View the file

Other files

File Type Posted
- TESTING REQUIREMENTS.pdf PDF
- UPDATED SECTION M.pdf PDF
HC102121QA072-0002.v0.pdf PDF
- SECTION M.pdf PDF
- HC102121QA072.v1.pdf PDF
- HC102121QA072-0001.v0.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Circuit Parameters

(A) Customer Premises Equipment (CPE) Requirement: Any and all Digital Service Units (DSUS), Customer Service Units (CSUS), Modulator/Demodulators (Modems), Network Termination Units (NTUS), or other CPE furnished by Telecommunication Provider (TP) for this service at termination location A and B shall be of a rack-mounted configuration and not a stand-alone configuration. In the event the TP does not have existing powered rack space and/or available card slots in CPE cages, chassis, or nests, the TP shall provide and install all racks and/or CPE Cages, Chassis, or nests required to support this service. Charges for hardware and associated installation are to be included in the TP’s non-recurring charge for this service. All TP provided racks and/or CPE cages, chassis, or nests installed to support this service shall be utilized exclusively for telecommunication services contracted by a DITCO contracting office.

(B) Network Operation Center: The TP shall have a network operations center (NOC) located in Europe or Asia that can respond to trouble calls on an immediate basis, 24 hours a day, 365 days a year.

The service provider shall have technicians who are able to read, write, and speak English fluently. The TP NOC shall have circuit visibility to assist in any circuit outages; the TP may use the embedded operations channel of the network termination device.

(C) Restoral/Maintenance: 24/7: TP shall provide 24 hour a day/7 day a week service restoral and maintenance. The TP restoral/maintenance shall be initiated within 1 hour of receipt of Government outage report, including after duty hours, weekends, and holidays. Maximum time to repair shall be 8 hours, including after duty hours, weekends and holidays. TP installation and restoral/maintenance personnel that have direct interface with Government personnel at service locations must understand, speak, and write English.

(D) Circuit Performance: Monthly availability must be 98.5% or greater for unprotected services and have a frame loss ratio of < .01% and Jitter < 30ms.

Latency measured round-trip, will be according to the following guidelines:

Within country: less than 25ms;

Within Europe: less than 75ms;

Outside Europe: less than 150ms.

Any APS switchover shall take less than 50 milliseconds.

ACCEPTABLE CONTRACTOR/TP RESPONSE: “UNDERSTAND, WILL COMPLY”.

File details come from the government source that posted it. Updated .