View the file

Other files

File Type Posted
Sample Vendor Block Diagram and Maps.pdf PDF
_HC101321QA507.v1 Contents.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON THE EXTENSION

FROM COMMERCIAL POP TO THE GOVERNMENT SERVICE DELIVERY POINT (SDP) AT THE "A" AND "Z"

LOCATION PRIOR TO CIRCUIT TURN OVER TO THE GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS.

LIGHT LEVELS MUST BE ADJUSTED TO -3 TO -9 DBM.

THE VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO BEGINNING THEIR

END-TO-END TESTING. PHONE: (C) 618-418-8627, (D) 418-8627.

THE PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE OF THEIR OR

LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "A" LOCATION TO

THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "Z"

LOCATION AND MUST INCLUDE THE EXTENSION BETWEEN THE COMMERCIAL DEMARC AND THE

GOVERNMENT'S SDP. VENDOR MUST ENSURE TEST SETS ARE PLACED AT THE DROP SIDE AT THE "A"

LOCATION AND AT THE "Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE

GOVERNMENT FOR ACCEPTANCE TESTING. THE VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW

THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK INTERCONNECT DEVICES

STANDARD, AND AT THE COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564.

CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:

(A) FIBER TERMINATION: FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-10GB ETHERNET-LAN-

PHY-SINGLE MODE FIBER), 1310NM. "SC" OR "LC" CONNECTORS AS DETERMINED BY SITE SURVEY.

NOTE: WHEN EXTENDED REACH OPTICS ARE USED THAT CHANGE THE TX/RX WAVELENGTH OF THE

OPTIC, THE VENDOR WILL NOTIFY THE GOVERNMENT 30 DAYS PRIOR TO DELIVERY.

(B) COMMITTED INFORMATION RATE (CIR): 10GB.

(C) ETHERNET FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION UNIT (MTU)

OF 9000 OCTETS (BYTES) JUMBO FRAMES.

(D) NO NETWORK INTERFACE UNIT, DEDICATED PATH.

(E) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO CIRCUIT.

(F) TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL ITU-T.Y.1564

BENCH MARKING METHODOLOGY FOR NETWORK INTERCONNECT DEVICES STANDARD, AND AT THE

COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564. NOTE: ETHERNET FRAME SIZE DESIGNATOR

'H' (MTU) IS EQUAL TO 9000 BYTES.

(G) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY, SEVEN DAYS

PER WEEK, MONTHLY PERFORMANCE OF 99.5% AVAILABILITY OR BETTER.

(H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECEIPT OF TROUBLE.

(I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.

(J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER.

(K) TELECOM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE AND ADMINISTRATION

MONITORING OF ETHERNET CIRCUIT.

(L) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY THE DISA GOC

IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. (C) 618-418-8627, (D) 418-

8627.

VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF THE SERVICE

IAW THE UNIQUE INSTALLATION FACTORS.

INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS.

VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO REQUIRING

ACCESS TO FACILITIES AT BOTH USER LOCATIONS.

VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO BEGINNING THEIR END-

TO-END TESTING.

MINIMUM TECHNICAL SPECIFICATIONS:

SPECIFIC FORMAT TO BE USED IS: LINE RATE: 10.3125 GIGABITS/S, +- 100 PPM LINE CODE: OPTICAL

1. TEST AND ACCEPTANCE: THIS CIRCUIT SHALL PASS A FULLY DOCUMENTED, SATISFACTORY, 72 HOUR

SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-418-8627 (D) 418-8627.

2. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING

PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN 99.5% OR

BETTER. FRAME LOSS SHALL BE EQUAL TO ZERO WHEN TESTING AT 10 GIGABIT HIGHEST FRAME RATE, AND SHALL MEET ITU-T-Y.1564 STANDARDS. JITTER SHALL BE LESS THAN 3 MSEC. DELAY SHALL BE

BETTER THAN 10 MSEC.

3. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24 HOURS.

4. ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE MEASURED IN MILLISECONDS

FROM THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-A TO THE CUSTOMER'S SERVICE DELIVERY

POINT (SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR EQUAL TO 10 (10MS (<450)/15MS (450-1000)/

20MS (1000-1500)/ 29MS (>1500)) MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S

MISSION. THE GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-UP

AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL, DISA IE161 WILL

NOTIFY DITCO IMMEDIATELY IN WRITING.

File details come from the government source that posted it. Updated .