SOWv2 MARSOC Project 10683116A-R3-MARSOC-CDI Office Rennovation-03May22.pdf

PDF 205 KB Posted

Attached to
MARSOC CD&I Cubical IT Infrastructure Rewire
Solicitation number
H92257-22-Q-0101
Issued by

View the file

Other files

File Type Posted
H9225722Q0101-01.pdf PDF
MARSOC VISIT CTRL GUIDE 2022.pdf PDF
H9225722Q0101.pdf PDF
G8 Furniture Wiring SOW.pdf PDF
G8 Furniture Layout.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

25 August 2022 Statement of Work (SOW) v2 MARSOC Project 10683116A-R3 – MARSOC CD&I Office Renovation, RR-400

1 INTRODUCTION. The Marine Corps Forces Special Operations Command, (MARSOC), Camp

Lejeune, NC has a requirement to renovate designated work spaces within Rm 2300 and Rm 2800B, Bldg RR400.

2 REQUIREMENTS. MARSOC G8 CD&I requests installing IT Network Infrastructure including network cabling and power in cubical furniture in RM 2300.

2.1 The contractor shall plan, engineer, design, install, test and demonstrate all systems, network accesses and end-user devices as required by the Technical Representative (TR).

2.2 The contractor shall perform space preparations (disconnect furniture base feed whips and network cabling from existing cubicle furniture), provide systems engineering and design, install infrastructure, and provide OT&E.

2.3 Responses to an RFP and any lists shall be organized by MARSOC G8 CD&I, as identified herein and in Enclosure (1), an UNCLASSIFIED depiction of locations.

2.4 Material Equipment List (MEL) – The contractor shall identify and list all materials to be procured to complete the project based on the final design and engineering solutions.

2.5 Data Infrastructure Installation (Room 2300)

2.5.1 Install CAT6 cabling for NIPR (green) and SIPR (red) within the new cubicle workspaces.

2.5.2 There will be 2 duplex outlets installed for each network in each of twenty-seven (27) cubicle spaces for a total of twenty-seven (27) NIPR and twenty-seven (27) SIPR duplex outlets.

2.5.3 Each network cable feeding from Telco (2020) to Room 2300 will utilize the appropriate cable tray system and ceiling panel per network and J-hooks maintaining directed spacing down the walls feeding to five (5) 18-port MUTOA’s (or power poles, vendor decides;1 for each network), centrally located with the spine for 2 locations.

2.5.4 Utilizing the appropriate spacing (3” requirement) for each network, install white T45 Panduit as cable management down the wall connecting to each MUTOA.

2.5.5 At the conference table area located in Room 2300 the vendor will remove the duplex outlets on the furniture panel and reinstall quad outlets on the adjoining wall.

2.5.6 The cabling will be terminated with CT Coupler jacks using the green icon jacks for NIPR and red icon for SIPR following the TA568A standard with labels.

2.5.7 Cables will be installed; 2 per workspace for each network, utilizing separate pathways within the cubicle spine to connect from the MUTOA using RJ-45 connections to the Siemon 2 port furniture adapter’s using CT Coupler jacks.

2.5.8 Blanks will be used to fill the unused port locations on the furniture jacks.

2.6 General Electrical Requirements (Room 2300/2800B)

2.6.1 Disconnect preexisting furniture feed whips as necessary.

2.6.2 Convert current furniture electrical (WHIP) into two (2) quad outlets each with 20 Amp dedicated power receptacles.One (1) circuit will be added to accommodate new conference table.

2.6.3 Extend existing circuit from ceiling mounted outlet down the wall for shredder and printers.

2.6.4 Upon installation of new furniture, connect furniture base feed whips to existing power circuits.

2.6.5 All penetrations made for new circuits shall be sealed.

2.6.6 The vendor will install ten (10) GFE power distribution units (PDU) one (1) at each workspace from the existing wall outlet in Room 2800B.

2.7 Data Infrastructure Installation (Room 2800B)

2.7.1 Install CAT6 cabling for NIPR (green) and SIPR (red) within the new cubicle workspaces utilizing the appropriate spacing (3” requirement) for each network.

2.7.2 There will be two (2) duplex outlets installed for each network in each of ten (10) cubicle spaces for a total of ten (10) NIPR and ten (10) SIPR duplex outlets.

2.7.3 The ten (10) cubicle spaces will be energized utilizing the existing power and MUTOA at the furniture spine.

2.7.4 The cabling will be terminated with CT Coupler jacks using the green icon jacks for NIPR and red icon for SIPR following the TA568A standard with labels.

25 August 2022 Statement of Work (SOW) v2 MARSOC Project 10683116A-R3 – MARSOC CD&I Office Renovation, RR-400

2.7.5 Cables will be installed; two (2) per workspace for each network, utilizing separate pathways within the cubicle spine to connect from the MUTOA using RJ-45 connections to the Siemon 2 port furniture adapter’s using CT Coupler jacks.

2.7.6 Blanks will be used to fille the unused port locations on the furniture jacks.

2.7.7 Relocate existing duplex power outlet from 18” to 72”

2.8 Assumptions:

2.8.1 Provide one (1) 10’ long patch cable for each installed network drop, green patch cables for NIPR and red patch cables for SIPR network.

2.8.2 Network outlets, cables, and patch panels will be labeled.

3 Period of Performance. The period of performance shall be from contract award for 180 days.

4 Place of Performance. Stone Bay, Bldg RR400, MCB Camp Lejeune, NC.

5 Contract Data Requirements List (CDRL). Post Award. The Contractor shall provide to the TR and the Contracting Officer’s Representative (COR) two (2), written deliverables for contract data:

5.1 (CDRL 1) A final, comprehensive Bill of Materials (BOM) shall be provided at kickoff. Contractor format is acceptable, and this report shall include the following information as it applies:

5.1.1 As-built drawing in commercial format as approved by the Government TR.

5.1.2 OEM Parts lists, system tag #s, model #s, serial #s, and all OEM warranty details.

5.1.3 Cable plant test and certification documentation shall be from the MUTOA to the termination point on the furniture panel.

5.1.4 Cable labeling schema.

5.2 (CDRL 2) The Contractor shall provide a (Microsoft Excel) spreadsheet identifying all firmware/software upgrade statuses, license renewals and any preventative and/or corrective maintenance actions pertaining to the identified AV systems and components.

5.3 SECURITY NOTICE. It is the responsibility of the Prime contractor to review and disseminate to any Subcontractor(s) a complete rendition of this SOW and Security guidance as contained in the Surge Contract DD-254. However, without exception, subcontractors are fully responsible for abiding by any and all Security Governance while aboard MCB Camp Lejeune.

ENCLOSURES

(1) Layout and ISO Drawings

(2) EXAMPLE Material Equipment List (MEL) End