HC101318QB129-0003.v0.pdf
PDF 13 KB Posted
- Solicitation number
- HC101318QB129
- Issued by
-
Defense Information Systems Agency
About this file
Amend 3
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HC101318QB129-0002.v0.pdf | ||
| HC101318QB129-0001.v0.pdf | ||
| Vendor_Sample_Maps_Version2.pdf | ||
| Vendor_Block_Sample_Version3.pptx | PPTX presentation | |
| Vendor_Sample_Maps_Version2.pdf | ||
| Vendor_Block_Sample_Version2.pdf | ||
| HC101318QB129.v0.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 9/11/2018
SUBJECT: HC101318QB129-0003 Amend: 0003
A. TYPE ACTION: ADMIN AMEND
1. PURPOSE: MOD P0003 IS ISSUED TO REQUEST THAT VENDORS REVISE MAPS TO
CLEARLY SHOW THE FOLLOWING:
- ACTUAL FIBER ROUTE IN MILES
- DIVERSITY/50 METER SEPARATION/ SHOW IN DIAGRAMS LOCATION OF DWDM SYSTEMS
TO VERIFY THAT DIVERSITY IS PROVIDED.
- CLEARLY SHOW THE SERVICE WIRING CENTERS (SWC) BEING USED FOR ACCESS AND
MORE DETAIL OF THE FIBER ROUTES TO SWC.
- SERVICE DATE WAS REVISED IN ACCORDANCE WITH PROCUREMENT ACQUISITION LEAD
TIMES FOR THIS TYPE OF SERVICE AND MUST BE MET.
- NO LEAD TIMES BEYOND THE SERVICE DATE WILL BE ACCEPTED.
- MAPS/DIAGRAMS WITH INCOMPLETE/INCORRECT INFORMATION WILL BE DEEMED
TECHNICALLY UNACCEPTABLE.
THE PURPOSE OF AMEND 0002 IS TO:
1. EXTEND QUOTES DUE DATE TO 23 AUG 18
2. SERVICE DATE IS REVISED TO COMPLY WITH PROCUREMENT ACQUISITION LEAD
TIMES TO 04 JAN 19 SIP. LEAD TIMES THAT GO BEYOND THE SERVICE DATE WILL NOT BE
ACCEPTED.
3. MAPS/DRAWINGS ARE REQUIRED TO CLEARLY SHOW FIBER ROUTE MILES, RTD
(CONTRACTORS SHALL MEET RTD OF 10 MILLISECONDS), AND 50 METER SEPARATION.
ALL INFORMATION IN MAPS/DRAWINGS MUST BE ACCURATE. MAPS/DRAWINGS
WITH INCORRECT INFORMATION WILL BE FOUND TECHNICALLY UNACCEPTABLE AND
SUBMISSION EXCLUDED FROM AWARD.
4. THIS REQUIREMENT MUST BE DIVERSE WITH SOLICITATION HC101318QA949/TSR
SG28MAR185778 AND MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE
END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS (SDP) FROM
TSR SG28MAR185778; MEANING THE PHYSICAL PATHS ARE TOTALLY SEPARATE
INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER BUILDS.
ADDITIONALLY AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION FROM TSR
SG28MAR185778.
HC101318QB129-0003
5. ALL VENDORS MUST ADDRESS ANY TESTING AND ACCEPTANCE REQUIREMENTS FOR
THESE SERVICES.
6. NOTICE OF COMPLETION MUST BE COORDINATE WITH THE TESTING & ACCEPTANCE
POC BEFORE SUBMITTING TO DITCO.
7. ALL VENDORS MUST VALIDATE QUOTES AS STILL IN EFFECT AND UNDER
CONSIDERATION. NO EXTENSIONS WILL BE APPROVED.
ALL ELSE REMAINS THE SAME
THE PURPOSE OF AMEND 0001 IS TO:
1. EXTEND QUOTES DUE DATE TO 25 JULY 18
2. SERVICE DATE IS REVISED TO COMPLY WITH PROCUREMENT ACQUISITION LEAD
TIMES TO 27 NOV 18 SIP. LEAD TIMES THAT GO BEYOND THE SERVICE DATE WILL NOT BE
ACCEPTED.
3. MAPS/DRAWINGS ARE REQUIRED TO CLEARLY SHOW FIBER ROUTE MILES, RTD
(CONTRACTORS SHALL MEET RTD OF 10 MILLISECONDS), AND 50 METER SEPARATION.
ALL INFORMATION IN MAPS/DRAWINGS MUST BE ACCURATE. MAPS/DRAWINGS
WITH INCORRECT INFORMATION WILL BE FOUND TECHNICALLY UNACCEPTABLE AND
SUBMISSION EXCLUDED FROM AWARD.
4. THIS REQUIREMENT MUST BE DIVERSE WITH SOLICITATION HC101318QA949/TSR
END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS (SDP) FROM
TSR SG28MAR185778; MEANING THE PHYSICAL PATHS ARE TOTALLY SEPARATE
INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER BUILDS.
5. ALL VENDORS MUST ADDRESS ANY TESTING AND ACCEPTANCE REQUIREMENTS FOR
THESE SERVICES.
6. NOTICE OF COMPLETION MUST BE COORDINATE WITH THE TESTING & ACCEPTANCE
POC BEFORE SUBMITTING TO DITCO.
7. ALL VENDORS MUST VALIDATE QUOTES AS STILL IN EFFECT AND UNDER
CONSIDERATION. NO EXTENSIONS WILL BE APPROVED.
ALL ELSE REMAINS THE SAME
SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A 10GB WAVE SERVICE BETWEEN
BLDG 61801, ROOM 1024, 2133 CUSHING STREET, FORT HUACHUCA, AZ., AND BLDG 5010,
ROOM 1, 5150 E. IRONWOOD STREET, DAVIS MONTHAN AFB, AZ. REVALIDATE TSP:
TSP0CJMTG-01
THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE
END TO END TO THE GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S) FROM TSR
SG28MAR185778 (QA949).
CONTRACTORS SHALL MEET RTD OF 10 MILLISECONDS
SEE UNIQUE INSTALL FACTORS
10GB WAVE SERVICE MUST BE ENGINEERED/PROVISIONED IN SUCH A WAY THAT THE
GOVERNMENT CAN CHANGE/REVISE CHANNELIZATION WITHOUT TELECOMM PROVIDER
INTERVENTION.
VENDORS MUST CLEARLY STATE IN QUOTES THEIR COMPLIANCE WITH GOVERNMENT
TESTING AND ACCEPTANCE REQUIREMENTS
2. EACH CONTRACTOR IS RESPONSIBLE FOR READING AND COMPLYING WITH ALL
TECHNICAL ASPECTS OF THIS SOLICITATION, TO INCLUDE READING AND AGREEING
WITH THE STANDARD PROVISIONS, ATTACHMENTS LISTING SPECIFIC TECHNICAL
REQUIREMENTS, PRICE QUOTE REQUIREMENTS, AND REQUESTED SERVICE DATE.
FAILURE TO READ AND ADHERE TO ANY PORTION OF THE INQUIRY SHALL RENDER THE
QUOTE NON-COMPLIANT AND RESULT IN IT BEING EXCLUDED FROM EVALUATION AND
AWARD.
3. THE SERVICE DATE TO BE MET IS: 11 NOV 18 (SIP). THE GOVERNMENT ASSUMES
THAT CONTRACTORS HAVE CONSIDERED ALL ISSUES THAT MAY IMPACT THE SERVICE
DATE. THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST CONSIDERATION
IAW STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL SERVICE DATE OR
COMPLY WITH ANY CONTRACT TERMS OR CONDITIONS.
4. CONTRACTORS SHALL SUBMIT QUOTES IAW STANDARD PROVISION 04. QUOTES
SHALL INCLUDE SUFFICIENT DETAIL FOR EFFECTIVE EVALUATION AND SHOULD
NOT SIMPLY REPHRASE OR RESTATE THE GOVERNMENT REQUIREMENTS. RATHER,
THEY MUST PROVIDE CONVINCING RATIONALE TO ADDRESS HOW THE CONTRACTOR
INTENDS TO MEET THE REQUIREMENT. IN RESPONSE TO THIS SOLICITATION, NO
TERMS OR CONDITIONS PLACED UPON THE GOVERNMENT, NOR ASSUMPTIONS WILL BE
ACCEPTED. CONTRACTORS ARE ENCOURAGED TO SUBMIT QUESTIONS AND REQUEST
CLARIFICATIONS OF THE REQUIREMENT (S) BEFORE SUBMITTING QUOTES. QUESTIONS
SHALL BE SUBMITTED TO CONTRACT SPECIALIST AND CONTRACTING OFFICER DURING
THE SOLICITATION PHASE ONLY, AND RESPONSES FOR ALL INTERESTED PARTIES WILL BE
POSTED TO FEDBIZOPPS. QUOTES MUST BE UPLOADED TO IDEAS.
5. THIS REQUIREMENT MUST BE DIVERSE WITH SOLICITATION HC101318QA949/TSR
END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS (SDP) FROM
TSR SG28MAR185778; MEANING THE PHYSICAL PATHS ARE TOTALLY SEPARATE
INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER BUILDS.
6. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE ROUTES
FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/OR
WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE
BEING MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES
AND ROUND TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD
PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS ARE
INCLUDED THE ATTACHMENTS.
7. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) WITH LOCAL
POCS AT EACH GOVERNMENT SITE. IT IS HIGHLY RECOMMENDED THAT AT A MINIMUM,
CONTRACTORS CONDUCT PHONE SURVEYS TO ADEQUATELY ASSESS THE MAGNITUDE OF
THE WORK TO BE PERFORMED IN DETERMINING THEIR PRICE STRATEGY.
8. THIS IS A REAWARD OF A CURRENT SERVICE, (CSA#GINT000082EBM). IF THE
INCUMBENT QUOTE IS EVALUATED AS THE LOWEST PRICE TECHNICABLE ACCEPTABLE,
THE CURRENT CSA WILL BE ADMINSTRATIVELY DISCONTINUED WITHIN 30 DAYS OF
INCUMBENT CONTRACTOR RECEIVING AWARD. INCUMBENT CONTRACTORS SHALL
SUBMIT NOTICE OF COMPLETION (NOC) WITHIN 30 DAYS.
9. ONCE TELECOMM PROVIDER HAS COMPLETED INSIDE WIRING FROM THEIR
FIBER DISTRIBUTION PANEL INSTALLED IN THEIR DWDM EQUIPMENT SUITE TO THE
GOVERNMENT SERVICE DELIVERY POINT (SDP) AT EACH LOCATION, THEY MUST
ENSURE THE LIGHT LEVEL READINGS (DB LOSS) ARE ADJUSTED TO READ -3 TO -9 LOSS.
ADDITIONALLY, THESE LEVELS MUST BE DOCUMENTED ON THE NOTICE OF COMPLETION
(NOC) SENT TO DITCO.
***THE VENDOR MUST TERMINATE SINGLE MODE FIBER AT BOTH LOCATIONS IAW
UNIQUE INSTALLATION FACTORS.***
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: SG28MAR185777
4. CCSD: 635J
Z. DITCO CONTACT:
Sara Vogelgesang
618-229-9704 sara.a.vogelgesang.civ@mail.mil
Angelina Hutson
DITCO Contracting Officer
Unless otherwise specified, all other terms and conditions are unchanged.
Paragraph E.SERVICE DATE change from:
Jan 4, 2019
To:
Jan 28, 2019
Paragraph V.QUOTE DUE DATE AND TIME change from:
Aug 23, 2018 9:00:00 AM CDT
To:
Sep 20, 2018 9:00:00 AM CDT
File details come from the government source that posted it.