied to all OEs associated with a Mission Partner’s workload except for Service
Provider-provided or Web Administration OEs.
Database Administration – Includes the labor to provide Database Administration support and to ensure databases comply with security guidelines. It only applies to Database servers.
Oracle Grid Control – Provides the Service Provider standard web based database monitoring and management interface to Mission Partner DBAs. It is included if the Mission Partner is paying for Database Administration, but can be selected as an option by those Mission Partners who elect to perform their own DBA support. It is billed at 10 percent of the Database administration rate.
Database Software Maintenance – Maintenance of Oracle database software. Costs associated with this include the software maintenance and not the license itself. Note: DB Software Maintenance is a required service if the Service
Provider provides Oracle licenses.
24 x 7 System Administration – Provides seven days a week, 24 hours a day (24x7), full system administration support. Standard system administration support is part of Basic Services.
24 x 7 Application Support –Provides seven days a week, 24 hours a day (24x7), full application support. Select this option if the standard 8x5 with two hour after-hours response time is insufficient.
24 x 7 Database Administration – Provides seven days a week, 24 hours a day (24x7) full database administration support. Select this option if the standard 8x5 with two-hour after-hours response time is insufficient.
Include any comments or relevant information related to the selected optional services above:
4. Conditional Services – Conditional services may be required depending upon the optional services selected. Review and check any applicable conditional services that apply:
Web Administration – Web Administration is another type of application support and it utilizes the Application
Support rate. This service supports the labor to administer a web server and its associated software. If a web server uses Microsoft's Internet Information Services (IIS), the Service Provider will install the feature and support static content at no additional charge, as this is included in the standard Basic Services rate.
Database Security –Includes the labor associated with ensuring database servers comply with security guidelines (e.g., consultative services on the STIG, handling STIG findings, database scans, and VMS entry and validation) and applies to those database servers for which the Mission Partner retains the DBA function themselves. It is billed at 10 percent of the optional Database Administration rate. Database security is included for those database servers that the Mission Partner selects Database Administration.
Capacity Planning Reporting – Mission Partners who maintain their own hardware and do not pay the Hardware
Services rate may elect to receive capacity planning reports billed at 10 percent of the Hardware Services rate.
Include any comments or relevant information related to the selected conditional services
5. Service Continuity – If remote site COOP support is required, please select one of the options below. Descriptions are based on DISA service levels for reference. These services may be application dependent depending on the level of automation required:
Shared COOP – Referred to as “Remote Recovery Combination 1” in the DISA Service Catalog
(RTO = 5 days, RPO = 7 days) – MAC III applications only
Shared COOP w/Replication Option – Referred to as “Remote Recovery Combination 1.2” in the DISA Service Catalog
(RTO = 5 days, RPO = 8 hours) – MAC III applications only
Dedicated COOP – Referred to as “Remote Recovery Combination 2” in the DISA Service Catalog
(RTO = 24 hours, RPO = 8 hours)
Dedicated COOP – Referred to as “Remote Recovery Combination 3” in the DISA Service Catalog
(RTO and RPO = 8 hours)
High-Availability COOP – Referred to as “Remote Recovery Combination 4” in the DISA Service Catalog
(RTO = 30 minutes, RPO = 1 Sec)
Custom – (Failover, T&D, Mission Partner-managed COOP, etc.)
No Service Provider-provided COOP
Note any special considerations related to your Service Continuity requirement here and provide more detailed specifications in the Non-Standard Requirements section, if applicable:
Is the detailing of production and COOP locations in the same documentation authorized? Yes No
Part 5 - Non-Standard Requirements
Fulfillment of non-standard requirements are generally not included in the Service Provider’s published server and storage rates and entail additional design and integration efforts, special considerations/approvals (waivers), and/or long procurement lead times.
1. Non-Standard Configurations or Mission Partner-Provided Items – Specify non-standard or Mission-Partner-provided hardware that must be deployed at a DECC in support of this system.
Item Name or
Description
Item Type
(Server, storage, network, software, other)
Purpose Justification
(explain why standard components will not work)
Source Acquired by
Maintenance
Arrangement if
Mission-Partner
Provided (contract number, vendor, expiration date)
Will the
Service
Provider
Pick Up
Maintenance
Upon Current
Contract
Expiration?
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes milCloud 2.0 SRF Template Version FY16.0 – Jun 2016
2. Non-Standard Support Requirements – Explain any non-standard operations or support requirements. (e.g., any SME labor or non-standard support functions.
3. Non-Standard Communications or Network Requirements – Explain any non-standard network or communications requirements. (e.g., any deviation from the Service Provider enclave designs, exceptional bandwidth, latency or access requirements, etc. Include diagrams if available.)
4. Non-Standard Other – Explain any non-standard unusual, unique or exceptional requirements that do not fit into the previous categories.
5. Additional Documentation – Attach and identify in the space below any documents that support the specification of non-standard requirement(s) noted in this section:
Task 4 PSD Development and Test Systems PSD is two environments, Development and Test, that have recently transitioned from RACE to two separate VDCs in milCloud 1.0. The data below has been extracted from their transition requests. There are separate support teams for each environment, and they are billed separately. Transition may be billed on a single Task Order.
Part 1 - Project Overview
Project Identification
58. System/Application
Name
59. Mission
Partner
60. Project Title 61. Service Provider
62. Priority
PSD Legacy RACE Dev and Test
DITCO PSD 3912 and 3913 Normal
63. Designated Hosting Site tbd 64. Managing Site Tbd
65. Project Description – Describe project details, dependencies, and constraints below. Attach any relevant design specifications or documentation to this section.
The Mission Partner requested an estimate to detail the total cost of support services provided with the milCloud
Plus service offering rate for the PSD Legacy Applications. The Mission Partner would order through the milCloud portal seven (7) milCloud Central Processing Units (CPUs), 18 gigabytes (GB) of Random Access
Memory (RAM) and 1220 GBs of usable storage. The PSD Legacy Applications Development environment consists of three (3) development Virtual Operating Environments (VOEs). To meet the requirements of this request, the Service Provider would provide the services outlined in Enclosure 1 with the milCloud Plus service rate to three (3) development VOEs
The Mission Partner requested an estimate to detail the total cost support services provided with the milCloud
Plus service offering rate for the PSD Legacy Test RACE/milCloud environment. The Mission Partner would order through the milCloud portal 12 milCloud Central Processing Units (CPUs), 26 gigabytes (GB) of Random
Access Memory (RAM) and 2,600 GBs of usable storage. The PSD Legacy Test environment consists of five (5) test and development Virtual Operating Environments (VOEs). To meet the requirements of this request, the
Service Provider would provide the services outlined in Enclosure 1 with the milCloud Plus service rate to five
(5) test and development VOEs
66. System/Application Description
Development and Test enclaves
67. Operational Impact
Development and Test Systems
68. CIC/ASC/BAN 69. MAC Level 70. Confidentiality Level 71. DoD Network
III
Public
Classified
Sensitive
NIPRNet
SIPRNet
Mission Partner DAA Accredited Enclave
(CDAE)
72. System DAA (Name, Title, Org, Email, Phone) DISA AO
73. Accreditation Status
74. If System/Application is NOT accredited, what is Mission Partner’s plan for achieving accreditation?
IATT
IATO
ATO
Not Accredited
Development system – VPN access only
75. Accrediting Agency 76. Accreditation Expiration 77. System DITPR Number
78. Accreditation
Repository
79. Residual Risk 80. VMS Registration eMASS Other Yes No Yes No Program Name:
81. PPSM ID Number 82. PPS Utilized 83. Application Development Environment
TBD Standard Non-Standard STIG’d Non-STIG’d
84. Critical Plans (select all that exist) 85. Reviews/Assessments (select all that exist)
Configuration Management Plan
Risk Management Plan
Vulnerability Management Plan
Patch Management Plan
Incident Response Plan
DoD 8500.2 IA Control Review
Location of Review:
Application Security and Development Review
Location of Review: AFNIC
Privacy Impact Assessment
Continuity of Operations Plan
Disaster Recovery Plan
Location of Assessment: AFMC/A6 XI
86. Tool Compatibility
HBSS Yes No Unknown
ESM Software Yes No Unknown
87. Open Source Software Yes No Unknown
CDSP - DoDD O-8530.01 and in support of CJCSI 6510.01F and CJCSI 6211.02D, require all DoD information systems and networks that process, store, transmit, display, or receive DoD information to be aligned in writing to an accredited Tier II CDSP.
The Mission Partner is required to obtain/maintain compliance with this requirement. DISA is able to provide this service or another provider can be used. In the case that another CDSP provider is chosen, a copy of the current SLA must be provided so that DISA analysts are able to provide TIPPER notifications the chosen CDSP.
88. Will the information system/application/network process, store, transmit, display, receive or disseminate DoD information
Yes No
89. Will the Mission Partner system connect to a DECC infrastructure?
Yes No
90. Does the Mission Partner intend to leverage the DISA
DECC Network Infrastructure?
Yes No
91. Does the Mission Partner intend to align to DISA for
CDSP services?
Yes No
92. If not aligned to DISA CDSP, provide name of other
CDSP. Please also provide SLA to <insert applicable
DISA office here> AND letterkenny.re.list.cdsp-requests@mail.mil
Mission Partner CDSP
93. PII 94. HIPAA 95. Financial System/ Application 96. Nuclear Information
Yes No Yes No Yes No Yes No
97. Data Access 98. CAC Enabled (Restricted/Private)
Unrestricted (unauthenticated)
Restricted (authenticated .com)
Private (access from .mil only)
Yes
No
99. Cyber Compliance
100. SSAE 16 101. FISCAM 102. PCI 103. C&A
Yes No Yes No Yes No Yes No
104. Incident Response 105. Penetration Testing
106. Points of Contact Name
Physical
Address Phone Email
Mission Partner Program POC Cora Benriquez
Mission Partner Technical POC
Mission Partner Financial POC
Mission Partner IA POC
Service Provider Team Lead
Service Provider Project Manager
Service Provider Technical Lead
Service Provider Customer Account
Rep (CAR)
Initial Operation Environment (IOE) Date – date that Operating Environments (OEs) are turned over to the application administrators for application load
Initial Operating Capability (IOC) Date – date that OEs are configured for production users
107. Target Letter Estimate
Date
108. Target Funding
Date
109. Target IOE
Date 110. Target IOC Date
111. Technical 112. Schedule 113. IA
High
Medium
Low
High
Medium
Low
High
Medium
Low
114. Enter Details of Any “High” or ‘Medium” Risks Noted:
N/A
Part 2 - Implementation and Cutover Support Requirements
6. Implementation Contacts
Role Name and Contact Information
Mission Partner Lead Technical POC
Mission Partner Lead Management POC
(Authority to approve changes)
7. Migration Requirements
Image Being
Migrated
(usable storage in GB)
Type
(e.g., DB Export, Flat
File, OVA Image)
File Transmission Method
(Offline Copy, Online Copy
(SFTP), Array-to-Array
Replication, Application
Replication)
Migration Method
(Import, Overlay, Mirror, OVA)
N_DIT01R_65_131 120
N_DIT01R_65_165 100
N_DIT01R_65_196
1,000
N_DIT02R_78_195 300
N_DIT02R_78_227 1200
N_DIT02R_78_162 300
N_DIT02R_78_194 300
N_DIT02R_78_226 500
8. Cutover Requirements
9. Performance Metrics
10. Global Service Desk Level 1 Support Information
12. Mission Partner Disposition – Which of these statements best describes the Partner’s view of their technical requirements?
The Mission Partner is providing a detailed specification for computing infrastructure that they expect to deliver
The Mission Partner is providing detailed technical requirements based on an existing environment but acknowledges the design may not be optimal for Cloud hosting and is willing to engage the Cloud Service Provider
The Mission Partner is providing general technical description and requires the Cloud Service Provider technical unique identifier if not known)
Server
Function
(e.g., web, database, app)
Environment
(Production, Test, COOP)
Estimated
Availability
Requirement
(Metered
Billing)
OS OS
Version
32-bit or 64-bit
# of vCPUR eq
Req RAM
(GB)
N_DIT01R_6
5_131 Dev 24/7/365
Windo ws 2008 64 2 8
N_DIT01R_6
5_165 Dev 24/7/365
Windo ws 2008 64 1 2
N_dit01r_65
_196 Dev 24/7/365
Windo
2008 64 4 8
N_DIT02R_78
_195 Test 24/7/365
Windo ws 2008 64 2 4
N_DIT02R_78
_227 Test 24/7/365
Windo ws 2008 64 2 4
N_DIT02R_78
_162 Test 24/7/365
Windo
2008 64 2 4
N_DIT02R_78
_194 Test 24/7/365
Windo ws 2008 64 2 6
N_DIT02R_78
_226 Test 24/7/365
Windo
2008 64 4 8
13. OE Storage Requirements – Specify the storage that is required by each OE (usable storage in GB)
Function
Allocation for
Application
Allocation for
Database
Allocation for
Logs
Allocation for
Flat Files
Desired Storage
Tier Or performance
Level
Total (GB)
N_DIT01R_65_131 120 Tier 1 120
N_DIT01R_65_165 100 Tier 1 100
N_dit01r_65_196 1000 Tier 1 1,000
N_DIT02R_78_195 300 Tier 1 300
N_DIT02R_78_227 1200 Tier 1 1200
N_DIT02R_78_162 300 Tier 1 300
N_DIT02R_78_194 300 Tier 1 300
N_DIT02R_78_226 500 Tier 1 500
Total Usable Storage Required (in GBs):
14. Web Interfaces – Identify URLs required and their attributes
Public – Any service intended to provide unclassified and non-sensitive information accessible from outside the NIPRNet, to include anonymous access.
Restricted – Any service intended to be accessible from the Internet and serves sensitive information to a limited set of users.
Access controls are in place to limit the user set who can access the service.
Private – Any service meant to be accessed only from the NIPRNet or SIPRNet, respectively (.mil only).
URL Name Application Public/Restricted/Private
(see definitions above)
Load-balanced to Multiple
15. External System Communication Requirements – List the OEs that require communication with any external system.
Specify the ports and protocols used by each. This does not include external access for administration by privileged users.
Internal Server or
Enclave Name
Function External Server or System
Name and Domain
Party Initiating
Communication
16. Internal System Communication Requirements – List the OEs that require communication with other OEs within the
Internal Server Function Target Internal
Server
Party Initiating
Communication
Ports Protocols Workload
17. Software Requirements – List all application software, tools and accessories. Do not include Cloud Service Provider-
Server Name Software
Vendor
Software
Name
Detail Version
Information
Software License
Provided/Procured by
Licensing or Acquisition
Notes
18. Open Source Software Requirements – List all open source software used. For open source, indicate whether or not the software has been DAA-approved. List additional information (i.e. licensing, vendor support, etc.) in the Notes column.
Software
Vendor
Software
Name
Version
Information
DAA-Approved Licensing, Acquisition, Support Notes
Yes No
Yes No
Yes No
19. User Authentication Requirements
Does user authentication / authorization require access to a remote resource (e.g., LDAP, AD)? Yes No
If Yes, who will manage the authentication / authorization database? .
20. Networking & Security
N/A
Describe any interconnection requirements among DoD applications operating at different classification levels
(e.g., SIPRNet to NIPRNet or vice versa).
Describe any system-to-system interfaces with government agencies, commercial companies, foreign countries, etc.
N/A
Are any network VPNs required to secure system-to-system interfaces? Yes No
If Yes, network VPNs required, remote sites are: .com .mil .gov
Characterize anticipated aggregate bandwidth requirements (data center inbound/outbound).
Load Balancing: Describe any local or global application and/or server load balancing requirements.
21. Local High Availability Requirements – Does the system require any specific local high availability feature for any specific
Yes No
If Yes, please elaborate on the requirement (if possible identify the OEs to be clustered and the type of clustering required,
22. Remote or Second Site High Availability Requirements – Does the system require remote or second site high availability
Yes No
If Yes, please elaborate on the requirement (if possible identify the OEs to be clustered and the type of clustering required,
6. Core Services – Every workload hosted in milCloud 2.0 is based on the amount of Compute capacity.
Compute Compute is the basic Infrastructure as a Service capability provided by the CSP. This include virtual CPU, Memory and storage at the rates identified by the CSP. This also includes a Client OS license for a supported OS.
7. Optional CSP Services –The below services may be acquired from the CSP These may have prerequisites in terms of
Automated Patch Management – Automated Patch Management provides an automated patching service for supported client OS’s. This service may be limited to security and system patching and may include prerequisite
8. Optional Value Add Services –The below services may be acquired from DISA. These may have prerequisites in terms of connectivity and root control of the OS. These may include any of the “Optional” service shown below. Review and check any requested optional services:
milCloud Plus – milCloud Plus includes System Administration (on-site support during normal business hours (8x5) with two-hour on-call response outside of normal hours), Security, Facilities Support, Standard OE (SOE) core software, Power, and Communications (local infrastructure/shared communications), and Level II Service Desk services. Level 1 and Level 3 services are not provided in Basic Services. Basic Services is assessed by OE.
Application Support – Tier 2 Service Desk support of a dedicated application. Examples include running special jobs on behalf of users, re-running aborted jobs, loading new releases of functional-user software, etc. If application support is selected, it will be applied to all OEs associated with a Mission Partner’s workload except for Service
Provider-provided or Web Administration OEs.
Database Administration – Includes the labor to provide Database Administration support and to ensure databases comply with security guidelines. It only applies to Database servers.
Oracle Grid Control – Provides the Service Provider standard web based database monitoring and management interface to Mission Partner DBAs. It is included if the Mission Partner is paying for Database Administration, but can be selected as an option by those Mission Partners who elect to perform their own DBA support. It is billed at 10 percent of the Database administration rate.
Database Software Maintenance – Maintenance of Oracle database software. Costs associated with this include the software maintenance and not the license itself. Note: DB Software Maintenance is a required service if the Service
Provider provides Oracle licenses.
24 x 7 System Administration – Provides seven days a week, 24 hours a day (24x7), full system administration support. Standard system administration support is part of Basic Services.
24 x 7 Application Support –Provides seven days a week, 24 hours a day (24x7), full application support. Select this option if the standard 8x5 with two hour after-hours response time is insufficient.
24 x 7 Database Administration – Provides seven days a week, 24 hours a day (24x7) full database administration support. Select this option if the standard 8x5 with two-hour after-hours response time is insufficient.
9. Conditional Services – Conditional services may be required depending upon the optional services selected. Review and
Web Administration – Web Administration is another type of application support and it utilizes the Application
Support rate. This service supports the labor to administer a web server and its associated software. If a web server uses Microsoft's Internet Information Services (IIS), the Service Provider will install the feature and support static content at no additional charge, as this is included in the standard Basic Services rate.
Database Security –Includes the labor associated with ensuring database servers comply with security guidelines (e.g., consultative services on the STIG, handling STIG findings, database scans, and VMS entry and validation) and applies to those database servers for which the Mission Partner retains the DBA function themselves. It is billed at 10 percent of the optional Database Administration rate. Database security is included for those database servers that the Mission Partner selects Database Administration.
Capacity Planning Reporting – Mission Partners who maintain their own hardware and do not pay the Hardware
Services rate may elect to receive capacity planning reports billed at 10 percent of the Hardware Services rate.
10. Service Continuity – If remote site COOP support is required, please select one of the options below. Descriptions are based on DISA service levels for reference. These services may be application dependent depending on the level of automation required:
Shared COOP – Referred to as “Remote Recovery Combination 1” in the DISA Service Catalog
(RTO = 5 days, RPO = 7 days) – MAC III applications only
Shared COOP w/Replication Option – Referred to as “Remote Recovery Combination 1.2” in the DISA Service Catalog
(RTO = 5 days, RPO = 8 hours) – MAC III applications only
Dedicated COOP – Referred to as “Remote Recovery Combination 2” in the DISA Service Catalog
(RTO = 24 hours, RPO = 8 hours)
Dedicated COOP – Referred to as “Remote Recovery Combination 3” in the DISA Service Catalog
(RTO and RPO = 8 hours)
High-Availability COOP – Referred to as “Remote Recovery Combination 4” in the DISA Service Catalog
(RTO = 30 minutes, RPO = 1 Sec)
Custom – (Failover, T&D, Mission Partner-managed COOP, etc.)
No Service Provider-provided COOP
Note any special considerations related to your Service Continuity requirement here and provide more detailed specifications in
Fulfillment of non-standard requirements are generally not…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .