Q_A.docx
DOCX document 34 KB Posted
- Attached to
- 1/75 Drone Filming
- Solicitation number
- H9242127QE001
- Issued by
-
United States Special Operations Command
About this file
This is a Questions and Answers (Q&A) document addressing clarifications submitted by offerors on solicitation H9242127QE001 for drone filming and aerial video support services for the 1/75 training unit under United States Special Operations Command (SOCOM).
The solicitation requires contractors to provide day and night aerial video capture, near-real-time editing, and on-site tactical playback support during Platoon Blank and Live Fire training iterations from November 30 through December 7, 2026. Key clarifications from the Q&A include: (1) Quote deadline is November 11, 2026 at 12:00 PM EST; (2) Technical proposals have a five-page limit excluding pilot certificates, NDAA certifications, serialized hardware lists, SAM representations, and supporting documents with no attachment limits; (3) Award will cover complete integrated services on a fixed-price basis including all travel, lodging, and per diem; (4) Minimum staffing consists of at least two two-person flight teams to support simultaneous UAS operations and sustained 24-hour availability; (5) No overlapping flight operations or simultaneous platoon iterations will occur; (6) Daily operating windows are not fixed-schedule based but contractor personnel must be available throughout the 24-hour performance period; (7) All contract work, including live-fire support, equipment transfer, data sanitization, and departure clearance, must be completed by December 7 with no operations authorized beyond that date; (8) Site layout, launch/recovery points, flight boundaries, and AAR locations (Technical Exhibit 3) will be provided post-award due to controlled information; and (9) Offerors must provide detailed specifications for night-sensing systems and proposed drone capabilities that meet or exceed PWS minimum requirements. Wage determination information is available in posted attachments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Game_filming DD Form 254.pdf | ||
| Questions_V2.docx | DOCX document | |
| H9242127QE001_answered_V1.docx | DOCX document | |
| Solicitation Amendment - H9242127QE0010001.pdf | ||
| 15-4485_wage determination.txt | TXT text file | |
| H9242127QE001 1-75dronefilmingQuestionsandAnswersForm.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please confirm the quote deadline and time zone. SF 1449 Block 8 states November 10, 2026 at 12:00 PM, while the submission instructions state November 11, 2026 at 12:00 PM EST. Please also please note the answer-posting date currently shows November 8, 2025.
Amendment states correct times.
Does the five-page technical page limit exclude pilot certificates, the NDAA certification and serialized hardware list, SAM representations, and other required supporting documents? Please identify which supporting documents must accompany the quote and any separate attachment limits.
Ignore five page limits no attachment limits Please confirm how technical acceptability, delivery, and price determines award among technically acceptable quotes, and whether award covers the complete integrated service. The evaluation language permits awards by item, while the three CLINs describe interdependent crew, aircraft, and PPE requirements.
Award will cover complete integrated service FFP to include for all Travel, Lodging, and Per Diem
Please provide the applicable wage determination, revision, and labor classifications for this service. Technical Exhibit 5 contains a description but no wage determination, and the equivalent federal wage table is blank.
The wage determination is available on attachments in posting.
Please provide the anticipated daily operating windows, typical and maximum iteration durations, and expected interval between iterations. Please confirm whether simultaneous platoon iterations or overlapping flight and AAR sessions occur, so offerors can size crews and processing capacity.
The daily operating window is not based on a fixed schedule. In accordance with the Performance Work Statement (PWS), contractor personnel must be available throughout the 24-hour period of performance specified in the PWS. There will be no overlapping flight iterations or simultaneous flight operations.
To meet PWS requirements and successfully accomplish the mission, the minimum staffing level shall consist of at least two two-person flight teams. This staffing level is required to support simultaneous UAS operations during scheduled iterations and to sustain both daytime and nighttime flight operations in accordance with PWS specifications.
Please clarify the workload for pricing included retrains: the historical or estimated number, duration, and latest daily completion time. Please confirm whether all directed repeats remain within November 30-December 7 and how work extending beyond December 7 is addressed.
Per the PWS and contract, no work will be performed before 30 November or after 7 December. All activities shall occur within the designated period of performance.
Please confirm the training schedule and December 7 responsibilities. The overnight schedule extends live-fire operations into December 7, while the daily workload table ( PWS Sec 5.4) ends on December 6. What time is reserved for final transfer, sanitization, and departure clearance?
In accordance with the PWS and the contract period of performance, all contractor responsibilities, including live-fire support, final equipment transfer, data sanitization, site restoration, accountability checks, and departure clearance, must be completed no later than 7 December. No contract performance is authorized beyond the established period of performance, and no work will extend into 8 December.
The overnight training schedule may continue into 7 December as required; however, all remaining closeout activities will be planned and executed within the period of performance to ensure completion by the end of 7 December. No contractor personnel or operations are expected to remain on-site or perform duties after the conclusion of the contract period of performance.
Please provide the site layout and approved operating areas described in Technical Exhibit 3, including launch/recovery points, flight boundaries, observation positions, and the AAR location. Please identify how offerors obtain any controlled layout information before quoting.
Due to the controlled nature of the information contained in Technical Exhibit 3, details regarding the site layout, launch/recovery points, flight boundaries, observation locations, AAR location, and approved operating areas will be provided to the selected contractor during post-award coordination. Offerors are not required to obtain this information prior to submitting a quote, as all relevant site-specific details will be furnished to the awardee following contract award.
Please clarify the night-sensor acceptance conditions: required NIR wavelengths, representative viewing distances and heights, minimum image detail, and the method for scoring 95 percent clarity. Does shot-placement verification require direct observation of target impacts, or sufficient imagery for evaluator interpretation?
Offerors shall provide, within their proposal, detailed specifications for the night-sensing system they intend to use to meet or exceed the minimum requirements established in the PWS. This should include sensor capabilities, image quality metrics, operating parameters, and any other relevant technical specifications.
The minimum acceptable performance requirements are those identified in the PWS. The Government will evaluate proposed capabilities against those requirements. Offerors are encouraged to provide the maximum level of performance achievable by their proposed solution; however, no additional acceptance criteria beyond those specified in the PWS are prescribed. The proposed system must demonstrate the ability to satisfy all PWS requirements related to night operations, target observation, and shot-placement verification.
Please clarify the extent of internal structure/objective-clearance coverage expected from overhead aircraft. Is coverage limited to activity visible from approved exterior flight positions, and what viewing limitations from roofs, walls, or vegetation are acceptable?
Will receive information at Period of Performance
Please confirm how the <60 minute turnaround is measured; whether it ends at local playback readiness or Government file receipt. If iterations overlap, does each retain its own ENDEX deadline, and how are range-directed media-transfer delays treated?
There will be no overlapping iterations. The 60-minute turnaround requirement begins upon completion of the iteration (ENDEX) and applies to the post-iteration processing and delivery requirements identified in the PWS.
Since iterations will not overlap, each iteration will be completed and processed independently. Any media transfer, playback preparation, or delivery activities required under the PWS shall be accomplished within 60 minutes following completion of the applicable iteration. Offerors should base their proposed approach on meeting this requirement after the iteration has concluded.
Please identify approved sanitization methods and verification criteria for flash media, SSDs, aircraft/controller internal memory, and field computers. If a device cannot support verifiable overwrite or cryptographic erasure, is Government retention or destruction required, and who bears that cost?
Approved sanitization methods and verification procedures shall be proposed by the contractor and must meet applicable industry standards and all contract requirements. Removable media used for data delivery shall be retained by the Government following transfer of the required data.
If a storage device cannot support a verifiable overwrite, cryptographic erase, or other approved sanitization method, the contractor shall coordinate with the Government for disposition instructions. Any costs associated with data management, sanitization, media replacement, retention requirements, or compliance with contract performance requirements shall be included in the contractor's proposed firm-fixed-price (FFP) and will not be separately reimbursed by the Government.
Please confirm the QCP submission deadline. The PWS states five business days after award or at the Post Award Conference, while the deliverables schedule states five calendar days.
This is correct as stated in PWS.
Please provide the QASP and the method or schedule for calculating invoice deductions for nonperformance. Please clarify how coverage and turnaround assessments account for Government-directed airspace holds, weather suspensions, and other range restrictions outside contractor control.
The Quality Assurance Surveillance Plan (QASP) and performance assessment criteria are identified within the PWS. Offerors should review the applicable PWS sections regarding performance standards, acceptable quality levels, and surveillance methods.
Contractors will not be assessed for delays or interruptions resulting from Government-directed airspace holds, weather suspensions, range restrictions, or other factors outside of the contractor's control, provided the contractor remains available and on-call in accordance with PWS requirements.
Performance evaluations related to coverage and turnaround times will be based on the contractor's compliance with the PWS when operations are authorized to proceed. Offerors should refer to the PWS for the complete performance assessment criteria and associated remedies for nonperformance.
Please clarify is airframes are subject to the NDAA compliance requirement.
Yes. All drones and associated systems proposed for contract performance must be fully NDAA compliant. This requirement applies to all airframes and any related equipment utilized to fulfill the requirements of the PWS. Offerors are responsible for ensuring that all proposed UAS platforms comply with applicable NDAA restrictions and requirements.
What are the expected daily hours, and how many hours of night operations per day? Is thermal (IR) imagery required, or low-light visible only?
The required capabilities for both daytime and nighttime operations are defined in the PWS. Offerors shall provide a solution that meets all PWS requirements, including any sensor, imaging, and night-operation capabilities specified therein.
The Government has not established fixed daily operating hours or a set number of nighttime operating hours per day. Operations may occur at any time during the 24-hour period of performance identified in the PWS, and offerors shall propose a staffing and operational approach capable of supporting those requirements.
Offerors are responsible for providing equipment, personnel, and operational solutions that satisfy all PWS requirements for both day and night operations. Thermal (IR), low-light visible, and any other required imaging capabilities shall be provided in accordance with the PWS.
What is 'near-real-time' turnaround expected for playback (e.g., within 1 hour of the iteration) and in what format/location is the AAR playback delivered?
Stated in PWS Will the Government handle airspace coordination (restricted area/range control), and what UAS approvals (e.g., DoD Blue UAS list, NDAA Sec. 848 compliant platforms) are required? Are DJI platforms prohibited?
Airspace coordination requirements are addressed in the PWS. Offerors shall review the PWS for detailed responsibilities regarding coordination with range control, restricted airspace, and other operational approvals.
All UAS platforms and associated systems proposed for contract performance must be NDAA compliant. DJI platforms are prohibited and shall not be used for performance under this contract. Offerors are responsible for ensuring that all proposed equipment complies with applicable NDAA requirements and any other requirements specified in the PWS.
Are contractor personnel required to hold a security clearance, and are there restrictions on storing footage on contractor devices/cloud (OPSEC, data handling, media destruction)?
Stated in PWS What media and format should raw and edited footage be delivered on, and does the Government retain all rights to footage?
The media delivery requirements are stated in the PWS. All raw and edited footage shall be delivered to the Government on removable media in accordance with PWS requirements.
The Government retains all rights to and ownership of all footage, imagery, recordings, and associated data collected during contract performance. As specified in the PWS, no footage, imagery, recordings, or data may leave the site. All required media shall be transferred to the Government on the designated removable media before contractor departure from the site.
What is the evaluation basis (LPTA or best value) and is this a total small business set-aside or full and open? The SAM notice shows no set-aside.
All information is in solicitation attachment.
Will travel and lodging be priced as part of the FFP, or reimbursed separately per JTR?
This contract is FFP Is the Government willing to price per training day (FFP per day) to accommodate schedule changes or weather cancellations? How are weather/range-closure days handled?
All contract line items shall be proposed and priced on a Firm-Fixed-Price (FFP) basis. The Government is not seeking pricing on a per-training-day basis.
Offerors should refer to the PWS for guidance regarding weather delays, weather cancellations, range closures, and other circumstances that may affect training operations. Any contractor responsibilities associated with these events shall be performed in accordance with the requirements and provisions outlined in the PWS.
Is there an incumbent or prior contract for this requirement?
No Facility clearance (PWS 1.11.1, 1.11.2, Exhibit 6). Is a SECRET FCL required at quote submission, or at award? Would the Government accept a prime that does not yet hold an FCL if a cleared subcontractor with the required FCL, DISS-verified SECRET personnel, and a DD 254 flow-down performs the work? If not, please confirm so offerors can decide whether to bid.
Must be provided before award which expected award
Missing exhibits. Technical Exhibits 3 (site locations), 4 (GFP), 5 (wage determination), and 6 (DD Form 254) are described in the PWS but were not included. Please provide them. The SCLS clause in the solicitation also shows blank wage rates.
Technical Exhibits 3 and 4 have been removed from the solicitation and are not applicable. Offerors should refer to the current solicitation attachments for all remaining exhibits and supporting documentation.
Technical Exhibit 5 (Wage Determination) and Technical Exhibit 6 (DD Form 254) are included in the updated attachments. The Service Contract Labor Standards (SCLS) wage determination and associated rates are provided within the applicable attachment package.
Please review the solicitation attachments in their entirety to ensure receipt of the most current exhibits and supporting documentation.
Dates. Block 8 of the SF 1449 shows offers due 10 Nov 2026 at 12:00 PM, while the addendum to 52.212-1 shows 11 Nov 2026 at 12:00 PM EST. Please confirm the due date. Also, what is the expected award date, given that AT Level I/OPSEC certificates are due 25 Nov and several deliverables are due 5 days before the 30 Nov start?
SF1449 updated in amendment. All due dates remain accurate.
Quote contents. Exhibit 2 lists the Part 107 certificates and NDAA hardware list as due "with proposal." Please confirm these are required with the quote, and whether the 5-page technical description limit excludes them.
Ignore 5-page limit. Yes all these items are due with quote.
Retrains (PWS 5.4.1). Retrains are included in the firm-fixed price. To price fairly, can the Government share the historical average number of retrain runs per platoon from prior PLFX events, or a maximum number covered by the price?
Retrains are included in the Firm-Fixed-Price (FFP). Offerors should propose pricing in accordance with the PWS requirements. Historical retraining data and maximum quantities will not be provided.
Cyber requirements. DFARS 252.204-7012 is incorporated. Will the Contractor handle covered defense information on its own systems, and do 252.204-7019/7020 (NIST SP 800-171 assessment / SPRS score) apply to this award?
Offerors shall comply with all applicable contract clauses and cybersecurity requirements identified in the solicitation and resulting contract.
Set-aside and location. Please confirm this is a total small business set-aside (FAR 52.219-6 is listed; the SF 1449 set-aside boxes are not legible in our copy), and that the sole place of performance is the MPRC at Fort Stewart, GA.
Refer to the solicitation for set-aside status and place-of-performance information.
Dates and schedule: What are the training dates, how many Platoon Blank and Live Fire iterations will there be, and how many hours of filming per day and per night?
The period of performance is established in the solicitation. Daily operating hours and night operations are not fixed and may occur throughout the 24-hour operational window identified in the PWS. Offerors shall provide a staffing solution capable of supporting 24-hour operations. No work shall extend beyond the period of performance.
Drones: Must the drones be on the Blue UAS list or otherwise NDAA-compliant? Is a thermal or night camera required for night filming? Is there a minimum video resolution?
All UAS platforms and associated systems must be NDAA compliant. DJI platforms are prohibited. Offerors shall provide all sensor capabilities required by the PWS, including day and night imaging requirements.
Airspace: Will the unit or Range Control handle airspace coordination and flight approvals on Fort Stewart, or will the contractor? Is an FAA Part 107 certificate with night training enough for the pilot?
Airspace coordination responsibilities are addressed in the PWS. Offerors shall review the PWS for coordination requirements. Contractor personnel must possess all certifications and qualifications required to perform the work.
Playback: How soon after each iteration does the unit need edited clips? Will the unit provide a playback space, screens and power, or should the contractor bring them? 60 minutes Playback and media delivery requirements are contained in the PWS. Required footage and playback materials must be available within 60 minutes after completion of the iteration.
Footage: What file format and delivery method do you want? Who keeps the raw footage, and are there any handling or security rules for it?
As stated in the PWS, footage shall be delivered on removable media. The Government retains ownership of all footage. No footage, imagery, or data shall leave the site without Government authorization.
Base access: What do contractor personnel need to get on post? Is a security clearance required?
Personnel must possess the required security clearances. Additional installation access requirements shall be coordinated prior to the start of the period of performance.
Pricing: Should we price per day, per iteration or as one total? Should travel and lodging be included in the price? How will quotes be evaluated?
All pricing shall be submitted as Firm-Fixed-Price (FFP). Travel, lodging, labor, equipment, and all other costs associated with contract performance shall be included in the proposed FFP.
Has this work been done under contract before? If so, can you share the prior contract number? Prior contract information will not be provided.
1. Security Clearance Requirements Is a SECRET facility clearance required for the prime contractor and all subcontractors?
Yes. All parties requiring access under the contract must possess the required security clearances before award.
Are individual drone operators required to hold SECRET clearances, or can uncleared personnel operate under escort?
Personnel requiring access must possess the appropriate clearances as required by the solicitation and security requirements.
Is a DD Form 254 applicable to this requirement, and if so, will it be provided?
Please review attachments
If the prime contractor holds the required clearance, must subcontractors independently hold one as well?
No. All parties must possess the required security clearance(s) prior to award.
2. Airspace Coordination Will Fort Stewart coordinate restricted airspace approvals, or is the contractor responsible?
Refer to the PWS regarding airspace coordination responsibilities.
If the contractor is responsible, will the installation provide a point of contact to assist with the approval process?
Any required coordination procedures will be provided in accordance with the PWS and post-award coordination.
3. Pricing Structure Is there a preferred pricing breakdown or format for submitting quotes?
Should pricing be itemized by personnel, equipment, travel, lodging, and postproduction? All need to be firmed fixed price according to solicitation Payment Terms Are mobilization payments or progress payments permitted under this contract? NO What is the anticipated invoicing and payment schedule? Normal invoicing procedures will be completed
Weather Delays and Range Closures How should contractors account for weather delays, range closures, or safety stand downs?
Refer to the PWS. Contractors will not be penalized for Government-directed pauses, weather delays, range closures, or other factors outside of the contractor's control, provided the contractor remains available and on-call as required by the PWS.
Are standby rates permitted for days when crews are on site but unable to operate?
All costs shall be included in the Firm-Fixed-Price proposal.
If filming extends beyond December 7 due to operational delays, how would additional days be handled?
Contract performance will not extend beyond the established period of performance. All contractor responsibilities must be completed no later than December 7.
Insurance Requirements What are the required general liability and aviation liability insurance limits?
Are additional insured endorsements or waivers of subrogation required?
Data Security and Footage Handling Will recorded footage be classified secret, considered Controlled Unclassified Information (CUI), or treated as unclassified material?
Classified secret Are there specific requirements for footage storage, encryption, editing, and transfer? All footage shall be transferred to the Government on removable media and shall not leave the site. Compliance will be verified by the Government.
Who will receive the final footage, and what is the required delivery method?
The Government will receive all footage and associated data in accordance with the PWS.
Personnel Safety and Base Access What personal protective equipment is required for filming during live fire exercises? See PWS What identification, background checks, or documentation will be required for crew members? Must have secret clearance DD 254 will be security check once offered award How far in advance must personnel information be submitted for installation access? Personnel must possess the required security clearances. DD Form 254 requirements will be addressed prior to award.
1. Will the Government accept an offeror whose SECRET Facility Clearance and personnel clearances are in process with DCSA at the time of award, provided interim clearances are granted before performance begins on 30 November 2026? NO
1. Can the Government provide the anticipated award date so offerors can align clearance timelines? Will provide
Must the prime contractor possess a SECRET Facility Security Clearance at quote submission, award, or commencement of performance?
All parties need security clearance before award.
Must all deployed personnel already hold SECRET clearances, and when must verification be completed?
The verification needs to be completed before can be awarded
Would a teaming arrangement involving a subcontractor with the required facility and personnel clearances be acceptable if the prime contractor does not hold a facility clearance?
All parties must possess clearance Could you provide the completed DD Form 254 referenced as Technical Exhibit 6? The PWS text available to us contains only a placeholder.
Technical Exhibit 6 (DD Form 254) will be provided. Offerors should review the updated attachments for the most current exhibits.
Must the prime contractor already hold a SECRET Facility Clearance, or may an uncleared prime use a subcontractor holding the required facility and personnel clearances? If the prime needs its own clearance, is government sponsorship available, and by what date must eligibility be established?
All parties need secret clear refer to PWS Please provide the actual DD Form 254 and applicable wage determination referenced as Technical Exhibits 6 and 5. The supplied PWS contains descriptions of those exhibits.
Technical Exhibit 5 (Wage Determination) and Technical Exhibit 6 (DD Form 254) will be provided. Offerors should review the updated attachments for the most current exhibits.
Please confirm the controlling schedule, expected hours for each day and night crew, and anticipated iteration duration. For fixed-price planning, what maximum operating windows apply to required retraining, repeat runs, and weather standby?
There are no fixed daily operating hours. Operations may occur at any time within the 24-hour operating period specified in the PWS. Offerors are responsible for proposing a staffing and operational approach capable of meeting all PWS requirements.
What documentation will establish compliance of the proposed aircraft, sensors, controllers, and software? Is Blue UAS listing required, and how will the government evaluate the night-imaging requirement for recording near-infrared aiming lasers?
Offerors shall provide specifications for the equipment proposed. The minimum acceptable requirements are those identified in the PWS.
What are the dates or general date range, location, and number of training days or iterations for this requirement?
Please see PWS Is there a minimum number of contractor personnel required on site, or is staffing left to the contractor as long as all PWS tasks are met?
For on-site tactical playback, does the Government need a live video feed during each iteration, playback of edited footage immediately after each iteration for the after-action review, or both?
Offerors are responsible for proposing staffing sufficient to meet all PWS requirements. At a minimum, staffing must support simultaneous operations and day/night mission requirements as specified in the PWS.
What turnaround time is expected for final edited or raw footage after the training is complete, and in what format and delivery method?
Refer to the PWS for operational and playback requirements.
Will an NDAA-compliant, Blue UAS-listed aircraft such as the Skydio X10D meet the aircraft requirement?
The Government does not endorse specific manufacturers or platforms. Offerors are responsible for proposing equipment that meets or exceeds all PWS requirements and complies with NDAA requirements.
The offeror's SAM.gov registration (UEI U3JDZRBYYRY6) is submitted and pending CAGE code assignment by DLA. Will the Government accept a quote while registration is pending? If not, is this a recurring requirement?
No The offeror cannot yet access the controlled PWS and solicitation because SAM registration is pending. Can these documents be provided another way?
Please see amendment PWS can be emailed
File details come from the government source that posted it. Updated .