Attachment_A_-_DMA_AFN-E__CLIN_Structure_12_June_2014.xlsx
XLSX spreadsheet 24 KB Posted
- Solicitation number
- HC1021-14-R-0002
- Issued by
-
Defense Information Systems Agency
About this file
HC1021-14-R-0002 ATTACHMENT A - CLIN STRUCTURE
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AFN-EUROPE_HC1021-14-R-0002_AMEND_0002.doc | DOC document | |
| AFN-EUROPE_HC1021-14-R-0002_AMEND_0001.doc | DOC document | |
| Attachment_C_-Satellite_Outage_Service_Report_Ex.pdf | ||
| AFN-EUROPE_HC1021-14-R-0002_RFP.doc | DOC document | |
| Attachment_B-_CDRL_OUTAGE_REPORT.pdf | ||
| Attachment_D_-_Past_Performance_Effort.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Estimated CLIN Structure CLIN Structure for AFN-Europe HC1021-14-R-0002 Tracking #: HQ0648AFN
| CLIN | Description | Region | Frequency Band | MHz | Each | Duration | NRC | MRC | Total Extended |
| Base Period: 24 Sep 2014- 23 Sep 2016 | |||||||||
| 0001 | Managed Transmission Services - Space Segment, 36 MHz (PWS 6.1 and 6.4) | European AOR, Azores, United Kingdom, Afghanistan & Qatar | Ku | 36 MHz | 24 Months | $ - 0 | $ - 0 | $ - 0 | |
| 0002 | Uplink Terminal (PWS 6.2 and 6.4) | 24 Months | $ - 0 | $ - 0 | $ - 0 | ||||
| 0003 | Terrestrial Connectivity (PWS 6.4.1) | 24 Months | $ - 0 | $ - 0 | $ - 0 | ||||
| 0004 | Operation Management (PWS 6.2 , 6.3 and 6.7) | 24 Months | $ - 0 | $ - 0 | $ - 0 | ||||
| 0005 | Communication Outage Report/Satellite Availability Reports (PWS 6.6 and 6.8) | 24 Months | NSP | N/A | N/A | ||||
| 0006 | Network Transition of DTH Services (PWS 6.5) | 74 Days |
| Option Period 01: 24 Sep 2016 - 23 Sep 2017 | ||||||||
| 1001 | Managed Transmission Services - Space Segment, 36 MHz (PWS 6.1 and 6.4) | European AOR, Azores, United Kingdom, Afghanistan & Qatar | Ku | 36 MHz | 12 Months | $ - 0 | $ - 0 | $ - 0 |
| 1002 | Uplink Terminal (PWS 6.2 and 6.4) | 12 Months | $ - 0 | $ - 0 | $ - 0 | |||
| 1003 | Terrestrial Connectivity (PWS 6.4.1) | 12 Months | $ - 0 | $ - 0 | $ - 0 | |||
| 1004 | Operation Management (PWS 6.2 , 6.3 and 6.7) | 12 Months | $ - 0 | $ - 0 | $ - 0 | |||
| 1005 | Communication Outage Report/Satellite Availability Reports (PWS 6.6 and 6.8) | 12 Months | NSP | N/A | N/A |
| Option Period 02: 24 Sep 2017 - 23 Sep 2018 | ||||||||
| 2001 | Managed Transmission Services - Space Segment, 36 MHz (PWS 6.1 and 6.4) | European AOR, Azores, United Kingdom, Afghanistan & Qatar | Ku | 36 MHz | 12 Months | $ - 0 | $ - 0 | $ - 0 |
| 2002 | Uplink Terminal (PWS 6.2 and 6.4) | 12 Months | $ - 0 | $ - 0 | $ - 0 | |||
| 2003 | Terrestrial Connectivity (PWS 6.4.1) | 12 Months | $ - 0 | $ - 0 | $ - 0 | |||
| 2004 | Operation Management (PWS 6.2 , 6.3 and 6.7) | 12 Months | $ - 0 | $ - 0 | $ - 0 | |||
| 2005 | Communication Outage Report/Satellite Availability Reports (PWS 6.6 and 6.8) | 12 Months | NSP | N/A | N/A |
| Option Period 03: 24 Sep 2018 - 23 Sep 2019 | ||||||||
| 3001 | Managed Transmission Services - Space Segment, 36 MHz (PWS 6.1 and 6.4) | European AOR, Azores, United Kingdom, Afghanistan & Qatar | Ku | 36 MHz | 12 Months | $ - 0 | $ - 0 | $ - 0 |
| 3002 | Uplink Terminal (PWS 6.2 and 6.4) | 12 Months | $ - 0 | $ - 0 | $ - 0 | |||
| 3003 | Terrestrial Connectivity (PWS 6.4.1) | 12 Months | $ - 0 | $ - 0 | $ - 0 | |||
| 3004 | Operation Management (PWS 6.2 , 6.3 and 6.7) | 12 Months | $ - 0 | $ - 0 | $ - 0 | |||
| 3005 | Communication Outage Report/Satellite Availability Reports (PWS 6.6 and 6.8) | 12 Months | NSP | N/A | N/A |
| Option Period 04: 24 Sep 2019 - 23 Sep 2020 | $ - 0 | $ - 0 | $ - 0 | |||||
| 4001 | Managed Transmission Services - Space Segment, 36 MHz (PWS 6.1 and 6.4) | European AOR, Azores, United Kingdom, Afghanistan & Qatar | Ku | 36 MHz | 12 Months | $ - 0 | $ - 0 | $ - 0 |
| 4002 | Uplink Terminal (PWS 6.2 and 6.4) | 12 Months | $ - 0 | $ - 0 | $ - 0 | |||
| 4003 | Terrestrial Connectivity (PWS 6.4.1) | 12 Months | $ - 0 | $ - 0 | $ - 0 | |||
| 4004 | Operation Management (PWS 6.2 , 6.3 and 6.7) | 12 Months | $ - 0 | $ - 0 | $ - 0 | |||
| 4005 | Communication Outage Report/Satellite Availability Reports (PWS 6.6 and 6.8) | 12 Months | NSP | N/A | N/A |
| Option Period 05: 24 Sep 2020 - 23 Sep 2021 | $ - 0 | $ - 0 | $ - 0 | |||||
| 5001 | Managed Transmission Services - Space Segment, 36 MHz (PWS 6.1 and 6.4) | European AOR, Azores, United Kingdom, Afghanistan & Qatar | Ku | 36 MHz | 12 Months | $ - 0 | $ - 0 | $ - 0 |
| 5002 | Uplink Terminal (PWS 6.2 and 6.4) | 12 Months | $ - 0 | $ - 0 | $ - 0 | |||
| 5003 | Terrestrial Connectivity (PWS 6.4.1) | 12 Months | $ - 0 | $ - 0 | $ - 0 | |||
| 5004 | Operation Management (PWS 6.2 , 6.3 and 6.7) | 12 Months | $ - 0 | $ - 0 | $ - 0 | |||
| 5005 | Communication Outage Report/Satellite Availability Reports (PWS 6.6 and 6.8) | 12 Months | NSP | N/A | N/A |
| $ - 0 | $ - 0 | $ - 0 | |||||||
| OPTIONAL CLINS (1) | |||||||||
| Description | Region | Frequency Band | MHz | Each | Duration | NRC | MRC | Total Extended | |
| Base Period: 24 Sep 2014- 23 Sep 2016 | |||||||||
| 000X | Relocation of Satellite Rx Sites within 2 Kilometers | European AOR | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 000X | Relocation of Satellite Rx Sites within 2 Kilometers | Azores | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 000X | Relocation of Satellite Rx Sites within 2 Kilometers | United Kingdom | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 000X | Relocation of Satellite Rx Sites within 2 Kilometers | Afghanistan | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 000X | Relocation of Satellite Rx Sites within 2 Kilometers | Qatar | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 000X | Relocation of Satellite Rx Sites more than 2 Kilometers | European AOR | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 000X | Relocation of Satellite Rx Sites more than 2 Kilometers | Azores | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 000X | Relocation of Satellite Rx Sites more than 2 Kilometers | United Kingdom | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 000X | Relocation of Satellite Rx Sites more than 2 Kilometers | Afghanistan | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 000X | Relocation of Satellite Rx Sites more than 2 Kilometers | Qatar | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 000X | New Downlink Terminal (w/installation) | European AOR | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 000X | New Downlink Terminal (w/installation) | Azores | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 000X | New Downlink Terminal (w/installation) | United Kingdom | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 000X | New Downlink Terminal (w/installation) | Afghanistan | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 000X | New Downlink Terminal (w/installation) | Qatar | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | |||||||||
| Option Period 01: 24 Sep 2016 - 23 Sep 2017 | |||||||||
| 100X | Relocation of Satellite Rx Sites within 2 Kilometers | European AOR | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 100X | Relocation of Satellite Rx Sites within 2 Kilometers | Azores | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 100X | Relocation of Satellite Rx Sites within 2 Kilometers | United Kingdom | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 100X | Relocation of Satellite Rx Sites within 2 Kilometers | Afghanistan | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 100X | Relocation of Satellite Rx Sites within 2 Kilometers | Qatar | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 100X | Relocation of Satellite Rx Sites more than 2 Kilometers | European AOR | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 100X | Relocation of Satellite Rx Sites more than 2 Kilometers | Azores | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 100X | Relocation of Satellite Rx Sites more than 2 Kilometers | United Kingdom | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 100X | Relocation of Satellite Rx Sites more than 2 Kilometers | Afghanistan | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 100X | Relocation of Satellite Rx Sites more than 2 Kilometers | Qatar | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 100X | New Downlink Terminal (w/installation) | European AOR | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 100X | New Downlink Terminal (w/installation) | Azores | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 100X | New Downlink Terminal (w/installation) | United Kingdom | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 100X | New Downlink Terminal (w/installation) | Afghanistan | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| 100X | New Downlink Terminal (w/installation) | Qatar | 1 | $ - 0 | $ - 0 | $ - 0 |
| Option Period 02: 24 Sep 2017 - 23 Sep 2018 | ||||||
| 200X | Relocation of Satellite Rx Sites within 2 Kilometers | European AOR | 1 | $ - 0 | $ - 0 | $ - 0 |
| 200X | Relocation of Satellite Rx Sites within 2 Kilometers | Azores | 1 | $ - 0 | $ - 0 | $ - 0 |
| 200X | Relocation of Satellite Rx Sites within 2 Kilometers | United Kingdom | 1 | $ - 0 | $ - 0 | $ - 0 |
| 200X | Relocation of Satellite Rx Sites within 2 Kilometers | Afghanistan | 1 | $ - 0 | $ - 0 | $ - 0 |
| 200X | Relocation of Satellite Rx Sites within 2 Kilometers | Qatar | 1 | $ - 0 | $ - 0 | $ - 0 |
| 200X | Relocation of Satellite Rx Sites more than 2 Kilometers | European AOR | 1 | $ - 0 | $ - 0 | $ - 0 |
| 200X | Relocation of Satellite Rx Sites more than 2 Kilometers | Azores | 1 | $ - 0 | $ - 0 | $ - 0 |
| 200X | Relocation of Satellite Rx Sites more than 2 Kilometers | United Kingdom | 1 | $ - 0 | $ - 0 | $ - 0 |
| 200X | Relocation of Satellite Rx Sites more than 2 Kilometers | Afghanistan | 1 | $ - 0 | $ - 0 | $ - 0 |
| 200X | Relocation of Satellite Rx Sites more than 2 Kilometers | Qatar | 1 | $ - 0 | $ - 0 | $ - 0 |
| 200X | New Downlink Terminal (w/installation) | European AOR | 1 | $ - 0 | $ - 0 | $ - 0 |
| 200X | New Downlink Terminal (w/installation) | Azores | 1 | $ - 0 | $ - 0 | $ - 0 |
| 200X | New Downlink Terminal (w/installation) | United Kingdom | 1 | $ - 0 | $ - 0 | $ - 0 |
| 200X | New Downlink Terminal (w/installation) | Afghanistan | 1 | $ - 0 | $ - 0 | $ - 0 |
| 200X | New Downlink Terminal (w/installation) | Qatar | 1 | $ - 0 | $ - 0 | $ - 0 |
| Option Period 03: 24 Sep 2018 - 23 Sep 2019 | ||||||
| 300X | Relocation of Satellite Rx Sites within 2 Kilometers | European AOR | 1 | $ - 0 | $ - 0 | $ - 0 |
| 300X | Relocation of Satellite Rx Sites within 2 Kilometers | Azores | 1 | $ - 0 | $ - 0 | $ - 0 |
| 300X | Relocation of Satellite Rx Sites within 2 Kilometers | United Kingdom | 1 | $ - 0 | $ - 0 | $ - 0 |
| 300X | Relocation of Satellite Rx Sites within 2 Kilometers | Afghanistan | 1 | $ - 0 | $ - 0 | $ - 0 |
| 300X | Relocation of Satellite Rx Sites within 2 Kilometers | Qatar | 1 | $ - 0 | $ - 0 | $ - 0 |
| 300X | Relocation of Satellite Rx Sites more than 2 Kilometers | European AOR | 1 | $ - 0 | $ - 0 | $ - 0 |
| 300X | Relocation of Satellite Rx Sites more than 2 Kilometers | Azores | 1 | $ - 0 | $ - 0 | $ - 0 |
| 300X | Relocation of Satellite Rx Sites more than 2 Kilometers | United Kingdom | 1 | $ - 0 | $ - 0 | $ - 0 |
| 300X | Relocation of Satellite Rx Sites more than 2 Kilometers | Afghanistan | 1 | $ - 0 | $ - 0 | $ - 0 |
| 300X | Relocation of Satellite Rx Sites more than 2 Kilometers | Qatar | 1 | $ - 0 | $ - 0 | $ - 0 |
| 300X | New Downlink Terminal (w/installation) | European AOR | 1 | $ - 0 | $ - 0 | $ - 0 |
| 300X | New Downlink Terminal (w/installation) | Azores | 1 | $ - 0 | $ - 0 | $ - 0 |
| 300X | New Downlink Terminal (w/installation) | United Kingdom | 1 | $ - 0 | $ - 0 | $ - 0 |
| 300X | New Downlink Terminal (w/installation) | Afghanistan | 1 | $ - 0 | $ - 0 | $ - 0 |
| 300X | New Downlink Terminal (w/installation) | Qatar | 1 | $ - 0 | $ - 0 | $ - 0 |
| Option Period 04: 24 Sep 2019 - 23 Sep 2020 | ||||||
| 400X | Relocation of Satellite Rx Sites within 2 Kilometers | European AOR | 1 | $ - 0 | $ - 0 | $ - 0 |
| 400X | Relocation of Satellite Rx Sites within 2 Kilometers | Azores | 1 | $ - 0 | $ - 0 | $ - 0 |
| 400X | Relocation of Satellite Rx Sites within 2 Kilometers | United Kingdom | 1 | $ - 0 | $ - 0 | $ - 0 |
| 400X | Relocation of Satellite Rx Sites within 2 Kilometers | Afghanistan | 1 | $ - 0 | $ - 0 | $ - 0 |
| 400X | Relocation of Satellite Rx Sites within 2 Kilometers | Qatar | 1 | $ - 0 | $ - 0 | $ - 0 |
| 400X | Relocation of Satellite Rx Sites more than 2 Kilometers | European AOR | 1 | $ - 0 | $ - 0 | $ - 0 |
| 400X | Relocation of Satellite Rx Sites more than 2 Kilometers | Azores | 1 | $ - 0 | $ - 0 | $ - 0 |
| 400X | Relocation of Satellite Rx Sites more than 2 Kilometers | United Kingdom | 1 | $ - 0 | $ - 0 | $ - 0 |
| 400X | Relocation of Satellite Rx Sites more than 2 Kilometers | Afghanistan | 1 | $ - 0 | $ - 0 | $ - 0 |
| 400X | Relocation of Satellite Rx Sites more than 2 Kilometers | Qatar | 1 | $ - 0 | $ - 0 | $ - 0 |
| 400X | New Downlink Terminal (w/installation) | European AOR | 1 | $ - 0 | $ - 0 | $ - 0 |
| 400X | New Downlink Terminal (w/installation) | Azores | 1 | $ - 0 | $ - 0 | $ - 0 |
| 400X | New Downlink Terminal (w/installation) | United Kingdom | 1 | $ - 0 | $ - 0 | $ - 0 |
| 400X | New Downlink Terminal (w/installation) | Afghanistan | 1 | $ - 0 | $ - 0 | $ - 0 |
| 400X | New Downlink Terminal (w/installation) | Qatar | 1 | $ - 0 | $ - 0 | $ - 0 |
| Option Period 05: 24 Sep 2020 - 23 Sep 2021 | ||||||
| 500X | Relocation of Satellite Rx Sites within 2 Kilometers | European AOR | 1 | $ - 0 | $ - 0 | $ - 0 |
| 500X | Relocation of Satellite Rx Sites within 2 Kilometers | Azores | 1 | $ - 0 | $ - 0 | $ - 0 |
| 500X | Relocation of Satellite Rx Sites within 2 Kilometers | United Kingdom | 1 | $ - 0 | $ - 0 | $ - 0 |
| 500X | Relocation of Satellite Rx Sites within 2 Kilometers | Afghanistan | 1 | $ - 0 | $ - 0 | $ - 0 |
| 500X | Relocation of Satellite Rx Sites within 2 Kilometers | Qatar | 1 | $ - 0 | $ - 0 | $ - 0 |
| 500X | Relocation of Satellite Rx Sites more than 2 Kilometers | European AOR | 1 | $ - 0 | $ - 0 | $ - 0 |
| 500X | Relocation of Satellite Rx Sites more than 2 Kilometers | Azores | 1 | $ - 0 | $ - 0 | $ - 0 |
| 500X | Relocation of Satellite Rx Sites more than 2 Kilometers | United Kingdom | 1 | $ - 0 | $ - 0 | $ - 0 |
| 500X | Relocation of Satellite Rx Sites more than 2 Kilometers | Afghanistan | 1 | $ - 0 | $ - 0 | $ - 0 |
| 500X | Relocation of Satellite Rx Sites more than 2 Kilometers | Qatar | 1 | $ - 0 | $ - 0 | $ - 0 |
| 500X | New Downlink Terminal (w/installation) | European AOR | 1 | $ - 0 | $ - 0 | $ - 0 |
| 500X | New Downlink Terminal (w/installation) | Azores | 1 | $ - 0 | $ - 0 | $ - 0 |
| 500X | New Downlink Terminal (w/installation) | United Kingdom | 1 | $ - 0 | $ - 0 | $ - 0 |
| 500X | New Downlink Terminal (w/installation) | Afghanistan | 1 | $ - 0 | $ - 0 | $ - 0 |
| 500X | New Downlink Terminal (w/installation) | Qatar | 1 | $ - 0 | $ - 0 | $ - 0 |
| Base Period |
| Option Period 01: |
| Option Period 02: |
| Option Period 03: |
| Option Period 04: |
| Option Period 05: |
| Total Base and Option Periods Price: |
| OPTIONAL CLINS |
| Base Period Optional CLINs: |
| Option Period 01 Optional CLINs: |
| Option Period 02 Optional CLINs: |
| Option Period 03 Optional CLINs: |
| Option Period 04 Optional CLINs: |
| Option Period 05 Optional CLINs: |
| Total Optional CLINS Base and Options Price: |
FAR 52.217-8 Price (2):
Total Evaluated Price (3):
The currency amounts in the cost/price proposal spreadsheet shall be rounded to the nearest whole number.
| (1) Optional CLINS – CLINS MAY OR MAY NOT BE EXERCISED. Based on the agency’s needs, these Optional CLINS may be exercised more than or less than the stated number of times in the base and/or each option period. |
| Optional CLINs will be numbered at the time they are exercised. |
| (2) IAW FAR 52.217-8 The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result |
| of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not |
| exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days. Since it is the intention of the Government to exercise all Option Periods, |
| the rates that are proposed for Option Period 05 will be used to determine the estimated costs of exercising this option. However, this clause may be executed following the base or any option period |
| at the rates proposed for that period. Offeror must enter proposed amount in line item C171. For evaluation purposes, the Government assumes that this clause will be exercised following Option Period 05; therefore, six months of the |
| Option Period 05 rates will be included in the price evaluation. |
| (3) The total evaluated price includes the 'Total Base and Option Periods Price' + 'Total Optional CLINs Base and Options Price' + 6-months of Option Period 05 pricing IAW FAR 52.217-8. |
File details come from the government source that posted it. Updated .