PERFORMANCE WORK STATEMENTSBT12.docx
DOCX document 16 KB Posted
- Solicitation number
- H92242-11-T-0012
- Issued by
-
United States Special Operations Command
About this file
Performance WOrk Statement
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
INSTALL FLOORING SBT-12 TACTICAL ATHLETE TRAINING AREA
SPECIAL BOAT TEAM TWELVE 3402 TARAWA ROAD SAN DIEGO, CA 92155
A. SCOPE
The Contractor shall provide the technical services, labor and material for the site preparation and modifications to the SBT-12 Tactical Athlete Training Area located in the SBT-12 Operational Storage Facility at Naval Amphibious Base Coronado. The following is a brief statement of the work to be accomplished.
1. Flooring:
a. Existing floor is painted concrete deck in like-new condition. It does not require leveling or
b. New flooring will cover a total area 38 ft x 144 ft of mixed type for a total of approximately 5,500-SF. See drawing for layout.
c. Flooring in Area A (approximately 19-ft Wide by 120-ft Long for a total of 2,300-SF) shall be PL264 Blended (polyethylene and nylon blend) Turf 5/8" (+/-1/8") Pile with Dual Polypropylene primary backing, 5mm Polyurethane Foam with Scrim as secondary backing. Total weight approximately 142oz per square yard.
i. Minimum 8-year warranty for materials required.
ii. Semi-seamless finished product required. This will be a training surface where athletes will perform strength and rehabilitation exercises. Seams presenting an obstacle to performance of exercises are not acceptable.
iii. Primary Color: Green. White 4-inch wide lines shall extend the width of the turf on the ends of Area A, and every 10-yards in between. White 4-inch-wide, 2-foot-long hash marks shall mark every 5-yards in between every full-width line. See drawing.
iv. Edges of Area A will be capped in commercial-grade T- or Edge-molding as appropriate for longevity of surfaces and to reduce tripping hazard.
d. Flooring Area B (two conjoined areas of 19-ft Wide by 120-ft Long and 38-ft Wide by 24-ft Long adjacent to Area A, approximately 3,200-SF Total) shall be pre-fabricated rubber athletic flooring, calendered and vulcanized with a base of natural and synthetic rubbers, stabilizing agents and pigmentation.
i. Thickness: 0.394" (10mm)
ii. Color: Grey (consult with customer for exact shade)
iii. Finish: sealskin type
iv. Semi-seamless finished product required. This will be a training surface where athletes will perform strength and rehabilitation exercises. Seams presenting an obstacle to performance of exercises are not acceptable.
v. Edges molding shall be provided and installed as appropriate. Edges adjacent to walls shall be covered with existing base molding (this will require the Contractor to remove and re-install of existing base molding).
vi. Performance Criteria
| Performance Criteria |
| Test Method |
| Result |
| Hardness Shore A |
| ASTM D2240 |
| 80/77 |
| Static Load Limit |
| ASTM F970 |
| 0.003 inches |
| Fungal Resistance Test |
| ASTM G21-90 |
| No Growth |
| Coefficient of Friction |
| ASTM D2047 |
| > 1.2 dry; >0.66 wet |
2. Submittals:
a. Contractor shall provide 12-inch by 12-inch mock-ups of both flooring types of the color.
texture and finish of the finished product to be installed.
| b. | Contractor shall provide 12-inch section of edge moldings. |
| c. | Contractor shall provide shop drawings for project illustrating layouts, details, |
dimensions and other data.
B. PERIOD OF PERFORMANCE
Start Task: Upon award of contract End Task: Within 45 days of award of contract
C. CONTRACTOR FURNISHED MATERIAL
1. Personal Protective Equipment (PPE)
2. Hand tools (Electrical/electronics tools)
3. All project materials and consumables necessary to complete this scope of work.
D. POC
Primary: Ruby Phillips (757)763-4432 ruby.phillips@nsweast.socom.mil Secondary:
Lavern Whitfield (757)763-4430 Arethalia.whitfield@nsweast.socom.mil
File details come from the government source that posted it. Updated .