HC101318QA625-0001.v0_solicitation_dated_6-4-18.pdf
PDF 10 KB Posted
- Solicitation number
- HC101318QA625
- Issued by
-
Defense Information Systems Agency
About this file
solicitation dated 6-4-18
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment-Testing_Requirements_for_Solicitation_QA625.docx | DOCX document | |
| Attachment-Circuit_Parameters_for_Solicitation_QA625.docx | DOCX document | |
| HC101318QA625.v0_5-3-18.pdf | ||
| Sample_Vendor_Block_Diagram_and_Circuit_Path_Maps_Version2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 6/4/2018
SUBJECT: HC101318QA625-0001 Amend: 0001
A. TYPE ACTION: ADMIN AMEND
1. PURPOSE: THE PURPOSE OF THIS AMENDMENT IS TO:
1. CHANGE THE PROPOSAL DUE DATE TO 11 APR 18 AT 4:00 P.M. (CST).
RECAP
SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN THE REAWARD AN UNPROTECTED
TRANSPARENT LEASED (10GB) WAVE DISA IE1 BACKBONE TRUNK BETWEEN THE EXISTING
DISA IE1 PROVIDED MSPP SWITCH (CISCO-ONS-15454-MSPP) (UMSWCAM010) BLDG
95, ROOM 112, 90 BASTOGNE AVE, FORT CAMPBELL, KY, AND THE EXISTING DISA IE1
PROVIDED ODXC SWITCH (SN 16000 INTELLIGENT OPTICAL SWITCH)(UODWSCO010)
BLDG 1575, ROOM C-1B, 103 WEST LOSEY STREET, SCOTT AFB, IL. **SEE UNIQUE INSTALL
FACTORS**
A. CONTRACTORS SHALL MEET RTD OF 10 MILLISECONDS.
B. REVALIDATE TSP.
C. SITE SURVEYS ARE AUTHORIZED AT BOTH GOVERNMENT SITES.
D. 10GB WAVE SERVICE MUST BE ENGINEERED/PROVISIONED IN SUCH A WAY THAT THE
GOVERNMENT CAN CHANGE/REVISE CHANNELIZATION WITHOUT TELECOMM PROVIDER
INTERVENTION.
2. EACH CONTRACTOR IS RESPONSIBLE FOR READING AND COMPLYING WITH ALL
TECHNICAL ASPECTS OF THIS SOLICITATION, TO INCLUDE READING AND AGREEING
WITH THE STANDARD PROVISIONS, ATTACHMENTS LISTING SPECIFIC TECHNICAL
REQUIREMENTS, PRICE QUOTE REQUIREMENTS, AND REQUESTED SERVICE DATE.
FAILURE TO READ AND ADHERE TO ANY PORTION OF THE INQUIRY SHALL RENDER THE
QUOTE NON-COMPLIANT AND RESULT IN IT BEING EXCLUDED FROM EVALUATION AND
AWARD.
3. THE SERVICE DATE TO BE MET IS: 12 OCT 18 (SIP). THE GOVERNMENT ASSUMES
THAT CONTRACTORS HAVE CONSIDERED ALL ISSUES THAT MAY IMPACT THE SERVICE
DATE. THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST CONSIDERATION
IAW STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL SERVICE DATE OR
COMPLY WITH ANY CONTRACT TERMS OR CONDITIONS.
4. CONTRACTORS SHALL SUBMIT QUOTES IAW STANDARD PROVISION 04. QUOTES
SHALL INCLUDE SUFFICIENT DETAIL FOR EFFECTIVE EVALUATION AND SHOULD
NOT SIMPLY REPHRASE OR RESTATE THE GOVERNMENT REQUIREMENTS. RATHER,
THEY MUST PROVIDE CONVINCING RATIONALE TO ADDRESS HOW THE CONTRACTOR
HC101318QA625-0001
INTENDS TO MEET THE REQUIREMENT. IN RESPONSE TO THIS SOLICITATION, NO
TERMS OR CONDITIONS PLACED UPON THE GOVERNMENT, NOR ASSUMPTIONS WILL BE
ACCEPTED. CONTRACTORS ARE ENCOURAGED TO SUBMIT QUESTIONS AND REQUEST
CLARIFICATIONS OF THE REQUIREMENT (S) BEFORE SUBMITTING QUOTES. QUESTIONS
SHALL BE SUBMITTED TO CONTRACT SPECIALIST AND CONTRACTING OFFICER DURING
THE SOLICITATION PHASE ONLY, AND RESPONSES FOR ALL INTERESTED PARTIES WILL BE
POSTED TO FEDBIZOPPS. QUOTES MUST BE UPLOADED TO IDEAS. IN THE EVENT IDEAS IS
UNAVAILABLE OR QUOTES FAIL TO UPLOAD, QUOTES MAY BE SENT TO THE FOLLOWING
MAILBOX:
disa.scott.ditco.mbx.pl8211@mail.mil DISA.SCOTT.DITCO.MBX.VENDOR-QUOTES@MAIL.MIL
5. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION
HC101318QA788/TSR# SG12FEB185639 AND MUST BE ENGINEERED AND PROVISIONED
TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS
(SDP) FROM TSR# SG12FEB185639; MEANING THE PHYSICAL PATHS ARE TOTALLY
SEPARATE INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER
BUILDS. ADDITIONALLY AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION
FROM TSR# SG12FEB185639.
6. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE ROUTES
FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/OR
WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE
BEING MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES
AND ROUND TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD
PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS ARE
INCLUDED THE ATTACHMENTS.
7. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) WITH LOCAL
POCS AT EACH GOVERNMENT SITE. IT IS HIGHLY RECOMMENDED THAT AT A MINIMUM,
CONTRACTORS CONDUCT PHONE SURVEYS TO ADEQUATELY ASSESS THE MAGNITUDE OF
THE WORK TO BE PERFORMED IN DETERMINING THEIR PRICE STRATEGY.
8. THIS IS A REAWARD OF A CURRENT SERVICE, CSA# GINT000067EBM. IF THE INCUMBENT
QUOTE IS EVALUATED AS THE LOWEST PRICE TECHNICABLE ACCEPTABLE, THE CURRENT
CSA WILL BE ADMINSTRATIVELY DISCONTINUED WITHIN 30 DAYS OF INCUMBENT
CONTRACTOR RECEIVING AWARD. INCUMBENT CONTRACTORS SHALL SUBMIT NOTICE OF
COMPLETION (NOC) WITHIN 30 DAYS.
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: SG12FEB185638
4. CCSD: XXXXDY0D
Z. DITCO CONTACT:
Christopher OConnor
618-229-9712 christopher.t.oconnor2.civ@mail.mil
Paul A. Heard
DITCO Contracting Officer
Unless otherwise specified, all other terms and conditions are unchanged.
Paragraph V.QUOTE DUE DATE AND TIME change from:
Jun 4, 2018 4:00:00 PM CDT
To:
Jun 18, 2018 4:00:00 PM CDT