HAESI 2.0 - Industry Day Presentation 2026 05 Aug 2026_Updated 07Aug2026_FINAL08192026.pptx
PPTX presentation 4 MB Posted
- Attached to
- HAESI 2. 0 INDUSTRY DAY 05 AUG 2026
- Solicitation number
- HAESI2008052026
About this file
This document is an Industry Day presentation for the Huntsville Architect Engineering & Support Indefinite Delivery Contract (HAESI 2.0), a comprehensive A/E services acquisition by the U.S. Army Corps of Engineers, Huntsville Engineering and Support Center.
HAESI 2.0 is a multiple-award indefinite delivery contract (IDC) suite with an anticipated contract value of $399 million and a period of performance consisting of one three-year base period and two two-year option periods (seven years total if all options are exercised), plus an optional six-month extension. The contract will utilize NAICS code 541330 (Engineering Services) with a small business size standard of $25.5 million. The acquisition strategy calls for six unrestricted awards and one small business-restricted award, with task orders issued on a qualifications-based selection (QBS) basis under FAR 36.602-1 and DFARS PGI 236.602-1. Task orders will be negotiated as Firm-Fixed Price (FFP) agreements, with those estimated under $1 million set aside for small business unless deemed technically inappropriate. Selection criteria include specialized experience and technical competence, professional qualifications, past performance, capacity, and knowledge of locality, as evaluated through SF330 submittals. Small business prime contractors are subject to FAR 52.219-14 limitations on subcontracting, restricting payment to non-similarly situated subcontractors to 50 percent of government contract payment for services.
The scope of services encompasses facility planning and programming, architectural and engineering design, geotechnical investigations, surveying, cost estimating, value engineering, CADD/BIM support, construction-phase services, commissioning, and technical analyses supporting DoD and federal agency facilities worldwide, including potential overseas locations in Germany, Italy, Japan, and the Republic of Korea. Anticipated milestones include sources sought posted May 27, 2026 (closed July 10, 2025), synopsis in Q2 FY2027, request for price proposal in Q4 FY2027, and contract award in Q2 FY2028. Contractors must comply with EM 385-1-1 safety requirements, achieve appropriate CMMC 2.0 cybersecurity maturity levels for handling FCI or CUI, and maintain DFARS compliance for cybersecurity reporting. Incumbent firms on HAESI 1.0 include AECOM Technical Services, Black & Veatch Special Projects Corp., Burns & McDonnell Engineering Company, Inc., Dynotec-KZF Joint Venture LLC (SB), The Mason & Hanger Group Inc., Michael Baker-Stanley Joint Venture, and Rogers, Lovelock & Fritz, Inc.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Copy of HAESI 2.0 Industry Day Partipation List 08 Aug 2026 (001 Updated)FINAL08192026.xlsx | XLSX spreadsheet | |
| HAESI 2.0 Industry Day Questions and Answers 07 Aug 2026_ FINAL08192026.docx | DOCX document | |
| HAESI 2.0 Industry Day Participant List .xlsx | XLSX spreadsheet | |
| DRAFT SOW HAESI 2.0 Section C- 07May26.docx | DOCX document | |
| Sources Sought Huntsville Architect Engineering Support IDC (HAESI 2.0) 19 May CLEAN_27May2026.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Army Engineering and Support Center, Huntsville
5 AUGUST 2026
HUNTSVILLE ARCHITECT ENGINEERING & SUPPORT INDEFINITE DELIVERY CONTRACT (HAESI 2.0)
Virtual industry day
“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”
.59
Government representatives
Daniel Cook – Chief Systems Cost Division
Tammy Cinnamon/Anna Tonnang – Acquisition Project Manager
Johnna Sebben – Contracting Officer, Facilities, Specialty Services, and Technology Support (FST)
Shete McCants-Robinson– Contract Specialist, FST
Nicole Boone – Office of Small Business Programs
Todd Lewis - Safety & Occupational Health Manager
Clay Weisenberger – Office of Counsel
RULES OF ENGAGEMENT
Meeting will be recorded.
Everything discussed is subject to change!
We are looking for your INPUT!
Submit your questions to shete.q.mccants-robinson@usace.army.mil.
The Presentation Slides, Responses to Questions, Transcript and Recording, and Attendees List will be posted to SAM.gov on or before 19 August.
NOTE: Until all required acquisition related documents are approved, the expectations shared herein are subject to change.
agenda Introduction – Mr. Cook HAESI 2.0 Overview – Ms. Cinnamon Acquisition Approach – Mrs. Sebben Small Business and Resources – Mrs. Boone ØCMMC Requirements – Mr. Weisenberger Safety Overview – Mr. Todd Lewis Questions and Wrap up – Mrs. Sebben
Highlights of the expected program elements. HAESI 2.0 provides comprehensive architect-engineer support services for planning, design, engineering, and technical solutions supporting facility and infrastructure projects worldwide.
INTRODUCTION
DANIEL COOK
CHIEF – SYSTEMS COST DIVISION
.59 HAESI 2.0 overview The Huntsville Architect Engineering Support Indefinite Delivery Contract (HAESI 2.0) contract is the primary tool providing comprehensive architectural, engineering, planning, design, survey, analysis, and technical support services for new and existing facilities and infrastructure projects.
Primary customers/stakeholders include the Department of Defense (DoD) and Facilities Repair Reduction, S&C, Planning and Programming (P&P), Secure Facilities, Access Control Point (ACP), Power Reliability Enhancement Program (PREP), Facility Technology Integration (FTI), Resource Development Coordinating Committee (RDCC) and Construction Branch.
Services include facility planning and programming, feasibility studies, geotechnical investigations, permitting, master planning, value engineering, surveying, cost estimating, engineering studies, architectural and engineering design, CADD/BIM support, design reviews, construction-phase services.
The numerous locations of these projects can be inside or outside the U.S. Possible overseas work locations include –Germany, Italy, Japan, and the Republic of Korea.
Highlights of the expected program elements for HAESI 2.0 include the delivery of architect-engineer services through qualifications-based task order competitions supporting facility planning, design, engineering studies, surveying, commissioning, and construction-phase services.
OVERVIEW
Tammy Cinnamon Program Manager
.59 HAESI 2.0 overview: Scope & intent The scope of services may include but are not limited to:
AE Design Services:
• Facility planning, programming, and master planning services
• Architectural and engineering design services
• New construction, renovation, and modernization support
• Feasibility studies and engineering analyses
• Geotechnical investigations and site assessments
• Surveying and field/site investigations
• Cost estimating and value engineering services
• Permitting and regulatory compliance support
• CADD/BIM development, documentation, and reviews
• Construction-phase support and commissioning services
• Economic analyses, technical studies, and specification development
HAESI 2.0 overview: Scope & intent (Continued…):
Technical Support:
• Engineering studies, evaluations, and technical analyses
• Design reviews and quality assurance/quality control (QA/QC) support
• CADD/BIM modeling, drawing development, and document management
• Site investigations, field assessments, and data collection Engineering Surveys and Assessments:
• Engineering surveys and site characterization
• Facility condition assessments and evaluations
• Geotechnical investigations and subsurface analyses
• Site and field investigations supporting project development
• Feasibility studies and infrastructure assessments
Engineering Studies:
Technical Analyses Original Research Engineering Studies Feasibility Studies Value Engineering Simulation Modeling Cybersecurity Systems Engineering policy development assistance Economic Analyses Engineering Forensics Decision Support studies
Facility Planning:
Master planning Facility planning Long-range facility Planning studies Programming
Solicitation & Other Documents Preparation:
Requests for Proposal (Design-Build) Specifications Submittal Registers Environmental Documentation DD1391 Planning Documents DD1354 documents, etc.
Commissioning:
Fundamental, enhanced, recommissioning, and retro-commissioning Measurement & verification Post-occupancy validation
Construction Phase Services:
Construction proposal evaluation Construction submittal review Requests for Information response Shop drawing review Site visits & construction inspection services Engineering During Construction Construction Management at Risk (CM@Risk)
Due to the diversity of the types of requirements that may be required, USACE is seeking professional and responsive architect-engineering firms that are thoroughly familiar with all aspects of DoD facility planning, programming, engineering, and construction.
Incumbent firms on the current HAESI 1.0 contract include:
AECOM Technical Services Black & Veatch Special Projects Corp.
Burns & McDonnell Engineering Company, Inc.
Dynotec-KZF Joint Venture, LLC (SB) The Mason & Hanger Group Inc.
Michael Baker – Stanley Joint Venture Rogers, Lovelock & Fritz, Inc acquisition approach
JOHNNA SEBBEN
CONTRACTING OFFICER, (FST)
Overview of our expected procurement strategy for the contracts and how we will select for task orders. Each task order will establish project-specific scope, deliverables, schedule, and performance requirements, ensuring flexible and efficient execution of architect-engineer services across a diverse portfolio of requirements.
.59 HAESI 2.0 - Acquisition approach North American Industry Classification System (NAICS) Code – 541330, Engineering Services
Small Business Size Standard - $25.5 Million
Anticipated Contract Value - $399 Million
Period of Performance: One (1) three-year base period and two (2) two-year option periods for a total of seven (7) years if all options are exercised. Contract will also include FAR 52.217-8, Option to Extend Services, allowing for a 6-month extension (if needed).
Contract Type: Multiple Award Indefinite Delivery Contract (IDC) suite.
Work will be issued by negotiated Firm-Fixed Price (FFP) Task Orders.
HAESI 2.0- Acquisition approach
Selection of firms will be qualifications-based.
Per RFO 36.602-1 and DFARS PGI 236.602-1 Selection Criteria, award will be made to the most highly qualified firms, as determined by an evaluation of the following criteria provided in the SF330, A-E Qualifications:
Specialized Experience & Technical Competence Professional Qualifications Past Performance Capacity Knowledge of Locality Other appropriate selection criteria
Secondary criteria will be used by the selection board as a tie-breaker, if necessary. These criteria will be identified in the synopsis and listed separately in relative order of importance after the listing of the primary selection criteria.
*EP 715-1-7 Construction Architect-Engineer Contracting in the U.S. Army Corps of Engineers
HAESI 2.0- Acquisition approach
IDC includes a portion of the awards reserved for small business concerns, under Section 1331 of the Small Business Jobs Act of 2010 in Public Law 111-240
Intend to make six (6) unrestricted awards and one (1) restricted-small business reserve award
Instead of two separate pools, the Government will issue a single unrestricted synopsis
IDC to allow Small Businesses to be considered for each task order Task orders estimated at less than $1M will be set aside, unless determination is made that the requirement is not appropriate based on technical complexity
FAR 52.219-14, Limitations in Subcontracting will still apply to prime small business concerns
HAESI 2.0- ANTICIPATED MILESTONES
| Milestone | Date |
| Market Research | Ongoing |
| Sources Sought | Posted 27 MAY 2026 |
Closed 10 JULY 2025
| Synopsis | 2nd Quarter FY 2027 |
| Request for Price Proposal | 4th Quarter FY 2027 |
| Award | 2nd Quarter FY 2028 |
NICOLE BOONE
CHIEF, HNC OFFICE OF SMALL BUSINESS
OFFICE OF SMALL BUSINESS PROGRAMS
.59
SMALL BUSINESS ADMINISTRATION (SBA)
TABLE OF SMALL BUSINESS SIZE STANDARDS
FOR SMALL BUSINESSES ONLY
For those portions of the contract that are reserved for small business, FAR 52.219-14, Limitations on Subcontracting applies.
For services (except construction), the prime will not pay more than 50% of the amount paid by the Government for contract performance to subcontractors that are not *similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50% subcontract amount that cannot be exceeded.
* Similarly situated entity: A first-tier subcontractor that has the same SB program status, without regard to its socioeconomic status AND is considered small for the size standard under the North American Industry Classification System (NAICS) code as the prime contractor assigned to the subcontract.
IAW OPORD 2026-03 (Implementation of Cybersecurity Maturity Model Certification (CMMC) and CUI-FCI Compliance)
Cybersecurity maturation model Certification (CMMC)
Clay Weisenberger Office Of Counsel
.59 CMMC 2.0 Program Guidance CMMC 2.0 Effective 10 SEP 25, Department of War (DoW) contractors handling Federal Contract Information (FCI) or Controlled Unclassified Information (CUI) must achieve specific cybersecurity maturity levels to protect sensitive data to be eligible for applicable contract actions. CMMC requirements are detailed in DFARS 252.204-7021 and 7025. Immediate action needed to align with NIST and DoW mandates. Implementation will be phased over three (3) years.
Phased implementation.
| Phase 1 - CMMC Level 1 and Level 1 Self - Started | |
| Phase 2 - CMMC Level 2 Self –Started-3rd Partied | Certified/Suspended until further notice (60 days from 13July26) |
| Phase 3 - CMMC Level 3 - FY28 (not anticipated at this time) | |
| Phase 4 – Reporting under DFARS – FY 29 |
Registration – Tracked in Supplier Performance Reporting System (SPRS). Contracting Officers will ensure/document status in SPRS prior to award.
Cmmc Requirements at a glance The CMMC Program provides assessments at three levels, each incorporating security requirements from existing regulations and guidelines.
Level 1: Basic Safeguarding of FCI - Annual self-assessment and annual affirmation of compliance with the 15 security requirements in FAR clause 52.204-21.
Level 2: Broad Protection of CUI - Either a self-assessment or an independent assessment by authorized Third-Party Assessment Organization (C3PAO) every three years. Decided type of info processed, transmitted, or stored on the contractor or subcontractor information systems. Annual verification of compliance with the 110 security requirements in NIST SP 800-171 Revision 2.
Level 3: Higher-Level Protection of CUI Against Advanced Persistent Threats - Achieve CMMC Status of Final Level 2 and undergo an assessment every three years by Defense Contract Management Agency’s (DCMA) Defense Industrial Base Cybersecurity Assessment Center (DIBCAC). Meet 24 addition requirements of NIST SP 800-172.
CMMC Phase II Suspension – Key Takeaways (July 2026) 13 July 2026 – DoW Immediately Suspends Phase II Start
Impact:
Rollout of mandatory 3rd-party assessments paused 60-day comprehensive review Phase I requirements remain unchanged, including Level 2 Self-Assessments (as applicable) DFARS 252.204-7012, NIST SP 800-171 and SPRS reporting still apply.
Contractors must continue protecting FCI and CUI
TAKEAWAY: Fluid situation. Monitor and stay vigilant.
TODD D. LEWIS
SAFETY MANAGER
SAFETY OVERVIEW
.59
USACE Safety & Occupational Health Requirements
COMPLIANCE WITH EM 385-1-1 IS REQUIRED:
Must utilize the ENG 6293 APP Worksheet More stringent than OSHA It requires site specific SOH plans It requires a qualified Site Safety & Health Officer onsite at all times work is being performed, employed by the Prime.
Chapter 2, EM 385-1-1, Program Management requires:
Documented inspections Specific training prior to start of work A robust bulletin board with deficiency log, OSHA posters, OSHA 300, visitors log
HNC has implemented a Safety Management System Safety is top down, proactive not reactive Leading indicators are tracked for trends Near-miss reporting, mitigations and controls Contractors MUST be proactive with Injury and Illness Prevention Programs
Questions & wrap up Everything discussed is subject to change.
We are looking for your INPUT!
Submit any additional questions to shete.q.mccants-robinson@usace.army.mil.
The Presentation Slides, Responses to Questions, Transcript and Recording, and Attendees List will be posted to SAM.gov on or before 7 AUG 2026
Thank you!