HAZMAT - BEAVER DAM.pdf

PDF 37 MB Posted

Attached to
IDIQ DECOMMISSIONING ON CN NATIONAL FOREST Federal contract opportunity
Solicitation number
12444621Q0041
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to IDIQ DECOMMISSIONING ON CN NATIONAL FOREST, newest first.
File Type Posted
SPECIFICATIONS - IDIQ - UPDATED.doc DOC document
TO 1 - MAPS.pdf PDF
BAT ASSESS - BEAVER DAM.pdf PDF
COMBINED SS - UPDATED 04.28.2021.docx DOCX document
TO 1 - SCHEDULE OF ITEMS - UPDATED.docx DOCX document
HAZMAT - WILL PROPERTY.pdf PDF
BAT ASSESS - WILL PROPERTY.pdf PDF
WD - NON HAZARD.pdf PDF
WD - HAZARDOUS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POTENTIAL LEAD-BASED PAINT

AND

ASBESTOS CONTAINING MATERIAL INSPECTIONS

FOR

THE UNITED STATES FOREST SERVICE

CHEQUAMEGON-NICOLET NATIONAL FOREST

JULY 2017

Coleman Engineering

Civil Engineering ● Environmental Engineering

Geotechnical Engineering ● Land Surveying ● Test Drilling Construction Quality Control ● Materials Laboratory Testing

Table of Contents

Page No.

1.0 INTRODUCTION

1.1 Background

1.2 Lead Based Paint Information

1.3 Lead Inspection Procedures

1.4 Asbestos Containing Material Information

1.5 ACM Inspection Procedures

2.0 SITE SUMMARIES

2.1 Great Divide District Vault Toilets

2.2 Washburn District Vault Toilets

2.3 Lakewood-Laona District Vault Toilets

2.4 Medford-Park Falls District Vault Toilet

2.5 Beaver Dam Lodge Buildings

2.6 Lakewood Property Building

2.7 Eagle River Buildings

2.8 Lower Ninemile Lake Boat Landing Vault Toilet

2.9 Newman Lake Buildings

2.10 Horsecamp Water Well House

2.11 Riley Creek Buildings

2.12 Argonne Buildings

3.0 RESULTS

3.1 Lead Paint Inspection Results

3.1.1 Great Divide District Vault Toilets

3.1.2 Washburn District Vault Toilets

3.1.3 Lakewood-Laona District Vault Toilets

3.1.4 Medford-Park Falls District Vault Toilet

3.1.5 Beaver Dam Lodge Buildings

3.1.6 Lakewood Property Building

3.1.7 Eagle River Buildings

3.1.8 Lower Ninemile Lake Boat Landing Vault Toilet

3.1.9 Newman Lake Buildings

3.1.10 Horsecamp Water Well House

3.1.11 Riley Creek Buildings

3.1.12 Argonne Buildings

Page No.

3.2 Asbestos Inspection Results

3.2.1 Great Divide District Vault Toilets

3.2.2 Washburn District Vault Toilets

3.2.3 Lakewood-Laona District Vault Toilets

3.2.4 Medford-Park Fall District Vault Toilets

3.2.5 Beaver Dam Lodge Buildings

3.2.6 Eagle River Buildings

3.2.7 Lower Ninemile Lake Boat Landing Vault Toilet

3.2.8 Newman Lake Buildings

3.2.9 Horsecamp Water Well House

3.2.10 Riley Creek Buildings

3.2.11 Argonne Buildings

4.0 SUMMARY

4.1 ACM and LBP Material Quantities

4.1.1 Great Divide District

4.1.2 Washburn District

4.1.3 Lakewood-Laona District

4.1.4 Medford-Park Falls District

4.1.5 Beaver Dam Lodge Buildings

4.1.6 Eagle River Buildings

4.1.7 Lower Ninemile Lake Boat Landing VT

4.1.8 Newman Lake Buildings

4.1.9 Riley Creek Buildings

4.1.10 Argonne Buildings

4.2 Recommendations

APPENDICES

APPENDIX A – FIGURES

APPENDIX B – SAMPLE LISTS AND DESCRIPTIONS

APPENDIX C – LEAD BASED PAINT ANALYTICAL RESULTS

APPENDIX D – ASBESTOS CONTAINING MATERIAL ANALYTICAL RESULTS

APPENDIX E – PHOTOGRAPHS

APPENDIX F – QUALIFICATIONS

Coleman Engineering Company 1 Lead and Asbestos Inspections United States Forest Service Chequamegon-Nicolet National Forest July 2017

1.0 INTRODUCTION

1.1 Background

Coleman Engineering Company (CEC) has been retained by the United States Forest Service (USFS) to perform inspections for potential Lead-Based Paint (LBP) and Asbestos Containing Material (ACM) on structures throughout the Chequamegon-Nicolet National Forest. Beginning on July 10, 2017, and continuing through July 19, 2017, inspections were conducted on vault toilets (VT), warehouses, garages, storage sheds, houses, a shelter, and an office building.

Demolition for the majority of these buildings, if not all, is up for consideration.

1.2 Lead Based Paint Information

The Wisconsin Administrative Code (DHS 163) definition of LBP will be referenced in this report where a potential lead poisoning hazard may be present. The Wisconsin Administrative Code defines LBP as having a surface concentration of lead that is more than 0.7 milligrams of lead per square centimeter of surface or more than 0.06% of lead per weight of paint chip sample.

The United States Department of Housing and Urban Development (HUD) in the Guidelines for the Evaluation and Control of Lead-Based Paint in Housing (HUD Guidelines) defines LBP as having a surface concentration of lead that is at or greater than 1 milligram of lead per square centimeter of surface or 0.5% or greater of lead per weight of a paint chip sample.

1.3 Lead Inspection Procedures

In July of 2017, CEC conducted inspections for sampling LBP among building materials present at each facility. Paint chip samples (1-inch square) were collected from each building to represent each homogenous area. Multiple paint chip samples were taken to represent a homogenous material with a large surface area. Sample locations and quantities were decided in-field by the Inspector according to the surface area, date placed, and color of each homogenous material.

Representative samples of potential LBP were collected and shipped under chain-of-custody (COC) protocol to International Asbestos Testing Laboratories, Inc. (iATL) in Mount Laurel, New Jersey, a National Voluntary Laboratory Accreditation Program (NVLAP) approved laboratory. The sample lists and descriptions are presented in Appendix B. The analytical results are attached in Appendix C.

1.4 Asbestos Containing Material (ACM) Information

ACM is a material containing naturally occurring minerals such as chrysotile, amosite, and crocidolite. These minerals have been used in fire-proofing building materials for its insulating properties and also in many other building materials for its structural properties. These materials become a hazard only when friable particles are released into the atmosphere from mechanical

Coleman Engineering Company 2 Lead and Asbestos Inspections

Chequamegon-Nicolet National Forest July 2017 damage. Inhalation of friable particles has resulted in various respiratory issues, such as asbestosis, lung cancer, and mesothelioma. Although these diseases have 15-40 year latency periods, in extreme cases, they have led to death. ACM may include, but is not limited to, floor and ceiling tile and mastic, drywall, transite paneling, roofing and siding shingles and felt paper, insulation, and pipe wrap. Production of most ACM was discontinued in the United States in 1977, but not in other countries. However, existing stockpiles were used in construction thereafter. There remains the potential for some stockpiled building materials, or ACM, from other nations to be incorporated into current premises. In non-construction materials, such as brake pads in vehicles, the use of asbestos is still common ground for its desirable qualities.

The facilities inspected would potentially be subject to three Federal Regulations; Environmental Protection Agency (EPA) Superfund Amendments and Reauthorization Act (SARA) Title III Community Right to Know, Occupational Safety and Health Administration (OSHA) 29 CFR Part 1926.1101 Occupational Exposure to Asbestos, also known as the Construction Standard, and the EPA National Emission Standard for Hazardous Air Pollutants (NESHAP), 40 CFR, Part 61, Subpart M. OSHA pertains to any work performed on ACM, while NESHAP applies to demolition or renovation of any institutional, commercial, industrial, or residential structure or installation, but excludes residential structures of four (4) dwelling units or less. The renovation must include 160 square feet or 260 linear feet of friable or potential friable ACM for NESHAP to apply. The definition of an ACM, as used by NESHAP is, “any material containing more than 1 percent asbestos as determined by using Polarized Light Microscopy (PLM). If the asbestos content is less than 10 percent, verify the asbestos content by point counting using PLM” (NESHAP). Point counting involves the actual counting of asbestos fibers viewed using PLM and a grid as opposed to a visual estimate.

There are two basic types of ACM: friable and non-friable. Non-friable is any non-Category I material consisting of more than 1 percent asbestos determined by PLM and, when dry, cannot be crushed or reduced to powder material by hand pressure. Friable ACM is any material containing more than 1 percent asbestos by PLM and can be reduced to a fine powder by hand pressure when dry. Because friable ACM is more easily damaged, it is more susceptible to release asbestos fibers and, therefore, is generally of greater concern.

NESHAP breaks non-friable ACM into two categories; Category I includes packing, gaskets, resilient floor coverings, and asphalt roof products, while ACM Category II includes all other non-friable ACM.

ACM, which is of concern and is regulated ACM (RACM) under NESHAP, includes all “friable ACM, Category I non-friable ACM that has become friable, Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by forces expected to act on the material in the course of demolition or renovation operations” (NESHAP 40 CFR 61). This definition of RACM implies a high potential for occupants or operators to inhale airborne fibers.

Coleman Engineering Company 3 Lead and Asbestos Inspections

Chequamegon-Nicolet National Forest July 2017

1.5 ACM Inspection Procedures

In July of 2017, CEC conducted inspections for sampling suspect ACM among building materials present at multiple facilities.

Representative samples of potential ACM (PACM) were collected and shipped, under COC protocol, for analysis by iATL in Mount Laurel, New Jersey; an NVLAP approved laboratory.

The sample lists and descriptions are presented in Appendix B. The analytical results can be found in Appendix D.

2.0 SITE SUMMARIES

2.1 Great Divide District Vault Toilets

West Torch Ski Trail Vault Toilet

The VT, at the trailhead of the West Torch Ski Trail, is located in a secluded part of the Chequamegon-Nicolet National Forest about 2 miles south of Clam Lake, WI on County Highway GG. The coordinates are 46.126978, -90.890422. CEC performed inspections on the West Torch Ski Trail VT on July 12, 2017. General location maps and site plans are presented in Appendix A.

The West Torch Ski Trail VT was built in 1964. The building is constructed of wood with a concrete foundation and has a corrugated fiberglass roof. The interior walls are painted white with a red painted floor, whereas the exterior is painted brown. The toilet consists of a poly-synthetic material and has a transite sewer vent stack. The VT is uninsulated, stands 7 feet tall (excluding the roof), and has an approximate area of 21 square feet. Photos are attached in Appendix E.

Potter Lake Boat Landing Vault Toilet

The Potter Lake Boat Landing VT sits within the Chequamegon-Nicolet National Forest, approximately 7.5 miles west of Mellen, WI on Potter Lake Road off of County Highway GG.

The coordinates are 46.296089, -90.801297. CEC conducted inspections on the Potter Lake Boat Landing VT on July 13, 2017. General location maps and site plans are presented in Appendix A.

The VT was built in 1964. The building consists of wood with a corrugated fiberglass roof and sits on a concrete foundation. The interior walls are painted white, has a red painted floor, and the exterior walls are painted brown. The toilet is made of a poly-synthetic, plastic-like material with a metal sewer vent stack. The VT is uninsulated, stands 6.8 feet tall, and has an approximate area of 22 square feet. Photos are attached in Appendix E.

Coleman Engineering Company 4 Lead and Asbestos Inspections

Chequamegon-Nicolet National Forest July 2017

Spillerberg Boat Landing Vault Toilet

The Spillerberg Boat Landing VT resides within the Chequamegon-Nicolet National Forest, approximately 7 miles north of Glidden, WI, and 1.5 miles west of Highway 13 off of Forest Road 181. The coordinates of the VT are 46.200633, -90.676208. CEC inspected the Spillerberg Boat Landing VT on July 13, 2017. General location maps and site plans are presented in Appendix A.

Constructed in 1964, the VT is uninsulated, sided in wood, and lies on a concrete foundation.

The exterior walls are painted brown, and a corrugated fiberglass roof shelters the VT. The interior walls are painted white, and the concrete floor is painted red. The toilet is metal, and the sewer vent stack consists of wood fibers pitched together into tar paper. Excluding the roof, the VT stands 7 feet tall and is approximately 20.5 square feet. Photos are attached in Appendix E.

Chip River Landing Vault Toilet

The Chip River Landing VT was built in 1964. It stands in the Chequamegon-Nicolet National Forest, 8 miles west of Clam Lake, WI, off of Forest Road 174 at the Chippewa River Boat Launch. The coordinates are 46.081667, -91.003944. CEC inspected the Chip River Landing VT on July 12, 2017. General location maps and site plans are attached in Appendix A.

The VT was constructed in 1964 and consists of uninsulated wood siding based on a concrete foundation. The exterior walls are painted brownish red. The interior walls are painted white and yellow, while the floor is painted light green. The VT has a corrugated fiberglass roof and has a transite sewer vent stack. The VT stands 6.8 feet tall with an area of 21 square feet.

Photos are displayed in Appendix E.

Mineral Lake Men’s Vault Toilet

The Mineral Lake Men’s VT, at the former Mineral Lake Campground, lies within the Chequamegon-Nicolet National Forest approximately 9 miles west of Mellen, WI, off of County Highway GG on Forest Road 1410. The coordinates are 46.290108, -90.8286. CEC performed an inspection on the Mineral Lake Men’s VT on July 12, 2017. General location maps and site plans are presented in Appendix A.

Constructed in 1964, the VT is uninsulated and built of wood panel siding with a concrete foundation and a corrugated fiberglass roof. The exterior walls are painted brown, whereas the interior walls are painted white, and the concrete floor is painted red. The sewer vent stack material is assumed to be acrylonitrile-butadiene-styrene (ABS), a plastic-like material similar to PVC. The VT stands 6.8 feet high with an area of approximately 21 square feet. Photographs are attached in Appendix E.

Coleman Engineering Company 5 Lead and Asbestos Inspections

Chequamegon-Nicolet National Forest July 2017

Lake Three Women’s Vault Toilet

The Lake Three Women’s VT resides approximately 11 miles west of Mellen, WI, off of Forest Road 198. The coordinates are 46.318586, -90.858475. CEC conducted an inspection on the Lake Three VT on July 12, 2017. General location maps and site plans can be found in Appendix A.

The VT was built in 1964 and was constructed with wood panel siding, a concrete foundation, asphalt roofing shingles, and is uninsulated. The interior walls are painted white, while the floor and the interior portion of the sewer vent stack are painted red. The exterior walls are painted brown. The toilet is made of metal, and the sewer vent stack consists of transite. The area of the VT is approximately 22 square feet and the height, excluding the roof, is about 6.8 feet. Photos are attached in Appendix E.

East Twin Boat Landing Vault Toilet

The East Twin Boat Landing VT is east of the East Twin Campground, approximately 14.8 miles west of Mellen, WI, off of County Highway GG. The coordinates are 46.193944, -90.854625. CEC performed an inspection on the East Twin Boat Landing VT on July 13, 2017.

General location maps and site plans can be found in Appendix A.

Constructed in 1964, the East Twin Boat Landing VT is uninsulated, has wood panel siding, a concrete foundation, and asphalt roofing shingles. The interior walls of the building are painted white, the floor is painted red, and the exterior walls are painted brown. The VT also contains a transite sewer vent stack. The area of the building is approximately 21 square feet, and it stands about 6.8 feet in height. Photos are attached in Appendix E.

Day Lake Blueberry Women’s Vault Toilet

The Day Lake Blueberry Women’s VT lies within the Day Lake Campground, 18 miles southwest of Mellen, WI, off of County Highway GG. The coordinates are 46.183064, -90.900975. It is one of three vault toilets inspected within the Day Lake Campground. CEC inspected the VT at the Blueberry Campground Site on July 12, 2017. General location maps and site plans are attached in Appendix A.

The Day Lake Blueberry Women’s VT was constructed in 1964. Approximately 25 square feet by 7 feet in height, the VT is uninsulated and built with wood panel siding, corrugated fiberglass roofing, and a concrete foundation. All of the exterior sides are painted brown. The interior walls are painted white and the concrete floor is painted red. The sewer vent stack consists of fibers pitched together into a tar paper. Photos are attached in Appendix E.

Day Lake Musky Bay Men’s Vault Toilet

The Day Lake Musky Bay Men’s VT also lies within the Day Lake Campground, 18 miles southwest of Mellen, WI, off of County Highway GG. The coordinates are 46.184642, Coleman Engineering Company 6 Lead and Asbestos Inspections

Chequamegon-Nicolet National Forest July 2017

-90.901317. CEC performed an inspection of the Day Lake Musky Bay Men’s VT on July 12, 2017. General location maps and site plans are attached in Appendix A.

Constructed in 1964, the VT is approximately 21 square feet by 7 feet tall. Materials used in building include wood panel siding, concrete foundation, and corrugated fiberglass roofing. The interior walls are painted white, and red paint coats the concrete floor. The exterior walls are painted brown, and the building is uninsulated. The original sewer vent stack appeared to have been replaced with a PVC pipe. Photographs are presented in Appendix E.

Day Lake Red Pine Men’s Vault Toilet

The Day Lake Red Pine Men’s VT lies within the Day Lake Campground as well, 18 miles southwest of Mellen, WI, off of County Highway GG. The coordinates are 46.183503, -90.903417. CEC conducted an inspection on the Day Lake Red Pine Men’s VT on July 12, 2017. General location maps and site plans are attached in Appendix A.

The Day Lake Red Pine VT was built in 1964. The uninsulated building was constructed with wood panel siding, a corrugated fiberglass roof, and is based on a concrete foundation. Brown paint covers the exterior walls, while the interior walls are painted white, and the floor is painted red. The sewer vent stack consists of tar paper. The approximate area of the building is 20 square feet by 7 feet in height. Photographs are displayed in Appendix E.

2.2 Washburn District Vault Toilets

Horseshoe Lake Dispersal FR 427 Vault Toilet

The Horseshoe Lake VT lies within the Washburn District of the Chequamegon-Nicolet National Forest. The VT can be found 10 miles north of Ino, WI, on Forest Road 427, at the Horseshoe Lake Dispersal Campsite. The coordinates are 46.642694, -91.177469. CEC inspected the VT at Horseshoe Lake on July 10, 2017. General location maps and site plans are presented in Appendix A.

In 1972, the Horseshoe Lake VT was built with wood panel siding, has a concrete foundation, and a corrugated fiberglass roof. The sewer vent stack consists of PVC, and the toilet has a poly-synthetic seat with a metal base. The concrete floor is painted gray, the interior walls are painted white, and the entire exterior is painted brown. The area of the VT is approximately 21 square feet, and it stands 7 feet tall. Photographs are attached in Appendix E.

Two Lakes Campground Men’s and Women’s #9 Vault Toilets

The Two Lakes Men’s and Women’s #9 VTs are located within the Two Lakes Campground seated between Bass Lake and Owen Lake within the Washburn District of the Chequamegon- Nicolet National Forest. They sit 12 miles north of Cable, WI, off of Forest Road 212/Lake Owen Drive. The VT’s, standing adjacent to each other, coordinates are 46.291619, Coleman Engineering Company 7 Lead and Asbestos Inspections

Chequamegon-Nicolet National Forest July 2017

-91.195456. CEC performed inspections on the Men’s and Women’s #9 VTs on July 12, 2017.

General location maps and site plans are displayed in Appendix A.

Both constructed in 1968, the building materials used were identical. Each of the VTs have wood siding, a concrete foundation, and corrugated fiberglass roofing. The interior walls are uninsulated and are painted white with an under layer of tan/cream colored paint. The floors are painted gray, and the exterior walls are painted brown. Transite was used to form the sewer vent stacks of both VTs with mastic seals to prevent seepage. The dimensions of each are identical with an area of approximately 23 square feet by 6.8 feet in height. Photographs are presented in Appendix E.

Two Lakes Campground Men’s and Women’s #10 Vault Toilets

The Two Lakes Men’s and Women’s #10 VTs are also located within the Two Lakes Campground seated between Bass Lake and Owen Lake within the Washburn District of the Chequamegon-Nicolet National Forest. They sit 12 miles north of Cable, WI, off of Forest Road 212/Lake Owen Drive. The coordinates for the VTs, standing next to each other, are 46.292817, -91.191414. CEC conducted inspections on Men’s and Women’s #10 VTs on July 12, 2017. General location maps and site plans are displayed in Appendix A.

Both constructed in 1968, the same building materials were used for both and are uninsulated.

The VTs have wood siding; they are based on a concrete foundation and have corrugated fiberglass roofs. Their interior walls are painted white, they have gray painted floors, and brown paint coating their exterior walls. Each of the VTs have brown exterior wall paint, and PVC was used in both for the sewer vent stacks. The dimensions were the same with a height of 6.8 feet and an area of approximately 23 square feet. Photographs are attached in Appendix E.

Bladder Lake SST Vault Toilet

The Bladder Lake SST VT is located within the Washburn District of the Chequamegon-Nicolet National Forest, 8 miles northeast of Iron River, WI, off of Upper Bladder Road, on Forest Road 849. The coordinates of the VT is 46.602889, -91.298633. CEC performed inspections on the Bladder Lake SST VT on July 10, 2017. Location maps and site plans are displayed in Appendix A.

Constructed in 1999, the VT is uninsulated; sits on a concrete foundation with wood siding and corrugated fiberglass roofing. The interior walls are painted white, the floor is painted green, and the exterior walls are painted brown. Metal was used for the sewer vent stack with black caulking in the roof seam to prevent seepage. The area of the VT is approximately 64 square feet by 8 feet in height. Photographs are presented in Appendix E.

Bass Lake CCC Vault Toilet

The Bass Lake VT lies 16 miles north of Drummond, WI, off of Forest Highway 35, on CCC Camp Road. Within the Washburn District of the Chequamegon-Nicolet National Forest, the

Coleman Engineering Company 8 Lead and Asbestos Inspections

Chequamegon-Nicolet National Forest July 2017 coordinates are 46.444617, -91.264811. CEC inspected the VT at Bass Lake on July 10, 2017.

General location maps and site plans are attached in Appendix A.

Constructed in 1967, the VT has an area of approximately 21 square feet by 6.8 feet in height.

The building materials used during construction include wood for the structural components and siding, a concrete foundation, and corrugated fiberglass roofing. The sewer vent stack is PVC and has black mastic around the roof seam to prevent seepage. The exterior walls are painted brown, whereas the interior walls are painted white, and the floor is painted gray. Photographs of the VT and the sampling points are presented in Appendix E.

2.3 Lakewood-Laona District Vault Toilets

Deer Lake Boat Landing Vault Toilet

The Deer Lake Boat Landing VT resides 10 miles east of Wabeno, WI, off of County Road C, on Forest Road 3847/Lake Drive. Standing within the Lakewood-Laona District of the Chequamegon-Nicolet National Forest, the coordinates are 45.441697, -88.490372. CEC performed an inspection on the Deer Lake Boat Landing VT on July 17, 2017. General location maps and site plans can be found in Appendix A.

Constructed in 1982, the VT is uninsulated and built with wood supports and siding, a concrete foundation, and corrugated fiberglass roofing. The interior walls are painted white, whereas the exterior walls are painted brown. However, the concrete floor is not painted. The sewer vent stack consists of ABS with black mastic encompassing the stack at the roof seam. The toilet seat is comprised of a poly-synthetic plastic-like material, but the base is metal. The area of the VT is approximately 20 square feet with a height of 6.8 feet, excluding the roof. Photographs of the VT are attached in Appendix E.

Ada Lake Boat Landing Vault Toilet

The Ada Lake Boat Landing VT, nested within the Lakewood-Laona District of the Chequamegon-Nicolet National Forest, is 9 miles west of Wabeno, WI, off of Highway 52, on Forest Road 2620. The coordinates are 45.367797, -88.731519. CEC conducted an inspection on the Ada Lake Boat Landing VT on July 17, 2017. General location maps and site plans are attached in Appendix A.

In 1965, the VT was built using wood for the wall supports and siding, concrete for the foundation, and corrugated fiberglass for the roof. The interior walls of the vault toilet are painted white, and the exterior walls are painted brown. Transite was used to form the sewer vent stack which is sealed at the roof seam with black mastic. The area of the VT is nearly 20 square feet by 6.8 feet tall. Photographs are presented in Appendix E.

Coleman Engineering Company 9 Lead and Asbestos Inspections

Chequamegon-Nicolet National Forest July 2017

Big Joe Vault Toilet

The Big Joe VT lies within the Lakewood-Laona District of the Chequamegon-Nicolet National Forest. Nestled on the bank of the Peshtigo River, the VT is 8 miles north of Laona, WI, off of Highway 139, on Kalata Road. The coordinates are 45.665231, -88.650883. CEC inspected the Big Joe VT on July 17, 2017. General location maps and site plans can be found in Appendix A.

In 1970, the VT was constructed with a wood frame and siding, a concrete foundation, and corrugated fiberglass roofing. The interior walls are painted white, as well as the interior portion of the sewer vent stack. Brown paint was used to coat the exterior walls. The sewer vent stack is comprised of fibers pitched together into a tar paper with black mastic filling the void of the roof seam. Furthermore, the toilet seat consists of a poly-synthetic material with a metal base. The area of the Big Joe VT is approximately 20 square feet with a height of 6.8 feet. Photographs of the VT are attached in Appendix E.

2.4 Medford-Park Falls District Vault Toilet

Foss Lake Vault Toilet

The Foss Lake VT lies within the Medford-Park Falls District of the Chequamegon-Nicolet National Forest. Located 19 miles west of Medford, WI, the VT is on the west side of County Road M. The coordinates are 45.21525, -90.618319. CEC performed an inspection on the Foss Lake VT on July 13, 2017. General location maps and site plans are attached in Appendix A.

In 1934, the Foss Lake VT was constructed with a wood frame and siding, concrete foundation, and corrugated fiberglass roofing. Both of the interior and exterior walls are painted white. The sewer stack consists of fibers pitched together into a tar paper, and the toilet is metal. Black mastic was used to fill the void in the roof seam of the sewer vent stack. A large patch of poison ivy was encountered within the vegetation encompassing the VT. Excluding the roof, the height of the VT is 7 feet with an approximate area of 23 square feet. Photographs are presented in Appendix E.

2.5 Beaver Dam Lodge Buildings

The Beaver Dam Lodge is on the shore of Beaver Dam Lake 36, seated within the Great Divide District of the Chequamegon-Nicolet National Forest. Approximately 9 miles west of Mellen, WI, off of Forest Road 188/Hanson Road, the coordinates of the Lodge are 46.331719, -90.803375. Inspections on all Beaver Dam Lodge Buildings took place on July 11, 2017.

General location maps and site plans are displayed in Appendix A.

Beaver Dam Lodge Fish House

Although the date that the Fish House was constructed is uncertain, it is understood that it was erected within the past 30 years. The building is uninsulated, based on a concrete foundation, is framed with wood, and has wood shingle siding. Asphalt shingles were used for the roofing

Coleman Engineering Company 10 Lead and Asbestos Inspections

Chequamegon-Nicolet National Forest July 2017 material; however, roofing felt was not used as an underlayment. The interior walls are coated with white paint, as well as the window frame, muntin bars, fascia, door, and the door frame.

The Fish House is approximately 100 square feet. Photographs are attached in Appendix E.

Beaver Dam Lodge Point House

Constructed in 1927, the Beaver Dam Lodge Point House was framed with wood and has half log siding on the interior and exterior walls. The East Porch lies on a concrete foundation;

however, due to the slope of the ground, the majority of the building is elevated and supported by anchored wood posts. Asphalt shingles protect the roof. There are two bathrooms, three bedrooms, a living room, an alcove, and two screened-in porches. A large rock mortar chimney decorates the northeast wall of the living room. Firebricks line the firebox of the fireplace within the living room. Wood tongue and groove flooring, adhered by mastic, was used in the living room and all bedrooms. The hallway and bathrooms have vinyl sheet flooring in different colors. Fibrous ceiling tiles were noted in both bathrooms. A furnace lies in the western corner of the living room. The furnace stack ties into a chimney encapsulated by wood tongue and groove siding. There is a piece of transite protecting and separating the wooden wall from the heat of the furnace stack. Cellulose fiber insulation was observed in the walls of the Point House but has settled to the bottom portion of the walls with time. The sewer vent stack, from Bathroom #2, was viewed from the scuttle hole in Bedroom #2. A sprinkler system was also observed in the attic for use in the event of a house fire. The insulation on the sewer stack and sprinkler piping were not sampled due to unstable ceilings, but it is assumed that both of the pipe coatings contain asbestos. The floor of the south porch is painted gray. White paint coats the alcove closet walls; and the exterior trim, eaves, and porch columns of the building. The exterior siding was not painted, however, it is evident that the half logs were soaked in a creosote treatment. The area of the Beaver Dam Lodge Point House is approximately 1,820 square feet.

Photographs are presented in Appendix E.

Beaver Dam Lodge Dead Animal House/Longview Cabin

In 1927, the Dead Animal House (DAH), also known as Longview Cabin, was constructed similarly to the Point House. The building was erected with wood with half log siding soaked in creosote, asphalt shingles, and a crawl space underneath the floors. There is a screened porch, a living room, three bedrooms, a bathroom, den/study, kitchenette, and a closet. A fireplace is on the northeast wall of the living room comprised of firebrick lining the firebox, and the chimney is derived from large rocks set in place by mortar. The building is insulated with cellulose fiber insulation. The floors of the DAH consist of wood tongue and groove planks that are nailed and adhered with mastic, however, in the Living Room and Bedroom #1, the wood floors have been overlaid with an off-white carpet and again with a green carpet as the top layer. Besides the fireplace, there are two electrical heating units in the DAH. One of them is wall mounted in the east corner of the Living Room, and the other is also placed on the wall in the Bathroom. A strip of thermal insulation paper separates the bathroom heater from the bathroom wall. The bathroom floor consists of yellow and black floor tile adhered by mastic. The top surface of the sink vanity is lined with a vinyl tile, and the shower is painted white. The bathroom and closet ceilings consist of fibrous ceiling tiles. In the kitchenette, the stove walls were covered by

Coleman Engineering Company 11 Lead and Asbestos Inspections

Chequamegon-Nicolet National Forest July 2017 copper tiles but were removed by the time of the inspection. However, the tile backing still exists and is a transite material. The exterior walls of the north corner are painted brown, whereas the window frames, door frames, porch roof supports and roof eaves are painted in white paint. Also, the floor of the screened in porch was painted gray. The approximate area of the DAH is nearly 1,340 square feet. Photographs are attached in Appendix E.

Beaver Dam Lodge Dining Hall

The Beaver Dam Lodge Dining Hall was constructed in 1928. It was built using wood for the frame, exterior siding, and interior walls. Asphalt shingles were used to cover the roof. Much of the northwestern portion of the ceiling was caving, therefore, materials were not inspected that were used to seal the seam between the chimney and roof. White paint coats the exterior trim, window and door frames, and the roof eaves. The Dining Hall includes a store room, pantry, kitchen, dining room, and a screened-in porch. Because of the failed roof supports, the pantry and store room were not sampled. The kitchen floor and a portion of the dining room floor are lined with vinyl tiles adhered by mastic to the wood floor. The other part of the dining room floor is covered by vinyl sheet flooring. Transite boards separate the kitchen ovens and the chimney of the firebrick oven from adjacent walls. This transite board is assumed to contain asbestos. The area of the Dining Hall is approximately 990 square feet. Photographs are attached in Appendix E.

Beaver Dam Lodge Shed

Constructed in 1928, the Beaver Dam Lodge Shed is uninsulated and approximately 290 square feet. It was built with wood, asphalt shingles and stands on a dirt floor. The wood siding is treated with creosote, and the asphalt shingles are underlain with roofing paper. The eaves and trim pieces are painted white. Photographs are displayed in Appendix E.

Beaver Dam Lodge Maid’s Cabin #1

In 1930, the Beaver Dam Lodge Maid’s Cabin #1 was built with wood, partially on a concrete foundation, and asphalt shingles were used to cover the roof. The building consists of a laundry room, two bedrooms, a foyer, and a bathroom. The wood clapboard siding is treated with creosote, and the eaves, window frames, door frames, and trim pieces are painted white. The Laundry Room has solid ceiling tiles, yellow painted walls, and floor tiles. The interior doors of the cabin are painted light pink, whereas the interior walls of both bedrooms are painted white.

The flooring is comprised of wood tongue and groove planks adhered by nails and mastic. The area of Maid’s Cabin #1 is roughly 540 square feet. Photographs are presented in Appendix E.

Beaver Dam Lodge Garage

In 1932, the Beaver Dam Lodge Garage was constructed with a wood frame, wood channel rustic siding, asphalt shingles, and sits on a concrete floor. A wall separates the building into two units. The southernmost unit is a garage area and the northern room is used for storage. The Garage is uninsulated, and the framing and trusses are exposed, however, the storage unit has

Coleman Engineering Company 12 Lead and Asbestos Inspections

Chequamegon-Nicolet National Forest July 2017 plywood sheets covering the interior walls that are painted light green. The area of the Garage is approximately 240 square feet. Photographs are attached in Appendix E.

Beaver Dam Lodge Storage Building

Also built in 1932, the Beaver Dam Lodge Storage Building is approximately 120 square feet.

Materials used during construction include wood framing and siding, asphalt shingles, and it sits on a concrete foundation. The exterior walls are painted brown while the trim, eaves, and door frame are painted white. The Storage Building contains the electrical circuit panels that regulate the rest of the Beaver Dam Lodge Buildings. The insulation on the wiring in the Storage Building, as well as the other buildings, is assumed to contain asbestos. Photographs are displayed in Appendix E.

Beaver Dam Lodge Maid’s Cabin #2

Constructed in 1936, the Beaver Dam Lodge Second Maid’s Cabin is a 120 square foot shack.

Built with wood siding and floors, and asphalt roofing, the cabin stands on cinder blocks at each corner. The exterior walls were once green, but have faded with age. The interior face of the door is green, and the wall board on the interior walls is painted white. Photographs are attached in Appendix E.

2.6 Lakewood Property Building

The Lakewood Property Building is a shed nestled behind the Storage Garage of the Lakewood- Laona Ranger District Office Building. Within the Chequamegon-Nicolet National Forest, the District Offices are located at 15085 State Highway 32, Lakewood, WI 54138. The coordinates for the shed are 45.295483, -88.515219. CEC mobilized to the Lakewood Property Building to conduct an inspection on July 17, 2017. General location maps and site plans are presented in Appendix A.

In 1990, the Lakewood Property Building was built with wood, asphalt shingles, and fiberglass bag insulation. The floor is comprised of sheets of plywood and the walls are fitted with Oriented Strand Board (OSB). Electrical components exist on an interior wall including a circuit/switch box, an electrical meter, wiring, and conduit wrapping around the interior walls.

Because the building materials used were relatively new, the building was not sampled for potential ACM. However, it was inspected for ACM, but the materials were deemed not to contain asbestos. The area of the shed is approximately 85 square feet by 8.0 feet in height.

On a side note, hornets were observed flying in and out of a hole in the wall near the door.

Photographs of the Lakewood Property Building are attached in Appendix E.

2.7 Eagle River Buildings

The Eagle River Buildings consist of a Bunkhouse with a detached garage located at 4369 Ranger Road, Eagle River, WI 54521. The facility serves as living quarters for USFS

Coleman Engineering Company 13 Lead and Asbestos Inspections

Chequamegon-Nicolet National Forest July 2017 employees and is adjoining to the Eagle River-Florence Ranger District Office Property. The coordinates of the Bunkhouse and Garage are 45.916411, -89.229572 and 45.91626, -89.229561, respectively. CEC mobilized to the Eagle River Buildings to perform inspections on July 18, 2017. However, because the buildings were occupied, a limited inspection was conducted to prevent occupants from being exposed to hazardous airborne asbestos conditions. General location maps and site plans are presented in Appendix A.

Eagle River Bunkhouse

In 1936, the Bunkhouse was framed with wood; has asphalt shingles, updated vinyl exterior siding, and drywall covering the interior walls. It has two (2) floors and a basement. The basement has a bathroom, a laundry/storage area, a canning room, and a stairwell leading to the exterior ground surface. The basement walls are composed of drywall painted yellow.

Furthermore, the basement stairs are painted gray. There are two water heaters and a natural gas furnace, all of which have been updated since the Bunkhouse was constructed. There are also two chimneys; one in the center of the basement and one within the west wall. The centralized chimney looked to have been abandoned but is presumed to have once served a coal fired furnace. The other chimney likely has two flues. One vents the smoke from the wood fireplace on the second floor, and the other acts as an outflow for exhaust from the furnace and water heater. Mastic was found in the seams where the exhaust stacks pass through the wall. Also, sheets of polystyrene, adhered by mastic, were placed within the walls adjacent to each water heater and the furnace. The floor of the basement bathroom (Bathroom #1) was formed by 1-inch square ceramic floor tiles set in place by mortar with grout filling the voids. Larger ceramic tiles, adhered with construction adhesive or caulking, were also used for the bathroom baseboards.

The rooms of the main floor include a porch, kitchen, dining room, living room, entryway, a bedroom, and a bathroom. The walls of each room are painted white, however, the floor of the porch is painted gray. The kitchen cabinetry is also painted white. The countertops are covered with yellow linoleum, and the vanity is sealed to the wall and countertops with caulking. The floors are covered with white linoleum flooring, which extends throughout the hallway and dining room. The ceilings of the dining room and living room consist of ceiling tiles, however, the ceiling tiles of the two rooms are not the same tiles. Separated from the Dining Room by a stairwell, the Living Room is carpeted and has a fireplace on the west wall. The mantle is wood, the firebox is cast iron which is insulated by firebrick and blown in fiberglass insulation, and the hearth is composed of red quarry tiles. The Living Room floor is covered with an off-white carpet. In the main floor bathroom (Bathroom #2), blue ceramic tiles, with grout filled seams, line the bottom half of the walls. Linoleum sheets cover the floor, however, the bathroom linoleum does not have the same pattern as the flooring in the kitchen, hallway, and dining room.

The void between the vanity and the walls are filled with two different types of caulk. White caulk seals the outermost surface, and clear caulk was found in deeper into the void. Inside the vanity cabinets, blue paint was observed covering the brick patterned plaster wall. The main floor bedroom (Bedroom #1) was finished with wood tongue and groove flooring and drywall coated with white paint.

Coleman Engineering Company 14 Lead and Asbestos Inspections

Chequamegon-Nicolet National Forest July 2017

Two bedrooms are on the second floor with crawl spaces running along the north and south walls and an attic above. A stairwell separates Bedroom #2 to the east and Bedroom #3 to the west.

Cement board, painted white, encapsulates the entirety of the second floor except for the tongue and groove wood floors in each bedroom. Blown-in fiberglass was used to insulate the walls of the second floor. Because only a limited inspection was conducted, it is uncertain what material was used to fill the walls of the main floor, however, fiberglass insulation was found in the crawl spaces and lining the fireplace. Therefore, it is conceivable that it was used to insulate the entire Bunkhouse.

The exterior faces of the Bunkhouse are covered with vinyl siding, although, as stated previously, it is evident that the original siding was replaced with the existing. It is also apparent that the original roofing materials were replaced with the current asphalt shingles. Within the concrete foundation are basement windows sunk into window wells. The frames, sashes, and muntins of these windows are painted green, and the panes are sealed by glazing. A coal chute door was also observed within the foundation on the south side of the building. The coal door is coated with gray paint and is sealed with caulk. Protruding from the west wall is a chimney consisting of stones set in place by mortar. The approximate area of the Bunkhouse is 2,470 square feet. Photographs are displayed in Appendix E.

Eagle River Bunkhouse Garage

Also built in 1936, the Eagle River Bunkhouse Garage is constructed of wood, asphalt shingles, and is based on a concrete foundation. The exterior sides consist of wood beveled siding, painted white, on top of felt paper. There are two wooden garage doors with windows set in place with glazing compound. The roof shingles are the same as the shingles used on the Bunkhouse and are laid on top of roofing paper. Exposed framing materials make up the interior walls, and the floor is bare concrete. The area of the Garage is approximately 576 square feet.

Photographs are attached in Appendix E.

2.8 Lower Ninemile Lake Boat Landing Vault Toilet

Nestled within the Eagle River-Florence District of the Chequamegon-Nicolet National Forest, the VT at the boat landing at Lower Ninemile Lake is 9 miles east of Eagle River, WI, off of East State Trunk Highway 70 and Forest Road 2437 on Nine Mile Road. The coordinates of the VT are 45.905459, -89.22934. CEC mobilized to the VT on July 19, 2017, in order to perform lead and asbestos inspections. General location maps and site plans are attached in Appendix A.

In 1982, the VT was built with wood, corrugated fiberglass roofing, and based on a concrete foundation. Board-and-batten siding form the exterior faces which are painted brown. The interior walls consist of white painted plywood, and the floor was painted red, but much of the paint has worn away. The sewer vent stack is composed of transite, and the toilet is a type of plastic material. The seam between the stack and green corrugated roofing is sealed with black mastic. The roof ridge is covered with metal flashing. The area of the VT is approximately 23 square feet. Photographs are presented in Appendix E.

Coleman Engineering Company 15 Lead and Asbestos Inspections

Chequamegon-Nicolet National Forest July 2017

2.9 Newman Lake Buildings

The buildings at the boat landing on Newman Lake include a family VT and a shelter. Within the Park Falls District of the Chequamegon-Nicolet National Forest, the buildings are nearly 8 miles south of Springstead, WI, off of WI-182, on Forest Road 1903/Park Road. The coordinates of the Family VT and Shelter are 45.959676, -90.156082 and 45.960029, -90.156058, respectively. CEC performed lead and asbestos inspections on these buildings on July 14, 2017. General location maps and site plans are attached in Appendix A.

Newman Lake Shelter

In 1934, the Shelter was built with wood; has asphalt roof shingles and stands on a concrete foundation. The exterior faces are pieced together with brown painted board-and-batten wood siding. The exterior roof overhang supports, eaves, and the interior walls are also painted brown.

However, the interior wall benches are coated with a light brown paint and the concrete floor is painted gray with a blue hue. Furthermore, the ceilings and trusses are painted white. There is a fireplace in the southeastern portion of the Shelter. The firebox is composed of cast iron and the flue is formed with vitrified clay. The chimney consists of brick set in mortar, which is sealed at the roof seam with black mastic. The approximate area of the Shelter is 962 square feet.

Photographs are attached in Appendix E.

Newman Lake Family SST – Vault Toilet

The Family VT was built in 1995. Wood, drywall, corrugated fiberglass roofing, and concrete were the materials used to construct the VT. There are two family bathrooms within the VT, and each room contains a bench, two toilets, and one sewer vent stack. The interior walls are formed by drywall painted white, and the concrete floors are painted gray with a blue hue. The door is missing from the east room. However, the interior face of the door on the western room is painted the same color as the floor. Brown painted wood tongue and groove siding encapsulates the exterior sides, and the roof is white corrugated fiberglass. Caulk was found in the voids between the undulations of the fiberglass and the eaves. The sewer vent stacks are PVC, and the interior sections are painted white, whereas the exterior portions are painted black. The seams between the fiberglass roofing and the stacks are filled with yellow caulking. The area of the Family VT is approximately 232 square feet. Photographs are displayed in Appendix E.

2.10 Horsecamp Water Well House

Secluded within the Washburn District of the Chequamegon-Nicolet National Forest, the Horsecamp Water Well House is approximately 10 miles north of Ino, WI, off of Brinks Road and Forest Road 237, on Forest Road 245. The coordinates are 46.642697, -91.183658. CEC performed lead and asbestos inspections on the Well House on July 10, 2017. General location maps and site plans are presented in Appendix A.

In 1995, the Well House was constructed with wood; sits on a concrete foundation, and the roof is covered with asphalt shingles overlaid on roofing paper. The north and south faces are sided

Coleman Engineering Company 16 Lead and Asbestos Inspections

Chequamegon-Nicolet National Forest July 2017 with board-and-batten siding with faded gray/white wash paint. The east and west sides are covered with particle board siding. The interior walls consist of unpainted plywood. A large generator produces electricity for the groundwater well pump, and the outflow of the pump tank is piped to an exterior spigot on the west wall. The gap around the water pipe and the west wall is sealed with beige caulk. An abandoned gas line enters through the north wall, which previously fueled the generator. The void between the gas line and north wall is filled with white caulk. Lastly, the door on the north wall is coated with green paint. The area of the Well House is approximately 63 square feet. Photographs are displayed in Appendix E.

2.11 Riley Creek Buildings

The Riley Creek Buildings are situated within the Park Falls District of the Chequamegon- Nicolet National Forest. They are located 14 miles east of Fifield, WI, on Forest Road 145, off of State Highway 70. The Riley Creek Buildings consist of an oil house, storage shed, an outhouse toilet, two warehouses, and an ice shack. Residing in proximity, the general coordinates of the buildings are 45.897611, -90.135056. CEC performed inspections on the Riley Creek Buildings on July 13, 2017. General location maps and site plans are attached in Appendix A.

Riley Creek Oil House

Constructed in 1939, the approximate area of the Oil House is 125 square feet. Built on a concrete foundation, the Oil House has a wood frame and sides, and asphalt shingles that cover the roof. Brown paint coats the Dutch Lap exterior siding, whereas the interior walls, rafters, and ceilings are painted red with a brown hue. Photographs are displayed in Appendix E.

Riley Creek Storage

In 1934, the Riley Creek Storage Shed was constructed with wood and asphalt shingles. The exterior wood siding is painted orange with a red hue. The interior walls are bare but were conceivably treated with creosote.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .