Attachment_1_-_Performance_Work_Statement_N7_Equip_Maintenance_14DEC2016.docx
DOCX document 29 KB Posted
- Attached to
- Food Service Equipment Maintenance
- Solicitation number
- H92244-17-T-0028
- Issued by
-
United States Special Operations Command
About this file
Attachment 1 - Performance Work Statement
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Galley Equipment Maintenance
1.0 General
The mission of the Food Service Division of the Naval Special Warfare Development Group is to prepare and provide performance based meals in support of advanced athletics in a clean, safe, and sanitary environment. The continued preventive maintenance and timely repairs of the galley equipment ensures that the mission can be carried out properly, safeguards the investment and longevity of the required food service equipment, and directly supports the commands readiness. In order to fulfill mission readiness requirements, the contractor shall provide qualified personnel, parts, and services necessary to perform preventive maintenance, non-scheduled maintenance, and repair services necessary to maintain all identified Government owned galley equipment in optimum working order.
The PWS requires the performance of maintenance services necessary and proper for, or incidental to, the contracted functions. The equipment type, quantities, manufacturer’s brand name, and galley locations are set forth in Attachment 1.
2.0 Applicable Documents
| 2.1 | Manufacturers’ equipment specifications and guides. |
| 2.2 | NAVMED P-5010-1 - Tri-Service Food Code |
| 2.4 | NAVSUP P-486, Rev 8 – Food Service Management |
3.0 Performance Requirements
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources (except those specifically designated as Government-furnished) to perform the following services:
3.1 Initial Inspection of Equipment: The contractor shall perform the initial inspection of all equipment at the Naval Special Warfare Development Group (NSWDG) galley location listed in Attachment 1 within 30 days of contract award. The inspection shall include but is not limited to: (1) identification of defects or tagged equipment in need of repair and (2) recommendation of equipment requiring preventative maintenance services. Inclusion of preventative maintenance as identified below.
3.1.1 The contractor shall provide the results of the equipment evaluation/analysis in the form of a report to the Government Technical Point of Contact (TPOC) within 5 days following the initial inspection period. The report shall identify the equipment by component name, serial, and/or model number as listed in Attachment 1, and shall provide information related to the required parts and labor necessary to restore equipment to working condition as specified in the manufacturer’s manual. The Government will have available onsite the Original Equipment manufacturer (OEM) manuals.
3.1.2 The TPOC will provide a written response within 15 days from receipt of the contractor’s report. The Government reserves the right to determine if replacement or recommended repairs will be accomplished. Equipment determined to be beyond repair will be removed from the equipment list and shall not be included under the preventive maintenance requirements of the contract. In the event of equipment replacement, the new or like item will be added to Attachment 1. Repair of equipment determined eligible for repair shall be accomplished in accordance with the requirements set forth from the equipment’s manufacturing manual.
3.1.3 The contractor shall develop a written phased replacement program, based on the manufactures recommended life cycle of the each piece of galley equipment listed in Attachment 1. The phased replacement program shall be submitted to the TPOC within 90 days of contract reward and reviewed/updated annually with the TPOC.
3.2 Preventive Maintenance: For the purpose of this contract, preventive maintenance includes inspections for the purposes of cleaning, lubricating, and adjusting or replacing worn out/broken parts. Preventive maintenance and instrument service for all equipment is to be provided during normal business hours 7:30a.m to 4:00p.m., Monday through Friday.
3.2.1 The contractor shall submit to the TPOC within 30 days of contract award a preventative maintenance schedule in accordance with the manufacturer’s recommendations for each piece of equipment and identify at what interval (monthly, quarterly, semi-annually) the maintenance shall occur.
3.2.2 Each piece of equipment shall be inspected on separate intervals as determined following to the initial inspection and as prescribed by the OEM. At any regularly scheduled preventive maintenance visit, if the contractor identifies any equipment parts requiring replacement, the TPOC shall be notified. The Government reserves the right to furnish parts required based on contractors recommendation and/or request. Servicing the equipment shall include all labor, including travel time; repair parts; maintenance supplies; tools; test equipment; and transportation.
3.2.3 Maintenance shall be performed in accordance with the OEM manuals and NAVSUP P-486, Rev 8. Strict compliance of the guidelines is mandatory to avoid the transmission of disease producing microorganisms, infecting disease, and growth of harmful bacteria or development of toxins formed by bacteria.
3.2.4 The contractor shall provide written documentation of any performed preventative maintenance in a written report to the TPOC within 2 business days following repairs of in-operable equipment.
3.3 Routine Services: The contractor shall provide fully qualified and accredited technicians to service the galley equipment for the specific purpose of performing routine repair services necessary to properly maintain equipment. Equipment used for food preparation, storage, dispensing, and sanitizing shall be maintained to provide the proper temperatures. (Reference Appendix 1)
3.3.1 The contractor shall replace worn or damaged parts with manufacturer approved, new replacement parts, if approved by the TPOC. The contractor shall acquire any parts needed to accomplish repairs at the most economic means to ensure equipment is repaired with minimal downtime. The contractor shall gain approval from the TPOC prior to performing maintenance. Instances where replacement parts or repairs may require an extended time period, the contractor shall guarantee services shall be completed within 3 working days (unless equipment manufacturer provides written documentation indicating that a longer lead time is required due to non-availability of part(s) from the date of initial service call.
3.3.1.1 Parts and components described herein by reference to a manufacturer’s name and/or part number and nomenclature shall be furnished in strict accordance with the manufacturer’s published data relating to said supplies except to the extent otherwise specified in this contract. Complete interchangeability of parts with original equipment is mandatory.
3.3.2 The contractor shall provide written documentation to include a log of any repair services performed in a written report to the TPOC within 2 business days following repairs of in-operable equipment.
3.4 Non-Scheduled Maintenance: For the purpose of this contract, non-scheduled maintenance is defined as any maintenance and/or servicing performed by the contractor on a piece of equipment at an other than planned time, and that is necessary to keep the piece of equipment in proper operating condition. After a repair call is made by the TPOC, the contractor shall report to NAS Oceana/Dam Neck Annex within a 12-hour period to make repairs on non-scheduled equipment.
3.4.1 There shall be no additional labor charges involved for non-scheduled maintenance.
3.4.2 The contractor shall provide written documentation of any performed non-scheduled maintenance in a written report to the TPOC within 2 business days following repairs of in-operable equipment.
4.0 Contractor Qualifications
4.1 The contractor shall provide fully qualified and accredited technicians who possess the capabilities to perform the required services. Service technicians shall be certified with the Commercial Food Equipment Service Association (CFESA) or equivalent. The service technician qualifications will meet or exceed the manufacturers recommended equipment repair specifications. Technicians shall be certified for maintenance on their specific equipment by the actual vendors or approved vendor agencies. The contractor is required to have EPA certified CFC service technicians on staff.
5.0 Base Access and Security
5.1 Base Entry Passes: To obtain base access, the contractor must enroll in NAS Oceana/Dam Neck Annex’s Rapid gate entry program. Once the contractor is enrolled, contractor employees must register through the rapid gate entry screening and credentialing process to obtain base access. Once granted base access, the Contractor will still need to be escorted onto the NSWDG compound. The TPOC will be required to submit all visitors requests for NSWDG and provide escorts to the contractor and it’s approved contractor employees.
5.2 The contractor shall establish appropriate administrative, technical, and physical safeguards to protect any and all nonpublic Government data to ensure the confidentiality, integrity, and availability of Government data.
6.0 Non-Personal Services
6.1 Contractor employees performing services under this PWS shall be controlled, directed and supervised at all times by management personnel of the Contractor. The Contractor shall ensure that employees properly comply with the tasks, policies, and procedures contained with this PWS. Contractor employees shall perform their duties independent of, and without the supervision of, a Government official. The task, duties and responsibilities set forth in this PWS may not be interpreted or implemented in any manner that results in any contractor employee creating or modifying federal policy, obligating the appropriated funds of the United States Government, overseeing the work of federal employees, providing direct personal services to any federal employee, or otherwise violating the prohibition set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation (FAR).
APPENDIX 1: OPERATING TEMPERATURES OF FOOD SERVICE EQUIPMENT
In addition to the standard preventive maintenance requirements, the equipment shall be carefully monitored during inspection to ensure that the operating parameters listed below are maintained. The guidelines for maintaining the equipment temperatures are set forth in: NAVMED P-5010-1, Chapter I and NAVSUP P-486, Rev 8.
1.0 Refrigerated Equipment
| Equipment |
| Operating Temperatures |
| Freezers |
| 0˚ or below |
| Dairy Box |
| 32˚ - 34˚ F |
| Chilled Bulk Storage Refrigerators |
| 32˚ - 38˚ F |
| Thaw Box—Refrigerators |
| 36˚ - 38˚ F |
| Reach– in Refrigerator |
| 32˚ - 41˚ F |
| Refrigerated Display Cabinets |
| 32˚ - 41˚ F |
| Milk Dispensers |
| 32˚ - 41˚ F |
2.0 Dish Washing Equipment
| Equipment Nomenclature |
| Wash |
| Rinse |
| Final Rinse |
| Dish Washing Machine |
| 150˚ - 160˚ F |
| 160˚ - 180˚ F |
| 180˚ - 195˚ F |
File details come from the government source that posted it. Updated .