ADDENDA_01_-_Performance_Work_Statement_(BASIC).pdf

PDF 64 KB Posted

Attached to
COURSE OF INSTRUCTION Federal contract opportunity
Solicitation number
H92240-19-T-0002
Issued by
United States Special Operations Command

View the file

Other files for this federal contract opportunity

Other files attached to COURSE OF INSTRUCTION, newest first.
File Type Posted
ADDENDA_04B_-_SCA_Wage_Determination_(Little_Creek,_VA).pdf PDF
ADDENDA_04C_-_SCA_Wage_Determination_(Newton,_MA).pdf PDF
H92240-19-T-0002.pdf PDF
ADDENDA_04A_-_SCA_Wage_Determination_(San_Diego,_CA).pdf PDF
ADDENDA_03_-_Pricing_Sheet__(BASIC).xlsx XLSX spreadsheet
ADDENDA_02_-_First_Order_Requirements.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) Naval Special Warfare Command

Vector Control Training

1. BACKGROUND

1.1 Naval Special Warfare Group FOUR (NSWG-4) Special Boat Team 12 (SBT 12) and SBT 20 requires basic familiarization training on the function, design, and trouble-shooting of the Vector Control systems installed on the Combatant Craft Medium (CCM) and Combatant Craft Heavy (CCH).

NSWG-4 operators require training support services in order to certify personnel in the operation and maintenance of the Vector Control systems they may encounter while training and deployed in support of military operations.

1.2 The training NSWG-4 currently receives is basic operator level maintenance designed toward providing a basic understanding of the Vector Controls systems. The training described here shall be advanced level training for personnel who will be involved in possible emergency situations, the repair, and maintenance of the systems.

2. OBJECTIVES

2.1 Naval Special Warfare Command intends to award a firm fixed priced sole source contract to the Original Equipment Manufacturer (OEM) of the Vector Control systems installed in NSWG-4 craft to acquire maintenance training and certification for the Vector Control Systems. We anticipate conducting six (6) Vector Control Course of Instruction (COI) per year. Courses will be awarded at the task order level and notional/estimated dates will be provided at the order level. Firm dates for training shall be negotiated by the appointed Contracting Officer Representative (COR) and the contractor at the order level.

2.2 Maximum class size shall be ten (10) students per course of instruction. COIs will be awarded at the task order level and, unless otherwise indicated in the order, the contractor shall commence COIs no later than 30 days after issuance of task order.

3. SCOPE

3.1 The contractor shall provide personnel, management, materials, equipment and facilities (not otherwise provided by the Government) necessary to conduct a four (4) day COI that familiarizes students with the design, function, repair, calibrating, and trouble-shooting of Vector Control steering mechanisms.

This COI shall be targeted at the shop-level maintainer through depot-level maintenance provider.

Facilities to host the COI will be provided by the Government when conducted at Government site.

4. REQUIREMENTS

4.1 Contractor shall conduct a 4-day COI which trains NSWG-4 personnel on the following topics:

4.1.1 Vector controls design and function for the CCM or CCH (Government will identify the type of craft prior to execution of training).

4.1.2 Common faults, trouble shooting, calibrating, and remediation

4.1.3 Main, backup, and emergency steering controls

4.2 Seven business days before start of a COI, the contractor will identify course classroom requirements and coordinate with the component command’s training representative executing the training blocks identified for execution (A001)

4.3 Contractor shall provide Course Curriculum/Outline and Gear/Consumables List to the component command’s training representative NLT seven business days prior to start of the first course for review and approval of Course Curriculum and Gear List. (A001). Contractor shall submit to the Contracting Officer Representative.

4.4 COI shall be a mix of hands-on practical application and classroom instruction.

4.5 Contractor shall provide standard VECTOR controls technical reference documentation and technical manuals on DVD and or CD ROM. (A002)

4.6 Contractor shall provide all student handouts, graduation certificates, homework assignments and/or workbooks. (A003)

5. DELIVERABLES

Deliverable CDRL PWS Ref. Delivery Date

Classroom Requirements, Course Materials and Gear List

A001 4.3 7 Business Days prior to start date of course

Technical Documentation A002 4.5 Upon completion of course

Certificate of Completion A003 4.6 Upon completion of course

6. CONTRACTOR TRAVEL

6.1 Contractor travel is authorized for training sessions on the East coast (Norfolk, VA and surrounding area) and West coast (San Diego, CA And surrounding area). Contractor shall include all costs in the proposed pricing of COIs; a separate contract line item will not be established for travel.

7. SECURITY

7.1 Contractor shall establish appropriate administrative, technical, and physical safeguards to protect any and all nonpublic Government data to ensure the confidentiality, integrity, and availability of Government data.

7.2 Contractor must be able to obtain personnel and vehicle access to military installations. Contractor is responsible for coordinating all necessary access through the local Military Pass and Decal Office.

7.3 Contractor personnel shall be citizens of the United States.

7.4 Contractor personnel performing under this PWS shall not divulge any information witnessed or otherwise gained during visit

8. SAFETY

8.1 Nothing in the Performance Work Statement, nor any Government action or failure to act in performance of the contract shall relieve the contractor of its responsibility for the safety of the contractor's personnel and property, the Government's personnel and property, and the general public.

Furthermore, nothing in this SOW shall relieve the contractor of its responsibility for complying with applicable Federal, State, and Local laws, ordinances, codes and regulations (including those requiring applicable licenses and permits) in connection with the performance of this contract.

9. QUALITY CONTROL

9.1 The contractor shall implement and maintain a Quality Control Plan (QCP) to ensure work performed conforms to the scope of work and meets the requirements under this PWS. The QCP shall, at a minimum provide a method for performing inspections; identifying, correcting and preventing problems/defective service; addressing customer complaints, and improving the quality of services over the life of the contract.

9.2 PERFORMANCE SUMMARY REQUIREMENTS:

Performanc e Element

Performance Requirement

Surveillance Method

Frequency Acceptable Quality Level

Contract Deliverables

Deliverables furnished as prescribed in the PWS (including Technical Exhibit 2)and Work Items as applicable

Government Representative to Monitor

100% inspection of all contract deliverables.

>98% of deliverables submitted timely and without rework required.

Overall Contract Performance

Overall contract performance of sufficient quality to earn a Satisfactory (or higher) rating in the COR’s annual report on Contractor Performance

Government Representative to Monitor/Review

Annual All performance elements rated Satisfactory (or higher)

Invoicing

Invoices delivered in a timely fashion.

Accuracy of invoices evaluated and no defects allowed. Errors in invoices will be grounds for the Government to return to vendor for re-processing

Review & Acceptance of the Invoice

Monthly >95% - of invoices submitted timely and accurately

10. QUALITY ASSURANCE

10.1 The Government reserves the right to perform inspections and surveillance to evaluate the Contractor’s compliance to the contract terms and performance of the requirements in the PWS. The Government will make every effort to ensure that the surveillance methods used are conducted in an objective, fair, and consistent manner.

10.2 Contract Discrepancy Report (CDR). In the event of unsatisfactory contractor performance, the CO will issue a CDR that will explain the circumstances and findings concerning the incomplete or unsatisfactory service. The contractor shall acknowledge receipt of the CDR and respond in writing as to how he/she shall correct the unacceptable performance and avoid a recurrence. The Government will review the contractor's corrective action response to determine acceptability and will use any completed CDR as part of an overall evaluation of Contractor performance when determining present or future contractual actions.

11. GOVERNMENT FURNISHED EQUIPMENT

11.1 The Government will provide a craft for training purposes when COI performed at NSWG4/SBT-20 or SBT-12 (12.1 and 12.2).

11.2 The Government will provide adequate classroom space when COI performed at NSWG4/SBT-20 or SBT-12 (12.1 and 12.2).

12. PLACE OF PERFORMANCE

12.1 NSWG4/SBT-20 JEB Little Creek, VA.

12.2 SBT-12 CCMF Coronado, CA.

12.3 Contractors Facility Newton, MA

13. PERIOD OF PERFORMANCE

13.1 The Contract shall have a five (5) year ordering period.

File details come from the government source that posted it.