Testing Requirements for Solicitation HC101318QA625

MINIMUM TECHNICAL SPECIFICATIONS:

SPECIFIC FORMAT TO BE USED IS:

LINE RATE: 10GB.

LINE CODE: NRZ

FRAME FORMAT: SCRAMBLED IAW

ANSI T1.104-1991 (R2003)

1. TEST AND ACCEPTANCE: FIBER OPTIC 10GB WAVE CIRCUITS

SHALL PASS A FULLY DOCUMENTED SATISFACTORY SOAK

TEST BY THE CONUS GNOSC AT SCOTT AFB, IL.

PRIMARY: (C) 618-220-8691 (D) 770-8691

2. THE WAVELENGTH TRANSMISSION SERVICE PROVIDED

SHALL MEET THE FOLLOWING PERFORMANCE REQUIREMENTS

ON A MONTHLY BASIS.

PERFORMANCE REQUIREMENT/PERFORMANCE SPECIFICATION:

NON-DIVERSE/NON-PROTECTED

AVAILABILITY: GREATER THAN OR EQUAL TO 99.5% OR BETTER.

MONTHLY SHORT INTERRUPTION EVENT COUNT (SEIC):

LESS THAN OR EQUAL TO 9

% ERRORED SECONDS (ES): LESS THAN OR EQUAL TO 0.005

% SEVERELY ERRORED SECONDS (SES): LESS THAN OR

EQUAL TO 0.00035

BACKGROUND BLOCK ERROR RATIO (BBER): LESS THAN

OR EQUAL TO 5 X 10-6

BIT COUNT INTEGRITY (BCI)/PATTERN SLIP (PAT SLIP):

LESS THAN OR EQUAL TO 1 PER 72 HOURS

JITTER SEE NOTE 1 (JITTER)

BER: LESS THAN OR EQUAL TO 1X10-12

DELAY (ONE WAY): * LESSER OF 10 MSEC OR

(0.01 X D MSEC) * WHERE "D" IS THE SDP TO SDP

TRANSMISSION DISTANCE, MEASURED SHORTEST GREAT

CIRCLE, IN KILOMETERS.

3. ROUND TRIP DELAY (RTD) SHALL BE LESS THAN OR EQUAL

TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE

GOVERNMENT'S MISSION. THE GOVERNMENT ACCEPTING

AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-UP

AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE

CONTRACTORS PROPOSAL, DISA IE161 WILL NOTIFY DITCO

IMMEDIATELY IN WRITING.

4. ***ATTENTION FORT CAMPBELL LOCATION***

THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED

TOTALLY DIVERSE END TO END TO THE GOVERNMENT'S SERVICE

DELIVERY POINTS (SDP'S) FROM TSR SF09FEB187504;

MEANING THAT THE PHYSICAL PATHS ARE TOTALLY SEPARATE

INCLUDING MAN HOLES, CONDUIT, (CENTRAL OFFICE

LOCATIONS), AND FIBER BUILDS. ADDITIONALLY AS A

MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION FROM

TSR SF09FEB187504.

5. TELECOMM PROVIDER MUST PROVIDE DISA COLOR POWERPOINT

DRAWINGS FOR TECHNICAL REVIEW SHOWING THE ROUTES FROM

THE COMMERCIAL DEMARCS TO THE SUPPORING CENTRAL

OFFICES AND OR WIRING CENTERS ENSURING THE PHYSICAL

END TO END DIVERSITY REQUIREMENTS ARE BEING MET.

DRAWINGS ALSO TO INCLUDE SEPARATION DISTANCES, TOTAL

FIBER MILES AND ROUND TRIP DELAY (RTD). ADDITIONALLY

MUST PROVIDE COLOR CODED MAPS AND MUST BE RED LINED

SHOWING HOW THE CIRCIT WILL BE ROUTED END TO END FROM

THE CUSTOMER A LOCATON TO THE CUSTOMER Z LOCATION.

6. NOTE 1 (JITTER).: IN A STEADY-STATE CONDITION,

THE PATTERN OF SYNCHRONOUS TRANSPORT SIGNAL (STS)

POINTER ADJUSTMENTS, SDN TO SDN (END-TO-END THROUGH

THE SERVICE PROVIDED NETWORK OUTPUTS), SHALL BE NO

MORE STRESSFUL (I.E., CREATE MORE JITTER THROUGH

THE DESYNCHRONIZER AS DESCRIBED IN TABLE 6 OF ANSI

T1.105.03-1994) THAN THE POINTER ADJUSTMENT

SEQUENCE IN FIGURE 5 OF ANSI T1.105.03-1994. DURING

TRANSIENT EVENTS (WHICH SHALL OCCUR NO MORE THAN 2

TIMES PER DAY), THE PATTERN OF STS POINTER

ADJUSTMENTS, SDN TO SDN (END-TO-END THROUGH THE

SERVICE PROVIDED NETWORK OUTPUTS), SHALL BE FOUR

OR LESS PER HOUR. ADDITIONALLY, THE MAXIMUM TIME

INTERVAL ERROR (MTIE) OVER A PERIOD OF S SECONDS,

OR WANDER, SHALL NOT EXCEED (.01S + 10000)

NANOSECONDS FOR VALUES OF S GREATER THAN 10,000.

7. WAVELENGTH TRANSMISSION SERVICES:

WAVELENGTH TRANSMISSION SERVICES FOR RATES

OF 10GBPS SHALL BE IN ACCORDANCE WITH ITU-T

RECOMMENDATIONS G.709 (03/2003), G.707(12/03),

G.957 (03/06), G.692(10/98) & TELCORDIA GR253-IE1.

THE PROVIDED WAVELENGTH TRANSMISSION SERVICE

SHALL NOT INHIBIT GOVERNMENT OPERATION OF

UNDERLYING PROTOCOLS AND TRANSPORT SYSTEMS

SUCH AS, BUT NOT LIMITED TO, SONET/SDH, IP,

ATM, GIGABIT ETHERNET, AND ENCRYPTION. THE

WAVELENGTH TRANSMISSION SERVICE PROVIDED SHALL

PASS ALL PAYLOAD, PATH AND LINE OVERHEAD BYTES

TRANSPARENTLY (UNTOUCHED/UNALTERED) AND WITHOUT

MONITORING SDP TO SDP. THERE SHALL NOT BE ANY

LINE TERMINATING EQUIPMENT (LTE) BETWEEN SDP

AND SDP.

8. 10GB WAVE SERVICE MUST BE TERMINATED TO THE

LINE SIDE OF THE FIBER TERMINATING PATCH PANEL

INSTALLED IN THE DISA IE1 PROVIDED MSPP SUITE AT

FORT CAMPBELL AND THE FIBER TERMINATING PATCH

PANEL INSTALLED IN THE DISA IE1 PROVIDED ODXC

SUITE INSTALLED AT SCOTT AFB.

9. TELECOMM PROVIDER MUST CONTACT DISA CONUS TIER-II

MSPP ENGINEERING UPON RECEIPT OF A VALID TSO TO

ESTABLISH THE COORDINATION AND ACTIVATION PROCESS.

PRI POC: CONTACT: MIKE REEVES

(C) 618-220-8973 (D) 770-8973

ALT POC: CONTACT: DAMION SCANDRICK

(C) 618-220-9634 (D) 770-9634

ALT POC: CONTACT: AARON SMITH

(C) 618-220-9820 (D) 770-9820

ALT POC: CONTACT: BOB RISKY

(C) 618-220-8632 (D) 770-8632

ALT POC: ORGANIZATIONAL NUMBER

(C) 618-220-8691 (D) 770-8691

10. ONCE TELECOMM PROVIDER HAS COMPLETED INSIDE

WIRING FROM THE DWDM EQUIPMENT SUITE TO THE

GOVERNMENT SERVICE DELIVERY POINT (SDP) AT EACH

LOCATION, THEY MUST ENSURE THE LIGHT LEVEL READINGS

(DB LOSS) ARE ADJUSTED TO READ -3 TO -9 LOSS.

ADDITIONALLY, THESE LEVELS MUST BE DOCUMENTED ON THE

NOTICE OF COMPLETION (NOC) SENT TO DITCO.

***THE VENDOR MUST TERMINATE 10GB WAVE SERVICE AT

BOTH LOCATIONS IAW UNIQUE INSTALLATION FACTORS.***

11. THE 10GB WAVE SERVICE MUST PASS A DOCUMENTED

SATISFACTORY 72 HOUR END TO END TEST IAW ITU

STANDARD M.2101 PRIOR TO TURN UP TO THE GOVERNMENT.

12. ANY ADDRESSEE ON THE TSO WILL NOTIFY ALL

ADDRESSEES IMMEDIATELY BY MESSAGE IDENTIFYING ANY ISSUES,

PROBLEMS, OR SITUATIONS WHICH MAY PREVENT OR DELAY THE

IMPLEMENTATION OF THIS TELECOMMUNICATIONS SERVICE ORDER (TSO).

ALL STATIONS WILL REVIEW THE CONFIGURATION, EQUIPMENT, CONTACT

NUMBERS AND ADDRESSES CONTAINED IN THIS TSO AND PROVIDE UPDATES

TO ORIGINATOR OF TSO ANY ERRORS SO THAT SUBSEQUENT TSOS MAY BE

UPDATED.

13. IMPLEMENTATION ASSISTANCE: FOR CIRCUIT INSTALLATION ASSISTANCE

WITH THE COMMERCIAL LEASED PATH, CONTACT

DCP COMMERICIAL ACTIVATION TEAM (CAT) AT D312-850-0820,

C614-692-0820

14. COMPLETION REPORT: STATION DESIGNATED IN PARAGRAPH 2H AS CCO/CMO

WILL SUBMIT COMPLETION REPORT IAW DISAC 310-130-1, SUPP 1, 2, 3

FORMAT OR DISAC 310-70-1. REPORT WILL BE ADDRESSED TO ORIGINATOR

AND ALL ADDRESSEES OF THIS TSO.

15. DD FORM 1368: DD FORM 1368'S (MODIFIED USE OF LEASED

COMMUNICATION FACILITIES), OR EMAIL EQUIVALENT, WILL BE

SUBMITTED, AS REQUIRED, ON THIS CIRCUIT IAW DISAC-DITCO 350-135-1

BY THE STATION DESIGNATED IN PARAGRAPH 2H AS CCO/CMO. GUIDANCE

ON SUBMISSION IS AVAILABLE AT

HTTP://WWW.DITCO.DISA.MIL/CORPORATELIBRARY/HOME.ASP. CLICK ON

"350-135-1, DEFENSE COMMERCIAL COMMUNICATIONS ACQUISITION

PROCEDURES."

16. UNSATISFACTORY SERVICE REPORTING INSTRUCTIONS: FOR UNSATISFACTORY

SERVICE OR TO REPORT EQUIPMENT AND/OR CIRCUIT PROBLEMS INVOLVING

DISA PROVIDED TRANSPORT AND/OR EQUIPMENT, PLEASE CONTACT THE

DISN CUSTOMER CONTACT CENTER (DCCC) SCOTT AFB, IL, TOLL FREE

NUMBER IS 1-844-347-2457 (1-844-DISA HLP) OPTION 2, COML

1-614-692-0032 OPTION 2, DSN 312-850-0032 OPTION 2.

17. SATELLITE OBJECTION: THE USE OF SATELLITE CONNECTIVITY IS NOT

ACCEPTABLE. ECHOPLEXING CHARACTERISTICS OF DTE TO DCE EQUIPMENT

ON THIS CIRCUIT WILL RESULT IN UNDESIRABLE PERFORMANCE DUE TO

PROPAGATION DELAYS OF SATELLITE TRANSMISSION.