PERFORMANCE WORK STATEMENT
View the file
Other files
| File | Type | Posted |
|---|---|---|
| H9224019T0034_0001.pdf | ||
| SOLICITATION_H9224019T0034.pdf | ||
| ADDENDA_02_-_SERVICE_CONTRACT_ACT_WAGE_DETERMINATION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS) Naval Special Warfare Command
Bauer K-60 Compressor
1. BACKGROUND
1.1 2nd Phase is down to one of two operating Bauer K-60 Compressors. Currently 2nd Phase is conducting pool week so the strain on the remaining operational compressor is increased leaving no redundancy in the event that the operational compressor were to go down.
2. OBJECTIVES
2.1 The objective of this requirement is to restore 2nd Phase to full operational capability.
3. SCOPE
3.1 The Contractor shall provide the personnel, management, materials, equipment and facilities (not otherwise provided by the Government) necessary to perform all maintenance and repairs on the 3rd Stage compressor cylinder head on the #2 Bauer K-60.
4. REQUIREMENTS
4.1 The contractor shall perform onsite repair of the #2 Bauer K-60 high pressure air compressor to resolve the issue with the 3rd stage cylinder head.
5. DELIVERABLES
5.1 N/A
6. CONTRACTOR MANPOWER REPORTING
6.1 N/A
7. CONTRACTOR TRAVEL
7.1 N/A
8. SECURITY
8.1 Contractor must be able to obtain personnel and vehicle access to military installations. Contractor is responsible for coordinating all necessary access through the local Military Pass and Decal Office.
8.2 Contractor is prohibited from taking any photographs or video on the military installations or of military personnel.
9. SAFETY
9.1 Nothing in the Statement of work, nor any Government action or failure to act in performance of the contract shall relieve the contractor of its responsibility for the safety of the contractor’s personnel and property, the Government’s personnel and property, and the general public. Furthermore, nothing in this PWS shall relieve the contractor of its responsibility for complying with applicable Federal, State, and Local laws, ordinances, codes and regulations (including those requiring applicable licenses and permits) in connection with the performance of this contract.
10. GOVERNMENT FURNISHED PROPERTY/EQUIPMENT/INFORMATION
(GFP/GFE/GFI)
10.1 N/A
11. QUALITY ASSURANCE
11.1 The Government reserves the right to perform inspections and surveillance to evaluate the Contractor’s compliance to the contract terms and performance of the requirements in the PWS. The Government will make every effort to ensure that the surveillance methods used are conducted in an objective, fair, and consistent manner.
11.2 Contract Discrepancy Report (CDR). In the event of unsatisfactory contractor performance, the CO will issue a CDR that will explain the circumstances and findings concerning the incomplete or unsatisfactory service. The contractor shall acknowledge receipt of the CDR and respond in writing as to how he/she shall correct the unacceptable performance and avoid a recurrence. The Government will review the contractor's corrective action response to determine acceptability and will use any completed CDR as part of an overall evaluation of Contractor performance when determining present or future contractual actions.
12. APPLICABLE DOCUMENTS
Document Web link/Citation
U.S. Navy Diving Manual Rev. 7 Chg A Available upon request
Bauer Compressor Technical Manual Available upon request
13. PLACE OF PERFORMANCE
13.1 The place of performance is the NSWBTC 2nd Phase compressor room located aboard the Naval Amphibious Base Coronado, CA.
14. PERIOD OF PERFORMANCE
14.1 Work shall start immediately after contract award as this maintenance/repair is of an emergent nature. Contractor shall complete repairs no later than three days after issuance of award.
| 4. REQUIREMENTS |
| 4.1 The contractor shall perform onsite repair of the #2 Bauer K-60 high pressure air compressor to resolve the issue with the 3rd stage cylinder head. |