Atch J-4 QASP 25 Jan 12.doc

DOC document 54 KB Posted

Attached to
Level 1 and 2 Hardware Maintenance Federal contract opportunity
Solicitation number
HC102812R0003
Issued by
Defense Information Systems Agency

About this file

Atch J-4 QASP

View the file

Other files for this federal contract opportunity

Other files attached to Level 1 and 2 Hardware Maintenance, newest first.
File Type Posted
SF 30 Amendment 0004.doc DOC document
RFP Questions and Answers 041 to 042 dated 14 Mar 2012.docx DOCX document
ATCH J-2 PWS Revised 6 Mar 2012.docx DOCX document
SF 30 Amendment 0003.doc DOC document
RFP Questions and Answers 004 to 040 dated 7 Mar 2012.docx DOCX document
HC102812R0003 Conformed Copy as of Am 0003.doc DOC document
SF 30 Amendment 0002.doc DOC document
HC102812R0003.doc DOC document
SF 30 HC102812R0003 AMD 0001.docx DOCX document
HC102812R0003 Conformed Copy as of Am 0001.doc DOC document
Atch J-5 Question Answer Submission Template Amd 0001.doc DOC document
ATCH J-2 PWS Dated 25 Jan 2012.docx DOCX document
HC102812R0003.doc DOC document
Atch J-5 Question Answer Submission Template.doc DOC document
Atch J-3 DD Form 254 26 Jan 2012.doc DOC document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DISA ON-SITE MAINT

QASP

QUALITY ASSURANCE PLAN (QASP)

DISA On-Site Hardware Maintenance

As of 25 January 2012

1. Title. DISA On-Site Hardware Maintenance

2. Work Requirements.

· Item 1 – Equipment Readiness/OEM Specifications

· Item 2, 3 – Response and Repair Time

· Item 4 - Response and Repair Outside of Principle Period of Maintenance (OPPM)

· Item 5, 7 – Provide Diagnostics and Call Home

· Item 6 - Engineering Change Proposals (ECPs)

· Item 8 - Predictive Maintenance

· Item 9 - Preventative Maintenance

· Item 10 - Other Services

· Item 11 – Best Effort T&M

· Item 12 – Emergency Maintenance

· Item 13 - Inspections and Certificate of Maintainability (COM)

· Item 14 - Monthly Reports

3. Primary Method of Surveillance.

Periodic Inspection, as required, is scheduled for Task 1 - 14. There will be 100% inspection for Task 1 – 14 when hardware maintenance support is required.

4. Scope of Performance.

The Contractor shall provide hardware maintenance support on the products identified within the contract. All terms shall be in accordance with the requirements of the contract.

5. Performance Standards.

Performance standards are identified below.

ITEM
PERFORMANCE OBJECTIVE
PWS

PARA.

PERFORMANCE THRESHOLD

1.
Ensure equipment readiness to meet OEM specifications
C.6.0
Zero outstanding maintenance issues that exceed maintenance level response and repair times for each maintenance call
2.
Respond to service call IAW Maintenance Level designated for equipment
C.6.1 and C.6.6
100% of each remedial maintenance call per month
3.
Repair equipment IAW Maintenance Level designated for equipment
C.6.1

and

C.6.6 100% of each remedial maintenance call per month

4.
Repair equipment OPPM when requested
C.6.2
100% of each OPPM maintenance call per month
5.
Provide Remote Diagnostics and Call Home remote support
C.6.3
100% available for each and all Level I and II equipment covered by this contract with this capability before contract start
6.
Schedule and perform ECP within 60 days upon notification by OEM
C.6.4
Zero outstanding ECPs for each equipment asset due to fault of contractor
7.
Respond to, and repair systems malfunction as identified by remote diagnostics/Call Home support
C.6.5
100% of each call home/system generated calls for each equipment asset
8.
PM schedule identified for all equipment levels I-II
C.6.7
100% PM schedule for each equipment asset for all equipment levels I and II
9.
Schedule and perform PM Services on all equipment
C.6.7
100% of PM services per month for each equipment asset, unless deferred by the Govt
10.
Provide other services – as requested – surge, standby maintenance, relocation
C.6.8.1 – C.6.8.3
100% for each requested situation
11.
Provide Best Effort T&M
C.6.8.4
100% for each requested situation
12.
Emergency Maintenance
C.6.9
100% for each requested situation
13.
Provide inspections and COM for all required equipment
C.6.10
100% for each required equipment
14.
Monthly Reporting
C.12
100% available for each equipment asset and all equipment

6. Remedies.

· During inspection, if performance thresholds are not met, equipment will be removed from contract and placed on a different contract IAW termination clauses found elsewhere in the contract.

· In the event the contractor is unable to repair the equipment within the performance thresholds and the Government must obtain service elsewhere (elevation to the OEM or other vendor), the contractor invoice will be reduced by the invoice amount of the Government obtained repair service.

7. Acceptable Quality Level (AQL):

The ACL for this project is 100% due to the critical support required for hardware maintenance for DISA processing...

8. Evaluation Method:

The COR will review the “ADPE Maintenance Record/FORM 7” to document the time elapsed between the initial call for support of a hardware maintenance/repair requirement, voice and physical response by the contractor and resolution to verify and validate contractor performance.

The “ADPE Maintenance Record/FORM 7” is defined as the official documentation from the

Government that hardware maintenance/repair is required. The “ADPE Maintenance Record/Form

7” captures the time the hardware error occurred, when the Government requests support from the contractor, and the time that the hardware error is resolved. The “ADPE Maintenance Record/Form

7” is the official measure of response and resolution time.

PAGE