Harold Keene Bond Forfeiture 1102284_PLANS_Final 5_5_26 - signed.pdf
PDF 9 MB Posted
- Attached to
- Harold Keene Surface Bond Forfeiture -1
- Solicitation number
- IFB-121436
- Issued by
- Dinwiddie County, Snowville CDP, Virginia
About this file
This is a project plan document for the Virginia Department of Energy's Abandoned Mined Land Repurposing Program for the Harold Keene Surface Bond Forfeiture project located in Dickinson County, Virginia. The project encompasses mined land reclamation and construction work including the removal of four ponds (6A, 7, 9, and 10), cleanup of a coal remnant stockpile and bench areas, backfill operations for a pit and point cut-through area, and wetland restoration. The work requires contractors to coordinate with Virginia utilities through VA811 before excavation, obtain Agency clearance before commencing work, and maintain close cooperation with the Agency and other project participants. Final grades for all earthwork shall not exceed 1.5 horizontal to 1 vertical slope ratios. The project includes temporary support systems during excavation and backfill operations to ensure stability.
The wetland restoration component requires the planting of native aquatic and wetland species in designated zones including arrowhead and sago pondweed in the aquatic root zone, soft stem bulrush, burreed, and three square rush in the reed bank zone, and common buttonbush, American elderberry, and silky dogwood in the shrub zone. All acidic and toxic materials above the water table must be encapsulated with a minimum four feet of non-toxic, non-combustible, and impermeable spoil material sourced from available on-site materials. Backfill material is available from spoil piles along existing benches and berms, and no existing pre-law highwall shall be disturbed during material retrieval operations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT INDEX MAP
ST. PAUL, VA QUADRANGLE
DESCRIPTION
INDEX OF SHEETS
GENERAL NOTES
1. Before performing any excavation contact VA811 at va811.com or dial 811 to confirm the location of any below ground utility lines in the work area.
2. Before starting the work, contact the Agency for proper clearance and be governed by the Agency's instructions.
3. The contractor is responsible for scheduling, expediting, directing, inspecting and coordinating the work so as to complete the work in the time agreed upon.
4. Work in close cooperation with the Agency and others engaged in the project so that the work will be completed in an orderly manner.
5. Provide temporary supports as may be required during construction to ensure the stability of the proposed excavation and backfill.
Harold Keene Surface - Bond Forfeiture P.N. 1102284
1. Cover Sheet
2. Site Plan (1 of 2)
3. Site Plan (2 of 2)
4. Pond 6A Removal
5. Pond 7 Removal
6. Pond 9 Removal
7. Pond 10 Removal
8. Stockpile Clean-UP Area
9. Pit Clean-Up Area
10. Point Removal Backfill
11. Pit Backfill
12. Wetland Restoration
13. Details
MINED LAND REPURPOSING
ABANDONED MINED LAND SECTION
N
Project Location
May 5, 2026
Pit
Point Cut-Through
Area With Pond 10 Backfill Material Available Final Grade Shall Be No Steeper Than 1.5H:1V
Coal Remnant Material In
Stockpile And Loading Area
Pond 10
Pond 9
Highwall Miner Holes In Previously
Backfilled Area
LEGEND
Contour (5')
Si te
P la n (1 o f 2
H
AR
O
LD
K
EE
N E
SU
R
FA
C
E
- B
O N
D F
O R
FE
IT
U R
E D
IC
KE
N
SO
N C
O U
N
TY
, V
IR
G
IN
IA
N
Existing Access Road
DMLR Permit Boundary
State Route
Gas Line
Coal Remnant Material On Bench
Add Backfill Material As Necessary To Cover Miner Holes Using All Reasonably Available Material To At Least 4' Above The Coal Seam - Final Grade Shall Not Be Steeper Than 1.5H:1V Backfill Material May Be Sourced From Spoil Material Piled Along The Existing Bench And/Or The Berm Along The Outer Edge Of The Existing Bench No Existing "Pre-Law" Highwall Shall Be Disturbed When Retrieving Spoil Material
Pond 7
Pond 6A
Disturbed Area To Be Seeded
Highwall Miner Holes
Pond 5 Partially Constructed At This Location - Area To Be Graded & Seeded
0.4 Acre Wetland
Restoration Area
Provide Drainage Relief Through Berm Into Natural Drain
Area With Pond 7 Backfill Material Available Final Grade Shall Not Be Steeper Than 1.5H:1V
Si te
P la n (2 o f 2
H
AR
O
LD
K
EE
N E
SU
R
FA
C
E
- B
O N
D F
O R
FE
IT
U R
E D
IC
KE
N
SO
N C
O U
N
TY
, V
IR
G
IN
IA
N
LEGEND
Contour (5')
Access Road
DMLR Permit Boundary
State Route
VIEW A-A'
VIEW B-B' VIEW C-C'
A
B B'
C C'
A'
PLAN VIEW
Po nd
A
R em ov al
H
AR
O
LD
K
EE
N E
SU
R
FA
C
E
- B
O N
D F
O R
FE
IT
U R
E D
IC
KE
N
SO
N C
O U
N
TY
, V
IR
G
IN
IA
N
LEGEND
Contour (5')
Contour (1')
Final Contour (5')
Final Contour (1')
1 VIEW 1-1'
ROAD
PROPOSED FINAL GRADE
APPROXIMATE EXISTING GRADE
PROPOSED FINAL GRADE
APPROXIMATE EXISTING GRADE
VIEW 2-2'
1' 2'
PLAN VIEW
AREA WITH BACFILL MATERIAL AVAILABLE
FINAL GRADE SHALL BE NO STEEPER
THAN 1.5H:1V
Po nd
R em ov al
H
AR
O
LD
K
EE
N E
SU
R
FA
C
E
- B
O N
D F
O R
FE
IT
U R
E D
IC
KE
N
SO
N C
O U
N
TY
, V
IR
G
IN
IA
N
LEGEND
Contour (5')
Contour (1')
Final Contour (5')
Access Road
APPROXIMATE SWALE LOCATION
APPROXIMATE SWALE LOCATION
APPROXIMATE EXISTING GRADE
APPROXIMATE EXISTING GRADE
VIEW A-A'
VIEW B-B'
A
B B'
A'
PLAN VIEW
CONSTRUCT SHALLOW
GRASS-LINED SWALE AS
DIRECTED BY PROJECT
INSPECTOR
PROPOSED FINAL GRADE
PROPOSED FINAL GRADE
Po nd
R em ov al
H
AR
O
LD
K
EE
N E
SU
R
FA
C
E
- B
O N
D F
O R
FE
IT
U R
E D
IC
KE
N
SO
N C
O U
N
TY
, V
IR
G
IN
IA
N
LEGEND
Contour (5')
Contour (1')
Final Contour (5')
Access Road
Final Contour (1')
Existing Ditch
Proposed Ditch
Proposed Swale
VIEW B-B' VIEW C-C'
VIEW D-D'
PLAN VIEW
B
B'
C
C'
D
D'
A
A'
VIEW A-A'
PROPOSED FINAL GRADE
APPROXIMATE
EXISTING GRADE
EMBANKMENT
APPROXIMATE ORIGINAL
AND FINAL GRADE
PROPOSED FINAL GRADE
PROPOSED FINAL GRADE
APPROXIMATE
EXISTING GRADE
EMBANKMENT
APPROXIMATE EXISTING GRADE
APPROXIMATE EXISTING GRADE
PROPOSED RIPRAP CHANNELPROPOSED RIPRAP CHANNEL
PROPOSED RIPRAP CHANNEL
Po nd
R em ov al
H
AR
O
LD
K
EE
N E
SU
R
FA
C
E
- B
O N
D F
O R
FE
IT
U R
E D
IC
KE
N
SO
N C
O U
N
TY
, V
IR
G
IN
IA
N
LEGEND
Contour (5')
Contour (1')
Final Contour (5')
Final Contour (1')
Proposed Riprap Channel
SCRAPE COAL REMNANT MATERIAL FROM STOCKPILE
AREA FOR ENCAPSULATION IN BACKFILL AREA
St oc kp ile
"C le an -U p" A re a
H
AR
O
LD
K
EE
N E
SU
R
FA
C
E
- B
O N
D F
O R
FE
IT
U R
E D
IC
KE
N
SO
N C
O U
N
TY
, V
IR
G
IN
IA
N
LEGEND
Contour (5')
Contour (1')
"Black" Material
SCRAPE BLACK COAL REMNANT MATERIAL FROM
BENCH AREA FOR ENCAPSULATION IN BACKFILL AREA
Be nc h "C le an
-U p"
A re a
H
AR
O
LD
K
EE
N E
SU
R
FA
C
E
- B
O N
D F
O R
FE
IT
U R
E D
IC
KE
N
SO
N C
O U
N
TY
, V
IR
G
IN
IA
N
LEGEND
Contour (5')
Contour (1')
"Black" Material
PLAN VIEW
4 4'
5'
2'
2 2'
1 1'
VIEW 3-3'
VIEW 5-5'
VIEW 4-4'
VIEW 1-1' VIEW 2-2'
Po in t C ut
-T hr ou gh
B ac kf ill
H
AR
O
LD
K
EE
N E
SU
R
FA
C
E
- B
O N
D F
O R
FE
IT
U R
E D
IC
KE
N
SO
N C
O U
N
TY
, V
IR
G
IN
IA
N
LEGEND
Existing Contour (5')
Existing Access Road
1' 2'
PLAN VIEW
3' 4'
VIEW 2-2'
VIEW 1-1'
VIEW 3-3'
VIEW 4-4'
Pi t B ac kf ill
H
AR
O
LD
K
EE
N E
SU
R
FA
C
E
- B
O N
D F
O R
FE
IT
U R
E D
IC
KE
N
SO
N C
O U
N
TY
, V
IR
G
IN
IA
N
LEGEND
Existing Contour (5')
VEGETATION ZONES SPECIES PLANTING ZONE PLANTING PERIOD PLANTING RATE PLANTING METHOD
AQUATIC ROOT ZONE: 1) ARROWHEAD (Saggitiaria latifolia) 0.5 VF BELOW NP DOWN TO 2.0 VF BELOW NP SPRING TO MID-SUMMER 725 PLANTS (APPROX. 3' X 3' CENTERS) PLANT TUBERS 2" TO 3" INTO WET SOIL
2) SAGO PONDWEED (Potamogeton pectinatus) 0.5 VF BELOW NP DOWN TO 2.0 VF BELOW NP SPRING TO EARLY SUMMER 725 PLANTS (APPROX. 3' X 3' CENTERS) PLANT TUBERS 2" TO 3" INTO WET SOIL
REED BANK ZONE: 1) SOFT STEM BULRUSH (Scirpus validus) 2.0 VF ABOVE NP DOWN TO 0.5 VF BELOW NP ALL YEAR 365 PLANTS (APPROX. 3' X 3' CENTERS) PLANT SPROUTED RHIZOMES 2" TO 3" INTO WET SOIL
2) BURREED ( Sparganium eurycarpum) 0.5 VF ABOVE NP DOWN TO 0.5 VF BELOW NP SPRING OR SUMMER 365 PLANTS (APPROX. 3' X 3' CENTERS) PLANT SEEDLINSG 3" TO 4" INTO WET SOIL
3) THREE SQUARE RUSH (Scirpus americanus) 2.0 VF ABOVE NP DOWN TO 0.5 VF BELOW NP ALL YEAR 365 PLANTS (APPROX. 3' X 3' CENTERS) PLANT RHIZOME SECTIONS 2" TO 3" INTO WET SOIL
SHRUB ZONE: 1) COMMON BUTTONBUSH (Cephalanthus occidentalis) 2.0 VF ABOVE NP AND UP SPRING TO EARLY FALL 320 TREES (APPROX. 8' X 8' CENTERS) HAND PLANT SEEDLINGS
2) AMERICAN ELDERBERRY (Sambucus canadensis) 3.0 VF ABOVE NP AND UP SPRING TO EARLY FALL 320 TREES (APPROX. 8' X 8' CENTERS) HAND PLANT SEEDLINGS
3) SILKY DOGWOOD (Cornus amomum) 3.0 VF ABOVE NP AND UP SPRING TO EARLY FALL 320 TREES (APPROX. 8' X 8' CENTERS) HAND PLANT SEEDLINGS
VF - VERTICAL FEET
NP - NORMAL POOL
NOTES:
1) GROUNDCOVER IN THE SHRUB ZONE WILL BE ESTABLISHED WITH THE SPECIES OUTLINED IN SECTION 8 OF THE TECHNICAL SPECIFICATIONS.
2) SHRUBS ARE THE ONLY WOODY PLANTS TO BE PLANTED ON THE WETLAND EMBANKMENTS.
3) OTHER SUITABLE NATIVE WETLAND PLANTS MAY BE SUBSTITUTED/ADDED BASED ON AVAILABILITY.
APPROXIMATELY 2' DEEPAPPROXIMATELY 1' DEEP
APPROXIMATELY 360'
PROFILE VIEW
PLAN VIEW TYPICAL PLANTING PATTERN
NORMAL POOLΔ
W et la nd
R es to ra tio n
H
AR
O
LD
K
EE
N E
SU
R
FA
C
E
- B
O N
D F
O R
FE
IT
U R
E D
IC
KE
N
SO
N C
O U
N
TY
, V
IR
G
IN
IA
N
LEGEND
Access Road
Shrub Zone
Reed Bank Zone
Aquatic Root Zone
COAL SEAM
Water Table
Acidic/Toxic Material (Above Water Table)
Non-Toxic Impermeable Material (MIN 4' of Cover)
Backfill Material (As Required)
Original Ground
Note:
All Acidic/Toxic Material will be encapsulated with a minimum 4' of the most non-toxic, non-combustible and impermeable spoil material available on-site.
D et ai ls
H
AR
O
LD
K
EE
N E
SU
R
FA
C
E
- B
O N
D F
O R
FE
IT
U R
E D
IC
KE
N
SO
N C
O U
N
TY
, V
IR
G
IN
IA
N
| Harold Keene Bond Forfeiture-Cover.pdf |
| Sheets and Views |
| Cover |
| Harold Keene Bond Forfeiture Site Plan 1.pdf |
| Sheets and Views |
| Site Plan 1 |
| Harold Keene Bond Forfeiture Site Plan 2.pdf |
| Sheets and Views |
| Site Plan 2 |
| Harold Keene Bond Forfeiture Pond 6A Removal.pdf |
| Sheets and Views |
| Pond 6A Removal |
| Harold Keene Bond Forfeiture Pond 7 Removal.pdf |
| Sheets and Views |
| Pond 7 Removal |
| Harold Keene Bond Forfeiture Pond 9 Removal.pdf |
| Sheets and Views |
| Pond 9 Removal |
| Harold Keene Bond Forfeiture Pond 10 Removal.pdf |
| Sheets and Views |
| Pond 10 Removal |
| Harold Keene Bond Forfeiture Stockpile Clean-Up Area.pdf |
| Sheets and Views |
| Stockpile Clean-Up Area |
| Harold Keene Bond Forfeiture Bench Clean-Up Area.pdf |
| Sheets and Views |
| Bench Clean-Up Area |
| Harold Keene Bond Forfeiture Point Cut-Through Backfill.pdf |
| Sheets and Views |
| Point Cut-Through Backfill |
| Harold Keene Bond Forfeiture Pit Backfill.pdf |
| Sheets and Views |
| Pit Backfill |
| Harold Keene Bond Forfeiture Wetland.pdf |
| Sheets and Views |
| Wetland |
| Harold Keene Bond Forfeiture Details.pdf |
| Sheets and Views |
| Details |
| 2026-05-27T09:48:20-0400 | |
| Holly F White |
| 2026-05-27T09:48:21-0400 | |
| Holly F White |
| 2026-05-27T09:48:24-0400 | |
| Holly F White |
| 2026-05-27T09:48:25-0400 | |
| Holly F White |
| 2026-05-27T09:48:26-0400 | |
| Holly F White |
| 2026-05-27T09:48:27-0400 | |
| Holly F White |
| 2026-05-27T09:48:28-0400 | |
| Holly F White |
| 2026-05-27T09:48:29-0400 | |
| Holly F White |
| 2026-05-27T09:48:31-0400 | |
| Holly F White |
| 2026-05-27T09:48:31-0400 | |
| Holly F White |
| 2026-05-27T09:48:33-0400 | |
| Holly F White |
| 2026-05-27T09:48:34-0400 | |
| Holly F White |
| 2026-05-27T09:48:35-0400 | |
| Holly F White |