Harold Keene Bond Forfeiture 1102284_BID SCHEDULE_Final 5_5_26.pdf
PDF 114 KB Posted
- Attached to
- Harold Keene Surface Bond Forfeiture -1
- Solicitation number
- IFB-121436
- Issued by
- Dinwiddie County, Snowville CDP, Virginia
About this file
This is a Bid Schedule for the Harold Keene Surface Bond Forfeiture project issued by the Virginia Department of Energy's Abandoned Mined Land Repurposing Program. The project encompasses reclamation and construction work across multiple scope items totaling 17 line items. Key project components include site preparation, installation of 2,500 linear feet of silt fence, backfill operations for a point cut-through area (17,000 cubic yards), pit backfill (10,000 cubic yards), and highwall miner area backfill (500 cubic yards). Additional work includes the placement of 600 tons of VDOT No. 57 stone, 100 tons of VDOT No. 2 stone, and 100 tons of crusher run stone. The project also requires regrade work and restoration activities across five pond areas (Ponds 5, 6A, 7, 9, and 10), as well as wetland restoration and revegetation efforts totaling 0.4 acres of wetland restoration, 0.4 acres of wetland restoration revegetation, and 30 acres of general revegetation.
Bidders must submit unit prices for all line items and provide a bid bond for any total bid exceeding $100,000. Mobilization costs are capped at no greater than 5 percent of the Total Base Bid amount (Items 2-17). Payment will be made on actual units used and verified in the field, with the Total Bid Price (Items 1-17) utilized for determining the contract award value and establishing performance and payment bond amounts. Any bidder submitting a unit price of $0 or leaving a unit price blank will be deemed nonresponsive. In cases of pricing extension errors, the unit price shall govern.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item No.
SPEC
No. Item Name
Approx.
Quantity Units Unit Price Total Price
1 1 Mobilization Job Lump Sum N/A Maximum Limit of No greater than 5% of Total Base Bid amount.
2 2 Site Preparation Job Lump Sum N/A
3 3 Silt Fence Installed 2500 L.F.
4 4 Point Cut-Through Backfill (≈ 17,000 C.Y.) 1 Lump Sum N/A
5 4 Pit Backfill (≈ 10,000 C.Y.) 1 Lump Sum N/A
6 4 Highwall Miner Area Backfill (≈ 500 C.Y.) 1 Lump Sum N/A
7 5 VDOT No. 57 Stone 600 TON
8 5 VDOT No. 2 Stone 100 TON
9 5 VDOT Crusher Run Stone 100 TON
10 6 Pond 5 Area Regrade 1 Lump Sum N/A
11 6 Pond 6A 1 Lump Sum N/A
12 6 Pond 7 1 Lump Sum N/A
13 6 Pond 9 1 Lump Sum N/A
14 6 Pond 10 1 Lump Sum N/A
15 7 Wetland Restoration 0.4 ACRE
16 8 Wetland Restoration Revegetation 0.4 ACRE
17 8 Revegetation 30 ACRE
Measurement Unit Definitions
BID SCHEDULE
HAROLD KEENE P.N. 1102284 BOND FORFEITURE
Total Base Bid (Items 2 - 17) L.F. - Linear Feet C.Y. - Cubic Yard ≈ Approximately Total Bid Price (Items 1 - 17)
(Firm) (Date)
(Signature) (Title)
"The Total Bid Price will be utilized for determining the amount of bid, to establish a contract award value, and to determine the performance and payment bond amounts for the successful Bidder. Each Bidder must submit a bid bond for all bids of $100,000 or more. Payment will be made on actual units used and verified in the field. Correct pricing is extremely important and price should be double checked before submitting a bid. In the case of errors in the extension of prices, the unit price shall govern." Any bidder who enters $0 as a unit price or leaves the unit price blank shall be considered a nonresponsive bidder.