Attachment_3_-_Initial_Task_Order_PWS.docx
DOCX document 21 KB Posted
- Attached to
- Concrete Target Support Services
- Solicitation number
- H92240-19-T-0004
- Issued by
-
United States Special Operations Command
About this file
Attachment 3
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_1_-_Performance_Work_Statement.docx | DOCX document | |
| H92240-19-T-0004.pdf | ||
| Attachment_5_-_Technical_Capability_Matrix.xlsx | XLSX spreadsheet | |
| Attachment_4_-_WD_2015-5635_Rev.-9.pdf | ||
| Attachment_2_-_Price_Evaluation_Spreadsheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 3 – Initial Task Order PWS
INITIAL TASK ORDER
PERFORMANCE WORK STATEMENT
FOR TARGET SUPPORT SERVICES
1.0 OBJECTIVES
1.1 The Naval Special Warfare Command (NSWC) requires concrete target manufacturing, transportation, placement and removal of target debris in support of the NSWC in the waters off the coast of San Clemente Island, CA.
2.0 SCOPE
2.1 The Contractor shall provide the personnel, management, materials, equipment, vessel and facilities necessary to provide the target manufacturing, transportation and placement.
3.0 REQUIREMENTS
3.1 The Contractor shall manufacture, transport and deliver and place and remove concrete targets debris in accordance with this PWS and as specifically identified herein.
3.2 The Contractor shall be able to manufacturer, transport and deliver and place the concrete targets within 21 days’ of Task Order receipt.
3.3 Concrete target specifications are as follows:
3.3.1. Approximately 4’x 3’ x 3’ with base width dimension wider than the top width for stability.
| 3.3.2. | One (1) re-bar lifting eye. |
| 3.3.3. | Four (4) pipe protrusions extending approximately 36” from the top of the clump. |
3.3.4. Targets shall weigh approximately 2,000 pounds.
3.3.4 Government anticipates delivery of 8 concrete targets 6 times a year.
| ELIN # |
| Description |
| Unit Price |
| Qty. |
| Total Price |
| A001 |
| Manufacture, Deliver & Placement of Eight (8) Concrete Clumps. |
4.0 PLACE OF PERFORMANCE
4.1 The targets shall be delivered off the coast of San Clemente Island, CA.
5.0 PERIOD OF PERFORMANCE
5.1 The initial task order period of performance is 01 January 2018 to 31 December 2019.