HC101321QA131-0001.v0.pdf
PDF 13 KB Posted
- Solicitation number
- HC101321QA131
- Issued by
-
Defense Information Systems Agency
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HC101321QA131-0004.v1 (2).pdf | ||
| HC101321QA131-0003.v0.pdf | ||
| HC101321QA131.v1.pdf | ||
| HC101321QA131-0002.v0 (1).pdf | ||
| Sample Vendor Block Diagram and Maps.pdf | ||
| HC101321QA131.v1.pdf | ||
| CIRCUIT AND TESTING REQUIREMENTS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 2/4/2021
SUBJECT: HC101321QA131-0001 Amend: 0001
A. TYPE ACTION: ADMIN AMEND
1. PURPOSE: *****AMEND 0001 IS TO CORRECT THE PURPOSE STATEMENT TO REFLECT
THE CORRECT DERMARK AT THE KEY WEST FL LOCATION. THE CORRECT PURPOSE IS AS
FOLLOWS:
PROVIDE, INSTALL AND MAINTAIN A LEASED 10GB ETHERNET IP BACKBONE CIRCUIT
BETWEEN (BLDG) 1279; 20 TRUMAN AVENUE NAS/TRUMAN ANNEX; KEY WEST, FL, 33040
AND BLDG 919, ROOM N213, 919 LANGLEY ST, JACKSONVILLE, FL.
THIS INFORMATION WAS ALSO CORRECTED IN THE LOCATION FOR THE KEY WEST SITE.
ALL ELSE REMAINS THE SAME. *****
1. PROVIDE, INSTALL AND MAINTAIN A LEASED 10GB ETHERNET IP BACKBONE CIRCUIT
BETWEEN (BLDG) 1279; 20 TRUMAN AVENUE NAS/TRUMAN ANNEX; KEY WEST, FL, 33040
AND BLDG 919, ROOM N213, 919 LANGLEY ST, JACKSONVILLE, FL.
- CONTRACTOR SHALL PROVIDE ETHERNET FRAME SIZE CONFIGURED TO SUPPORT
MAXIMUM TRANSMISSION UNIT (MTU) OF 9000 (BYTES) JUMBO FRAMES
- CONTRACTORS SHALL MEET RTD OF 15 MILLISECONDS TO SUPPORT THE GOVERNMENT
MISSION. IF THE RTD CHANGES IT WOULD BE NOTIFIED VIA AMENDMENT TO SOLICITATION.
- SEE UNIQUE INSTALL FACTS
- CUSTOMER REQUESTS SOONER IF POSSIBLE SERVICE DATE (SIP)
- VENDOR QUOTE MUST INCLUDE THE A LOC AND Z LOC LEC’S ALONG WITH THE
VENDOR’S SUB-CONTRACTOR/LONG-HAUL PROVIDER/CARRIERS FOR THE SERVICE
-VENDOR QUOTES MUST INDICATE IF LEC’S ARE CURRENTLY ON-NET OR IF A BUILD IS
REQUIRED TO COMPLETE THE SERVICE.
- IF A BUILD IS REQUIRED TO COMPLETE THE SERVICE, VENDOR MUST INDICATE THE
SCOPE OF THE BUILD (LENGTH, BURIED/AERIAL, TRENCHING/DIRECTIONAL BORING, NEW
CONDUIT, ETC), AND VENDOR MUST INDICATE IF THE SITE HAS GRANTED PERMISSION
FOR VENDOR TO BUILD INTO THE SITE (MUST ALSO PROVIDE THE SITE POC’S NAME THAT
GRANTED PERMISSION) AND HAS SUFFICIENT SPACE, POWER AND HVAC CAPACITY TO
SUPPORT THE VENDOR EQUIPMENT AND CABLING.
HC101321QA131-0001
2. CONTRACTORS ARE RESPONSIBLE FOR READING AND ADDRESSING ALL TECHNICAL
REQUIREMENTS OF THIS INQUIRY/SOLICITATION, READING AND AGREEING WITH THE
STANDARD PROVISIONS, PROVIDE PRICE QUOTATION IN ACCORDANCE WITH STANDARD
PROVISION 4, AND MEET THE REQUESTED SERVICE DATE.
3. THE SERVICE DATE TO BE MET IS: 04 JUN 21 (SIP) TO COMPLY WITH PROCUREMENT
ACQUISITION LEAD TIME (PALT) FOR THIS TYPE OF SERVICE. ANY CHANGES TO THE
ORIGINAL SERVICE DATE WILL BE NOTIFIED VIA AMENDMENT TO THE SOLICITATION AND
POSTED TO FBO. THE GOVERNMENT ASSUMES THAT CONTRACTORS HAVE CONSIDERED
ALL ISSUES THAT MAY DELAY THE DELIVERY OF CIRCUIT ON REQUESTED SERVICE
DATE. THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST CONSIDERATION IAW
STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL SERVICE.
4. CONTRACTORS MUST ENSURE THAT QUOTES SHALL INCLUDE SUFFICIENT DETAIL
FOR EFFECTIVE EVALUATION AND SHOULD NOT SIMPLY REPHRASE OR RESTATE THE
GOVERNMENT REQUIREMENTS. RATHER, CONTRACTORS MUST PROVIDE CONVINCING
RATIONALE TO ADDRESS HOW THEY INTEND TO MEET THE REQUIREMENT. IN RESPONSE
TO THIS SOLICITATION, NO TERMS OR CONDITIONS PLACED UPON THE GOVERNMENT,
NOR ASSUMPTIONS WILL BE ACCEPTED. CONTRACTORS ARE INSTRUCTED TO SUBMIT
QUESTIONS AND REQUEST CLARIFICATIONS OF THE REQUIREMENT (S) BEFORE
SUBMITTING QUOTES. QUOTES MUST BE UPLOADED TO IDEAS.
5. TO DETERMINE THE AWARDEE(S) OF AVOIDANCE REQUIREMENTS, THE GOVERNMENT
WILL FIRST EVALUATE THE LOWEST PRICED SOLUTION FOR EACH SOLICITATION.
IF THOSE TWO SOLUTIONS ARE AVOIDANCE FROM EACH OTHER AND MEET ALL
REQUIREMENTS, AWARD WILL BE MADE TO THE CONTRACTOR OR CONTRACTORS THAT
PROPOSED THE TWO SOLUTIONS. IF THE TWO LOWEST PRICED SOLUTIONS ARE NOT
AWARDABLE BECAUSE THEY ARE NOT AVOIDANCE FROM EACH OTHER OR DO NOT
MEET REQUIREMENTS, THE GOVERNMENT WILL EVALUATE THE NEXT LOWEST PRICED
COMBINATION FOR BOTH SOLICITATIONS UNTIL IT DETERMINES THE LOWEST PRICED
COMBINATION THAT MEETS ALL REQUIREMENTS. AWARDS WILL BE MADE AS A PAIR TO
ONE CONTRACTOR ONLY OR SPLIT THE AWARD BETWEEN TWO CONTRACTORS THAT
MEET ALL TECHNICAL REQUIREMENTS, REQUESTED SERVICE DATE AND PROPOSE THE
LOWEST PRICE.
6. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE
ROUTES FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES
AND/OR WIRING CENTERS, ENSURING THE PHYSICAL END TO END REQUIREMENTS
ARE BEING MET. DRAWINGS MUST INCLUDE DISTANCES, TOTAL FIBER MILES AND
ROUND TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD
PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS
INCLUDED WITH INQUIRY/SOLICITATION SHALL BE FOLLOWED IN ORDER TO PROVIDE THE
REQUIRED TECHNICAL INFORMATION. MAPS AND DRAWINGS WITH ERRORS, MISMATCH
INFORMATION, MISSING RTD, AND NOT ENOUGH DETAIL TO DETERMINE THE FIBER PATH
WILL BE FOUND TECHNICALLY DEFICIENT AND WILL NOT BE ACCEPTED.
7. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) AND
SHOULD BE CONDUCTED IN COORDINATION WITH LOCAL POCS AT EACH GOVERNMENT
SITE. IT IS HIGHLY RECOMMENDED THAT AT A MINIMUM, CONTRACTORS CONDUCT PHONE
SURVEYS TO ADEQUATELY ASSESS THE MAGNITUDE OF THE WORK TO BE PERFORMED IN
DETERMINING THEIR PRICE STRATEGY.
8. CONTRACTORS MUST ADDRESS IN QUOTES COMPLIANCE WITH TESTING AND
ACCEPTANCE REQUIREMENTS.
9. TESTING & ACCEPTANCE REQUIREMENTS MUST BE COORDINATED WITH CUSTOMER
ACCEPTANCE AUTHORITY BEFORE NOTICE OF COMPLETION IS SUBMITTED TO DITCO.
FOR DISA REQUIREMENTS THE TESTING AND ACCEPTING AUTHORITY IS: DISA DSCC IE
Mailbox DCP Commercial Activation
10. ESTABLISH TSP: TSP0KW6KA-01
11. FAILURE TO READ AND ADDRESS ANY OF THE TECHNICAL REQUIREMENTS AND
SERVICE DATE REQUESTED IN THIS INQUIRY SHALL RENDER THE QUOTE NON-COMPLIANT
AND RESULT IN IT BEING EXCLUDED FROM EVALUATION AND AWARD.
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: RU22JAN216951
4. CCSD: DIR3B7E1
Z. DITCO CONTACT:
Alana Mann
Not Applicable alana.j.mann.civ@mail.mil
Robert E Spencer
DITCO Contracting Officer
Location B, LOCATION OF TERMINATION B change from:
ADDRESS: (BLDG) 291; 80 TRUMAN AVENUE NAS TRUMANANNEX, KEY WEST, FL 33040-9051
ROOM: (RM) 210;
LOCATION: TRMNANNX
To:
ADDRESS: (BLDG) 1279; 20 TRUMAN AVENUE, NAS/TRUMAN ANNEX; KEY WEST, FL, 33040
ROOM: (RM) 210;
LOCATION: TRMNANNX
Location B, DEMARK change from:
(BLDG) 291; (RM) 210; 80 TRUMAN AVENUE NAS TRUMAN ANNEX,
KEY WEST, FL 33040-9051
PRI: JOSH AGRESTO, D483-1775, C305-293-1775
EMAIL: JOSHUA.B.AGRESTO.CIV@MAIL.MIL
(BLDG) 1279; (RM) 126; 1 FL; 20 TRUMAN AVENUE NAS/TRUMAN ANNEX; KEY WEST, FL, 33040
PRI: JOSH AGRESTO, D483-1775, C305-293-1775
EMAIL: JOSHUA.B.AGRESTO.CIV@MAIL.MIL
Location B, UNIQUE INSTALLATION FACTORS change from:
(1)JUNIPER MX240 (GFE)(DISA IE1 PROVIDED)NODE ID: UJEWTRN040
(2) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE, SINGLE-MODE, 1310NM, DISA IE4
(3) FIBER TERMINATING PATCH PANEL (GFE)(DISA IE1 PROVIDED) RACK/SHELF/PORT - TBD
(4) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE, SINGLE-MODE, 1310NM, TELCO.
(5) FIBER TERMINATING PATCH PANEL (GFE) (SITE PROVIDED)
(6) FIBER CABLE, ON-BASE, SINGLE-MODE, TRUMAN ANNEX PERSONNEL.
AMPLIFYING INFO:
A. DISA IE4 IS RESPONSIBLE FOR INSTALLATION AND GSM-O FOR MAINTENANCE OF JUNIPER MX240 ROUTER AND
OPTICAL INTERFACE CARD BLDG 289, ROOM 226.
B. DISA IE4 IS RESPONSIBLE FOR INSTALLATION AND GSM-O FOR MAINTENANCE OF SINGLE MODE FIBER FROM
THE OPTICAL INTERFACE CARD INSTALLED IN THE JUNIPER MX240 ROUTER TO THE DROP SIDE OF THE DISA IE1
PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN THE JUNIPER MX240 ROUTER SUITE. "SC" TO "SC"
CONNECTORS.
C. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SINGLE MODE FIBER FROM THE LINE SIDE
OF THE DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN THE JUNIPER MX240 ROUTER SUITE
(UJEWTRN040) BLDG 289, ROOM 226 TO THE DROP SIDE OF THE SITE PROVIDED FIBER TERMINATING PATCH
PANEL BLDG 289, ROOM 226. TERMINATE WITH "SC" CONNECTORS TO THE DISA PATCH PANEL. COORDINATE
TYPE CONNECTORS TO SITE FIBER PATCH PANEL.
D. VENDOR MUST SCHEDULE/COORDINATE WITH THE POC'S LISTED ON THIS ORDER 72 HOURS IN ADVANCE PRIOR
TO SITE SURVEYS OR INSTALLATIONS.
E. CIRCUIT MUST BE TAGGED WITH VENDOR'S LONG HAUL CIRCUIT ID AND LOCAL EXCHANGE CARRIER CIRCUIT
NO. AS APPLICABLE AT LINE SIDE OF DISA IE1 PROVIDED FIBER PATCH PANEL INSTALLED IN DISA JUNIPER
ROUTER SUITE BLDG 289, ROOM 226.
F. TRUMAN ANNEX PERSONNEL ARE RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SINGLE MODE
FIBER FROM THE LINE SIDE OF SITE PROVIDED FIBER TERMINATING PATCH PANEL BLDG 289, ROOM 226 TO THE
LINE SIDE OF THE SITE PROVIDED FIBER TERMINATING PATCH PANEL BLDG 1279, ROOM 126, USING EXISTING ON-
BASE SINGLE-MODE FIBER.
(1)JUNIPER MX240 (GFE)(DISA IE1 PROVIDED)NODE ID: UJEWTRN040
(2) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE, SINGLE-MODE, 1310NM, DISA IE4
(3) FIBER TERMINATING PATCH PANEL (GFE)(DISA IE1 PROVIDED) RACK/SHELF/PORT - TBD
(4) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE, SINGLE-MODE, 1310NM, TELCO.
(5) FIBER TERMINATING PATCH PANEL (GFE) (SITE PROVIDED)
(6) FIBER CABLE, ON-BASE, SINGLE-MODE, TRUMAN ANNEX PERSONNEL.
AMPLIFYING INFO:
THE SDP IS LOCATED AT BLDG 289, ROOM 226
A. DISA IE4 IS RESPONSIBLE FOR INSTALLATION AND GSM-O FOR MAINTENANCE OF JUNIPER MX240 ROUTER AND
OPTICAL INTERFACE CARD BLDG 289, ROOM 226.
B. DISA IE4 IS RESPONSIBLE FOR INSTALLATION AND GSM-O FOR MAINTENANCE OF SINGLE MODE FIBER FROM
THE OPTICAL INTERFACE CARD INSTALLED IN THE JUNIPER MX240 ROUTER TO THE DROP SIDE OF THE DISA IE1
PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN THE JUNIPER MX240 ROUTER SUITE. "SC" TO "SC"
CONNECTORS.
C. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SINGLE MODE FIBER FROM THE LINE SIDE
OF THE DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN THE JUNIPER MX240 ROUTER SUITE
(UJEWTRN040) BLDG 289, ROOM 226 TO THE DROP SIDE OF THE SITE PROVIDED FIBER TERMINATING PATCH
PANEL BLDG 289, ROOM 226. TERMINATE WITH "SC" CONNECTORS TO THE DISA PATCH PANEL. COORDINATE
TYPE CONNECTORS TO SITE FIBER PATCH PANEL.
D. VENDOR MUST SCHEDULE/COORDINATE WITH THE POC'S LISTED ON THIS ORDER 72 HOURS IN ADVANCE PRIOR
TO SITE SURVEYS OR INSTALLATIONS.
E. CIRCUIT MUST BE TAGGED WITH VENDOR'S LONG HAUL CIRCUIT ID AND LOCAL EXCHANGE CARRIER CIRCUIT
NO. AS APPLICABLE AT LINE SIDE OF DISA IE1 PROVIDED FIBER PATCH PANEL INSTALLED IN DISA JUNIPER
ROUTER SUITE BLDG 289, ROOM 226.
F. TRUMAN ANNEX PERSONNEL ARE RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SINGLE MODE
FIBER FROM THE LINE SIDE OF SITE PROVIDED FIBER TERMINATING PATCH PANEL BLDG 289, ROOM 226 TO THE
LINE SIDE OF THE SITE PROVIDED FIBER TERMINATING PATCH PANEL BLDG 1279, ROOM 126, USING EXISTING ON-
BASE SINGLE-MODE FIBER.
File details come from the government source that posted it. Updated .