IQO INQUIRY

FM: PL8211

TO: Contractors

DATE (MM/DD/YYYY): 5/11/2023

SUBJECT: HC101322QA095-0003 Amend: 0003

A. TYPE ACTION: AMEND

1. PURPOSE: AMENDMENT IS ISSUED TO:

1. Remove TSP code 2. Specify Interface as OPTICAL: 1000BASE; PHYSICAL: LX 3. UPDATE

QUOTE DUE DATE TO 18 MAY 2023 4. EXTEND SERVICE DATE TO 15 SEP 2023

SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A DEDICATED WHEELHOUSE

FIRSTNET CONNECTION SERVICE AT 2 MB OVER THE IQO CONTRACT FROM AT&T

FACILITY; UNMANNED SITE; HAYMARKET, VA, 20169/CCI TO AT&T FACILITY; UNMANNED

SITE; HAYMARKET, VA, 20169/CCI. THIS REQUIREMENTS IS TO REPLACE EXISTING ATT

TECHNOLOGY FOR CURRENT WHEELHOUSE CIRCUITS AND MAINTAIN THE SAME LEVEL OF

PERFORMANCE.

2. CIRCUIT MUST BE ABLE TO PROVIDE VIRTUAL PRIVATE NETWORK (VPN) CONNECTION.

A NETWORK-BASED MPLS VPN TO LINK LOCATIONS AND EFFICIENTLY TRANSMIT

APPLICATIONS SUCH AS VOICE, DATA, AND VIDEO OVER A SINGLE CONNECTION USING

VARIOUS ACCESS TECHNOLOGIES.

3. ANY TESTING & ACCEPTANCE REQUIREMENTS MUST BE COORDINATED WITH

GOVERNMENT POC.

4. CONTRACTORS ARE RESPONSIBLE FOR READING AND ADDRESSING ALL TECHNICAL

REQUIREMENTS OF THIS SOLICITATION, READING AND AGREEING WITH THE STANDARD

PROVISIONS, PROVIDE PRICE QUOTATION IN ACCORDANCE WITH STANDARD PROVISION 4,

AND MEET THE REQUESTED SERVICE DATE.

5. THE SERVICE DATE TO BE MET IS: 11 MAY 2023(SIP).

6. CONTRACTORS MUST CONSIDER ALL ISSUES THAT MAY DELAY THE DELIVERY OF

CIRCUIT ON APPROVED SERVICE DATE. THE GOVERNMENT MAY CANCEL, TERMINATE,

OR REQUEST CONSIDERATION IAW STANDARD PROVISION 42 FOR FAILURE TO MEET

CONTRACTUAL SERVICE.

7. QUOTES MUST INCLUDE NAME AND INFORMATION ABOUT SUB-CONTRACTOR/LONG

HAUL PROVIDER/OTHER CARRIER INSTALLING CIRCUIT IS ON NET/OFF NET.

8. ESTABLISH TSP: TSP0LCJQY-02

9. MAXIMUM TRANSMISSION DELAY FOR ANY CIRCUIT UP TO 500 MILES AIR-MILES IN

LENGTH SHALL BE NO GREATER THAN 13MS ONE-WAY AND ANY POINT-TO-POINT CIRCUIT

LONGER THAN 500 AIR-MILES SHALL BE NO GREATER THAN 50MS ONE WAY WITHIN THE 48

CONTINENTAL STATES. ANY APS SWITCHOVER SHALL TAKE LESS THAN 50 MILLISECONDS

MONTHLY AVAILABILITY SHALL BE NO LESS THAN 99.5%.

M. ADDITIONAL INFORMATION:

HC101322QA095-0003

3. TSR NUMBER: JS30NOV215389

4. CCSD: CUED7RTU

Z. DITCO CONTACT:

Aaron Fuehne aaron.j.fuehne.civ@mail.mil

Dale L. Rupright

DITCO Contracting Officer

Unless otherwise specified, all other terms and conditions are unchanged.

Paragraph C.TSP AUTHORIZATION CODE/RESTORATION CODE change from:

TSP0LCJQY-02

To:

Paragraph E.SERVICE DATE change from:

Sep 8, 2023

Sep 15, 2023

Paragraph M.3.TSR NUMBER change from:

JS30NOV215389C

JS30NOV215389

Paragraph V.QUOTE DUE DATE AND TIME change from:

May 11, 2023 4:00:00 PM CDT

May 18, 2023 4:00:00 PM CDT

Location A, INTERFACE change from:

FAST ETHERNET; ELECTRICAL: 100BASE-T; PHYSICAL: RJ-45

OPTICAL: 1000BASE; PHYSICAL: LX

Location B, INTERFACE change from:

INTERFACE: FAST ETHERNET; ELECTRICAL: 100BASE-T; PHYSICAL:

RJ-45

OPTICAL: 1000BASE; PHYSICAL: LX