IQO INQUIRY

FM: PL8211

TO: Contractors

DATE (MM/DD/YYYY): 3/15/2023

SUBJECT: HC101322QA095-0001 Amend: 0001

A. TYPE ACTION: AMEND

1. PURPOSE: AMENDMENT IS ISSUED TO:

1. UPDATE THE TSP TO TSP0LCJQY-02: 2. REMOVE THE REFERENCE "LATENCY WILL BE

MEASURED WILL BE ACCORDING TO THE FOLLOWING MAXIMUM TRANSMISSION DELAY

FOR ANY CIRCUIT UP TO 500 MILES AIR-MILES IN LENGTH SHALL BE NO GREATER THAN

13MS ONE-WAY AND ANY POINT-TO-POINT CIRCUIT LONGER THAN 500 AIR-MILES SHALL

BE NO GREATER THAN 50MS ONE WAY WITHIN THE 48 CONTINENTAL STATES. ANY APS

SWITCHOVER SHALL TAKE LESS THAN 50 MILLISECONDS MONTHLY AVAILABILITY SHALL

BE NO LESS THAN 99.5%". 3. INFORM THAT THIS REQUIREMENT IS ISSUED TO REPLACE

CSA AT000010EBM. 4. QUOTES DUE DATE IS CHANGED TO 31 MAR 23. 5. SERVICE DATE

CHANGES TO 14 AUG 23 SIP.

SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A DEDICATED WHEELHOUSE

FASTNET CONNECTION SERVICE AT 10 MB OVER THE IQO CONTRACT FROM AT&T

FACILITY; UNMANNED SITE; HAYMARKET, VA, 20169/CCI TO AT&T FACILITY; UNMANNED

SITE; HAYMARKET, VA, 20169/CCI. THIS REQUIREMENTS IS TO REPLACE EXISTING ATT

TECHNOLOGY FOR CURRENT WHEELHOUSE CIRCUITS AND MAINTAIN THE SAME LEVEL OF

PERFORMANCE.

2. CIRCUIT MUST BE ABLE TO PROVIDE VIRTUAL PRIVATE NETWORK (VPN) CONNECTION.

A NETWORK-BASED MPLS VPN TO LINK LOCATIONS AND EFFICIENTLY TRANSMIT

APPLICATIONS SUCH AS VOICE, DATA, AND VIDEO OVER A SINGLE CONNECTION USING

VARIOUS ACCESS TECHNOLOGIES.

3. ANY TESTING & ACCEPTANCE REQUIREMENTS MUST BE COORDINATED WITH

GOVERNMENT POC.

4. CONTRACTORS ARE RESPONSIBLE FOR READING AND ADDRESSING ALL TECHNICAL

REQUIREMENTS OF THIS SOLICITATION, READING AND AGREEING WITH THE STANDARD

PROVISIONS, PROVIDE PRICE QUOTATION IN ACCORDANCE WITH STANDARD PROVISION 4,

AND MEET THE REQUESTED SERVICE DATE.

5. THE SERVICE DATE TO BE MET IS: 11 MAY 2023(SIP).

6. CONTRACTORS MUST CONSIDER ALL ISSUES THAT MAY DELAY THE DELIVERY OF

CIRCUIT ON APPROVED SERVICE DATE. THE GOVERNMENT MAY CANCEL, TERMINATE,

OR REQUEST CONSIDERATION IAW STANDARD PROVISION 42 FOR FAILURE TO MEET

CONTRACTUAL SERVICE.

7. QUOTES MUST INCLUDE NAME AND INFORMATION ABOUT SUB-CONTRACTOR/LONG

HAUL PROVIDER/OTHER CARRIER INSTALLING CIRCUIT IS ON NET/OFF NET.

8. ESTABLISH TSP: TSP0LCJQY-02

HC101322QA095-0001

9. MAXIMUM TRANSMISSION DELAY FOR ANY CIRCUIT UP TO 500 MILES AIR-MILES IN

LENGTH SHALL BE NO GREATER THAN 13MS ONE-WAY AND ANY POINT-TO-POINT CIRCUIT

LONGER THAN 500 AIR-MILES SHALL BE NO GREATER THAN 50MS ONE WAY WITHIN THE 48

CONTINENTAL STATES. ANY APS SWITCHOVER SHALL TAKE LESS THAN 50 MILLISECONDS

MONTHLY AVAILABILITY SHALL BE NO LESS THAN 99.5%.

M. ADDITIONAL INFORMATION:

3. TSR NUMBER: JS30NOV215389

4. CCSD: CUED7RTU

Z. DITCO CONTACT:

Aaron Fuehne aaron.j.fuehne.civ@mail.mil

Dale L. Rupright

DITCO Contracting Officer

Unless otherwise specified, all other terms and conditions are unchanged.

Paragraph E.SERVICE DATE change from:

May 11, 2023

To:

Aug 14, 2023

Paragraph M.3.TSR NUMBER change from:

JS30NOV215389B

JS30NOV215389

Paragraph V.QUOTE DUE DATE AND TIME change from:

Feb 10, 2023 4:00:00 PM CST

Mar 31, 2023 4:00:00 PM CDT