Hancock VOR Roof Drawings.pdf

PDF 6 MB Posted

Attached to
Replacement roof at Hancock VOR/DME facility
Solicitation number
2301629
Issued by

View the file

Other files

File Type Posted
HNK VOR Roof RFO (Plywood).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

SUBMITTED BY:

APPROVED BY:

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

EASTERN SERVICE AREA – NEW YORK TECHNICAL SUPPORT CENTER

VOR

REPLACEMENT OF THE VOR BUILDING ROOF

DETAILS

HANCOCK HANCOCK NY

DWG NO REV

HNK-D-VOR

SHEET A002 DATE

09/15/2022

NOTES:

1. INSTALL WALKING PADS AROUND PERIMETER OF TEEPEE, AROUND PERIMETER OF ROOF, FROM THE LADDER

TIE DOWN POINT TO THE TEEPEE AND INSIDE THE TEEPEE.

2. CONTRACTOR SHALL REMOVE AND RE-INSTALL ALL VOR MONITORING ANTENNAS IN THE SAME LOCATION.

3. ROTTED T&G ROOF DECKING SHALL BE REPLACED AS NECESSARY

4. THE CONTRACTOR SHALL ENSURE THAT THE FACILITY REMAINS PROTECTED FROM THE WEATHER AT ALL TIMES. CAUTION SHALL BE USED WHEN WORKING AROUND THE VOR ANTENNAS LOCATED INSIDE THE TEEPEE

5. THE CONTRACTOR HAS THE OPTION OF EITHER USING THE COPPER MESH OR INSTALLING A 16OZ PER SQUARE FOOT COPPER COUNTERPOISE/TERNE PLATE. ALL LAP JOINTS SHALL BE 3/4" ANS SOLDERED FULL LENGTH AND

WIDTH.

6. CONTRACTOR SHALL INSPECT BUILDING INTERIOR CEILING AND REPLACE THE DAMAGED AREA

PAINT EXPOSED WOOD

DECK AND NAILER WHITE

WITH EXTERIOR PAINT

CONTRACTOR SHALL FURNISH AND INSTALL 16 MONITOR ANTENNA

SUPPORT ASSEMBLIES AT LOCATIONS SET BY THE SURVEY LAYOUT

REPLACEMENT OF THE VOR BUILDING

MONITOR ANTENNA SUPPORT ASSEMBLY

HANCOCK HANCOCK NY

SHEET S001 DATE

Page-1�

2023-01-04T13:44:31-0500

JOSEPH C HENN

2023-01-05T11:03:52-0500

MICHAEL M. SHUCAVAGE

REPLACEMENT OF THE VOR BUILDING

ROOF PLAN

HANCOCK HANCOCK NY

SHEET C001 DATE

16 VOR ANTENNA

MONITORS (TYP)

REMOVED BY THE

FAA

N

MAG

1. CONTRACTOR TO REMOVE THE 16 VOR ANTENNA MONITOR ANTENNAS AND MOUNTING

PLATES. CONTRACTOR TO STORE THE ANTENNAS AND PLATES ON-SITE. THE ANTENNAS AND

PLATES SHALL BE REINSTALLED IN THE SAME EXACT LOCATION UPON COMPLETION OF THE

INSTALLATION OF THE NEW ROOFING SYSTEM. A NYS LICENSED SURVEYOR SHALL BE USED

TO RECORD THE EXSITING LOCATION OF THE MONITOR ANTENNA AND LAYOUT THE FINAL

LOCATION/ORIENTATION.

2. CONTRACTOR SHALL CONFIRM ALL DIMENSIONS OF SHELTER AND ROOF.

3. CONTRACTOR TO PROPERLY STORE AND SECURE THE VOR TEEPEE WHEN ON THE

GROUND.

REMOVE EXISTING ROOFING SYSTEM

DOWN TO THE EXISTING METAL

TERNEPLATE AND INSTALL NEW FULLY

ADHERED EPDM ROOFING SYSTEM.

R 26'-5"

INSTALL WALKWAY PADS AROUND

ENTIRE PERIMETER OF TEEPEE

INSTALL WALKWAY PADS

AROUND ENTIRE

PERIMETER OF ANTENNAS

(REMAINDER NOT SHOWN

FOR CLARITY)

EXISTING GROUND CABLE TO

REMAIN. REMOVE AND RE-ATTACH

AS NEEDED FOR INSTALLING NEW

ROOFING SYSTEM (4 PLACES)

REMOVE AND SAVE

ANTENNA MOUNTING/

KEYSTONE BRACKETS,

FABRICATE NEW

SUPPORT ASSEMBLY

AND REINSTALL

BENEATH ROOF DECK

(16 TOTAL) SEE S001

36' X 36' X 10'

SHELTER

UNBOLT AND REMOVE FIBERGLASS VOR ANTENNA TEEPEE.

REINSTALL TEEPEE IN SAME EXACT LOCATION AFTER NEW ROOF

IS INSTALLED. IF NECESSARY, REMOVE TOP COVER TO ALLOW

FOR PROPER REMOVAL OF THE TEEPEE. CONTRACTOR TO

REMOVE ALL EXISTING GASKETS/CAULKING MATERIAL AND CLEAN

ALL SURFACES TO ALLOW FOR PROPER INSTALLATION OF NEW

GASKET AND CAULKING R 5'-0"

22.5 DEGREES

Page-1�

2023-01-04T13:43:02-0500

JOSEPH C HENN

2023-01-05T11:00:33-0500

MICHAEL M. SHUCAVAGE

PROFILE DETAILS

HANCOCK HANCOCK NY

SHEET A002 DATE

REMOVE FIBERGLASS TEEPEE AND REINSTALL OVER NEW ROOFING SYSTEM.

INSTALL REFERENCE MARKINGS TO ENSURE TEEPEE IS REINSTALLED IN THE

PROPER LOCATION (CENTERED ON ROOF). TEEPEE SHALL BE PROPERLY

SECURED AND STORED WHEN ON THE GROUND. ANY DAMAGE SUSTAINED

DURING THE MOVING/STORAGE OF THE TEEPEE SHALL BE REPAIRED BY THE

CONTRACTOR AT NO ADDITIONAL COST.

EXISTING COPPER BOND STRIP

EXISTING VOR

MOUNTING RING

WALKING PADS (TYP)

INSTALL FULLY ADHERED ROOF

MEMBRANE

INSTALL ¾” EXTERIOR GRADE PLYWOOD AND FASTEN PER ROOF

MANUFACTURER SPECIFICATONS

EXISTING GROUNDING CONDUCTORS TO REMAIN (4 TOTAL)

1. INSTALL WALKING PADS AROUND PERIMETER OF TEEPEE, AROUND PERIMETER OF ROOF, FROM THE LADDER

TIE DOWN POINT TO THE TEEPEE AND INSIDE THE TEEPEE.

2. CONTRACTOR SHALL REMOVE AND RE-INSTALL ALL VOR MONITORING ANTENNAS IN THE SAME LOCATION. A STATE OF NY LICENSED SURVEYOR SHALL BE USED TO RECORD THE EXISITNG LOCATION AND ORIENTATION OF

EACH ANTENNA AND THEN CONFIRM THE FINAL LOCATION.

3. THE CONTRACTOR SHALL ENSURE THAT THE FACILITY REMAINS PROTECTED FROM THE WEATHER AT ALL TIMES. CAUTION SHALL BE USED WHEN WORKING AROUND THE VOR ANTENNAS LOCATED INSIDE THE TEEPEE

EXISTING TERNE PLATE TO REMAIN

ROOFING PROFILE DETAILS

26'-5"

R O

O F

C

EN

TE

R

LI

E

EXISTING VINYL SOFFIT BETWEEN ROOF EDGE

AND BUILDING (DIMENSION VARIES) TO REMAIN

REPLACE DAMAGED INTERIOR

CEILING PANELS AND PAINT TO

MATCH EXISTING COLOR

INSTALL TEMINATION BAR IN ACCORDANCE WITH MANUFACTURER

SPECIFICATIONS

VOR BUILDING WALL

EXISTING VINYL SIDING AND INSULATION BOARD TO

REMAIN

EXISTING 2" X 6" TONGUE AND

GROVE DECKING

EXISTING ROOF DECK

BLOCKING

2" X 12" FACIA BOARD WITH WHITE

FLASHING TO REMAIN

PAINT EXPOSED NAILER AND BOTTOM OF ROOF BOARDS WITH PRIMER AND 2 COATS

OF EXTERIOR ACRYLIC LATEX WHITE PAINT PRIOR TO INSTALLATION OF THE

MONITORING ANTENNA BRACKETS. NAILERS SHALL BE DRY AND ABLE TO ACCEPT THE

PAINT. DO NOT PAINT WHILE NAILER IS UNABLE TO ABSORB THE PAINT. TOUCH UP AS

NECESSARY AFTER INSTALLATION OF THE BRACKETS.

EXISTING ROOF SUPPORT

CHANNELS AND STEEL BEAMS VOR BUILDING CEILING PANELS

EXTEND PLYWOOD AND MEMBRANE INTO TEEPEE

INSTALL RUBATEX GASKET BETWEEN TEEPEE BASE AND ROOF

MEMBRANE. USE CONTACT ADHESIVE TO HOLD GASKET IN PLACE

IF REQUIRED

INSTALL CAULKING AROUND TEEPEE PERIMETER

(INSIDE AND OUTSIDE). CAULKING MUST BE

COMPATABLE WITH THE ROOFING MEMBRANE

(polyurethane-based elastomeric sealant 3M 5200)

INSTALL 4' LONG 2" X 8" PRESSURE TREATED NAILER (TRIM AS NECESSARY TO

FIT BETWEEN BUILDING FACIA AND ROOF EDGE) CENTERED AT EACH

MONITORING ANTENNA LOCATION (16 TOTAL) USING 6 EQUALLY SPACED

GALVANIZED LAG SCREWS. SEE S001 FOR MONITORING ANTENNA BRACKET

SUPPORT FABRICATION MOUNTING DETAILS.DIM VARIES

X

X

INSTALL ADHESIVE/MASTIC IN ACCORDANCE WITH ROOF

MANUFACTURER SPECIFICATIONS

INSTALL SEALANT IN ACCORDANCE WITH ROOF MANUFACTURER

SPECIFICATIONS

SAND OR CHAMFER TOP EDGE OF PLYWOOD (ENTIRE PERIMETER)

SECURE TEEPEE USING EXISTING 3/8" LAG BOLTS AND WASHERS.

CONTRACTOR TO REPLACE ANY DAMAGED LAG BOLTS AT NO

ADDITIONAL COST. INSTALL CAULKING IN THE PILOT HOLES

(36 TOTAL)

Page-1�

2023-01-04T13:43:45-0500

JOSEPH C HENN

2023-01-05T11:02:46-0500

MICHAEL M. SHUCAVAGE

KELSEY, NY

HANCOCK (HNK) VOR/DME

REPLACEMENT OF VOR BUILDING ROOF

EASTERN SERIVCE AREA – NEW YORK TECHNICAL SUPPORT CENTER

COVER

KELSEY HANCOCK VOR NY

HNK-D-BLDG

SHEET G001DATE

11/29/2022

Page-1�

2023-01-04T13:40:21-0500

JOSEPH C HENN

2023-01-05T10:53:57-0500

MICHAEL M. SHUCAVAGE

INDEX

KELSEY HANCOCK VOR NY

HNK-D-BLDG

SHEET G002DATE

11/29/2022

DRAWING LIST ABBREVIATIONS SYMBOLS LEGEND

GENERAL

G001 TITLE

G002 INDEX

G003 PHOTOS

CIVIL

C001 ROOF PLAN

C002 ROOF PROFILE

STRUCTURAL

S001 MONITOR ANTENNA SUPPORT ASSEMBLY

EES EARTH ELECTRODE SYSTEM

EMT ELECTRICAL METALLIC CONDUIT

FAA FEDERAL AVIATION ADMINISTRATION

GFM GOVERNMENT FURNISHED MATERIAL

JB JUNCTION BOX

PVC-RGSC PVC COATED RIGID GALVANIZED STEEL CONDUIT

RE RESIDENT ENGINEER

RF RADIO FREQUENCY

RGSC RIGID GALVANIZED STEEL CONDUIT

SS STAINLESS STEEL

SYMBOL DESCRIPTIONNOTES

A1

DETAIL CALLOUT

DETAIL

NUMBER

SHEET WHERE

DETAIL IS DRAWN

REFERENCE PLANE

A-1

A-1

SECTION

SECTION

NUMBER

SHEET WHERE

SECTION IS DRAWN

Page-1�

2023-01-04T13:41:37-0500

JOSEPH C HENN

2023-01-05T10:56:50-0500

MICHAEL M. SHUCAVAGE

PHOTOS

KELSEY HANCOCK VOR NY

SHEET G003 DATE

09/07/2022

Page-1�