D
Engineering Change Notice 1 1 - 1 7 - 0 4 FOR HI-IAU\KAI, TASK SSI -040 (03 )
Drawings a f fec ted:
H I - 4 2 4 - 0 0 3 Rev A H I - 4 6 1 A - 0 0 3 Rev -
C
Subject Synopsis:
Lengths of t ransducer cables for Kongsberg EM 300 devices are reduced f rom 20 meters to 15 meters. This change necessitates rerouting the coble "Moonpipes" to reduce length where possible to under 15 meters, or to under 20 meters, with splice in a dry compar tment , where necessary.
H I - 4 2 4 - 0 0 3 Rev A:
New routing for Receive Array:
From wet t ransducers, through bo t tom shell, conveyed through 6" or 8" or 10" diameter schedule 80 pipe, f rom approximately 26 " off vessel centerl ine stbd, up and curving forward, through lightening hole at f rame 35, diagonally through WT BHD 34, diagonally through WT BHD 33, passing through of t sound room, diagonally through WT BHD 3 1 , turning upwards through 10' 0" f lat at f rame 2 6 - 2 5 at 4 ' 6" stbd, enlarged to 8 " if necessary, to on MCT at 16' 0 " ABL (approx 12" above Load Line). At this point, cables emerge into the laundry room, and then go forward into a new dry 6, 8, or 10" sch 80 pipe passageway, f rom bhd 24, through EG tank, across centerl ine, elbowing up, reducing as required to 8", emerging through main deck at 1 7 - 1 6 at approximately 6' 6" off CL port, through on MCT, and thence to Transceiver.
New routing for Transmit Array:
From wet t ransducers, through bot tom shell, conveyed through 8 or 10" diameter schedule 80 pipe, f rom approximately f rame 3 3 - 2 3 3 2 " port, curving forward diagonally, penetrat ing transverse f rame 32, continuing in direct diagonal nature, through ballast tank, through bhd 24 into fuel oil tank, through swash bhds, turning up and enlarging to 12", through main deck, through MCT, to Transceiver. MCT shall be a 12" size (300 m m ) Brottberg or equivalent.
B General
A
Where bhds or f rames are penetrated through new cuts, pipes shall be welded to cuts with continuous welds suitably sized per ABS welding guidelines for appropriate st ructura l members. Where f raming members must be cropped, new headers shall be put in place to maintain the original panel size, or smaller panel size as appropriate.
Vent pipes as per referenced original drawing shall be installed to lower moonpipes up to fr^<=^h^nr^ dffck ns dpsrr ihpd jp referenced drawing New dry pipe passage shall not require venting.
H I - 4 6 1 A - 0 0 3 Rev -
6" pipe, f rame 29 - 24 port , not required. 4 " pipe, f rame 34 - 24 port, not required.
A P P R O V E D This approval covers only ABS requirements and does not include items not required by ABS.
See Comments in ABS letter dated:
NOV 2 4 2004
».BS AME
By Directior
ENGINEERING CHANGE NOTICE # 1 1 - 1 7 - 0 4
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
OFFICE OF MARINE & AVIATION OPERATIONS
CdWTRAiCT f
Seaworthy Systems, Inc.
M •» Ma m>%S)
50-ABNA-0-00032
1IAR-SSI-040 (03)
DSGN 11-17-04
WRP
WRP
NOM APPROVAL
NCAA SHIP HflALAKAl
ENGINEERING CHANGE NOTICE
TRANSCEIVER AND
MOON PIPE
INSTALLATION
SIZE
D
CAGE CODE
0YLJ5
SCALE: AS SHOWN
NOAA DRAWING NUMBER
HI -424 -003
REV
ECN
CAO FILENAME Ni-4a4-oo3^ SHT 1 OF 2
24 23 22 21 20 19 18 17
D
FIVE (5) PIPES
FOR EK60 SYSTEM.
FIELD-RUN TO ALLOW
ADEQUATE CLEARANCE
SEE REF 6 FOR
ADOmONAL DETAILS.
14-B
20 15
PLAN 20 -C (14 -01
MAIN DECK. LKG DOWN TO HULL
SCALE: 1/4" = 1'
CABLE SPLICES FOR
RX ARE IN OVHD OF
LAUNDRY ROOM &
INSIDE DRY PIPE
OVHD
B
(N) 3" SCH 80 BRANCH VENTS COMBINE
TO 4" UNE. FOLLOW RTE OF EXIST TK
VENT LINES TO FBD DK. SEE DETAIL 16-D.
W LINES FOR EK60 ARE NOT VENTED.
PROFILE 20 -B f l 4 - B )
LOOKING STARBOARD
SCALE: 1/4" = 1'
2' 10" BOW-UNE
(APPROXIMATELY WHERE THE PROFILE
14-B IS TAKEN
TX CABLE ROUTE. «8" OR 10". DIRECT PIPE RUN
(NO SPLICES) THRU BLST TANK. INTO FO TK. UP
TO SODA MACHINE AREA.
SKETCH ECN 1 1 - 1 7 - 0 4
APPROVED
This approval covers only ABS requirements and does not include items not required by ABS.
See Comments in ABS letter dated:
NOV 2 4 2004
ABS AMERICAS
By Direction' ^
SKETCH ECN 1 1 - 1 7 - 0 4
SIZE
D
CAGE CODE
0YLJ5
SCALE: AS SHOWN
NOAA DRAWING NUMBER
H I - 4 2 4 - 0 0 3
REV
tCH
CAD RLENAME SHT 1 OF 2
D
C
B
A
24 23 22 21 20 19 18 17
File details come from the government source that posted it. Updated .