This document outlines the requirements for a commercial telecommunications circuit. Key details include:

The solicitation requests quotes to provide, install, and maintain a 10Gbps non-switched Ethernet circuit using IQ Optical Transport between Building 2664, Room 101 at Naval Air Weapons Station China Lake in Ridgecrest, California and Building 2145, Room 105 at Beale Air Force Base in California. This requirement is for a diversity pairing with solicitation number HC101322QA349. Quotes are due by June 13, 2022 at 4:00pm Central Time and should be submitted to DITCO at Scott Air Force Base. The selected vendor must comply with commercial item terms and conditions in existing basic agreements and submit representations and certifications if no agreement exists. The solicitation also specifies service requirements, testing criteria, points of contact, and that the circuit must be accepted by the Defense Information Systems Agency Global Operations Center.

View the file

Other files

File Type Posted
HC101322QA348-0001.v0.pdf PDF
Sample Vendor Block Diagram and Maps.pdf PDF
HC101322QA348.v1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIRCUIT SPECIFICATIONS:

1. TELECOMM PROVIDER MUST PROVIDE TOTAL FIBER MILES AND ROUND TRIP DELAY (RTD) FROM THE CUSTOMER "A" LOCATION TO THE CUSTOMER "Z" LOCATION.

2. THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END TO END TO THE GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S) FROM TSR RU07APR227812; MEANING THAT THE PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING MANHOLES, CONDUIT, (CENTRAL OFFICE LOCATIONS), AND FIBER BUILDS. ADDITIONALLY, AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION FROM TSR RU07APR227812

3. VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON EXTENSION FROM COMMERCIAL POP TO GOVERNMENT SERVICE DELIVERY POINT (SDP) AT THE "A" AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO THE GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE ADJUSTED TO -3 TO -9 DBM.

4. VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION AT THE "A" AND "Z" LOCATIONS.

5. VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE COORDINATION AND ACTIVATION PROCESS.

6. PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "A" LOCATION TO THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION BETWEEN THE COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP. VENDOR MUST ENSURE TEST SETS ARE PLACED AT THE DROP SIDE AT THE "A" LOCATION AND AT THE "Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE GOVERNMENT FOR ACCEPTANCE TESTING.

CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:

(1) FIBER TERMINATION FRAME FORMAT OF ETHERNET, 802.3AE, 1310NM

(2) THROUGHPUT SHALL BE REPORTED AS LAYER 2 (L2) CIR. CIR: 10G LEASED CIRCUITS, THE VENDOR/TP IS REQUIRED TO DELIVER THE LAYER 2 CIR THROUGHPUT OF 9884.9 MBPS USING THE SPECIFIED EMIX FRAME PATTERN ABCDEFGH OF CORROSPONDING FRAME SIZES OF 64, 128, 256, 512, 1024, 1280, 1518 AND 9000 BYTES

(3) RTD: ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE MEASURED IN MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-A TO THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION. NOTE: FOR LOCATIONS THAT HAVE A TOTAL FIBER ROUTE DISTANCE OVER 600 MILES (ONE WAY), WHERE THE 10 MILLISECONDS RTD SPECIFICATION CANNOT REASONABLE BE MET, THE RTD SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS PER 350 MILES MEASURED IN A STRAIGHT LINE BETWEEN THE A AND Z LOCATIONS.THE GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-UP AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL, DISA IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING.

(4) ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE:

(A) AVAILABILITY SHALL BE GREATER THAN 99.5% OR BETTER.

(B) FRAME LOSS SHALL BE EQUAL TO ZERO WHEN TESTING AT 10 GIGABIT HIGHEST FRAME RATE AND SHALL MEET ITU-T-Y.1564 STANDARDS.

(C) JITTER SHALL BE LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10 MSEC.

(5) MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24 HOURS.

(6). THE VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION AT BOTH LOCATIONS.

(7) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER

(8) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES

(9) TELECOM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE AND ADMINISTRATION MONITORING OF ETHERNET CIRCUIT

(10) VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS (11). VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO BEGINNING THEIR END-TO-END TESTING.

(12). THE VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION ROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE COORDINATION AND ACTIVATION PROCESS. PHONE: (C) 618-418-8627, (D) 418-8627.

TEST & ACCEPTANCE INSTRUCTIONS:

-THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY THE DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP.

1.TESTING CRITERIA:

-THE PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "A" LOCATION TO THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION BETWEEN THE COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP. VENDOR MUST ENSURE TEST SETS ARE PLACED AT THE DROP SIDE AT THE "A" LOCATION AND AT THE "Z" LOCATION.

-TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE GOVERNMENT FOR ACCEPTANCE TESTING. THE VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564.

2. THIS CIRCUIT SHALL PASS A FULLY DOCUMENTED, SATISFACTORY, 72 HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-418-8627 (D) 418-8627.

3. 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECEIPT OF TROUBLE

4. THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON THE EXTENSION FROM COMMERCIAL POP TO THE GOVERNMENT SERVICE DELIVERY POINT (SDP) AT THE "A" AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO THE GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE ADJUSTED TO -3 TO -9 DBM.

5. THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY THE DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. (C) 618-418-8627, (D) 418-8627, disa.scott.global.mbx.casa-infrastructure-integration-lease-bb-t@mail.mil